Drawbridge Operation Regulation; Sacramento River, Sacramento, CA, 11122 [2015-04267]

Download as PDF 11122 Federal Register / Vol. 80, No. 40 / Monday, March 2, 2015 / Rules and Regulations federal_register/code_of_ federalregulations/ibr_locations.html. Alberta E. Mills, Acting Secretary, Consumer Product Safety Commission. [FR Doc. 2015–03717 Filed 2–27–15; 8:45 am] BILLING CODE 6355–01–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG–2014–1076] Drawbridge Operation Regulation; Sacramento River, Sacramento, CA Coast Guard, DHS. Notice of deviation from drawbridge regulation. AGENCY: ACTION: The Coast Guard has issued a temporary deviation from the operating schedule that governs the Tower Drawbridge across the Sacramento River, mile 59.0 at Sacramento, CA. The deviation is necessary to allow the community to participate in footrace events. This deviation allows the bridge to remain in the closed-to-navigation position during the deviation period. DATES: This deviation is effective from 7:45 a.m. on March 14, 2015, to 1 p.m. on March 15, 2015. ADDRESSES: The docket for this deviation, [USCG–2014–1076], is available at https://www.regulations.gov. Type the docket number in the ‘‘SEARCH’’ box and click ‘‘SEARCH.’’ Click on Open Docket Folder on the line associated with this deviation. You may also visit the Docket Management Facility in Room W12–140 on the ground floor of the Department of Transportation West Building, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: If you have questions on this temporary deviation, call or email David H. Sulouff, Chief, Bridge Section, Eleventh Coast Guard District; telephone 510– 437–3516, email David.H.Sulouff@ uscg.mil. If you have questions on viewing the docket, call Cheryl Collins, Program Manager, Docket Operations, telephone 202–366–9826. SUPPLEMENTARY INFORMATION: California Department of Transportation has requested a temporary change to the operation of the Tower Drawbridge, mile 59.0, over Sacramento River, at wreier-aviles on DSK5TPTVN1PROD with RULES SUMMARY: VerDate Sep<11>2014 14:17 Feb 27, 2015 Jkt 235001 Sacramento, CA. The drawbridge navigation span provides a vertical clearance of 30 feet above Mean High Water in the closed-to-navigation position. The draw opens on signal from May 1 through October 31 from 6 a.m. to 10 p.m. and from November 1 through April 30 from 9 a.m. to 5 p.m. At all other times the draw shall open on signal if at least four hours notice is given, as required by 33 CFR 117.189(a). Navigation on the waterway is commercial and recreational. The drawspan will be secured in the closed-to-navigation position 7:45 a.m. to 9:45 a.m. on March 14, 2015, and from 7:30 a.m. to 1 p.m. on March 15, 2015, to allow the community to participate in the Shamrock 5K footrace and the Shamrock Half Marathon, respectively. This temporary deviation has been coordinated with the waterway users. No objections to the proposed temporary deviation were raised. Vessels able to pass through the bridge in the closed position may do so at any time. The bridge will be able to open for emergencies and there is no immediate alternate route for vessels to pass. The Coast Guard will also inform the users of the waterway through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridge so that vessels can arrange their transits to minimize any impact caused by the temporary deviation. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: February 12, 2015. D.H. Sulouff, District Bridge Chief, Eleventh Coast Guard District. [FR Doc. 2015–04267 Filed 2–27–15; 8:45 am] BILLING CODE 9110–04–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG–2015–0112] Drawbridge Operation Regulation; Cape Fear River, Wilmington, NC Coast Guard, DHS. Notice of deviation from drawbridge regulation. AGENCY: ACTION: The Coast Guard has issued a temporary deviation from the operating schedule that governs the North SUMMARY: PO 00000 Frm 00046 Fmt 4700 Sfmt 4700 Carolina Department of Transportation (NCDOT) Cape Fear Memorial Bridge across the Cape Fear River, mile 26.8, in Wilmington, NC. This temporary deviation allows the bridge to remain in the closed to navigation position for up to five days to facilitate biennial maintenance and inspections. DATES: This deviation is effective from 7 a.m. on March 16, 2015 to 5 p.m. March 20, 2015. ADDRESSES: The docket for this deviation [USCG–2015–0112] is available at https://www.regulations.gov. Type the docket number in the ‘‘SEARCH’’ box and click ‘‘SEARCH’’. Click on Open Docket Folder on the line associated with this deviation. You may also visit the Docket Management Facility in Room W12–140 on the ground floor of the Department of Transportation West Building, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: If you have questions on this temporary deviation, call or email Terrance Knowles, Environmental Protection Specialist, Coast Guard; telephone 757– 398–6587, email Terrance.A.Knowles@ uscg.mil. If you have questions on viewing the docket, call Cheryl Collins, Program Manager, Docket Operations, at 202–366–9826. SUPPLEMENTARY INFORMATION: North Carolina Department of Transportation (NCDOT), who owns and operates this vertical lift-type drawbridge, has requested a temporary deviation from the current operating regulation to facilitate biennial maintenance and inspections. Under the regular operating schedule, the bridge opens on signal, except for two other time periods in July and November as described in 33 CFR 117.822. The Cape Fear Memorial Bridge has 65 feet of vertical clearance in the closed position at mean high water. Under this temporary deviation the repairs would restrict the operation of the draw. It would allow the bridge to remain closed from 7 a.m. March 16, 2015, to 5 p.m. March 20, 2015 to facilitate biennial maintenance and inspections. The Coast Guard will also inform the users of the waterways through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridge so that vessels can arrange their transits to minimize any impact caused by the temporary deviation. Vessels able to pass under the bridge in the closed position may do so at any E:\FR\FM\02MRR1.SGM 02MRR1

