Delegation of Authority to the States of Iowa; Kansas; Missouri; Nebraska; Lincoln-Lancaster County, NE; and City of Omaha, NE., for New Source Performance Standards (NSPS), National Emission Standards for Hazardous Air Pollutants (NESHAP) Including Maximum Achievable Control Technology (MACT) Standards, 10596-10608 [2015-04171]
Download as PDF
tkelley on DSK3SPTVN1PROD with RULES
10596
Federal Register / Vol. 80, No. 39 / Friday, February 27, 2015 / Rules and Regulations
• Does not contain any unfunded
mandate or significantly or uniquely
affect small governments, as described
in the Unfunded Mandates Reform Act
of 1995 (Pub. L. 104–4);
• Does not have Federalism
implications as specified in Executive
Order 13132 (64 FR 43255, August 10,
1999);
• Is not an economically significant
regulatory action based on health or
safety risks subject to Executive Order
13045 (62 FR 19885, April 23, 1997);
• Is not a significant regulatory action
subject to Executive Order 13211 (66 FR
28355, May 22, 2001);
• Is not subject to requirements of
Section 12(d) of the National
Technology Transfer and Advancement
Act of 1995 (15 U.S.C. 272 note) because
application of those requirements would
be inconsistent with the Clean Air Act;
and
• Does not provide EPA with the
discretionary authority to address, as
appropriate, disproportionate human
health or environmental effects, using
practicable and legally permissible
methods, under Executive Order 12898
(59 FR 7629, February 16, 1994).
In addition, the SIP is not approved
to apply on any Indian reservation land
or in any other area where EPA or an
Indian tribe has demonstrated that a
tribe has jurisdiction. In those areas of
Indian country, the rule does not have
tribal implications and will not impose
substantial direct costs on tribal
governments or preempt tribal law as
specified by Executive Order 13175 (65
FR 67249, November 9, 2000).
The Congressional Review Act, 5
U.S.C. 801 et seq., as added by the Small
Business Regulatory Enforcement
Fairness Act of 1996, generally provides
that before a rule may take effect, the
agency promulgating the rule must
submit a rule report, which includes a
copy of the rule, to each House of the
Congress and to the Comptroller General
of the United States. EPA will submit a
report containing this action and other
required information to the U.S. Senate,
the U.S. House of Representatives, and
the Comptroller General of the United
States prior to publication of the rule in
the Federal Register. A major rule
cannot take effect until 60 days after it
is published in the Federal Register.
This action is not a ‘‘major rule’’ as
defined by 5 U.S.C. 804(2).
Under section 307(b)(1) of the CAA,
petitions for judicial review of this
action must be filed in the United States
Court of Appeals for the appropriate
circuit by April 28, 2015. Filing a
petition for reconsideration by the
Administrator of this final rule does not
affect the finality of this action for the
VerDate Sep<11>2014
16:12 Feb 26, 2015
Jkt 235001
purposes of judicial review nor does it
extend the time within which a petition
for judicial review may be filed, and
shall not postpone the effectiveness of
such rule or action. Parties with
objections to this direct final rule are
encouraged to file a comment in
response to the parallel notice of
proposed rulemaking for this action
published in the proposed rules section
of today’s Federal Register, rather than
file an immediate petition for judicial
review of this direct final rule, so that
EPA can withdraw this direct final rule
and address the comment in the
proposed rulemaking. This action may
not be challenged later in proceedings to
enforce its requirements. (See section
307(b)(2).)
through (H), and (J) through (M) for the
2008 Ozone NAAQS. We are not
finalizing action on section
110(a)(2)(D)(i)(I)—Interstate transport
prongs 1 and 2 or visibility portions of
section 110(a)(2)(D)(i)(II) and
110(a)(2)(J).
(h) Approval—In a June 7, 2013,
submittal, Ohio certified that the State
has satisfied the infrastructure SIP
requirements of section 110(a)(2)(A)
through (H), and (J) through (M) for the
2010 SO2 NAAQS. We are only taking
action on the PSD portions 110(a)(2)(C),
(D)(i), and (J).
List of Subjects in 40 CFR Part 52
Environmental protection, Air
pollution control, Incorporation by
reference, Intergovernmental relations,
Lead, Nitrogen dioxide, Ozone,
Reporting and recordkeeping
requirements, Sulfur oxides.
ENVIRONMENTAL PROTECTION
AGENCY
Dated: February 17, 2015.
Susan Hedman,
Regional Administrator, Region 5.
40 CFR part 52 is amended as follows:
PART 52—APPROVAL AND
PROMULGATION OF
IMPLEMENTATION PLANS
1. The authority citation for part 52
continues to read as follows:
■
Authority: 42 U.S.C. 7401 et seq.
2. Section 52.1891 is amended by
revising paragraphs (e) through (g) and
adding paragraph (h) to read as follows:
■
§ 52.1891 Section 110(a)(2) infrastructure
requirements.
*
*
*
*
*
(e) Approval—In a October 12, 2011,
submittal, supplemented on June 7,
2013, Ohio certified that the State has
satisfied the infrastructure SIP
requirements of section 110(a)(2)(A)
through (H), and (J) through (M) for the
2008 Lead NAAQS.
(f) Approval—In a February 8, 2013,
submittal, supplemented on February
25, 2013, and June 7, 2013, Ohio
certified that the State has satisfied the
infrastructure SIP requirements of
section 110(a)(2)(A) through (H), and (J)
through (M) for the 2010 NO2 NAAQS.
We are not finalizing action on the
visibility protection requirements of
(D)(i)(II).
(g) Approval—In a December 27,
2012, submittal, supplemented on June
7, 2013, Ohio certified that the State has
satisfied the infrastructure SIP
requirements of section 110(a)(2)(A)
PO 00000
Frm 00028
Fmt 4700
Sfmt 4700
[FR Doc. 2015–04011 Filed 2–26–15; 8:45 am]
BILLING CODE 6560–50–P
40 CFR Parts 60, 61, and 63
[EPA–R07–OAR–2015–0016; FRL–9923–69–
Region–7]
Delegation of Authority to the States of
Iowa; Kansas; Missouri; Nebraska;
Lincoln-Lancaster County, NE; and
City of Omaha, NE., for New Source
Performance Standards (NSPS),
National Emission Standards for
Hazardous Air Pollutants (NESHAP)
Including Maximum Achievable
Control Technology (MACT) Standards
Environmental Protection
Agency (EPA).
ACTION: Delegation of authority.
AGENCY:
The States of Iowa, Kansas,
Missouri, and Nebraska and the local
agencies of Lincoln-Lancaster County,
Nebraska, and the city of Omaha,
Nebraska, have submitted updated
regulations for delegation of EPA
authority for implementation and
enforcement of NSPS, NESHAP, and
MACT standards. The submissions
cover new EPA standards and, in some
instances, revisions to standards
previously delegated. EPA’s review of
the pertinent regulations shows that
they contain adequate and effective
procedures for the implementation and
enforcement of these Federal standards.
This action informs the public of
delegations to the above-mentioned
agencies.
SUMMARY:
This document is effective on
February 27, 2015. The dates of
delegation can be found in the
SUPPLEMENTARY INFORMATION section of
this document.
ADDRESSES: Copies of documents
relative to this action are available for
public inspection during normal
business hours at the Environmental
DATES:
E:\FR\FM\27FER1.SGM
27FER1
Federal Register / Vol. 80, No. 39 / Friday, February 27, 2015 / Rules and Regulations
Protection Agency, Air Planning and
Development Branch, 11201 Renner
Road, Lenexa, Kansas 66219. The
interested persons wanting to examine
these documents should make an
appointment with the office at least 24
hours in advance.
Effective immediately, all
notifications, applications, reports, and
other correspondence required pursuant
to the newly delegated standards and
revisions identified in this document
must be submitted with respect to
sources located in the jurisdictions
identified in this document, to the
following addresses:
Iowa Department of Natural
Resources, Air Quality Bureau, 7900
Hickman Road, Suite 1, Windsor
Heights, Iowa 50324.
Kansas Department of Health and the
Environment, Bureau of Air, 1000 SW
Jackson Street, Suite 310, Topeka,
Kansas 66612–1367.
Missouri Department of Natural
Resources, Air Pollution Control
Program, PO Box 176, Jefferson City,
Missouri 65102–0176.
Nebraska Department of
Environmental Quality, Air Quality
Division, 1200 ‘‘N’’ Street, Suite 400,
P.O. Box 98922, Lincoln, Nebraska
68509.
Lincoln-Lancaster County Health
Department, Division of Environmental
Public Health, Air Quality Section, 3140
‘‘N’’ Street, Lincoln, Nebraska 68510.
City of Omaha, Public Works
Department, Air Quality Control
Division, 5600 South 10th Street,
Omaha, Nebraska 68107.
Duplicates of required documents
must also continue to be submitted to
the EPA Regional Office at the above
address.
FOR FURTHER INFORMATION CONTACT: Ms.
Paula Higbee at (913) 551–7028, or by
email at higbee.paula@epa.gov.
