Application To Export Electric Energy; Vitol Inc., 11664 [2015-04499]
Download as PDF
11664
Federal Register / Vol. 80, No. 42 / Wednesday, March 4, 2015 / Notices
sufficiency of supply or reliability of the
U.S. electric power supply system.
Copies of this application will be
made available, upon request, for public
inspection and copying at the address
provided above, by accessing the
program Web site at https://energy.gov/
node/11845, or by emailing Angela Troy
at Angela.Troy@hq.doe.gov.
Issued in Washington, DC, on February 25,
2015.
Brian Mills,
Director, Permitting and Siting, Office of
Electricity Delivery and Energy Reliability.
[FR Doc. 2015–04497 Filed 3–3–15; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
[OE Docket No. EA–407]
Application To Export Electric Energy;
Vitol Inc.
Office of Electricity Delivery
and Energy Reliability, DOE.
ACTION: Notice of Application.
AGENCY:
Vitol Inc. (Vitol or Applicant)
has applied for authority to transmit
electric energy from the United States to
Mexico pursuant to section 202(e) of the
Federal Power Act.
DATES: Comments, protests, or motions
to intervene must be submitted on or
before April 3, 2015.
ADDRESSES: Comments, protests,
motions to intervene, or requests for
more information should be addressed
to: Office of Electricity Delivery and
Energy Reliability, Mail Code: OE–20,
U.S. Department of Energy, 1000
Independence Avenue SW.,
Washington, DC 20585–0350. Because
of delays in handling conventional mail,
it is recommended that documents be
transmitted by overnight mail, by
electronic mail to Electricity.Exports@
hq.doe.gov, or by facsimile to 202–586–
8008.
SUPPLEMENTARY INFORMATION: Exports of
electricity from the United States to a
foreign country are regulated by the
Department of Energy (DOE) pursuant to
sections 301(b) and 402(f) of the
Department of Energy Organization Act
(42 U.S.C. 7151(b), 7172(f)) and require
authorization under section 202(e) of
the Federal Power Act (16 U.S.C.
824a(e)).
On February 10, 2015, DOE received
an application from Vitol for authority
to transmit electric energy from the
United States to Mexico as a power
marketer for a five-year term using
existing international transmission
facilities. The Applicant is also
requesting an expedited review of the
mstockstill on DSK4VPTVN1PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
18:11 Mar 03, 2015
Jkt 235001
Application and for DOE to issue the
requested authorization within 60 days.
In its application, Vitol states that it
does not own or control any electric
generation or transmission facilities,
and it does not have a franchised service
area. The electric energy that Vitol
proposes to export to Mexico would be
surplus energy purchased from third
parties such as electric utilities and
Federal power marketing agencies
pursuant to voluntary agreements. The
existing international transmission
facilities to be utilized by the Applicant
have previously been authorized by
Presidential permits issued pursuant to
Executive Order 10485, as amended,
and are appropriate for open access
transmission by third parties.
Procedural Matters: Any person
desiring to be heard in this proceeding
should file a comment or protest to the
application at the address provided
above. Protests should be filed in
accordance with Rule 211 of the Federal
Energy Regulatory Commission’s (FERC)
Rules of Practice and Procedures (18
CFR 385.211). Any person desiring to
become a party to these proceedings
should file a motion to intervene at the
above address in accordance with FERC
Rule 214 (18 CFR 385.214). Five copies
of such comments, protests, or motions
to intervene should be sent to the
address provided above on or before the
date listed above.
Comments and other filings
concerning the Vitol application to
export electric energy to Mexico should
be clearly marked with OE Docket No.
EA–407. An additional copy is to be
provided directly to both Robert F. Viola
and Kolby Kettler, Vitol Inc., 1100
Louisiana Street, Suite 5500, Houston,
TX 77002.
A final decision will be made on this
application after the environmental
impacts have been evaluated pursuant
to DOE’s National Environmental Policy
Act Implementing Procedures (10 CFR
part 1021) and after a determination is
made by DOE that the proposed action
will not have an adverse impact on the
sufficiency of supply or reliability of the
U.S. electric power supply system.
Copies of this application will be
made available, upon request, for public
inspection and copying at the address
provided above, by accessing the
program Web site at https://energy.gov/
node/11845, or by emailing Angela Troy
at Angela.Troy@hq.doe.gov.
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
Issued in Washington, DC, on February 25,
2015.
Brian Mills,
Director, Permitting and Siting, Office of
Electricity Delivery and Energy Reliability.
[FR Doc. 2015–04499 Filed 3–3–15; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Notice of Procedure Requiring
Designation of U.S. Resident Agent for
Applicants and Authorization Holders
That Neither Reside in Nor Have a
Place of Business or Other Corporate
Presence in the United States
Office of Fossil Energy, DOE.
Notice of procedure.
AGENCY:
ACTION:
The Office of Fossil Energy
(FE) of the Department of Energy (DOE)
is hereby notifying both applicants for
authorizations to import or export
natural gas, including liquefied natural
gas (LNG), and the current holders of
such authorizations that neither reside
in nor have a place of business or other
corporate presence in the United States
that they must identify an agent resident
within the United States to receive
service of legal process. This notice
applies to any such applicant and/or
authorization holder that has not
already identified a U.S. agent in its
existing proceeding in a filing or other
correspondence with DOE/FE.
