Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on Fukushima; Notice of Meeting, 13639 [2015-05988]
Download as PDF
Federal Register / Vol. 80, No. 50 / Monday, March 16, 2015 / Notices
contacting the identified DFO.
Moreover, in view of the possibility that
the schedule for ACRS meetings may be
adjusted by the Chairman as necessary
to facilitate the conduct of the meeting,
persons planning to attend should check
with these references if such
rescheduling would result in a major
inconvenience.
If attending this meeting, please enter
through the One White Flint North
building, 11555 Rockville Pike,
Rockville, MD. After registering with
security, please contact Mr. Theron
Brown (Telephone 240–888–9835) to be
escorted to the meeting room.
Dated: March 9, 2015.
Mark L. Banks,
Chief, Technical Support Branch, Advisory
Committee on Reactor Safeguards.
[FR Doc. 2015–05946 Filed 3–13–15; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
Advisory Committee on Reactor
Safeguards (ACRS); Meeting of the
ACRS Subcommittee on Fukushima;
Notice of Meeting
Rmajette on DSK2VPTVN1PROD with NOTICES
The ACRS Subcommittee on
Fukushima will hold a meeting on
March 20, 2015, Room T–2B1, 11545
Rockville Pike, Rockville, Maryland.
The meeting will be open to public
attendance.
The agenda for the subject meeting
shall be as follows:
Friday, March 20, 2015—8:30 a.m.
Until 12:00 p.m.
The Subcommittee will review and
discuss the development of an Interim
Staff Guidance in support of Order EA–
13–109, Reliable Hardened Vents, Phase
2. The Subcommittee will hear
presentations by and hold discussions
with the NRC staff and other interested
persons regarding this matter. The
Subcommittee will gather information,
analyze relevant issues and facts, and
formulate proposed positions and
actions, as appropriate, for deliberation
by the Full Committee.
Members of the public desiring to
provide oral statements and/or written
comments should notify the Designated
Federal Official (DFO), Weidong Wang
(Telephone 301–415–6279 or Email:
Weidong.Wang@nrc.gov) five days prior
to the meeting, if possible, so that
appropriate arrangements can be made.
Thirty-five hard copies of each
presentation or handout should be
provided to the DFO thirty minutes
before the meeting. In addition, one
electronic copy of each presentation
VerDate Sep<11>2014
14:09 Mar 13, 2015
Jkt 235001
should be emailed to the DFO one day
before the meeting. If an electronic copy
cannot be provided within this
timeframe, presenters should provide
the DFO with a CD containing each
presentation at least thirty minutes
before the meeting. Electronic
recordings will be permitted only
during those portions of the meeting
that are open to the public. Detailed
procedures for the conduct of and
participation in ACRS meetings were
published in the Federal Register on
October 13, 2014, (79 FR 59307).
Detailed meeting agendas and meeting
transcripts are available on the NRC
Web site at https://www.nrc.gov/readingrm/doc-collections/acrs. Information
regarding topics to be discussed,
changes to the agenda, whether the
meeting has been canceled or
rescheduled, and the time allotted to
present oral statements can be obtained
from the Web site cited above or by
contacting the identified DFO.
Moreover, in view of the possibility that
the schedule for ACRS meetings may be
adjusted by the Chairman as necessary
to facilitate the conduct of the meeting,
persons planning to attend should check
with these references if such
rescheduling would result in a major
inconvenience.
If attending this meeting, please enter
through the One White Flint North
building, 11555 Rockville Pike,
Rockville, MD. After registering with
security, please contact Mr. Theron
Brown (Telephone 240–888–9835) to be
escorted to the meeting room.
13639
hearing, and petition for leave to
intervene; order, correction.
The U.S. Nuclear Regulatory
Commission (NRC) is correcting a notice
that was published in the Federal
Register on February 3, 2015, that
contained an amendment request for
Perry Nuclear Plant, Unit 1. This action
is being taken to correct the date of the
NRC’s Agencywide Documents Access
and Management System (ADAMS)
accession number for the amendment
request from FirstEnergy Nuclear
Operating Company.
FOR FURTHER INFORMATION CONTACT: Eva
A. Brown, Office of Nuclear Reactor
Regulation, U.S. Nuclear Regulatory
Commission, Washington, DC 20555–
0001; telephone: 301–415–2315; email:
Eva.Brown@nrc.gov.
SUPPLEMENTARY INFORMATION: In the
Federal Register of February 3, 2015 (80
FR 5816), FR Doc. 2015–01917, on page
5819, in the middle of the second
column, under ‘‘FirstEnergy Nuclear
Operating Company, Docket No. 50–
440, Perry Nuclear Power Plant, Unit 1,
Lake County, Perry Ohio,’’ after ‘‘Date of
amendment request,’’ the date
‘‘September 12, 2014’’ is corrected to
read ‘‘October 8, 2014.’’