SUPPLEMENTARY INFORMATION: The
supplementary information is organized
in the following order:
I. What does this action do?
II. What is the authority for delegation?
III. What does delegation accomplish?
IV. What has been delegated?
V. What has not been delegated?
List of Delegation Tables
Table I—NSPS, 40 CFR part 60
Table II—NESHAP, 40 CFR part 61
Table III—NESHAP, 40 CFR part 63
I. What does this action do?
EPA is providing notice of an update
to its delegable authority for
implementation and enforcement of the
Federal standards shown in the tables
below to the states of Iowa, Kansas,
Missouri, and Nebraska. This action
updates the delegation tables previously
published at 78 FR 71510 (November
29, 2013). EPA has established
procedures by which these agencies are
automatically delegated the authority to
implement the standards when they
adopt regulations which are identical to
the Federal standards. We then
periodically provide notice of the new
and revised standards for which
delegation has been given. This
document does not affect or alter the
status of the listed standards under state
or Federal law.
II. What is the authority for delegation?
1. Section 111(c)(1) of the Clean Air
Act (CAA) authorizes EPA to delegate
authority to any state agency which
submits adequate regulatory procedures
for implementation and enforcement of
the NSPS program. The NSPS are
codified at 40 CFR part 60.
2. Section 112(l) of the CAA and 40
CFR part 63, subpart E, authorizes EPA
to delegate authority to any state or local
agency which submits adequate
regulatory procedures for
implementation and enforcement of
emission standards for hazardous air
pollutants. The hazardous air pollutant
standards are codified at 40 CFR parts
61 and 63, respectively.
III. What does delegation accomplish?
Delegation confers primary
responsibility for implementation and
enforcement of the listed standards to
the respective state and local air
agencies. However, EPA also retains the
concurrent authority to enforce the
standards.
IV. What has been delegated?
Tables I, II, and III below list the
delegated standards. Each item listed in
the Subpart column has two relevant
dates listed in each column for each
state. The first date in each block is the
10597
reference date to the CFR contained in
the state rule. In general, the state or
local agency has adopted the applicable
standard through the date as noted in
the table. The second date is the most
recent effective date of the state agency
rule for which the EPA has granted the
delegation. This document specifically
addresses revisions to the columns for
Iowa, Kansas, Missouri, and Nebraska
and the local agencies of LincolnLancaster County, Nebraska, and the
city of Omaha, Nebraska. If there are no
dates listed in the delegation table, the
state has not accepted delegation of the
standard and implementation of those
standards reside with EPA.
V. What has not been delegated?
1. The EPA regulations effective after
the first date specified in each block
have not been delegated, and authority
for implementation of these regulations
is retained solely by EPA.
2. In some cases, the standards
themselves specify that specific
provisions cannot be delegated. In such
cases, a specific section of the standard
details what authorities can and cannot
be delegated. You should review the
applicable standard in the CFR for this
information.
3. In some cases, the state rules do not
adopt the Federal standard in its
entirety. Each state rule (available from
the respective agency) should be
consulted for specific information.
4. In some cases, existing delegation
agreements between the EPA and the
agencies limit the scope of the delegated
standards. Copies of delegation
agreements are available from the state
agencies, or from this office.
5. With respect to 40 CFR part 63,
subpart A, General Provisions (see Table
III), EPA has determined that sections
63.6(g), 63.6(h)(9), 63.7(e)(2)(ii) and (f),
63.8(f), and 63.10(f) cannot be delegated.
Additional information is contained in
an EPA memorandum titled ‘‘Delegation
of 40 CFR part 63 General Provisions
Authorities to State and Local Air
Pollution Control Agencies’’ from John
Seitz, Director, Office of Air Quality
Planning and Standards, dated July 10,
1998.
List of Delegation Tables
tkelley on DSK3SPTVN1PROD with RULES
TABLE I—DELEGATION OF AUTHORITY—PART 60 NSPS—REGION 7
Sub-Part
Source category
State of Iowa
State of Kansas
State of Missouri
A ..................
General Provisions .......
06/28/11 .......................
10/24/12 .......................
07/01/08 .......................
11/05/10 .......................
Except 60.4; 60.9;
60.10; 60.16.
6/30/12 .........................
12/30/13 .......................
Except 60.4; 60.9; and
60.10.
VerDate Sep<11>2014
16:12 Feb 26, 2015
Jkt 235001
PO 00000
Frm 00029
Fmt 4700
Sfmt 4700
E:\FR\FM\27FER1.SGM
27FER1
State of Nebraska
07/01/13.
05/13/14.
10598
Federal Register / Vol. 80, No. 39 / Friday, February 27, 2015 / Rules and Regulations
TABLE I—DELEGATION OF AUTHORITY—PART 60 NSPS—REGION 7—Continued
Sub-Part
Source category
State of Iowa
State of Kansas
State of Missouri
D ..................
Fossil-Fuel Fired Steam
Generators for Which
Construction is Commenced After August
17, 1971.
Electric Utility Steam
Generating Units for
Which Construction is
Commenced After
September 18, 1978.
Industrial-CommercialInstitutional Steam
Generating Units.
Small Industrial-Commercial-Institutional
Steam Generating
Units.
Incinerators ..................
06/28/11 .......................
10/24/12 .......................
07/01/08 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
06/28/11 .......................
10/24/12 .......................
07/01/08 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
06/28/11 .......................
10/24/12 .......................
07/01/08 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
06/28/11 .......................
10/24/12 .......................
07/01/08 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
06/28/11
10/24/12
06/28/11
10/24/12
07/01/08
11/05/10
07/01/08
11/05/10
.......................
.......................
.......................
.......................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
07/01/13.
05/13/14.
06/28/11 .......................
10/24/12 .......................
07/01/08 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
06/28/11 .......................
10/24/12 .......................
07/01/08 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
10/17/00 .......................
10/21/12 .......................
06/28/11 .......................
10/24/12 .......................
......................................
07/01/08 .......................
11/05/10 .......................
07/01/08 .......................
11/05/10 .......................
......................................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
07/01/13.
05/13/14.
07/01/13.
05/13/14.
06/28/11
10/24/12
06/28/11
10/24/12
06/28/11
10/24/12
07/01/08 .......................
11/05/10 .......................
07/01/08 .......................
11/05/10 .......................
07/01/08 .......................
11/05/10 .......................
Except provisions in Ja:
60.100a(c); in
60.101a, the definition of ‘‘flare’’;
60.102a(g); and
60.107a(d) and (e).
......................................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
07/01/13.
05/13/14.
07/01/13.
05/13/14.
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
Da ................
Db ................
Dc ................
E ..................
Ea ................
F ...................
Municipal Waste Combustors for Which
Construction is Commenced After December 20, 1989,
and on or before
September 20 1994.
Large Municipal Waste
Combustors for
Which Construction is
Commenced after
September 20, 1994,
or for Which Modification or Reconstruction is Commenced After June
19, 1996.
Hospital/Medical/Infectious Waste Incinerators for Which Construction Commenced
after June 20, 1996.
Portland Cement Plants
G ..................
Nitric Acid Plants ..........
Ga ................
Nitric Acid Plants for
Which Construction,
Reconstruction, or
Modification Commenced After October 14, 2011.
Sulfuric Acid Plants ......
Eb ................
Ec .................
H ..................
I ....................
tkelley on DSK3SPTVN1PROD with RULES
J ...................
Ja .................
VerDate Sep<11>2014
Hot Mix Asphalt Facilities.
Petroleum Refineries ...
Standards of Performance for Petroleum
Refineries for Which
Construction, Reconstruction, or Modification Commenced
After May 14, 2007.
16:12 Feb 26, 2015
Jkt 235001
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
......................................
PO 00000
Frm 00030
Fmt 4700
Sfmt 4700
E:\FR\FM\27FER1.SGM
27FER1
State of Nebraska
Federal Register / Vol. 80, No. 39 / Friday, February 27, 2015 / Rules and Regulations
10599
TABLE I—DELEGATION OF AUTHORITY—PART 60 NSPS—REGION 7—Continued
Sub-Part
Source category
State of Iowa
State of Kansas
State of Missouri
K ..................
06/28/11 .......................
10/24/12 .......................
07/01/08 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
06/28/11 .......................
10/24/12 .......................
07/01/08 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
06/28/11 .......................
10/24/12 .......................
07/01/08 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
06/28/11
10/24/12
06/28/11
10/24/12
07/01/08
11/05/10
07/01/08
11/05/10
.......................
.......................
.......................
.......................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
07/01/13.
05/13/14.
06/28/11 .......................
10/24/12 .......................
07/01/08 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
06/28/11 .......................
10/24/12 .......................
07/01/08 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
Q ..................
Storage Vessels for Petroleum Liquids for
Which Construction,
Reconstruction, or
Modification Commenced After June
11, 1973, and Prior
to May 19, 1978.
Storage Vessels for Petroleum Liquids for
Which Construction,
Reconstruction, or
Modification Commenced After May
18, 1978, and Prior
to July 23, 1984.
Volatile Organic Liquid
Storage Vessels (including Petroleum
Liquid Storage Vessels) for Which Construction, Reconstruction, or Modification
Commenced After
July 23, 1984.
Secondary Lead Smelters.
Secondary Brass and
Bronze Production
Plants.
Basic Oxygen Process
Furnaces for Which
Construction is Commenced After June
11, 1973.
Basic Oxygen Process
Steelmaking Facilities
for Which Construction is Commenced
After January 20,
1983.