DATES: This procedural change is
effective March 4, 2015. Those affected
by the change must comply by April 3,
2015.
ADDRESSES: Submissions of information
required by this procedure can be made
using one of the following:
SUMMARY:
Electronic Filing by Email
fergas@hq.doe.gov.
Regular Mail
U.S. Department of Energy (FE–34),
Office of Oil and Gas Global Security
and Supply, Office of Fossil Energy,
P.O. Box 44375, Washington, DC 20026–
4375.
Hand Delivery or Private Delivery
Services (e.g., FedEx, UPS, etc.)
U.S. Department of Energy (FE–34),
Office of Oil and Gas Global Security
and Supply, Office of Fossil Energy,
Forrestal Building, Room 3E–042, 1000
Independence Avenue SW.,
Washington, DC 20585.
FOR FURTHER INFORMATION CONTACT:
Larine Moore or Beverly Howard, U.S.
Department of Energy (FE–34), Office of
Oil and Gas Global Security and Supply,
Office of Fossil Energy, Forrestal
E:\FR\FM\04MRN1.SGM
04MRN1
Agencies
[Federal Register Volume 80, Number 42 (Wednesday, March 4, 2015)]
[Notices]
[Page 11664]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-04499]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[OE Docket No. EA-407]
Application To Export Electric Energy; Vitol Inc.
AGENCY: Office of Electricity Delivery and Energy Reliability, DOE.
ACTION: Notice of Application.
-----------------------------------------------------------------------
SUMMARY: Vitol Inc. (Vitol or Applicant) has applied for authority to
transmit electric energy from the United States to Mexico pursuant to
section 202(e) of the Federal Power Act.
DATES: Comments, protests, or motions to intervene must be submitted on
or before April 3, 2015.
ADDRESSES: Comments, protests, motions to intervene, or requests for
more information should be addressed to: Office of Electricity Delivery
and Energy Reliability, Mail Code: OE-20, U.S. Department of Energy,
1000 Independence Avenue SW., Washington, DC 20585-0350. Because of
delays in handling conventional mail, it is recommended that documents
be transmitted by overnight mail, by electronic mail to
Electricity.Exports@hq.doe.gov, or by facsimile to 202-586-8008.
SUPPLEMENTARY INFORMATION: Exports of electricity from the United
States to a foreign country are regulated by the Department of Energy
(DOE) pursuant to sections 301(b) and 402(f) of the Department of
Energy Organization Act (42 U.S.C. 7151(b), 7172(f)) and require
authorization under section 202(e) of the Federal Power Act (16 U.S.C.
824a(e)).
On February 10, 2015, DOE received an application from Vitol for
authority to transmit electric energy from the United States to Mexico
as a power marketer for a five-year term using existing international
transmission facilities. The Applicant is also requesting an expedited
review of the Application and for DOE to issue the requested
authorization within 60 days.
In its application, Vitol states that it does not own or control
any electric generation or transmission facilities, and it does not
have a franchised service area. The electric energy that Vitol proposes
to export to Mexico would be surplus energy purchased from third
parties such as electric utilities and Federal power marketing agencies
pursuant to voluntary agreements. The existing international
transmission facilities to be utilized by the Applicant have previously
been authorized by Presidential permits issued pursuant to Executive
Order 10485, as amended, and are appropriate for open access
transmission by third parties.
Procedural Matters: Any person desiring to be heard in this
proceeding should file a comment or protest to the application at the
address provided above. Protests should be filed in accordance with
Rule 211 of the Federal Energy Regulatory Commission's (FERC) Rules of
Practice and Procedures (18 CFR 385.211). Any person desiring to become
a party to these proceedings should file a motion to intervene at the
above address in accordance with FERC Rule 214 (18 CFR 385.214). Five
copies of such comments, protests, or motions to intervene should be
sent to the address provided above on or before the date listed above.
Comments and other filings concerning the Vitol application to
export electric energy to Mexico should be clearly marked with OE
Docket No. EA-407. An additional copy is to be provided directly to
both Robert F. Viola and Kolby Kettler, Vitol Inc., 1100 Louisiana
Street, Suite 5500, Houston, TX 77002.
A final decision will be made on this application after the
environmental impacts have been evaluated pursuant to DOE's National
Environmental Policy Act Implementing Procedures (10 CFR part 1021) and
after a determination is made by DOE that the proposed action will not
have an adverse impact on the sufficiency of supply or reliability of
the U.S. electric power supply system.
Copies of this application will be made available, upon request,
for public inspection and copying at the address provided above, by
accessing the program Web site at https://energy.gov/node/11845, or by
emailing Angela Troy at Angela.Troy@hq.doe.gov.
Issued in Washington, DC, on February 25, 2015.
Brian Mills,
Director, Permitting and Siting, Office of Electricity Delivery and
Energy Reliability.
[FR Doc. 2015-04499 Filed 3-3-15; 8:45 am]
BILLING CODE 6450-01-P