North East Wisconsin Hydro, LLC; Notice of Authorization for Continued Project Operation, 13371 [2015-05690]
Download as PDF
Federal Register / Vol. 80, No. 49 / Friday, March 13, 2015 / Notices
Dated: March 4, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–05686 Filed 3–12–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. AC15–60–000]
National Grid USA; Notice of Request
for Waiver
mstockstill on DSK4VPTVN1PROD with NOTICES
Take notice that on March 4, 2015,
National Grid USA, on behalf of certain
of its subsidiary operating companies 1
submitted a request for a waiver
granting a permanent standing
extension, until 150 days after its fiscal
year end of March 31 each year, to
submit the Federal Energy Regulatory
Commission (Commission) Form 1,
Form 1–F, and Form 2–A Supplemental
Statements with CPA Certifications as
well as the first quarter Form 3–Qs that
would otherwise be due earlier in the
year.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211 or 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
1 These companies include Massachusetts Electric
Company, Nantucket Electric Company, New
England Hydro-Transmission Corporation, New
England Hydro-Transmission Electric Company,
Inc., New England Power Company, The
Narragansett Electric Company, Niagara Mohawk
Power Corporation, National Grid LNG, LP, New
England Electric Transmission Corporation, and
National Grid Generation, LLC.
VerDate Sep<11>2014
19:27 Mar 12, 2015
Jkt 235001
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on March 25, 2015.
Dated: March 4, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–05683 Filed 3–12–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2744–000]
North East Wisconsin Hydro, LLC;
Notice of Authorization for Continued
Project Operation
On February 28, 2013 the North East
Wisconsin Hydro, LLC, licensee for the
Menominee-Park Mill Hydroelectric
Project, filed an Application for a New
License pursuant to the Federal Power
Act (FPA) and the Commission’s
regulations thereunder. The
Menominee-Park Mill Hydroelectric
Project is located on Menominee River
in Marinette County, Wisconsin and in
Menominee County, Michigan.
The license for Project No. 2744 was
issued for a period ending February 28,
2015. Section 15(a)(1) of the FPA, 16
U.S.C. 808(a)(1), requires the
Commission, at the expiration of a
license term, to issue from year-to-year
an annual license to the then licensee
under the terms and conditions of the
prior license until a new license is
issued, or the project is otherwise
disposed of as provided in section 15 or
any other applicable section of the FPA.
If the project’s prior license waived the
applicability of section 15 of the FPA,
then, based on section 9(b) of the
Administrative Procedure Act, 5 U.S.C.
558(c), and as set forth at 18 CFR
16.21(a), if the licensee of such project
has filed an application for a subsequent
license, the licensee may continue to
operate the project in accordance with
the terms and conditions of the license
after the minor or minor part license
expires, until the Commission acts on
its application. If the licensee of such a
project has not filed an application for
PO 00000
Frm 00050
Fmt 4703
Sfmt 4703
13371
a subsequent license, then it may be
required, pursuant to 18 CFR 16.21(b),
to continue project operations until the
Commission issues someone else a
license for the project or otherwise
orders disposition of the project.
If the project is subject to section 15
of the FPA, notice is hereby given that
an annual license for Project No. 2744
is issued to the licensee for a period
effective March 1, 2015 through
February 29, 2016 or until the issuance
of a new license for the project or other
disposition under the FPA, whichever
comes first. If issuance of a new license
(or other disposition) does not take
place on or before February 29, 2016,
notice is hereby given that, pursuant to
18 CFR 16.18(c), an annual license
under section 15(a)(1) of the FPA is
renewed automatically without further
order or notice by the Commission,
unless the Commission orders
otherwise.
If the project is not subject to section
15 of the FPA, notice is hereby given
that the licensee, North East Wisconsin
Hydro, LLC, is authorized to continue
operation of Menominee-Park Mill
Hydroelectric Project, until such time as
the Commission acts on its application
for a subsequent license.
Dated: March 4, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–05690 Filed 3–12–15; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPP–2008–0850; FRL–9922–40]
Chlorpyrifos Registration Review;
Revised Human Health Risk
Assessment; Extension of Comment
Period
Environmental Protection
Agency.
ACTION: Notice; Extension of comment
period.
AGENCY:
EPA issued a notice in the
Federal Register of January 14, 2015,
concerning the availability of the
chlorpyrifos registration review; revised
human health risk assessment. This
document extends the comment period
for 45 days, from March 16, 2015 to
April 30, 2015.
DATES: Comments, identified by docket
identification (ID) number EPA–HQ–
OPP–2008–0850, must be received on or
before: April 30, 2015.
ADDRESSES: Follow the detailed
instructions provided under ADDRESSES
SUMMARY:
E:\FR\FM\13MRN1.SGM
13MRN1
Agencies
[Federal Register Volume 80, Number 49 (Friday, March 13, 2015)]
[Notices]
[Page 13371]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-05690]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2744-000]
North East Wisconsin Hydro, LLC; Notice of Authorization for
Continued Project Operation
On February 28, 2013 the North East Wisconsin Hydro, LLC, licensee
for the Menominee-Park Mill Hydroelectric Project, filed an Application
for a New License pursuant to the Federal Power Act (FPA) and the
Commission's regulations thereunder. The Menominee-Park Mill
Hydroelectric Project is located on Menominee River in Marinette
County, Wisconsin and in Menominee County, Michigan.
The license for Project No. 2744 was issued for a period ending
February 28, 2015. Section 15(a)(1) of the FPA, 16 U.S.C. 808(a)(1),
requires the Commission, at the expiration of a license term, to issue
from year-to-year an annual license to the then licensee under the
terms and conditions of the prior license until a new license is
issued, or the project is otherwise disposed of as provided in section
15 or any other applicable section of the FPA. If the project's prior
license waived the applicability of section 15 of the FPA, then, based
on section 9(b) of the Administrative Procedure Act, 5 U.S.C. 558(c),
and as set forth at 18 CFR 16.21(a), if the licensee of such project
has filed an application for a subsequent license, the licensee may
continue to operate the project in accordance with the terms and
conditions of the license after the minor or minor part license
expires, until the Commission acts on its application. If the licensee
of such a project has not filed an application for a subsequent
license, then it may be required, pursuant to 18 CFR 16.21(b), to
continue project operations until the Commission issues someone else a
license for the project or otherwise orders disposition of the project.
If the project is subject to section 15 of the FPA, notice is
hereby given that an annual license for Project No. 2744 is issued to
the licensee for a period effective March 1, 2015 through February 29,
2016 or until the issuance of a new license for the project or other
disposition under the FPA, whichever comes first. If issuance of a new
license (or other disposition) does not take place on or before
February 29, 2016, notice is hereby given that, pursuant to 18 CFR
16.18(c), an annual license under section 15(a)(1) of the FPA is
renewed automatically without further order or notice by the
Commission, unless the Commission orders otherwise.
If the project is not subject to section 15 of the FPA, notice is
hereby given that the licensee, North East Wisconsin Hydro, LLC, is
authorized to continue operation of Menominee-Park Mill Hydroelectric
Project, until such time as the Commission acts on its application for
a subsequent license.
Dated: March 4, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-05690 Filed 3-12-15; 8:45 am]
BILLING CODE 6717-01-P