Sewage Treatment
Plants.
Primary Copper Smelters.
Primary Zinc Smelters
R ..................
Primary Lead Smelters
S ..................
Primary Aluminum Reduction Plants.
Phosphate Fertilizer Industry: Wet Process
Phosphoric Acid
Plants.
Phosphate Fertilizer Industry: Superphosphoric Acid Plants.
Phosphate Fertilizer Industry: Diammonium
Phosphate Plants.
Phosphate Fertilizer Industry: Triple Superphosphate Plants.
Phosphate Fertilizer Industry: Granular Triple Superphosphate
Storage Facilities.
Coal Preparation Plants
06/28/11
10/24/12
06/28/11
10/24/12
06/28/11
10/24/12
06/28/11
10/24/12
06/28/11
10/24/12
06/28/11
10/24/12
07/01/08
11/05/10
07/01/08
11/05/10
07/01/08
11/05/10
07/01/08
11/05/10
07/01/08
11/05/10
07/01/08
11/05/10
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
07/01/13.
05/13/14.
07/01/13.
05/13/14.
07/01/13.
05/13/14.
07/01/13.
05/13/14.
07/01/13.
05/13/14.
06/28/11 .......................
10/24/12 .......................
07/01/08 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
06/28/11 .......................
10/24/12 .......................
07/01/08 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
06/28/11 .......................
10/24/12 .......................
07/01/08 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
06/28/11 .......................
10/24/12 .......................
07/01/08 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
06/28/11 .......................
10/24/12 .......................
07/01/08 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
Ka ................
Kb ................
L ...................
M ..................
N ..................
Na ................
O ..................
P ..................
T ...................
U ..................
V ..................
tkelley on DSK3SPTVN1PROD with RULES
W .................
X ..................
Y ..................
VerDate Sep<11>2014
16:12 Feb 26, 2015
Jkt 235001
PO 00000
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
Frm 00031
Fmt 4700
Sfmt 4700
E:\FR\FM\27FER1.SGM
27FER1
State of Nebraska
10600
Federal Register / Vol. 80, No. 39 / Friday, February 27, 2015 / Rules and Regulations
TABLE I—DELEGATION OF AUTHORITY—PART 60 NSPS—REGION 7—Continued
Sub-Part
Source category
Z ...................
Ferroalloy Production
Facilities.
Steel Plants: Electric
Arc Furnaces Constructed After October 21, 1974, and on
or Before August 17,
1983.
Steel Plants: Electric
Arc Furnaces and
Argon-Oxygen
Decarburization Vessels Constructed
After August 17,
1983.
Kraft Pulp Mills .............
AA ................
AAa ..............
BB ................
CC ................
DD ................
EE ................
GG ...............
HH ................
KK ................
LL .................
MM ...............
NN ................
PP ................
QQ ...............
RR ................
SS ................
TT ................
UU ................
VV ................
tkelley on DSK3SPTVN1PROD with RULES
VVa ..............
WW ..............
XX ................
AAA ..............
VerDate Sep<11>2014
Glass Manufacturing
Plants.
Grain Elevators ............
Surface Coating of
Metal Furniture.
Stationary Gas Turbines.
Lime Manufacturing
Plants.
Lead-Acid Battery Manufacturing Plants.
Metallic Mineral Processing Plants.
Automobile and Light
Duty Truck Surface
Coating Operations.
Phosphate Rock Plants
Ammonium Sulfate
Manufacture.
Graphic Arts Industry:
Publication Rotogravure Printing.
Pressure Sensitive
Tape and Label Surface Coating Operations.
Industrial Surface Coating: Large Appliances.
Metal Coil Surface
Coating.
Asphalt Processing and
Asphalt Roofing Manufacture.
Equipment Leaks of
VOC in the Synthetic
Organic Chemicals
Manufacturing Industry.
Equipment Leaks of
VOC in the Synthetic
Organic Chemicals
Manufacturing Industry for Which Construction, Reconstruction, or Modification
Commenced After
November 7, 2006.
Beverage Can Surface
Coating Industry.
Bulk Gasoline Terminals.
New Residential Wood
Heaters.
16:12 Feb 26, 2015
Jkt 235001
State of Iowa
06/28/11
10/24/12
06/28/11
10/24/12
State of Kansas
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
07/01/13.
05/13/14.
06/28/11 .......................
10/24/12 .......................
07/01/08 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
06/28/11
10/24/12
06/28/11
10/24/12
06/28/11
10/24/12
06/28/11
10/24/12
06/28/11
10/24/12
06/28/11
10/24/12
06/28/11
10/24/12
06/28/11
10/24/12
06/28/11
10/24/12
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
07/01/08
11/05/10
07/01/08
11/05/10
07/01/08
11/05/10
07/01/08
11/05/10
07/01/08
11/05/10
07/01/08
11/05/10
07/01/08
11/05/10
07/01/08
11/05/10
07/01/08
11/05/10
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
07/01/13.
05/13/14.
07/01/13.
05/13/14.
07/01/13.
05/13/14.
07/01/13.
05/13/14.
07/01/13.
05/13/14.
07/01/13.
05/13/14.
07/01/13.
05/13/14.
07/01/13.
05/13/14.
06/28/11
10/24/12
06/28/11
10/24/12
06/28/11
10/24/12
.......................
.......................
.......................
.......................
.......................
.......................
07/01/08
11/05/10
07/01/08
11/05/10
07/01/08
11/05/10
.......................
.......................
.......................
.......................
.......................
.......................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
07/01/13.
05/13/14.
07/01/13.
05/13/14.
06/28/11 .......................
10/24/12 .......................
07/01/08 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
06/28/11
10/24/12
06/28/11
10/24/12
06/28/11
10/24/12
07/01/08
11/05/10
07/01/08
11/05/10
07/01/08
11/05/10
.......................
.......................
.......................
.......................
.......................
.......................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
07/01/13.
05/13/14.
07/01/13.
05/13/14.
06/28/11 .......................
10/24/12 .......................
07/01/08 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
......................................
......................................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
06/28/11 .......................
10/24/12 .......................
06/28/11 .......................
10/24/12 .......................
......................................
07/01/08
11/05/10
07/01/08
11/05/10
07/01/08
11/05/10
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
07/01/13.
05/13/14.
07/01/13.
05/13/14.
.......................
.......................
.......................
.......................
.......................
.......................
Frm 00032
07/01/08
11/05/10
07/01/08
11/05/10
State of Nebraska
.......................
.......................
.......................
.......................
PO 00000
.......................
.......................
.......................
.......................
State of Missouri
Fmt 4700
.......................
.......................
.......................
.......................
.......................
.......................
Sfmt 4700
E:\FR\FM\27FER1.SGM
27FER1
Federal Register / Vol. 80, No. 39 / Friday, February 27, 2015 / Rules and Regulations
10601
TABLE I—DELEGATION OF AUTHORITY—PART 60 NSPS—REGION 7—Continued
Sub-Part
Source category
BBB ..............
Rubber Tire Manufacturing Industry.
Volatile Organic Compound (VOC) Emissions from the Polymer Manufacturing
Industry.
Flexible Vinyl and Urethane Coating and
Printing.
Equipment Leaks of
VOC in Petroleum
Refineries.
Equipment Leaks of
VOC in Petroleum
Refineries for Which
Construction, Reconstruction, or Modification Commenced
After November 7,
2006.
Synthetic Fiber Production Facilities.
Volatile Organic Compound (VOC) Emissions From the Synthetic Organic Chemical Manufacturing Industry (SOCMI) AIR
Oxidation Unit Processes.
Petroleum Dry Cleaners
DDD .............
FFF ..............
GGG ............
GGGa ..........
HHH .............
III ..................
JJJ ...............
KKK ..............
LLL ...............
NNN .............
OOO ............
PPP ..............
QQQ ............
RRR .............
tkelley on DSK3SPTVN1PROD with RULES
SSS ..............
TTT ..............
UUU .............
VerDate Sep<11>2014
Equipment Leaks of
VOC from Onshore
Natural Gas Processing Plants.
Onshore Natural Gas
Processing: SO2
Emissions.
Volatile Organic Compound (VOC) Emissions from Synthetic
Organic Chemical
Manufacturing Industry (SOCMI) Distillation Operations.
Nonmetallic Mineral
Processing Plants.
Wool Fiberglass Insulation Manufacturing
Plants.
VOC Emissions from
Petroleum Refinery
Wastewater Systems.
Volatile Organic Compound Emissions
from Synthetic Organic Chemical Manufacturing Industry
(SOCMI) Reactor
Processes.
Magnetic Tape Coating
Facilities.
Industrial Surface Coating: Surface Coating
of Plastic Parts for
Business Machines.
Calciners and Dryers in
Mineral Industries.
16:12 Feb 26, 2015
Jkt 235001
State of Iowa
06/28/11
10/24/12
06/28/11
10/24/12
State of Kansas
.......................
.......................
.......................
.......................
State of Nebraska
.......................
.......................
.......................
.......................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
07/01/13.
05/13/14.
06/28/11 .......................
10/24/12 .......................
07/01/08 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
06/28/11 .......................
10/24/12 .......................
07/01/08 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
......................................
......................................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
06/28/11
10/24/12
06/28/11
10/24/12
.......................
.......................
.......................
.......................
