Cub River Irrigation Company; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene, 11432-11433 [2015-04368]
Download as PDF
11432
Federal Register / Vol. 80, No. 41 / Tuesday, March 3, 2015 / Notices
Applicants: New Jersey Resources
Corporation.
Description: New Jersey Resources
Corporation submits FERC 65–A
Material Change in Facts of Exemption
Notification.
Filed Date: 2/24/15.
Accession Number: 20150224–5260.
Comments Due: 5 p.m. ET 3/17/15.
Docket Numbers: PH15–12–000.
Applicants: Energy Transfer Equity,
L.P.
Description: Energy Transfer Equity,
L.P. submits FERC 65–A Exemption
Notification.
Filed Date: 2/24/15.
Accession Number: 20150224–5263.
Comments Due: 5 p.m. ET 3/17/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 25, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–04369 Filed 3–2–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. OR15–18–000]
Sunoco Pipeline L.P.; Notice of
Petition for Declaratory Order
mstockstill on DSK4VPTVN1PROD with NOTICES
Take notice that on February 23, 2015,
pursuant to Rule 207(a)(2) of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.207(a)(2) (2014),
Sunoco Pipeline L.P. filed a petition for
a declaratory order approving the
proposed tariff rate structure, proration
policy, and various aspects of the
Transportation Service Agreement for
the Delaware Basin Extension project, as
more fully explained in the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. Anyone filing a motion
to intervene or protest must serve a copy
of that document on the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern time
on March 23, 2015.
Dated: February 25, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–04373 Filed 3–2–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CD15–19–000]
Cub River Irrigation Company; Notice
of Preliminary Determination of a
Qualifying Conduit Hydropower
Facility and Soliciting Comments and
Motions To Intervene
On February 10, 2015, the Cub River
Irrigation Company filed a notice of
intent to construct a qualifying conduit
hydropower facility, pursuant to section
30 of the Federal Power Act (FPA), as
amended by section 4 of the
Hydropower Regulatory Efficiency Act
of 2013 (HREA). The proposed Middle
Ditch Hydroelectric Project would have
an installed capacity of 480 kilowatts
(kW) and would be located on the
existing Middle Ditch Canal, which
transports water for agricultural
irrigation purposes. The project would
be located near the Town of Franklin in
Franklin County, Idaho.
Applicant Contact: Don Baldwin, P.O.
Box 215, Lewiston, UT 84320, Phone
No. (435) 512–4672.
FERC Contact: Robert Bell, Phone No.
(202) 502–6062, email: robert.bell@
ferc.gov.
Qualifying Conduit Hydropower
Facility Description: The proposed
project would consist of: (1) Four
proposed intake structures with 16-inch
butterfly valves attached directly to the
42-inch-diameter main pipeline; (2) a
proposed 60- by 40-foot powerhouse
containing four turbine generator units
with a total installed capacity of 480
kW; (3) three proposed 17-foot-long, 16inch-diameter pipes which return water
to the 42-inch main pipeline and, for the
fourth unit that only operates when the
other three units are not, a proposed 17foot-long, 30-inch-diameter pipeline
that returns water to Middle Ditch
Canal; and (4) appurtenant facilities.
The proposed project would have an
estimated annual generating capacity of
756 megawatt-hours.
A qualifying conduit hydropower
facility is one that is determined or
deemed to meet all of the criteria shown
in the table below.
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY
Description
Satisfies
(Y/N)
The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar
manmade water conveyance that is operated for the distribution of water for agricultural,
municipal, or industrial consumption and not primarily for the generation of electricity.
Y
Statutory provision
FPA 30(a)(3)(A), as amended
by HREA.
VerDate Sep<11>2014
19:24 Mar 02, 2015
Jkt 235001
PO 00000
Frm 00046
Fmt 4703
Sfmt 4703
E:\FR\FM\03MRN1.SGM
03MRN1
Federal Register / Vol. 80, No. 41 / Tuesday, March 3, 2015 / Notices
11433
TABLE 1—CRITERIA FOR QUALIFYING CONDUIT HYDROPOWER FACILITY—Continued
Description
Satisfies
(Y/N)
FPA 30(a)(3)(C)(i), as amended
by HREA.
FPA 30(a)(3)(C)(ii), as amended by HREA.
FPA 30(a)(3)(C)(iii), as amended by HREA.
mstockstill on DSK4VPTVN1PROD with NOTICES
Statutory provision
The facility is constructed, operated, or maintained for the generation of electric power and
uses for such generation only the hydroelectric potential of a non-federally owned conduit.