SUMMARY:
Dated in Rockville, Maryland, this 9th day
of March, 2015.
For the Nuclear Regulatory Commission.
Eva A. Brown,
Senior Project Manager, Plant Licensing III–
2 and Planning and Analysis Branch, Division
of Operating Reactor Licensing, Office of
Nuclear Reactor Regulation.
Date: March 9, 2015.
Mark L. Banks,
Chief, Technical Support Branch, Advisory
Committee on Reactor Safeguards.
[FR Doc. 2015–05944 Filed 3–13–15; 8:45 am]
[FR Doc. 2015–05988 Filed 3–13–15; 8:45 am]
OFFICE OF SCIENCE AND
TECHNOLOGY POLICY
BILLING CODE 7590–01–P
Impact of the Select Agent Regulations
NUCLEAR REGULATORY
COMMISSION
ACTION:
Applications and Amendments to
Facility Operating Licenses and
Combined Licenses Involving
Proposed No Significant Hazards
Considerations and Containing
Sensitive Unclassified Non-Safeguards
Information and Order Imposing
Procedures for Access to Sensitive
Unclassified Non-Safeguards
Information; Corrections
Nuclear Regulatory
Commission.
ACTION: License amendment request;
opportunity to comment, request a
AGENCY:
Frm 00126
Fmt 4703
Request for Public Comment.
Public comment is requested
on the impact that the Select Agent
Regulations have had on science,
technology, and national security, and
on the benefits, costs, and limitations of
these regulations. Drawing on these
comments and other information
available to it, a Fast Track Action
Committee under the Committee on
Homeland and National Security of the
National Science and Technology
Council will review the impacts and
consider options to address the
identified challenges or gaps concerning
those regulations. Comments of up to
three pages or fewer (12,000 characters)
are requested and must be received by
SUMMARY:
[NRC–2015–0007]
PO 00000
BILLING CODE 7590–01–P
Sfmt 4703
E:\FR\FM\16MRN1.SGM
16MRN1
Agencies
[Federal Register Volume 80, Number 50 (Monday, March 16, 2015)]
[Notices]
[Page 13639]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-05988]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
Advisory Committee on Reactor Safeguards (ACRS); Meeting of the
ACRS Subcommittee on Fukushima; Notice of Meeting
The ACRS Subcommittee on Fukushima will hold a meeting on March 20,
2015, Room T-2B1, 11545 Rockville Pike, Rockville, Maryland.
The meeting will be open to public attendance.
The agenda for the subject meeting shall be as follows:
Friday, March 20, 2015--8:30 a.m. Until 12:00 p.m.
The Subcommittee will review and discuss the development of an
Interim Staff Guidance in support of Order EA-13-109, Reliable Hardened
Vents, Phase 2. The Subcommittee will hear presentations by and hold
discussions with the NRC staff and other interested persons regarding
this matter. The Subcommittee will gather information, analyze relevant
issues and facts, and formulate proposed positions and actions, as
appropriate, for deliberation by the Full Committee.
Members of the public desiring to provide oral statements and/or
written comments should notify the Designated Federal Official (DFO),
Weidong Wang (Telephone 301-415-6279 or Email: Weidong.Wang@nrc.gov)
five days prior to the meeting, if possible, so that appropriate
arrangements can be made. Thirty-five hard copies of each presentation
or handout should be provided to the DFO thirty minutes before the
meeting. In addition, one electronic copy of each presentation should
be emailed to the DFO one day before the meeting. If an electronic copy
cannot be provided within this timeframe, presenters should provide the
DFO with a CD containing each presentation at least thirty minutes
before the meeting. Electronic recordings will be permitted only during
those portions of the meeting that are open to the public. Detailed
procedures for the conduct of and participation in ACRS meetings were
published in the Federal Register on October 13, 2014, (79 FR 59307).
Detailed meeting agendas and meeting transcripts are available on
the NRC Web site at https://www.nrc.gov/reading-rm/doc-collections/acrs.
Information regarding topics to be discussed, changes to the agenda,
whether the meeting has been canceled or rescheduled, and the time
allotted to present oral statements can be obtained from the Web site
cited above or by contacting the identified DFO. Moreover, in view of
the possibility that the schedule for ACRS meetings may be adjusted by
the Chairman as necessary to facilitate the conduct of the meeting,
persons planning to attend should check with these references if such
rescheduling would result in a major inconvenience.
If attending this meeting, please enter through the One White Flint
North building, 11555 Rockville Pike, Rockville, MD. After registering
with security, please contact Mr. Theron Brown (Telephone 240-888-9835)
to be escorted to the meeting room.
Date: March 9, 2015.
Mark L. Banks,
Chief, Technical Support Branch, Advisory Committee on Reactor
Safeguards.
[FR Doc. 2015-05988 Filed 3-13-15; 8:45 am]
BILLING CODE 7590-01-P