07/01/08
11/05/10
07/01/08
11/05/10
.......................
.......................
.......................
.......................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
07/01/13.
05/13/14.
06/28/11
10/24/12
06/28/11
10/24/12
.......................
.......................
.......................
.......................
07/01/08
11/05/10
07/01/08
11/05/10
.......................
.......................
.......................
.......................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
07/01/13.
05/13/14.
06/28/11 .......................
10/24/12 .......................
07/01/08 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
06/28/11 .......................
10/24/12 .......................
07/01/08 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
06/28/11
10/24/12
06/28/11
10/24/12
07/01/08
11/05/10
07/01/08
11/05/10
.......................
.......................
.......................
.......................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
07/01/13.
05/13/14.
06/28/11 .......................
10/24/12 .......................
07/01/08 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
06/28/11 .......................
10/24/12 .......................
07/01/08 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
06/28/11
10/24/12
06/28/11
10/24/12
07/01/08
11/05/10
07/01/08
11/05/10
.......................
.......................
.......................
.......................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
07/01/13.
05/13/14.
07/01/08 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
06/28/11 .......................
10/24/12 .......................
PO 00000
Frm 00033
07/01/08
11/05/10
07/01/08
11/05/10
State of Missouri
Fmt 4700
Sfmt 4700
E:\FR\FM\27FER1.SGM
27FER1
10602
Federal Register / Vol. 80, No. 39 / Friday, February 27, 2015 / Rules and Regulations
TABLE I—DELEGATION OF AUTHORITY—PART 60 NSPS—REGION 7—Continued
Sub-Part
Source category
State of Iowa
State of Kansas
State of Missouri
VVV ..............
Polymeric Coating of
Supporting Substrates Facilities.
Municipal Solid Waste
Landfills.
Small Municipal Waste
Combustion Units for
Which Construction is
Commenced After
August 30, 1999 or
for Which Modification or Reconstruction is Commenced
After June 6, 2001.
Commercial and Industrial Solid Waste Incineration Units for
Which Construction is
Commenced After
November 30, 1999
or for Which Modification or Reconstruction is Commenced on or After
June 1, 2001.
Commercial and Industrial Solid Waste Incineration Units that
Commenced Construction On or Before November 30,
1999.
Other Solid Waste Incineration Units for
Which Construction
Commenced After
December 9, 2004 or
Modification or Reconstruction Commenced On or After
June 16, 2006.
Other Solid Waste Incineration Units that
Commenced Construction On or Before December 9,
2004.
Stationary Compression
Ignition Internal Combustion Engines.
Stationary Spark Ignition Internal Combustion Engines.
Stationary Combustion
Turbines.
New Sewage Sludge
Incinerator Units.
Emission Guidelines
and Compliance
Times for Existing
Sewage Sludge Incineration Units.
Crude Oil and Natural
Gas Production,
Transmission and
Distribution.
06/28/11 .......................
10/24/12 .......................
07/01/08 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
06/28/11
10/24/12
06/28/11
10/24/12
07/01/08
11/05/10
07/01/08
11/05/10
.......................
.......................
.......................
.......................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
07/01/13.
05/13/14.
06/28/11 .......................
10/24/12 .......................
07/01/05 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
......................................
07/01/05 .......................
11/05/10 .......................
Not delegated ..............
07/01/13.
05/13/14.
06/28/11 .......................
10/24/12 .......................
07/01/08 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
......................................
07/01/08 .......................
11/05/10 .......................
Not delegated ..............
07/01/13.
05/13/14.
06/28/11 .......................
10/24/12 .......................
07/01/08 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
06/28/11 .......................
10/24/12 .......................
07/01/08 .......................
11/05/10 .......................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
06/28/11 .......................
10/24/12 .......................
......................................
07/01/08 .......................
11/05/10 .......................
......................................
......................................
......................................
6/30/12 .........................
12/30/13 .......................
6/30/12 .........................
12/30/13 .......................
......................................
07/01/13.
05/13/14.
07/01/13.
05/13/14.
07/01/13.
05/13/14.
......................................
......................................
6/30/12 .........................
12/30/13 .......................
07/01/13.
05/13/14.
WWW ...........
AAAA ...........
CCCC ..........
DDDD ..........
EEEE ...........
FFFF ............
IIII .................
JJJJ ..............
KKKK ...........
LLLL .............
MMMM .........
tkelley on DSK3SPTVN1PROD with RULES
OOOO ..........
VerDate Sep<11>2014
16:12 Feb 26, 2015
Jkt 235001
PO 00000
.......................
.......................
.......................
.......................
Frm 00034
Fmt 4700
Sfmt 4700
E:\FR\FM\27FER1.SGM
27FER1
State of Nebraska
Federal Register / Vol. 80, No. 39 / Friday, February 27, 2015 / Rules and Regulations
10603
TABLE II—DELEGATION OF AUTHORITY—PART 61 NESHAP—REGION 7
Sub-Part
Source category
State of Iowa
State of Kansas
State of
Missouri
State of
Nebraska
LincolnLancaster
County
A ......................
General Provisions .....................
9/19/11 .............
10/24/12 ...........
07/01/13 ...........
12/10/13 ...........
07/01/09.
12/22/12.
Not delegated ...
Not delegated ...
Not delegated ...
Not delegated.
C ......................
Radon Emissions from Underground Uranium Mines.
Beryllium .....................................
6/30/12 .............
12/30/13 ...........
Except 61.04,
61.16 and
61.17.
Not delegated ...
07/01/01 ...........
07/21/10 ...........
B ......................
07/01/10 ...........
12/28/12 ...........
Except 61.04,
61.16 and
61.17.
Not delegated ...
D ......................
Beryllium Rocket Motor Firing ....
E ......................
Mercury .......................................
F ......................
Vinyl Chloride ..............................
J .......................
Equipment Leaks (Fugitive Emission Sources) of Benzene.
Benzene Emissions from Coke
By-Product Recovery Plants.
Asbestos .....................................
9/19/11 .............
10/24/12 ...........
9/19/11 .............
10/24/12 ...........
9/19/11 .............
10/24/12 ...........
9/19/11 .............
10/24/12 ...........
9/19/11 .............
10/24/12 ...........
9/19/11 .............
10/24/12 ...........
9/19/11 .............
10/24/12 ...........
9/19/11 .............
10/24/12 ...........
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
07/01/01
07/21/10
07/01/01
07/21/10
07/01/01
07/21/10
07/01/01
07/21/10
07/01/01
07/21/10
07/01/01
07/21/10
07/01/01
07/21/10
07/01/01
07/21/10
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
07/01/09.
12/22/12.
07/01/09.
12/22/12.
07/01/09.
12/22/12.
07/01/09.
12/22/12.
07/01/09.
12/22/12.
07/01/09.
12/22/12.
07/01/09.
12/22/12.
07/01/09.
12/22/12.
9/19/11 .............
10/24/12 ...........
07/01/10 ...........
12/28/12 ...........
6/30/12 .............
12/30/13 ...........
07/01/01 ...........
07/21/10 ...........
07/01/13 ...........
12/10/13 ...........
07/01/09.
12/22/12.
9/19/11 .............
10/24/12 ...........
07/01/10 ...........
12/28/12 ...........
6/30/12 .............
12/30/13 ...........
07/01/01 ...........
07/21/10 ...........
07/01/13 ...........
12/10/13 ...........
07/01/09.
12/22/12.
Not delegated ...
Not delegated ...
Not delegated ...
Not delegated ...
Not delegated ...
Not delegated.
Not delegated ...
Not delegated ...
Not delegated ...
Not delegated ...
Not delegated ...
Not delegated.
Not delegated ...
Not delegated ...
Not delegated ...
Not delegated ...
Not delegated ...
Not delegated.
9/19/11 .............
10/24/12 ...........
Not delegated ...
07/01/10 ...........
12/28/12 ...........
Not delegated ...
6/30/12 .............
12/30/13 ...........
Not delegated ...
07/01/01 ...........
07/21/10 ...........
Not delegated ...
07/01/13 ...........
12/10/13 ...........
Not delegated ...
07/01/09.
12/22/12.
Not delegated.
9/19/11 .............
10/24/12 ...........
9/19/11 .............
10/24/12 ...........
9/19/11 .............
10/24/12 ...........
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
07/01/01
07/21/10
07/01/01
07/21/10
07/01/01
07/21/10
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
07/01/09.
12/22/12.
07/01/09.
12/22/12.
07/01/09.
12/22/12.
L .......................
M ......................
N ......................
O ......................
P ......................
Q ......................
R ......................
T ......................
V ......................
W .....................
Y ......................
BB ....................
FF ....................
Inorganic Arsenic Emissions
from
Glass
Manufacturing
Plants.
Inorganic Arsenic Emissions
From Primary Copper Smelters.
Inorganic Arsenic Emissions
From Arsenic Trioxide and Metallic Arsenic Production Facilities.
Radon Emissions From Department of Energy Facilities.
Radon
Emissions
From
Phosphogypsum Stacks.
Radon Emissions From the Disposal of Uranium Mill Tailings.
Equipment Leaks (Fugitive Emission Sources).
Radon Emissions From Operating Mill Tailings.
Benzene Emissions From Benzene Storage Vessels.
Benzene Emissions From Benzene Transfer Operations.
