Express Pipeline LLC; Notice of Petition for Declaratory Order, 13369-13370 [2015-05687]

Download as PDF Federal Register / Vol. 80, No. 49 / Friday, March 13, 2015 / Notices mstockstill on DSK4VPTVN1PROD with NOTICES recorded, please send your comments so that the Commission receives them in Washington, DC on or before December 4, 2015. This is not your only public input opportunity; please refer to the Environmental Review Process flowchart in attachment 1. For your convenience, there are three methods you can use to submit your comments to the Commission. In all instances, please reference the project docket number (PF14–21–000) with your submission. The Commission encourages electronic filing of comments and has expert staff available to assist you at (202) 502–8258 or efiling@ferc.gov. (1) You can file your comments electronically using the eComment feature located on the Commission’s Web site (www.ferc.gov) under the link to Documents and Filings. This is an easy method for interested persons to submit brief, text-only comments on a project; (2) You can file your comments electronically using the eFiling feature located on the Commission’s Web site (www.ferc.gov) under the link to Documents and Filings. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on ‘‘eRegister.’’ You must select the type of filing you are making. If you are filing a comment on a particular project, please select ‘‘Comment on a Filing’’; or (3) You can file a paper copy of your comments by mailing them to the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC 20426. In addition to the methods listed above, we will also hold public scoping meetings and mail notices to our environmental mailing list identifying the date, time, and locations of these meetings later this year. Environmental Mailing List The environmental mailing list includes federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; other interested parties; and local libraries and newspapers. This list also includes all affected landowners (as defined in the Commission’s regulations) who are potential right-of-way grantors, whose property may be used temporarily for project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the project. We will VerDate Sep<11>2014 19:27 Mar 12, 2015 Jkt 235001 update the environmental mailing list as the analysis proceeds to ensure that we send the information related to this environmental review to all individuals, organizations, and government entities interested in and/or potentially affected by the planned project. Copies of the completed draft EIS will be sent to the environmental mailing list for public review and comment. If you would prefer to receive a paper copy of the document instead of the CD version, or would like to remove your name from the mailing list, please return the attached Information Request (attachment 3). 13369 documents. Go to www.ferc.gov/docsfiling/esubscription.asp. Further, public meetings or site visits will be posted on the Commission’s calendar located at www.ferc.gov/ EventCalendar/EventsList.aspx along with other related information. Finally, additional information about the project can be seen from the Applicant’s Web site at https://ak-lng.com. Dated: March 4, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–05691 Filed 3–12–15; 8:45 am] BILLING CODE 6717–01–P Becoming an Intervenor Once the Applicants file its application with the Commission, you may want to become an ‘‘intervenor’’ which is an official party to the Commission’s proceeding. Intervenors play a more formal role in the process and are able to file briefs, appear at hearings, and be heard by the courts if they choose to appeal the Commission’s final ruling. An intervenor formally participates in the proceeding by filing a request to intervene. Instructions for becoming an intervenor are in the User’s Guide under the ‘‘e-filing’’ link on the Commission’s Web site. Please note that the Commission will not accept requests for intervenor status at this time. You must wait until the Commission receives a formal application for the project. Additional Information Additional information about the project is available from the Commission’s Office of External Affairs, at (866) 208–FERC, or on the FERC Web site (www.ferc.gov) using the eLibrary link. Click on the eLibrary link, click on ‘‘General Search’’ and enter the docket number, excluding the last three digits in the Docket Number field (i.e., PF14– 21). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208–3676, or for TTY, contact (202) 502–8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the PO 00000 Frm 00048 Fmt 4703 Sfmt 4703 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR15–20–000] Express Pipeline LLC; Notice of Petition for Declaratory Order Take notice that on February 27, 2015, pursuant to Rule 207(a)(2) of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.207(a)(2) (2014), Express Pipeline LLC filed a petition for a declaratory order seeking approval of a committed rate structure and related contract terms to support the cost of additional tanks, pumps, and piping to ‘‘debottleneck, ’’ a constraint point on its system, all as more fully explained in the petition. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Petitioner. