Drawbridge Operation Regulations; Harlem River, New York City, NY, 12082-12083 [2015-05233]
Download as PDF
12082
Federal Register / Vol. 80, No. 44 / Friday, March 6, 2015 / Rules and Regulations
(4) This rulemaking does not impose
or revise any information collections
subject to the Paperwork Reduction Act.
List of Subjects in 22 CFR Part 172
Service of process.
Accordingly, for the reasons set forth
above, title 22, part 172, is amended as
follows:
PART 172—SERVICE OF PROCESS;
PRODUCTION OR DISCLOSURE OF
OFFICIAL INFORMATION IN
RESPONSE TO COURT ORDERS,
SUBPOENAS, NOTICES OF
DEPOSITIONS, REQUESTS FOR
ADMISSIONS, INTERROGATORIES, OR
SIMILAR REQUESTS OR DEMANDS IN
CONNECTION WITH FEDERAL OR
STATE LITIGATION; EXPERT
TESTIMONY
1. The authority citation for part 172
is amended as follows:
■
Authority: 5 U.S.C. 301; 8 U.S.C. 1202(f);
22 U.S.C. 2658, 2664, 3926.
2. In § 172.2(a), the last sentence is
revised to read as follows:
■
§ 172.2 Service of summonses and
complaints.
(a) * * * All such documents should
be delivered or addressed to: The
Executive Office, Office of the Legal
Adviser, Suite 5.600, 600 19th Street
NW., Washington DC 20036. (Note that
the suite number is 5.600.)
*
*
*
*
*
Dated: February 27, 2015.
Alice Kottmyer,
Attorney Adviser, Office of the Legal Adviser.
[FR Doc. 2015–05285 Filed 3–5–15; 8:45 am]
BILLING CODE 4710–08–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2015–0079]
Drawbridge Operation Regulation;
Oakland Inner Harbor, Alameda, CA
Coast Guard, DHS.
ACTION: Notice of deviation from
drawbridge regulation.
AGENCY:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Alameda
County highway drawbridge at High
Street across the Oakland Inner Harbor,
mile 6.0, at Alameda, CA. The deviation
is necessary to allow the bridge owner
to make necessary repairs and
rmajette on DSK2TPTVN1PROD with RULES
SUMMARY:
VerDate Sep<11>2014
15:26 Mar 05, 2015
Jkt 235001
rehabilitation of the bridge. This
deviation allows single leaf operation of
the double leaf, bascule-style
drawbridge during the deviation period.
DATES: This deviation is effective
without actual notice from March 6,
2015 through 6:30 p.m. on April 27,
2015. For the purposes of enforcement,
actual notice will be used from 9:30 a.m.
on March 2, 2015, until March 6, 2015.
ADDRESSES: The docket for this
deviation, [USCG–2015–0079], is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email David H.
Sulouff, Chief, Bridge Section, Eleventh
Coast Guard District; telephone 510–
437–3516, email David.H.Sulouff@
uscg.mil. If you have questions on
viewing the docket, call Cheryl Collins,
Program Manager, Docket Operations,
telephone 202–366–9826.
SUPPLEMENTARY INFORMATION: Alameda
County has requested a temporary
change to the operation of the Alameda
County highway bridge at High Street,
mile 6.0, over Oakland Inner Harbor, at
Alameda, CA. The drawbridge
navigation span provides horizontal
clearance of 244 feet between pier
fenders. During single leaf operation,
horizontal clearance is reduced to
approximately 100 feet. The drawbridge
provides a vertical clearance of 16 feet
above Mean High Water in the closedto-navigation position and unlimited
vertical clearance in the open-tonavigation position. As required by 33
CFR 117.181, the draw opens on signal;
except that, from 8 a.m. to 9 a.m. and
4:30 p.m. to 6:30 p.m. Monday through
Friday except Federal holidays, the
draw need not be opened for the passage
of vessels. However, the draw shall
open during the above closed periods
for vessels which must for reasons of
safety, move on a tide or slack water, if
at least two hours notice is given.
Navigation on the waterway is
commercial, recreational, emergency
and law enforcement vessels.
During the deviation period, the
drawspan will be operated with only
one leaf between 9:30 a.m. and 6:30
p.m., Monday through Friday, while the
PO 00000
Frm 00010
Fmt 4700
Sfmt 4700
opposite leaf will be secured in the
closed-to-navigation position for
rehabilitation. A two hour advance
notice will be required from vessel
operators for a double leaf opening. At
night and on weekends, the drawbridge
will resume the normal double leaf
operation, when work is not being
performed on the bridge. This
temporary deviation has been
coordinated with the waterway users.