Benzene Waste Operations ........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
...........
City of Omaha
TABLE III—DELEGATION OF AUTHORITY—PART 63 NESHAP—REGION 7
Source category
State of Iowa
State of Kansas
State of
Missouri
State of
Nebraska
LincolnLancaster
County
A .......................
tkelley on DSK3SPTVN1PROD with RULES
Sub-Part
General Provisions ...............
9/19/11 ..........
10/24/12 ........
6/30/12 .............
12/30/13 ...........
Except 63.13 &
63.15(a)(2).
07/01/13 ........
05/13/14 ........
07/01/13 ........
12/10/13 ........
07/01/11.
12/22/12.
F .......................
Organic Hazardous Air Pollutants From the Synthetic
Organic Chemical Manufacturing Industry.
9/19/11 ..........
10/24/12 ........
07/01/10 ...............................
12/28/12 ...............................
Except 63.6(f)(1), (g), (h)(1)
and (h)(9); 63.7(e)(2)(ii)
and (f); 63.8(f); 63.10(f);
63.12; 63.13; 63.14(b)(27)
and phrase ‘‘and table 5 to
subpart DDDDD of this
part’’; 63.14(b)(35), (39)
through (53), and (55)
through (62); in
63.14(i)(1), the phrase
‘‘table 5 to subpart
DDDDD of this part’’; and
63.15.
07/01/10 ...............................
12/28/12 ...............................
6/30/12 .............
12/30/13 ...........
07/01/13 ........
05/13/14 ........
07/01/13 ........
12/10/13 ........
07/01/11.
12/22/12.
E:\FR\FM\27FER1.SGM
27FER1
VerDate Sep<11>2014
16:12 Feb 26, 2015
Jkt 235001
PO 00000
Frm 00035
Fmt 4700
Sfmt 4700
City of Omaha
10604
Federal Register / Vol. 80, No. 39 / Friday, February 27, 2015 / Rules and Regulations
TABLE III—DELEGATION OF AUTHORITY—PART 63 NESHAP—REGION 7—Continued
Sub-Part
Source category
State of Iowa
State of Kansas
State of
Missouri
State of
Nebraska
LincolnLancaster
County
G ......................
Organic Hazardous Air Pollutants From the Synthetic
Organic Chemical Manufacturing Industry for Process Vents, Storage Vessels, Transfer Operations,
and Wastewater.
Organic Hazardous Air Pollutants for Equipment
Leaks.
Organic Hazardous Air Pollutants for Certain Processes Subject to the Negotiated Regulation for
Equipment Leaks.
Polyvinyl Chloride and Copolymers Production.
Coke Oven Batteries ............
9/19/11 ..........
10/24/12 ........
07/01/10 ...............................
12/28/12 ...............................
6/30/12 .............
12/30/13 ...........
07/01/13 ........
05/13/14 ........
07/01/13 ........
12/10/13 ........
07/01/11.
12/22/12.
9/19/11 ..........
10/24/12 ........
07/01/10 ...............................
12/28/12 ...............................
6/30/12 .............
12/30/13 ...........
07/01/13 ........
05/13/14 ........
07/01/13 ........
12/10/13 ........
07/01/11.
12/22/12.
9/19/11 ..........
10/24/12 ........
07/01/10 ...............................
12/28/12 ...............................
6/30/12 .............
12/30/13 ...........
07/01/13 ........
05/13/14 ........
07/01/13 ........
12/10/13 ........
07/01/11.
12/22/12.
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
...............................
...............................
...............................
...............................
...............................
...............................
Not delegated ..
Not delegated
Not delegated.
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
Not delegated
07/01/13 ........
05/13/14 ........
07/01/13 ........
12/10/13.
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13 ........
07/01/11.
12/22/12.
9/19/11 ..........
10/24/12 ........
07/01/10 ...............................
12/28/12 ...............................
6/30/12 .............
12/30/13 ...........
07/01/13 ........
05/13/14 ........
07/01/13 ........
12/10/13 ........
07/01/11.
12/22/12.
9/19/11 ..........
10/24/12 ........
07/01/10 ...............................
12/28/12 ...............................
6/30/12 .............
12/30/13 ...........
07/01/13 ........
05/13/14 ........
07/01/13 ........
12/10/13 ........
07/01/11.
12/22/12.
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
07/01/10
12/28/12
07/01/10
12/28/12
...............................
...............................
...............................
...............................
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
07/01/13
05/13/14
07/01/13
05/13/14
........
........
........
........
07/01/13
12/10/13
07/01/13
12/10/13
........
........
........
........
07/01/11.
12/22/12.
07/01/11.
12/22/12.
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
........
........
........
........
........
........
........
........
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
........
........
........
........
........
........
........
........
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
...............................
...............................
...............................
...............................
...............................
...............................
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13.
6/30/12 .............
12/30/13 ...........
07/01/13 ........
05/13/14 ........
Not delegated
07/01/13 ........
12/10/13 ........
Not delegated
07/01/11.
12/22/12.
Not delegated.
07/01/13 ........
05/13/14 ........
07/01/13 ........
12/10/13 ........
07/01/11.
12/22/12.
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13.
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
07/01/13 ........
05/13/14 ........
Not delegated
07/01/13 ........
12/10/13 ........
Not delegated
07/01/11.
12/22/12.
Not delegated.
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
........
........
........
........
........
........
........
........
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
9/19/11 ..........
10/24/12 ........
07/01/10 ...............................
12/28/12 ...............................
6/30/12 .............
12/30/13 ...........
07/01/13 ........
05/13/14 ........
07/01/13 ........
12/10/13 ........
07/01/11.
12/22/12.
E:\FR\FM\27FER1.SGM
27FER1
H ......................
I ........................
J .......................
L .......................
M ......................
N ......................
O ......................
Q ......................
R ......................
S .......................
T .......................
U ......................
W ......................
X .......................
Y .......................
AA/BB ..............
CC ....................
DD ....................
EE ....................
GG ...................
HH ....................
II .......................
JJ .....................
KK ....................
tkelley on DSK3SPTVN1PROD with RULES
LL .....................
MM ...................
OO ...................
VerDate Sep<11>2014
National Perchloroethylene
Air Emission Standards for
Dry Cleaning Facilities.
Chromium Emissions From
Hard and Decorative
Chromium Electroplating
and Chromium Anodizing
Tanks.
Ethylene Oxide Emissions
Standards for Sterilization
Facilities.
Industrial Process Cooling
Towers.
Gasoline Distribution Facilities (Bulk Gasoline Terminals and Pipeline Breakout
Stations).
Pulp and Paper Industry ......
Halogenated Solvent Cleaning.
Polymers and Resins Group
I.
Epoxy Resins Production
and Non-Nylon
Polyamides Production.
Secondary Lead Smelting ....
Marine Tank Vessel Loading
Operations.
Phosphoric Acid Manufacturing Plants/Phosphate
Fertilizers Production
Plants.
Petroleum Refineries ............
Off-Site Waste and Recovery Operations.
Magnetic Tape Manufacturing Operations.
Aerospace Industry Surface
Coating Manufacturing
and Rework Facilities.
Oil and Natural Gas Production Facilities.
Shipbuilding and Ship Repair
(Surface Coating).
Wood Furniture Manufacturing Operations.
Printing and Publishing Industry.
Primary Aluminum Reduction
Plants.
Chemical Recovery Combustion Sources at Kraft,
Soda, Sulfite, and StandAlong Semichemical Pulp
Mills.
Tanks-Level 1 .......................
16:12 Feb 26, 2015
Jkt 235001
PO 00000
Frm 00036
Fmt 4700
Sfmt 4700
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
City of Omaha
Not delegated.
Federal Register / Vol. 80, No. 39 / Friday, February 27, 2015 / Rules and Regulations
10605
TABLE III—DELEGATION OF AUTHORITY—PART 63 NESHAP—REGION 7—Continued
State of
Missouri
LincolnLancaster
County
Source category
State of Iowa
PP ....................
Containers ............................
QQ ...................
Surface Impoundments ........
RR ....................
Individual Drain Systems .....
SS ....................
Closed Vent Systems, Control Devices, Recovery Devices and Routing to a
Fuel Gas System or a
Process.
Equipment Leaks—Control
Level 1 Standards.
Equipment Leaks—Control
Level 2 Standards.
Oil-Water Separators and
Organic-Water Separators.
Storage Vessel (Tanks)—
Control Level 2.
Ethylene Manufacturing
Process Units: Heat Exchange Systems and
Waste Operations.
Generic Maximum Achievable Control Technology
Standards.
Steel Pickling-HCL Process
Facilities and Hydrochloric
Acid Regeneration Plants.
Mineral Wool Production ......
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
........
........
........
........
........
........
........
........
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
........
........
........
........
........
........
........
........
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
........
........
........
........
........
........
........
........
........
........
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
........
........
........
........
........
........
........
........
........
........
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
9/19/11 ..........
10/24/12 ........
07/01/10 ...............................
12/28/12 ...............................
6/30/12 .............
12/30/13 ...........
07/01/13 ........
05/13/14 ........
07/01/13 ........
12/10/13 ........
07/01/11.
12/22/12.
9/19/11 ..........
10/24/12 ........
07/01/10 ...............................
12/28/12 ...............................