The facility has an installed capacity that does not exceed 5 megawatts ..................................
Y
On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA.
Preliminary Determination: Based
upon the above criteria, Commission
staff preliminarily determines that the
proposal satisfies the requirements for a
qualifying conduit hydropower facility,
which is not required to be licensed or
exempted from licensing.
Comments and Motions to Intervene:
Deadline for filing comments contesting
whether the facility meets the qualifying
criteria is 45 days from the issuance
date of this notice.
Deadline for filing motions to
intervene is 30 days from the issuance
date of this notice.
Anyone may submit comments or a
motion to intervene in accordance with
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210 and
385.214. Any motions to intervene must
be received on or before the specified
deadline date for the particular
proceeding.
Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the ‘‘COMMENTS
CONTESTING QUALIFICATION FOR A
CONDUIT HYDROPOWER FACILITY’’
or ‘‘MOTION TO INTERVENE,’’ as
applicable; (2) state in the heading the
name of the applicant and the project
number of the application to which the
filing responds; (3) state the name,
address, and telephone number of the
person filing; and (4) otherwise comply
with the requirements of sections
385.2001 through 385.2005 of the
Commission’s regulations.1 All
comments contesting Commission staff’s
preliminary determination that the
facility meets the qualifying criteria
must set forth their evidentiary basis.
The Commission strongly encourages
electronic filing. Please file motions to
intervene and comments using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
1 18
CFR 385.2001–2005 (2014).
VerDate Sep<11>2014
19:24 Mar 02, 2015
Jkt 235001
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Locations of Notice of Intent: Copies
of the notice of intent can be obtained
directly from the applicant or such
copies can be viewed and reproduced at
the Commission in its Public Reference
Room, Room 2A, 888 First Street NE.,
Washington, DC 20426. The filing may
also be viewed on the web at https://
www.ferc.gov/docs-filing/elibrary.asp
using the ‘‘eLibrary’’ link. Enter the
docket number (e.g., CD15–19–000) in
the docket number field to access the
document. For assistance, call toll-free
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502–8659.
Dated: February 25, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–04368 Filed 3–2–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Energy Regulatory Commission
[Project No. 14650–000]
Paul Greyshock; Notice of Preliminary
Permit Application Accepted for Filing
and Soliciting Comments, Motions To
Intervene, and Competing Applications
On December 4, 2014, Paul Greyshock
filed an application for a preliminary
permit, pursuant to section 4(f) of the
Federal Power Act (FPA), proposing to
study the feasibility of the Ft. Pierce
Pilot Project (Ft. Pierce Project or
project) to be located in the Fort Pierce
Inlet, near the City of Fort Pierce, St.
Lucie County, Florida. The sole purpose
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
Y
Y
of a preliminary permit, if issued, is to
grant the permit holder priority to file
a license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
owned by others without the owners’
express permission.
The proposed project would consist of
the following: A prototype sub-surface
propeller generator encased within 6foot-diameter, 2-foot-wide tube,
screened on both ends to protect marine
life and protect the mechanism from
debris. The generator has a capacity of
40 kilowatts, and will be suspended in
18-foot-deep water near the mouth of
the inlet. Anchors on each end of the
generator housing will secure it to the
inlet floor. A transmission cable will
connect the generator to a series of
batteries located behind the Manatee
Bar and Grill to monitor load and
output. The estimated annual generation
of the Ft. Pierce Project would be 80.0
megawatt-hours.
Applicant Contact: Mr. Paul
Greyshock, Cyclo-Ocean Inc., 670 16th
St., Vero Beach, Florida 32960; phone:
(772) 501–4865 or Mr. David Cox, 2044
14th Ave., Suite 24, Vero Beach, Florida
32960; phone: (772) 564 0540.
FERC Contact: Michael Spencer;
phone: (202) 502–6093.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
E:\FR\FM\03MRN1.SGM
03MRN1
Agencies
[Federal Register Volume 80, Number 41 (Tuesday, March 3, 2015)]
[Notices]
[Pages 11432-11433]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-04368]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD15-19-000]
Cub River Irrigation Company; Notice of Preliminary Determination
of a Qualifying Conduit Hydropower Facility and Soliciting Comments and
Motions To Intervene
On February 10, 2015, the Cub River Irrigation Company filed a
notice of intent to construct a qualifying conduit hydropower facility,
pursuant to section 30 of the Federal Power Act (FPA), as amended by
section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA).
