Federal Register / Vol. 80, No. 49 / Friday, March 13, 2015 / Notices
mstockstill on DSK4VPTVN1PROD with NOTICES
recorded, please send your comments so
that the Commission receives them in
Washington, DC on or before December
4, 2015. This is not your only public
input opportunity; please refer to the
Environmental Review Process
flowchart in attachment 1.
For your convenience, there are three
methods you can use to submit your
comments to the Commission. In all
instances, please reference the project
docket number (PF14–21–000) with
your submission. The Commission
encourages electronic filing of
comments and has expert staff available
to assist you at (202) 502–8258 or
efiling@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature located on the Commission’s
Web site (www.ferc.gov) under the link
to Documents and Filings. This is an
easy method for interested persons to
submit brief, text-only comments on a
project;
(2) You can file your comments
electronically using the eFiling feature
located on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You must select
the type of filing you are making. If you
are filing a comment on a particular
project, please select ‘‘Comment on a
Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Room
1A, Washington, DC 20426.
In addition to the methods listed
above, we will also hold public scoping
meetings and mail notices to our
environmental mailing list identifying
the date, time, and locations of these
meetings later this year.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
VerDate Sep<11>2014
19:27 Mar 12, 2015
Jkt 235001
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the planned project.
Copies of the completed draft EIS will
be sent to the environmental mailing list
for public review and comment. If you
would prefer to receive a paper copy of
the document instead of the CD version,
or would like to remove your name from
the mailing list, please return the
attached Information Request
(attachment 3).
13369
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Further, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information. Finally,
additional information about the project
can be seen from the Applicant’s Web
site at https://ak-lng.com.
Dated: March 4, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–05691 Filed 3–12–15; 8:45 am]
BILLING CODE 6717–01–P
Becoming an Intervenor
Once the Applicants file its
application with the Commission, you
may want to become an ‘‘intervenor’’
which is an official party to the
Commission’s proceeding. Intervenors
play a more formal role in the process
and are able to file briefs, appear at
hearings, and be heard by the courts if
they choose to appeal the Commission’s
final ruling. An intervenor formally
participates in the proceeding by filing
a request to intervene. Instructions for
becoming an intervenor are in the User’s
Guide under the ‘‘e-filing’’ link on the
Commission’s Web site. Please note that
the Commission will not accept requests
for intervenor status at this time. You
must wait until the Commission
receives a formal application for the
project.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site (www.ferc.gov) using the eLibrary
link. Click on the eLibrary link, click on
‘‘General Search’’ and enter the docket
number, excluding the last three digits
in the Docket Number field (i.e., PF14–
21). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR15–20–000]
Express Pipeline LLC; Notice of
Petition for Declaratory Order
Take notice that on February 27, 2015,
pursuant to Rule 207(a)(2) of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.207(a)(2) (2014),
Express Pipeline LLC filed a petition for
a declaratory order seeking approval of
a committed rate structure and related
contract terms to support the cost of
additional tanks, pumps, and piping to
‘‘debottleneck, ’’ a constraint point on
its system, all as more fully explained
in the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
E:\FR\FM\13MRN1.SGM
13MRN1
13370
Federal Register / Vol. 80, No. 49 / Friday, March 13, 2015 / Notices
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on March 20, 2015.
Dated: March 4, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–05687 Filed 3–12–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–95–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
Columbia Gas Transmission, LLC;
Notice of Application
Take notice that on February 20, 2015,
Columbia Gas Transmission, LLC
(Columbia) 5151 San Felipe, Suite 2500,
Houston, Texas 77056, filed an
application pursuant to sections 7(b)
and 7(c) of the Natural Gas Act (NGA)
and the Federal Energy Regulatory
Commission’s (Commission) regulations
seeking authorization to replace
approximately 34 miles of existing 20inch diameter pipeline with like size
pipeline in Greene, Washington, and
Allegheny counties, Pennsylvania, and
install necessary appurtenant facilities
associated with the replacement
pipeline (Tri-County Project), all as
more fully described in the application
which is on file with the Commission
and open to public inspection. The
filing may also be viewed on the web at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
application should be directed to Tyler
R. Brown, Senior Counsel, Columbia
Gas Transmission, LLC, 5151 San Felipe
Suite 2500, Houston, TX 77056, or call
(713) 386–3797.
On May 27, 2014, Commission staff
granted Columbia’s request to use the
pre-filing process and assigned Docket
No. PF14–11–000 to staff activities
VerDate Sep<11>2014
19:27 Mar 12, 2015
Jkt 235001
involving the Tri-County Project. Now,
as of the filing of this application on
February 20, 2015, the NEPA Pre-Filing
Process for this project has ended. From
this time forward, this proceeding will
be conducted in Docket No. CP15–95–
000 as noted in the caption of this
Notice.
Specifically, Columbia will replace
pipe in three segments. Segment 1
begins at Columbia’s Hero-Jollytown
regulator station in Greene County, and
continues 15 miles north to Columbia’s
existing Waynesburg Compressor
Station. Segment 2 begins at a point
near Columbia’s existing Redd Farm
Compressor Station 4 in Washington
County, and continues approximately
11 miles in a northerly direction to the
existing Sharp Farm station. Segment 3
begins at Columbia’s Sharp Farm
station, and continues 12 miles north to
the terminus of Line 1570 where it
intersects with 20-inch Line 1485 in
Allegheny County. Columbia states that
the total cost of the replacement project
is approximately 136 million dollars.
Additionally, Columbia is requesting a
pre-determination for rolled-in rate
treatment since the primary purpose of
the Tri-County Project is to replace
existing bare steel pipeline due to the
age and condition of the facilities.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
PO 00000
Frm 00049
Fmt 4703
Sfmt 4703
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
7 copies of filings made in the
proceeding with the Commission and
must mail a copy to the applicant and
to every other party. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Comment Date: March 25, 2015.
E:\FR\FM\13MRN1.SGM
13MRN1
Agencies
[Federal Register Volume 80, Number 49 (Friday, March 13, 2015)]
[Notices]
[Pages 13369-13370]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-05687]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. OR15-20-000]
Express Pipeline LLC; Notice of Petition for Declaratory Order
Take notice that on February 27, 2015, pursuant to Rule 207(a)(2)
of the Federal Energy Regulatory Commission's (Commission) Rules of
Practice and Procedure, 18 CFR 385.207(a)(2) (2014), Express Pipeline
LLC filed a petition for a declaratory order seeking approval of a
committed rate structure and related contract terms to support the cost
of additional tanks, pumps, and piping to ``debottleneck, '' a
constraint point on its system, all as more fully explained in the
petition.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date.
Anyone filing a motion to intervene or protest must serve a copy of
that document on the Petitioner.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
[[Page 13370]]
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern time on March 20, 2015.
Dated: March 4, 2015.
Kimberly D. Bose,
Secretary.