No objections to the proposed
temporary deviation were raised.
Vessels able to pass through the
bridge in the closed position may do so
at any time. The bridge will be able to
open for emergencies and there is no
immediate alternate route for larger
vessels to pass. The Coast Guard will
also inform the waterway users via our
Local and Broadcast Notices to Mariners
of the change in operating schedule for
the bridge so vessel operators can
arrange their transits to minimize any
impact caused by the temporary
deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: February 17, 2015.
D.H. Sulouff,
District Bridge Chief, Eleventh Coast Guard
District.
[FR Doc. 2015–05231 Filed 3–5–15; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2015–0065]
Drawbridge Operation Regulations;
Harlem River, New York City, NY
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the operation of
the Metro-North (Park Avenue) Bridge
across the Harlem River, mile 2.1, at
New York City, New York. This
deviation is necessary to allow the
bridge owner to perform electrical
repairs at the bridge. This deviation
allows the bridge to remain closed from
March 13, 2015 through May 21, 2015.
DATES: This deviation is effective from
March 13, 2015 through May 21, 2015.
SUMMARY:
E:\FR\FM\06MRR1.SGM
06MRR1
Federal Register / Vol. 80, No. 44 / Friday, March 6, 2015 / Rules and Regulations
The docket for this
deviation, [USCG–2015–0065] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140, on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC, 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Mr. Joe M. Arca,
Project Officer, First Coast Guard
District, telephone (212) 514–4336,
joe.m.arca@uscg.mil. If you have
questions on viewing the docket, call
Cheryl Collins, Program Manager,
Docket Operations, telephone (202)
366–9826.
SUPPLEMENTARY INFORMATION: The
Metro-North (Park Avenue) Bridge
across the Harlem River, mile 2.1, at
New York City, New York, has a vertical
clearance in the closed position of 25
feet at mean high water and 30 feet at
mean low water. The existing bridge
operating regulations are found at 33
CFR 117.789(c).
The waterway is transited by
commercial vessels.
The bridge owner, Metro-North,
requested a temporary deviation from
the normal operating schedule to
facilitate electrical repairs as a result of
damage incurred from Hurricane Sandy.
Under this temporary deviation, the
Metro-North (Park Avenue) Bridge may
remain in the closed position from
March 13, 2015 through May 21, 2015.
The habitual users can transit under
the bridge without requesting bridge
openings due to the high vertical
clearance under the bridge.
There are no alternate routes for
vessel traffic; however, vessels that can
pass under the closed draw during this
closure may do so at all times. The
bridge may not be opened in the event
of an emergency.
The Coast Guard will inform the users
of the waterways through our Local and
Broadcast Notice to Mariners of the
change in operating schedule for the
bridge so that vessels can arrange their
transits to minimize any impact caused
by the temporary deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
rmajette on DSK2TPTVN1PROD with RULES
ADDRESSES:
VerDate Sep<11>2014
15:26 Mar 05, 2015
Jkt 235001
Dated: February 23, 2015.
C.J. Bisignano,
Supervisory Bridge Management Specialist,
First Coast Guard District.
[FR Doc. 2015–05233 Filed 3–5–15; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2015–0085]
Drawbridge Operation Regulations;
Cheesequake Creek, Morgan, NJ
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the operation of
the New Jersey Transit Rail Operations
(NJTRO) railroad bridge across
Cheesequake Creek, mile 0.2, at Morgan,
New Jersey. This deviation is necessary
to allow the bridge owner to perform
structural repairs at the bridge. This
deviation allows the bridge to remain
closed on three consecutive weekends.
DATES: This deviation is effective from
6 a.m. on March 14, 2015 through 7 p.m.
on March 28, 2015.
ADDRESSES: The docket for this
deviation, [USCG–2015–0085] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140, on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC, 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Mr. Joe M. Arca,
Project Officer, First Coast Guard
District, telephone (212) 514–4336,
joe.m.arca@uscg.mil. If you have
questions on viewing the docket, call
Cheryl Collins, Program Manager,
Docket Operations, telephone (202)
366–9826.
SUPPLEMENTARY INFORMATION: The
NJTRO railroad bridge across
Cheesequake Creek, mile 0.2, at Morgan,
New Jersey, has a vertical clearance in
the closed position of 3 feet at mean
high water and 8 feet at mean low water.
SUMMARY:
PO 00000
Frm 00011
Fmt 4700
Sfmt 4700
12083
The existing bridge operating
regulations are found at 33 CFR
117.709(b).