6/30/12 .............
12/30/13 ...........
07/01/13 ........
05/13/14 ........
07/01/13 ........
12/10/13 ........
07/01/11.
12/22/12.
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
12/20/06 ........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
07/01/13 ........
05/13/14 ........
07/01/13 ........
05/13/14 ........
07/01/13 ........
05/13/14 ........
07/01/13 ........
05/13/14 ........
07/01/13 ........
05/13/14 ........
07/01/13 ........
05/13/14 ........
07/01/13 ........
05/13/14 ........
07/01/13 ........
05/13/14 ........
07/01/13 ........
05/13/14 ........
07/01/13 ........
05/13/14 ........
07/01/13 ........
05/13/14 ........
Not delegated
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13.
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13.
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13 ........
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
Not delegated.
E:\FR\FM\27FER1.SGM
27FER1
TT .....................
UU ....................
VV ....................
WW ..................
XX ....................
YY ....................
CCC .................
DDD .................
EEE ..................
GGG .................
HHH .................
Hazardous Waste Combustors.
Pharmaceutical Production ..
PPP ..................
Natural Gas Transmission
and Storage Facilities.
Flexible Polyurethane Foam
Production.
Polymers and Resins Group
IV.
Portland Cement Manufacturing Industry.
Pesticide Active Ingredient
Production.
Wool Fiberglass Manufacturing.
Manufacture of Amino/Phenolic Resins.
Polyether Polyols Production
QQQ .................
Primary Copper Smelting .....
RRR .................
TTT ..................
Secondary Aluminum Production.
Primary Lead Smelting .........
UUU .................
Petroleum Refineries ............
VVV ..................
Publicly Owned Treatment
Works.
Ferroalloys Production .........
III ......................
JJJ ....................
LLL ...................
MMM ................
NNN .................
OOO .................
XXX ..................
AAAA ...............
CCCC ...............
tkelley on DSK3SPTVN1PROD with RULES
DDDD ...............
EEEE ...............
FFFF ................
GGGG ..............
HHHH ...............
VerDate Sep<11>2014
Municipal Solid Waste Landfills.
Manufacturing of Nutritional
Yeast.
Plywood and Composite
Wood Products.
Organic Liquids Distribution
(Non-Gasoline).
Misc. Organic Chemical
Manufacturing.
Solvent Extraction for Vegetable Oil Production.
Wet Formed Fiberglass Mat
Production.
16:12 Feb 26, 2015
Jkt 235001
PO 00000
State of Kansas
State of
Nebraska
Sub-Part
Frm 00037
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
Fmt 4700
Sfmt 4700
07/01/13 ........
05/13/14 ........
07/01/13 ........
05/13/14 ........
07/01/13 ........
05/13/14 ........
07/01/13 ........
05/13/14 ........
07/01/13 ........
05/13/14 ........
07/01/13 ........
05/13/14 ........
07/01/13 ........
05/13/14 ........
Not delegated
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
........
........
........
........
........
........
........
........
City of Omaha
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
Not delegated.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
10606
Federal Register / Vol. 80, No. 39 / Friday, February 27, 2015 / Rules and Regulations
TABLE III—DELEGATION OF AUTHORITY—PART 63 NESHAP—REGION 7—Continued
Sub-Part
Source category
State of Iowa
State of Kansas
State of
Missouri
State of
Nebraska
LincolnLancaster
County
IIII .....................
Surface Coating of Automobiles and Light-Duty
Trucks.
Paper and Other Web Coating.
Surface Coating of Metal
Cans.
Surface Coating of Misc.
Metal Parts and Products.
Surface Coating of Large
Appliances.
Printing, Coating and Dyeing
of Fabrics and Other Textiles.
Surface Coating of Plastic
Parts and Products.
Surface Coating of Wood
Building Products.
Surface Coating of Metal
Furniture.
Surface Coating of Metal
Coil.
Leather Finishing Operations
9/19/11 ..........
10/24/12 ........
07/01/10 ...............................
12/28/12 ...............................
6/30/12 .............
12/30/13 ...........
07/01/13 ........
05/13/14 ........
07/01/13 ........
12/10/13 ........
07/01/11.
12/22/12.
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
........
........
........
........
........
........
........
........
........
........
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
........
........
........
........
........
........
........
........
........
........
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
01/30/13 ........
10/23/13 ........
07/01/10 ...............................
12/28/12 ...............................
07/01/10 ...............................
12/28/12 ...............................
07/01/10 ...............................
12/28/12 ...............................
07/01/10 ...............................
12/28/12 ...............................
07/01/10 ...............................
12/28/12 ...............................
07/01/10 ...............................
12/28/12 ...............................
07/01/10 ...............................
12/28/12 ...............................
07/01/10 ...............................
12/28/12 ...............................
07/01/10 ...............................
12/28/12 ...............................
07/01/10 ...............................
12/28/12 ...............................
7/1/09 ...................................
12/28/12 ...............................
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
...............................
...............................
...............................
...............................
...............................
...............................
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
07/01/13 ........
05/13/14 ........
Not delegated
Not delegated
Not delegated .......................
6/30/12 .............
12/30/13 ...........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
Not delegated
07/01/10 ...............................
12/28/12 ...............................
07/01/10 ...............................
12/28/12 ...............................
07/01/10 ...............................
12/28/12 ...............................
07/01/10 ...............................
12/28/12 ...............................
07/01/10 ...............................
12/28/12 ...............................
Not delegated .......................
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
JJJJ ..................
KKKK ...............
MMMM .............
NNNN ...............
OOOO ..............
PPPP ...............
QQQQ ..............
RRRR ...............
SSSS ...............
TTTT ................
UUUU ...............
VVVV ...............
WWWW ............
XXXX ...............
YYYY ...............
ZZZZ ................
AAAAA .............
BBBBB .............
CCCCC ............
DDDDD ............
EEEEE .............
FFFFF ..............
Cellulose Products Manufacturing.
Boat Manufacturing ..............
Reinforced Plastic Composites Production.
Rubber Tire Manufacturing ..
Stationary Combustion Turbines.
Stationary Reciprocating Internal Combustion Engines.
Lime Manufacturing Plants ..
Semiconductor Manufacturing.
Coke Ovens: Pushing,
Quenching, and Battery
Stacks.
Industrial, Commercial and
Institutional Boilers and
Process Heaters.
Iron and Steel Foundries .....
GGGGG ...........
Integrated Iron and Steel
Manufacturing Facilities.
Site Remediation ..................
HHHHH ............
Misc. Coating Manufacturing
IIIII ....................
NNNNN ............
Mercury Cell Chlor-Alkali
Plants.
Brick and Structural Clay
Products Manufacturing.
Clay Ceramics Manufacturing.
Asphalt Processing and Asphalt Roofing Manufacturing.
Flexible Poly-urethane Foam
Fabrication Operation.
Hydrochloric Acid Production
PPPPP .............
Engine Test Cells/Stands .....
QQQQQ ...........
Friction Materials Manufacturing Facilities.
Taconite Iron Ore Processing.
Refractory Products Manufacturing.
Primary Magnesium Refining
JJJJJ ................
KKKKK .............
LLLLL ...............
tkelley on DSK3SPTVN1PROD with RULES
MMMMM ..........
RRRRR ............
SSSSS .............
TTTTT ..............
VerDate Sep<11>2014
16:12 Feb 26, 2015
Jkt 235001
PO 00000
City of Omaha
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13.
07/01/13 ........
12/10/13 ........
07/01/11.
12/22/12.
Not delegated.
07/01/13 ........
05/13/14 ........
07/01/13 ........
12/10/13 ........
Not delegated.
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
Not delegated ..
07/01/13 ........
05/13/14 ........
07/01/13 ........
05/13/14 ........
07/01/13 ........
05/13/14 ........
07/01/13 ........
05/13/14 ........
Not delegated
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
Not delegated.
Not delegated .......................
Not delegated ..
Not delegated
07/01/10 ...............................
12/28/12 ...............................
6/30/12 .............
12/30/13 ...........
07/01/13 ........
05/13/14 ........
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13.
07/01/13 ........
12/10/13.
07/01/13 ........
12/10/13.
07/01/13 ........
12/10/13 ........
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
07/01/13 ........
05/13/14 ........
07/01/13 ........
05/13/14 ........
07/01/13 ........
05/13/14 ........
Not delegated
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13.
07/01/13 ........
12/10/13.
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13 ........
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
Not delegated.
E:\FR\FM\27FER1.SGM
27FER1
Frm 00038
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
Fmt 4700
Sfmt 4700
Not delegated
Not delegated
Not delegated
07/01/13 ........
05/13/14 ........
Not delegated
Not delegated.
Not delegated.
Not delegated.
07/01/11.
12/22/12.
Not delegated.
07/01/11.
12/22/12.
Not delegated.
Federal Register / Vol. 80, No. 39 / Friday, February 27, 2015 / Rules and Regulations
10607
TABLE III—DELEGATION OF AUTHORITY—PART 63 NESHAP—REGION 7—Continued
Sub-Part
Source category
State of Iowa
State of Kansas
State of
Missouri
State of
Nebraska
LincolnLancaster
County
UUUUU ............
Not delegated
07/01/10 ...............................
12/28/12 ...............................
6/30/12 .............
