Drawbridge Operation Regulation; Sloop Channel, Jones Beach, NY, 13766 [2015-06148]
Download as PDF
13766
Federal Register / Vol. 80, No. 51 / Tuesday, March 17, 2015 / Rules and Regulations
not open for maritime traffic, from 7:30
a.m. to 11:00 a.m. on April 12, 2015.
The bridges shall operate in accordance
to 33 CFR 117.1059 at all other times.
Vessels able to pass through the
bridges in the closed-to-navigation
position may do so at anytime. The
bridges will be required to open, if
needed, for vessels engaged in
emergency response operations during
this closure period. Waterway usage on
this part of the Snohomish River and
Steamboat Slough includes vessels
ranging from commercial tug and barge
to small pleasure craft. Mariners will be
notified and kept informed of the
bridges’ operational status via the Coast
Guard Notice to Mariners publication
and Broadcast Notice to Mariners as
appropriate.
In accordance with 33 CFR 117.35(e),
the drawbridges must return to their
regular operating schedule immediately
at the end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: March 3, 2015.
Steven M. Fischer,
Bridge Administrator, Thirteenth Coast Guard
District.
[FR Doc. 2015–06034 Filed 3–16–15; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2015–0108]
Drawbridge Operation Regulation;
Sloop Channel, Jones Beach, NY
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the operation of
the Wantagh State Parkway Bridge, mile
15.4, across Sloop Channel at Jones
Beach, New York. This deviation is
necessary to facilitate public safety
during a public event, the Jones Beach
Park’s Air Show. This deviation allows
the bridge to remain closed for an hour
and a half on each day of the air show
to help reduce vehicular traffic delays.
DATES: This deviation is effective
between 4:30 p.m. and 6 p.m. on May
23 and May 24, 2015.
ADDRESSES: The docket for this
deviation, [USCG–2015–0108] is
available at https://www.regulations.gov.
rljohnson on DSK3VPTVN1PROD with RULES
SUMMARY:
VerDate Sep<11>2014
15:20 Mar 16, 2015
Jkt 235001
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140, on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
Dated: March 3, 2015.
C.J. Bisignano,
Supervisory Bridge Management Specialist,
First Coast Guard District.
If
you have questions on this temporary
deviation, call or email Ms. Judy LeungYee, Project Officer, First Coast Guard
District, telephone (212) 514–4330,
judy.k.leung-yee@uscg.mil. If you have
questions on viewing the docket, call
Cheryl Collins, Program Manager,
Docket Operations, telephone (202)
366–9826.
33 CFR Part 117
FOR FURTHER INFORMATION CONTACT:
The
Wantagh State Parkway Bridge across
Sloop Channel, mile 15.4, at Jones
Beach, New York, has a vertical
clearance in the closed position of 16
feet at mean high water and 19.5 feet at
mean low water. The existing bridge
operating regulations are found at 33
CFR 117.5.
The waterway is transited by seasonal
recreational vessels of various sizes.
The bridge owner, New York State
Parks, Recreation and Historic
Preservation, requested a temporary
deviation from the normal operating
schedule to facilitate public safety
during the annual Jones Beach Park’s
Air Show over Memorial Day Weekend.
Under this temporary deviation, the
Wantagh State Parkway Bridge may
remain in the closed position between
4:30 p.m. and 6 p.m. on May 23 and
May 24, 2015.
There are no alternate routes for
vessel traffic. The vertical clearance
under the bridge is 16 feet at mean high
water and 19.5 feet at mean low water.
The bridge may be opened in the event
of an emergency.
The Coast Guard will inform the users
of the waterways through our Local and
Broadcast Notice to Mariners of the
change in operating schedule for the
bridges so that vessels can arrange their
transits to minimize any impact caused
by the temporary deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
SUPPLEMENTARY INFORMATION:
PO 00000
Frm 00010
Fmt 4700
Sfmt 4700
[FR Doc. 2015–06148 Filed 3–16–15; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
[Docket No. USCG–2015–0127]
Drawbridge Operation Regulation;
Columbia River, Celilo, OR and
Wishram, WA
Coast Guard, DHS.
Notice of temporary deviation
from drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Burlington
Northern Santa Fe Railway Bridge, also
known as the Celilo Bridge, across the
Columbia River, mile 201.2, at Celilo,
OR and Wishram, WA. The deviation is
necessary to replace lift span rail joints.
This deviation allows the bridge to
remain in the closed-to-navigation
position during maintenance activities.
DATES: This deviation is effective
without actual notice March 13, 2015
until 3 p.m. For the purposes of
enforcement, actual notice will be used
from 7 a.m. on March 9, 2015, until 3
p.m. March 13, 2015.
ADDRESSES: The docket for this
deviation, [USCG–2015–0127] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Mr. Steven
Fischer, Bridge Administrator, Coast
Guard Thirteenth District; telephone
206–220–7282, email d13-pfd13bridges@uscg.mil. If you have
questions on viewing the docket, call
Cheryl Collins, Program Manager,
Docket Operations, telephone 202–366–
9826.
SUMMARY:
E:\FR\FM\17MRR1.SGM
17MRR1
Agencies
[Federal Register Volume 80, Number 51 (Tuesday, March 17, 2015)]
[Rules and Regulations]
[Page 13766]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-06148]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2015-0108]
Drawbridge Operation Regulation; Sloop Channel, Jones Beach, NY
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the operation of the Wantagh State
Parkway Bridge, mile 15.4, across Sloop Channel at Jones Beach, New
York. This deviation is necessary to facilitate public safety during a
public event, the Jones Beach Park's Air Show. This deviation allows
the bridge to remain closed for an hour and a half on each day of the
air show to help reduce vehicular traffic delays.
DATES: This deviation is effective between 4:30 p.m. and 6 p.m. on May
23 and May 24, 2015.
ADDRESSES: The docket for this deviation, [USCG-2015-0108] is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation. You may also visit the Docket
Management Facility in Room W12-140, on the ground floor of the
Department of Transportation West Building, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Ms. Judy Leung-Yee, Project Officer,
First Coast Guard District, telephone (212) 514-4330, judy.k.leung-yee@uscg.mil. If you have questions on viewing the docket, call Cheryl
Collins, Program Manager, Docket Operations, telephone (202) 366-9826.
SUPPLEMENTARY INFORMATION: The Wantagh State Parkway Bridge across
Sloop Channel, mile 15.4, at Jones Beach, New York, has a vertical
clearance in the closed position of 16 feet at mean high water and 19.5
feet at mean low water. The existing bridge operating regulations are
found at 33 CFR 117.5.
The waterway is transited by seasonal recreational vessels of
various sizes.
The bridge owner, New York State Parks, Recreation and Historic
Preservation, requested a temporary deviation from the normal operating
schedule to facilitate public safety during the annual Jones Beach
Park's Air Show over Memorial Day Weekend.
Under this temporary deviation, the Wantagh State Parkway Bridge
may remain in the closed position between 4:30 p.m. and 6 p.m. on May
23 and May 24, 2015.
There are no alternate routes for vessel traffic. The vertical
clearance under the bridge is 16 feet at mean high water and 19.5 feet
at mean low water. The bridge may be opened in the event of an
emergency.
The Coast Guard will inform the users of the waterways through our
Local and Broadcast Notice to Mariners of the change in operating
schedule for the bridges so that vessels can arrange their transits to
minimize any impact caused by the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: March 3, 2015.
C.J. Bisignano,
Supervisory Bridge Management Specialist, First Coast Guard District.
[FR Doc. 2015-06148 Filed 3-16-15; 8:45 am]
BILLING CODE 9110-04-P