The waterway is transited by seasonal
recreational vessels of various sizes.
The bridge owner, NJTRO, requested
a temporary deviation from the normal
operating schedule to facilitate
structural repairs at the bridge.
Under this temporary deviation the
NJTRO railroad bridge shall remain in
the closed position for three consecutive
weekends from 6 a.m. on Saturday
through 7 p.m. on Sunday on the
following dates: March 14 and 15,
March 21 and 22, and March 28 and 29,
2015.
The draw shall maintain its normal
operating schedule at all other times.
There are no alternate routes for
vessel traffic; however, vessels that can
pass under the closed draw during this
closure may do so at all times. The
bridge may be opened in the event of an
emergency.
The Coast Guard will inform the users
of the waterways through our Local and
Broadcast Notice to Mariners of the
change in operating schedule for the
bridge so that vessels can arrange their
transits to minimize any impact caused
by the temporary deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: February 23, 2015.
C.J. Bisignano,
Supervisory Bridge Management Specialist,
First Coast Guard District.
[FR Doc. 2015–05234 Filed 3–5–15; 8:45 am]
BILLING CODE 9110–04–P
ENVIRONMENTAL PROTECTION
AGENCY
40 CFR Parts 9 and 721
[EPA–HQ–OPPT–2011–0941; FRL–9922–30]
RIN 2070–AB27
Significant New Use Rule for Pentane,
1,1,1,2,3,3-hexafluoro-4-(1,1,2,3,3,3hexafluoropropoxy)Environmental Protection
Agency (EPA).
ACTION: Final rule.
AGENCY:
EPA is finalizing a significant
new use rule (SNUR) under the Toxic
Substances Control Act (TSCA) for the
chemical substance Pentane, 1,1,1,2,3,3hexafluoro-4-(1,1,2,3,3,3hexafluoropropoxy)- that was the
SUMMARY:
E:\FR\FM\06MRR1.SGM
06MRR1
Agencies
[Federal Register Volume 80, Number 44 (Friday, March 6, 2015)]
[Rules and Regulations]
[Pages 12082-12083]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-05233]
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2015-0065]
Drawbridge Operation Regulations; Harlem River, New York City, NY
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulation.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the operation of the Metro-North (Park
Avenue) Bridge across the Harlem River, mile 2.1, at New York City, New
York. This deviation is necessary to allow the bridge owner to perform
electrical repairs at the bridge. This deviation allows the bridge to
remain closed from March 13, 2015 through May 21, 2015.
DATES: This deviation is effective from March 13, 2015 through May 21,
2015.
[[Page 12083]]
ADDRESSES: The docket for this deviation, [USCG-2015-0065] is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation. You may also visit the Docket
Management Facility in Room W12-140, on the ground floor of the
Department of Transportation West Building, 1200 New Jersey Avenue SE.,
Washington, DC, 20590, between 9 a.m. and 5 p.m., Monday through
Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Mr. Joe M. Arca, Project Officer,
First Coast Guard District, telephone (212) 514-4336,
joe.m.arca@uscg.mil. If you have questions on viewing the docket, call
Cheryl Collins, Program Manager, Docket Operations, telephone (202)
366-9826.
SUPPLEMENTARY INFORMATION: The Metro-North (Park Avenue) Bridge across
the Harlem River, mile 2.1, at New York City, New York, has a vertical
clearance in the closed position of 25 feet at mean high water and 30
feet at mean low water. The existing bridge operating regulations are
found at 33 CFR 117.789(c).
The waterway is transited by commercial vessels.
The bridge owner, Metro-North, requested a temporary deviation from
the normal operating schedule to facilitate electrical repairs as a
result of damage incurred from Hurricane Sandy.
Under this temporary deviation, the Metro-North (Park Avenue)
Bridge may remain in the closed position from March 13, 2015 through
May 21, 2015.
The habitual users can transit under the bridge without requesting
bridge openings due to the high vertical clearance under the bridge.
There are no alternate routes for vessel traffic; however, vessels
that can pass under the closed draw during this closure may do so at
all times. The bridge may not be opened in the event of an emergency.
The Coast Guard will inform the users of the waterways through our
Local and Broadcast Notice to Mariners of the change in operating
schedule for the bridge so that vessels can arrange their transits to
minimize any impact caused by the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: February 23, 2015.
C.J. Bisignano,
Supervisory Bridge Management Specialist, First Coast Guard District.
[FR Doc. 2015-05233 Filed 3-5-15; 8:45 am]
BILLING CODE 9110-04-P