12/30/13 ...........
07/01/13 ........
05/13/14 ........
07/01/13 ........
12/10/13.
Not delegated.
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
07/01/10
12/28/12
07/01/10
12/28/12
...............................
...............................
...............................
...............................
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
07/01/13
05/13/14
07/01/13
05/13/14
........
........
........
........
07/01/13
12/10/13
07/01/13
12/10/13
........
........
........
........
07/01/11.
12/22/12.
07/01/11.
12/22/12.
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
07/01/10
12/28/12
07/01/10
12/28/12
...............................
...............................
...............................
...............................
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
07/01/13
05/13/14
07/01/13
05/13/14
........
........
........
........
07/01/13
12/10/13
07/01/13
12/10/13
........
........
........
........
07/01/11.
12/22/12.
07/01/11.
12/22/12.
1/24/11 ..........
10/24/12 ........
Not delegated
EEEEEE ...........
Coal and Oil-fired Electric
Utility Steam Generating
Units.
Hospital Ethylene Oxide
Sterilizer.
Electric Arc Furnace
Steelmaking Facilities or
Stainless and Non-stainless Steel Manufacturing
(EAFs).
Iron and Steel Foundries
Area Sources.
Gasoline Distribution Bulk
Terminal, Bulk Plant and
Pipeline Facilities.
Gasoline Distribution, Gasoline Dispensing Facilities.
PVC & Copolymer Production.
Primary Copper Smelting .....
FFFFFF ............
Secondary Copper Smelting
Not delegated
GGGGGG ........
Primary Nonferrous Metal ....
Not delegated
HHHHHH ..........
Paint Stripping Operations,
Misc. Surface Coating,
Autobody Refinishing.
Industrial, Commercial, and
Institutional Boilers.
Acrylic/Modacrylic Fibers
Production.
Carbon Black Production .....
9/19/11 ..........
10/24/12 ........
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
........
........
........
........
........
........
........
........
........
........
........
........
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
07/01/13
12/10/13
........
........
........
........
........
........
........
........
........
........
........
........
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
........
07/01/13 ........
12/10/13.
07/01/13 ........
12/10/13.
07/01/13 ........
12/10/13.
07/01/13 ........
12/10/13,
07/01/13 ........
12/10/13.
07/01/13 ........
12/10/13.
07/01/13 ........
12/10/13.
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13 ........
07/01/13 ........
12/10/13.
07/01/13 ........
12/10/13.
07/01/13 ........
12/10/13.
07/01/13 ........
12/10/13.
07/01/13 ........
12/10/13.
Not delegated.
Not delegated
07/01/10 ...............................
12/28/12 ...............................
6/30/12 .............
12/30/13 ...........
07/01/13 ........
05/13/14 ........
07/01/13 ........
12/10/13.
Not delegated.
Not delegated
...............................
...............................
...............................
...............................
...............................
...............................
...............................
...............................
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
6/30/12 .............
12/30/13 ...........
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
07/01/13
05/13/14
........
........
........
........
........
........
........
........
07/01/13 ........
12/10/13.
07/01/13 ........
12/10/13.
07/01/13 ........
12/10/13.
07/01/13 ........
12/10/13.
Not delegated.
6/28/11 ..........
1/24/11 ..........
12/23/11 ........
09/10/14 ........
Not delegated
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
07/01/10
12/28/12
Not delegated
...............................................
6/30/12 .............
12/30/13 ...........
07/01/13 ........
05/13/14 ........
07/01/13 ........
12/10/13.
Not delegated.
E:\FR\FM\27FER1.SGM
27FER1
WWWWW ........
YYYYY .............
ZZZZZ ..............
BBBBBB ...........
CCCCCC ..........
DDDDDD ..........
JJJJJJ ..............
LLLLLL .............
MMMMMM .......
NNNNNN ..........
OOOOOO ........
PPPPPP ...........
QQQQQQ ........
RRRRRR ..........
SSSSSS ...........
TTTTTT ............
VVVVVV ...........
WWWWWW .....
XXXXXX ...........
YYYYYY ...........
ZZZZZZ ............
AAAAAAA ........
BBBBBBB ........
CCCCCCC .......
DDDDDDD .......
tkelley on DSK3SPTVN1PROD with RULES
EEEEEEE ........
HHHHHHH .......
VerDate Sep<11>2014
Not delegated
Not delegated
9/19/11 ..........
10/24/12 ........
9/19/11 ..........
10/24/12 ........
Chromium Compounds ........ 9/19/11 ..........
10/24/12 ........
Flexible Polyurethane Foam
9/19/11 ..........
Fabrication and Production. 10/24/12 ........
Lead Acid Battery Manufac9/19/11 ..........
turing.
10/24/12 ........
Wood Preserving .................. 9/19/11 ..........
10/24/12 ........
Clay Ceramics Manufac9/19/11 ..........
turing.
10/24/12 ........
Pressed & Blown Glass
9/19/11 ..........
Manufacturing.
10/24/12 ........
Secondary Non-Ferrous Met- 9/19/11 ..........
als.
10/24/12 ........
Chemical Manufacturing
12/21/12 ........
Area Sources.
09/10/14 ........
Plating and Polishing ........... 9/19/11 ..........
10/24/12 ........
Metal Fabrication and Fin9/19/11 ..........
ishing.
10/24/12 ........
Ferroalloys Production ......... Not delegated
Area Source Standards for
Aluminum, Copper and
Other Nonferrous Foundries.
Asphalt Processing and Asphalt Roofing Manufacturing.
Chemical Preparations Industry.
Paints and Allied Products
Manufacturing.
Prepared Foods Manufacturing.
Gold Mine Ore Processing
and Production Area
Source Category.
Polyvinyl Chloride and Copolymers Production.
16:12 Feb 26, 2015
Jkt 235001
6/28/11 ..........
1/24/11 ..........
PO 00000
Frm 00039
Fmt 4700
Sfmt 4700
City of Omaha
Not delegated.
Not delegated.
Not delegated.
Not delegated.
Not delegated.
Not delegated.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
07/01/11.
12/22/12.
Not delegated.
Not delegated.
Not delegated.
Not delegated.
Not delegated.
Not delegated.
Not delegated.
Not delegated.
10608
Federal Register / Vol. 80, No. 39 / Friday, February 27, 2015 / Rules and Regulations
Note: At this time, Missouri is
temporarily not accepting delegation for
area source NESHAP requirements (40
CFR part 63, subparts 5W–7H) within
the State of Missouri as described in an
August 24, 2010 letter from MDNR to
the U.S. EPA, Region 7.
Summary of This Action
All sources subject to the
requirements of 40 CFR parts 60, 61,
and 63 are also subject to the equivalent
requirements of the above-mentioned
state or local agencies.
This document informs the public of
delegations to the above-mentioned
agencies of the above-referenced Federal
regulations.
Authority
This document is issued under the
authority of sections 101, 110, 112, and
301 of the CAA, as amended (42 U.S.C.
7401, 7410, 7412, and 7601).
Dated: February 13, 2015.
Karl Brooks,
Regional Administrator, Region 7.
[FR Doc. 2015–04171 Filed 2–26–15; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
40 CFR Part 62
[EPA–R08–OAR–2014–0811; FRL–9923–24–
Region 8]
Promulgation of State Air Quality
Implementation Plans for Designated
Facilities and Pollutants: Colorado,
Montana, North Dakota, South Dakota,
Utah, and Wyoming; Negative
Declarations; Control of Emissions
From Existing Sewage Sludge
Incineration Units
Environmental Protection
Agency.
ACTION: Direct final rule.
AGENCY:
The Environmental Protection
Agency (EPA) is taking direct final
action publishing negative declarations
for sewage sludge incineration (SSI)
units for: the State of Colorado, the State
of Montana, the State of North Dakota,
the State of South Dakota, the State of
Utah, and the State of Wyoming. Each
state notified EPA in its negative
declaration letter that there are no SSI
units subject to the requirements of
sections 111(d) and 129 of the Clean Air
Act (CAA) within the jurisdictional
boundaries of their state. EPA is
accepting the negative declarations in
accordance with the requirements of the
CAA.
tkelley on DSK3SPTVN1PROD with RULES
SUMMARY:
VerDate Sep<11>2014
16:12 Feb 26, 2015
Jkt 235001
This rule is effective on April 28,
2015 without further notice, unless EPA
receives adverse comments by March
30, 2015. If adverse comments are
received, EPA will publish a timely
withdrawal of the direct final rule in the
Federal Register informing the public
that the rule will not take effect.
ADDRESSES: Submit your comments,
identified by Docket ID No. EPA–R08–
OAR–2014–0811, by one of the
following methods:
• https://www.regulations.gov. Follow
the on-line instructions for submitting
comments.
• Email: morrison.kendra@epa.gov.
• Fax: (303) 312–6064 (please alert
the individual listed in the FOR FURTHER
INFORMATION CONTACT section if you are
faxing comments).
• Mail: Carl Daly, Director, Air
Program, Environmental Protection
Agency (EPA), Region 8, Mailcode 8P–
AR, 1595 Wynkoop Street, Denver,
Colorado 80202–1129.