Agencies

[Federal Register Volume 80, Number 40 (Monday, March 2, 2015)]
[Rules and Regulations]
[Page 11122]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-04267]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2014-1076]


Drawbridge Operation Regulation; Sacramento River, Sacramento, CA

AGENCY: Coast Guard, DHS.

ACTION: Notice of deviation from drawbridge regulation.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
operating schedule that governs the Tower Drawbridge across the 
Sacramento River, mile 59.0 at Sacramento, CA. The deviation is 
necessary to allow the community to participate in footrace events. 
This deviation allows the bridge to remain in the closed-to-navigation 
position during the deviation period.

DATES: This deviation is effective from 7:45 a.m. on March 14, 2015, to 
1 p.m. on March 15, 2015.

ADDRESSES: The docket for this deviation, [USCG-2014-1076], is 
available at https://www.regulations.gov. Type the docket number in the 
``SEARCH'' box and click ``SEARCH.'' Click on Open Docket Folder on the 
line associated with this deviation. You may also visit the Docket 
Management Facility in Room W12-140 on the ground floor of the 
Department of Transportation West Building, 1200 New Jersey Avenue SE., 
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, 
except Federal holidays.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email David H. Sulouff, Chief, Bridge 
Section, Eleventh Coast Guard District; telephone 510-437-3516, email 
David.H.Sulouff@uscg.mil. If you have questions on viewing the docket, 
call Cheryl Collins, Program Manager, Docket Operations, telephone 202-
366-9826.

SUPPLEMENTARY INFORMATION: California Department of Transportation has 
requested a temporary change to the operation of the Tower Drawbridge, 
mile 59.0, over Sacramento River, at Sacramento, CA. The drawbridge 
navigation span provides a vertical clearance of 30 feet above Mean 
High Water in the closed-to-navigation position. The draw opens on 
signal from May 1 through October 31 from 6 a.m. to 10 p.m. and from 
November 1 through April 30 from 9 a.m. to 5 p.m. At all other times 
the draw shall open on signal if at least four hours notice is given, 
as required by 33 CFR 117.189(a). Navigation on the waterway is 
commercial and recreational.
    The drawspan will be secured in the closed-to-navigation position 
7:45 a.m. to 9:45 a.m. on March 14, 2015, and from 7:30 a.m. to 1 p.m. 
on March 15, 2015, to allow the community to participate in the 
Shamrock 5K footrace and the Shamrock Half Marathon, respectively. This 
temporary deviation has been coordinated with the waterway users. No 
objections to the proposed temporary deviation were raised.
    Vessels able to pass through the bridge in the closed position may 
do so at any time. The bridge will be able to open for emergencies and 
there is no immediate alternate route for vessels to pass. The Coast 
Guard will also inform the users of the waterway through our Local and 
Broadcast Notices to Mariners of the change in operating schedule for 
the bridge so that vessels can arrange their transits to minimize any 
impact caused by the temporary deviation.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.

    Dated: February 12, 2015.
D.H. Sulouff,
District Bridge Chief, Eleventh Coast Guard District.
[FR Doc. 2015-04267 Filed 2-27-15; 8:45 am]
BILLING CODE 9110-04-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.