The proposed Middle Ditch Hydroelectric Project would have an installed
capacity of 480 kilowatts (kW) and would be located on the existing
Middle Ditch Canal, which transports water for agricultural irrigation
purposes. The project would be located near the Town of Franklin in
Franklin County, Idaho.
Applicant Contact: Don Baldwin, P.O. Box 215, Lewiston, UT 84320,
Phone No. (435) 512-4672.
FERC Contact: Robert Bell, Phone No. (202) 502-6062, email:
robert.bell@ferc.gov.
Qualifying Conduit Hydropower Facility Description: The proposed
project would consist of: (1) Four proposed intake structures with 16-
inch butterfly valves attached directly to the 42-inch-diameter main
pipeline; (2) a proposed 60- by 40-foot powerhouse containing four
turbine generator units with a total installed capacity of 480 kW; (3)
three proposed 17-foot-long, 16-inch-diameter pipes which return water
to the 42-inch main pipeline and, for the fourth unit that only
operates when the other three units are not, a proposed 17-foot-long,
30-inch-diameter pipeline that returns water to Middle Ditch Canal; and
(4) appurtenant facilities. The proposed project would have an
estimated annual generating capacity of 756 megawatt-hours.
A qualifying conduit hydropower facility is one that is determined
or deemed to meet all of the criteria shown in the table below.
Table 1--Criteria for Qualifying Conduit Hydropower Facility
----------------------------------------------------------------------------------------------------------------
Statutory provision Description Satisfies (Y/N)
----------------------------------------------------------------------------------------------------------------
FPA 30(a)(3)(A), as amended by HREA........... The conduit the facility uses is a tunnel, Y
canal, pipeline, aqueduct, flume, ditch, or
similar manmade water conveyance that is
operated for the distribution of water for
agricultural, municipal, or industrial
consumption and not primarily for the
generation of electricity.
[[Page 11433]]
FPA 30(a)(3)(C)(i), as amended by HREA........ The facility is constructed, operated, or Y
maintained for the generation of electric
power and uses for such generation only the
hydroelectric potential of a non-federally
owned conduit.
FPA 30(a)(3)(C)(ii), as amended by HREA....... The facility has an installed capacity that Y
does not exceed 5 megawatts.
FPA 30(a)(3)(C)(iii), as amended by HREA...... On or before August 9, 2013, the facility is Y
not licensed, or exempted from the licensing
requirements of Part I of the FPA.
----------------------------------------------------------------------------------------------------------------
Preliminary Determination: Based upon the above criteria,
Commission staff preliminarily determines that the proposal satisfies
the requirements for a qualifying conduit hydropower facility, which is
not required to be licensed or exempted from licensing.
Comments and Motions to Intervene: Deadline for filing comments
contesting whether the facility meets the qualifying criteria is 45
days from the issuance date of this notice.
Deadline for filing motions to intervene is 30 days from the
issuance date of this notice.
Anyone may submit comments or a motion to intervene in accordance
with the requirements of Rules of Practice and Procedure, 18 CFR
385.210 and 385.214. Any motions to intervene must be received on or
before the specified deadline date for the particular proceeding.
Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the ``COMMENTS CONTESTING QUALIFICATION FOR
A CONDUIT HYDROPOWER FACILITY'' or ``MOTION TO INTERVENE,'' as
applicable; (2) state in the heading the name of the applicant and the
project number of the application to which the filing responds; (3)
state the name, address, and telephone number of the person filing; and
(4) otherwise comply with the requirements of sections 385.2001 through
385.2005 of the Commission's regulations.\1\ All comments contesting
Commission staff's preliminary determination that the facility meets
the qualifying criteria must set forth their evidentiary basis.
---------------------------------------------------------------------------
\1\ 18 CFR 385.2001-2005 (2014).
---------------------------------------------------------------------------
The Commission strongly encourages electronic filing. Please file
motions to intervene and comments using the Commission's eFiling system
at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. A copy of all other filings in
reference to this application must be accompanied by proof of service
on all persons listed in the service list prepared by the Commission in
this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Locations of Notice of Intent: Copies of the notice of intent can
be obtained directly from the applicant or such copies can be viewed
and reproduced at the Commission in its Public Reference Room, Room 2A,
888 First Street NE., Washington, DC 20426. The filing may also be
viewed on the web at https://www.ferc.gov/docs-filing/elibrary.asp using
the ``eLibrary'' link. Enter the docket number (e.g., CD15-19-000) in
the docket number field to access the document. For assistance, call
toll-free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY,
call (202) 502-8659.
Dated: February 25, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-04368 Filed 3-2-15; 8:45 am]