Orlando Utilities Commission; Notice of Filing, 11192 [2015-04239]
Download as PDF
11192
Federal Register / Vol. 80, No. 40 / Monday, March 2, 2015 / Notices
Becoming an Intervenor
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Once Eagle LNG files its application
with the Commission, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are in the ‘‘Document-less
Intervention Guide’’ under the ‘‘e-filing’’
link on the Commission’s Web site.
Motions to intervene are more fully
described at https://www.ferc.gov/help/
how-to/intervene.asp. Please note that
the Commission will not accept requests
for intervenor status at this time. You
must wait until the Commission
receives a formal application for the
Project.
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
Orlando Utilities Commission; Notice
of Filing
Additional information about the
Project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site (www.ferc.gov) using the eLibrary
link. Click on the eLibrary link, click on
‘‘General Search’’ and enter the docket
number, excluding the last three digits
in the Docket Number field (i.e., PF15–
7). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to https://www.ferc.gov/
docs-filing/esubscription.asp.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Take notice that on February 19, 2015,
the Orlando Utilities Commission
submitted its tariff filing per 35.28(e):
Amendment to its Order No. 1000
Regional Compliance Filings, to be
effective 1/1/2015.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on March 23, 2015.
Dated: February 24, 2015.
Kimberly D. Bose,
Secretary.
Dated: February 24, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–04206 Filed 2–27–15; 8:45 am]
[FR Doc. 2015–04239 Filed 2–27–15; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
Additional Information
asabaliauskas on DSK5VPTVN1PROD with NOTICES
[Project No. 14661–000]
[Docket No. NJ15–4–001]
VerDate Sep<11>2014
16:55 Feb 27, 2015
Jkt 235001
PO 00000
Frm 00039
Fmt 4703
Sfmt 4703
Adam Robert Rousselle, II; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On February 5, 2015, Adam Robert
Rousselle, II filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Nockamixon Dam Water Power Project
(project) to be located on Tohickon
Creek, in Bucks County, Pennsylvania.
The sole purpose of a preliminary
permit, if issued, is to grant the permit
holder priority to file a license
application during the permit term. A
preliminary permit does not authorize
the permit holder to perform any landdisturbing activities or otherwise enter
upon lands or waters owned by others
without the owners’ express permission.
The proposed project would consist of
the following: (1) The existing
Nockamixon dam, which is 1,511 feet
long and approximately 112 feet high
discharging into Tohickon Creek; (2)
Nockamixon dam impounds a reservoir
of 40,000 acre-feet with a surface area of
1,450 acres, at a pool elevation of 395.0
feet mean sea level; (3) a proposed
reinforced concrete powerhouse
housing three pump turbine generating
units with a total installed capacity of
150 kilowatts; (4) a proposed 826-footlong, 34.5-kilovolt primary transmission
line connected to Metropolitan Edison
Company; and (5) appurtenant facilities.
The estimated annual generation of the
project would be 834,000 kilowatthours.
Applicant Contact: Mr. Adam Robert
Rousselle, II, 104 Autumn Trace Drive,
New Hope, PA 18938, phone: 215–485–
1708.
FERC Contact: Tim Looney; phone:
(202) 502–6096.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
E:\FR\FM\02MRN1.SGM
02MRN1
Agencies
[Federal Register Volume 80, Number 40 (Monday, March 2, 2015)]
[Notices]
[Page 11192]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-04239]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. NJ15-4-001]
Orlando Utilities Commission; Notice of Filing
Take notice that on February 19, 2015, the Orlando Utilities
Commission submitted its tariff filing per 35.28(e): Amendment to its
Order No. 1000 Regional Compliance Filings, to be effective 1/1/2015.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date. On or
before the comment date, it is not necessary to serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on March 23, 2015.
Dated: February 24, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-04239 Filed 2-27-15; 8:45 am]