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the E:\FR\FM\13MRN1.SGM 13MRN1 13370 Federal Register / Vol. 80, No. 49 / Friday, March 13, 2015 / Notices ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern time on March 20, 2015. Dated: March 4, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–05687 Filed 3–12–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP15–95–000] mstockstill on DSK4VPTVN1PROD with NOTICES Columbia Gas Transmission, LLC; Notice of Application Take notice that on February 20, 2015, Columbia Gas Transmission, LLC (Columbia) 5151 San Felipe, Suite 2500, Houston, Texas 77056, filed an application pursuant to sections 7(b) and 7(c) of the Natural Gas Act (NGA) and the Federal Energy Regulatory Commission’s (Commission) regulations seeking authorization to replace approximately 34 miles of existing 20inch diameter pipeline with like size pipeline in Greene, Washington, and Allegheny counties, Pennsylvania, and install necessary appurtenant facilities associated with the replacement pipeline (Tri-County Project), all as more fully described in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208–3676 or TTY, (202) 502–8659. Any questions regarding this application should be directed to Tyler R. Brown, Senior Counsel, Columbia Gas Transmission, LLC, 5151 San Felipe Suite 2500, Houston, TX 77056, or call (713) 386–3797. On May 27, 2014, Commission staff granted Columbia’s request to use the pre-filing process and assigned Docket No. PF14–11–000 to staff activities VerDate Sep<11>2014 19:27 Mar 12, 2015 Jkt 235001 involving the Tri-County Project. Now, as of the filing of this application on February 20, 2015, the NEPA Pre-Filing Process for this project has ended. From this time forward, this proceeding will be conducted in Docket No. CP15–95– 000 as noted in the caption of this Notice. Specifically, Columbia will replace pipe in three segments. Segment 1 begins at Columbia’s Hero-Jollytown regulator station in Greene County, and continues 15 miles north to Columbia’s existing Waynesburg Compressor Station. Segment 2 begins at a point near Columbia’s existing Redd Farm Compressor Station 4 in Washington County, and continues approximately 11 miles in a northerly direction to the existing Sharp Farm station. Segment 3 begins at Columbia’s Sharp Farm station, and continues 12 miles north to the terminus of Line 1570 where it intersects with 20-inch Line 1485 in Allegheny County. Columbia states that the total cost of the replacement project is approximately 136 million dollars. Additionally, Columbia is requesting a pre-determination for rolled-in rate treatment since the primary purpose of the Tri-County Project is to replace existing bare steel pipeline due to the age and condition of the facilities. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. There are two ways to become involved in the Commission’s review of this project. First, any person wishing to obtain legal status by becoming a party to the proceedings for this project should, on or before the comment date stated below file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, a motion to intervene in accordance with the requirements of the PO 00000 Frm 00049 Fmt 4703 Sfmt 4703 Commission’s Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). A person obtaining party status will be placed on the service list maintained by the Secretary of the Commission and will receive copies of all documents filed by the applicant and by all other parties. A party must submit 7 copies of filings made in the proceeding with the Commission and must mail a copy to the applicant and to every other party. Only parties to the proceeding can ask for court review of Commission orders in the proceeding. However, a person does not have to intervene in order to have comments considered. The second way to participate is by filing with the Secretary of the Commission, as soon as possible, an original and two copies of comments in support of or in opposition to this project. The Commission will consider these comments in determining the appropriate action to be taken, but the filing of a comment alone will not serve to make the filer a party to the proceeding. The Commission’s rules require that persons filing comments in opposition to the project provide copies of their protests only to the party or parties directly involved in the protest. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commentors will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commentors will not be required to serve copies of filed documents on all other parties. However, the non-party commentors will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE., Washington, DC 20426. Comment Date: March 25, 2015. E:\FR\FM\13MRN1.SGM 13MRN1

Agencies

[Federal Register Volume 80, Number 49 (Friday, March 13, 2015)]
[Notices]
[Pages 13369-13370]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-05687]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. OR15-20-000]


Express Pipeline LLC; Notice of Petition for Declaratory Order

    Take notice that on February 27, 2015, pursuant to Rule 207(a)(2) 
of the Federal Energy Regulatory Commission's (Commission) Rules of 
Practice and Procedure, 18 CFR 385.207(a)(2) (2014), Express Pipeline 
LLC filed a petition for a declaratory order seeking approval of a 
committed rate structure and related contract terms to support the cost 
of additional tanks, pumps, and piping to ``debottleneck, '' a 
constraint point on its system, all as more fully explained in the 
petition.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Petitioner.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 5 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the

[[Page 13370]]

``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern time on March 20, 2015.

    Dated: March 4, 2015.
Kimberly D. Bose,
 Secretary.
[FR Doc. 2015-05687 Filed 3-12-15; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.