• Hand Delivery: Carl Daly, Director,
Air Program, Environmental Protection
Agency (EPA), Region 8, Mailcode 8P–
AR, 1595 Wynkoop Street, Denver,
Colorado 80202–1129. Such deliveries
are only accepted Monday through
Friday, 8:00 a.m. to 4:30 p.m., excluding
federal holidays. Special arrangements
should be made for deliveries of boxed
information.
Instructions: Direct your comments to
Docket ID No. EPA–R08–OAR–2014–
0811.
EPA’s policy is that all comments
received will be included in the public
docket without change and may be
made available online at https://
www.regulations.gov, including any
personal information provided, unless
the comment includes information
claimed to be Confidential Business
Information (CBI) or other information
whose disclosure is restricted by statute.
Do not submit information that you
consider to be CBI or otherwise
protected through https://
www.regulations.gov or email. The
https://www.regulations.gov Web site is
an ‘‘anonymous access’’ system, which
means EPA will not know your identity
or contact information unless you
provide it in the body of your comment.
If you send an email comment directly
to EPA, without going through https://
www.regulations.gov your email address
will be automatically captured and
included as part of the comment that is
placed in the public docket and made
available on the Internet. If you submit
an electronic comment, EPA
recommends that you include your
name and other contact information in
the body of your comment and with any
DATES:
PO 00000
Frm 00040
Fmt 4700
Sfmt 4700
disk or CD–ROM you submit. If EPA
cannot read your comment due to
technical difficulties and cannot contact
you for clarification, EPA may not be
able to consider your comment.
Electronic files should avoid the use of
special characters, any form of
encryption, and be free of any defects or
viruses. For additional instructions on
submitting comments, see Section I,
General Information of this document.
Docket: All documents in the docket
are listed in the https://
www.regulations.gov index. Although
listed in the index, some information is
not publicly available, e.g., CBI or other
information whose disclosure is
restricted by statute. Certain other
material, such as copyrighted material,
will be publicly available only in hard
copy. Publicly available docket
materials are available either
electronically in https://
www.regulations.gov or in hard copy at
the Air Program, Environmental
Protection Agency (EPA), Region 8,
1595 Wynkoop Street, Denver, Colorado
80202–1129. EPA requests that if at all
possible, you contact the individual
listed in the FOR FURTHER INFORMATION
CONTACT section to view the hard copy
of the docket. You may view the hard
copy of the docket Monday through
Friday, 8:00 a.m. to 4:00 p.m., excluding
federal holidays.
FOR FURTHER INFORMATION CONTACT:
Kendra Morrison, Air Program, 1595
Wynkoop Street, Denver, Colorado
80202–1129, 303–312–6145,
morrison.kendra@epa.gov.
SUPPLEMENTARY INFORMATION:
Table of Contents
I. General Information
II. Background
A. Colorado
B. Montana
C. North Dakota
D. South Dakota
E. Utah
F. Wyoming
III. Final Action
IV. Statutory and Executive Orders Review
Definitions
For the purpose of this document, we
are giving meaning to certain words and
initials as follows:
(i) The words or initials Act or CAA
mean or refer to the Clean Air Act,
unless the context indicates otherwise.
(ii) The initials EG mean emission
guidelines.
(iii) The words EPA, we, us or our
mean or refer to the United States
Environmental Protection Agency.
(iv) The initials NSPS mean new
source performance standards.
E:\FR\FM\27FER1.SGM
27FER1
Agencies
[Federal Register Volume 80, Number 39 (Friday, February 27, 2015)]
[Rules and Regulations]
[Pages 10596-10608]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-04171]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Parts 60, 61, and 63
[EPA-R07-OAR-2015-0016; FRL-9923-69-Region-7]
Delegation of Authority to the States of Iowa; Kansas; Missouri;
Nebraska; Lincoln-Lancaster County, NE; and City of Omaha, NE., for New
Source Performance Standards (NSPS), National Emission Standards for
Hazardous Air Pollutants (NESHAP) Including Maximum Achievable Control
Technology (MACT) Standards
AGENCY: Environmental Protection Agency (EPA).
ACTION: Delegation of authority.
-----------------------------------------------------------------------
SUMMARY: The States of Iowa, Kansas, Missouri, and Nebraska and the
local agencies of Lincoln-Lancaster County, Nebraska, and the city of
Omaha, Nebraska, have submitted updated regulations for delegation of
EPA authority for implementation and enforcement of NSPS, NESHAP, and
MACT standards. The submissions cover new EPA standards and, in some
instances, revisions to standards previously delegated. EPA's review of
the pertinent regulations shows that they contain adequate and
effective procedures for the implementation and enforcement of these
Federal standards. This action informs the public of delegations to the
above-mentioned agencies.
DATES: This document is effective on February 27, 2015. The dates of
delegation can be found in the SUPPLEMENTARY INFORMATION section of
this document.
ADDRESSES: Copies of documents relative to this action are available
for public inspection during normal business hours at the Environmental
[[Page 10597]]
Protection Agency, Air Planning and Development Branch, 11201 Renner
Road, Lenexa, Kansas 66219. The interested persons wanting to examine
these documents should make an appointment with the office at least 24
hours in advance.
Effective immediately, all notifications, applications, reports,
and other correspondence required pursuant to the newly delegated
standards and revisions identified in this document must be submitted
with respect to sources located in the jurisdictions identified in this
document, to the following addresses:
Iowa Department of Natural Resources, Air Quality Bureau, 7900
Hickman Road, Suite 1, Windsor Heights, Iowa 50324.
Kansas Department of Health and the Environment, Bureau of Air,
1000 SW Jackson Street, Suite 310, Topeka, Kansas 66612-1367.
Missouri Department of Natural Resources, Air Pollution Control
Program, PO Box 176, Jefferson City, Missouri 65102-0176.
Nebraska Department of Environmental Quality, Air Quality Division,
1200 ``N'' Street, Suite 400, P.O. Box 98922, Lincoln, Nebraska 68509.
Lincoln-Lancaster County Health Department, Division of
Environmental Public Health, Air Quality Section, 3140 ``N'' Street,
Lincoln, Nebraska 68510.
City of Omaha, Public Works Department, Air Quality Control
Division, 5600 South 10th Street, Omaha, Nebraska 68107.
Duplicates of required documents must also continue to be submitted
to the EPA Regional Office at the above address.
FOR FURTHER INFORMATION CONTACT: Ms. Paula Higbee at (913) 551-7028, or
by email at higbee.paula@epa.gov.
SUPPLEMENTARY INFORMATION: The supplementary information is organized
in the following order:
I. What does this action do?
II. What is the authority for delegation?
III. What does delegation accomplish?
IV. What has been delegated?
V. What has not been delegated?
List of Delegation Tables
Table I--NSPS, 40 CFR part 60
Table II--NESHAP, 40 CFR part 61
Table III--NESHAP, 40 CFR part 63
I. What does this action do?
EPA is providing notice of an update to its delegable authority for
implementation and enforcement of the Federal standards shown in the
tables below to the states of Iowa, Kansas, Missouri, and Nebraska.
This action updates the delegation tables previously published at 78 FR
71510 (November 29, 2013). EPA has established procedures by which
these agencies are automatically delegated the authority to implement
the standards when they adopt regulations which are identical to the
Federal standards. We then periodically provide notice of the new and
revised standards for which delegation has been given. This document
does not affect or alter the status of the listed standards under state
or Federal law.
II. What is the authority for delegation?
1. Section 111(c)(1) of the Clean Air Act (CAA) authorizes EPA to
delegate authority to any state agency which submits adequate
regulatory procedures for implementation and enforcement of the NSPS
program. The NSPS are codified at 40 CFR part 60.
2. Section 112(l) of the CAA and 40 CFR part 63, subpart E,
authorizes EPA to delegate authority to any state or local agency which
submits adequate regulatory procedures for implementation and
enforcement of emission standards for hazardous air pollutants. The
hazardous air pollutant standards are codified at 40 CFR parts 61 and
63, respectively.
III. What does delegation accomplish?
Delegation confers primary responsibility for implementation and
enforcement of the listed standards to the respective state and local
air agencies. However, EPA also retains the concurrent authority to
enforce the standards.
IV. What has been delegated?
Tables I, II, and III below list the delegated standards. Each item
listed in the Subpart column has two relevant dates listed in each
column for each state. The first date in each block is the reference
date to the CFR contained in the state rule. In general, the state or
local agency has adopted the applicable standard through the date as
noted in the table. The second date is the most recent effective date
of the state agency rule for which the EPA has granted the delegation.
This document specifically addresses revisions to the columns for Iowa,
Kansas, Missouri, and Nebraska and the local agencies of Lincoln-
Lancaster County, Nebraska, and the city of Omaha, Nebraska. If there
are no dates listed in the delegation table, the state has not accepted
delegation of the standard and implementation of those standards reside
with EPA.
V. What has not been delegated?
1. The EPA regulations effective after the first date specified in
each block have not been delegated, and authority for implementation of
these regulations is retained solely by EPA.
2. In some cases, the standards themselves specify that specific
provisions cannot be delegated. In such cases, a specific section of
the standard details what authorities can and cannot be delegated. You
should review the applicable standard in the CFR for this information.
3. In some cases, the state rules do not adopt the Federal standard
in its entirety. Each state rule (available from the respective agency)
should be consulted for specific information.
4. In some cases, existing delegation agreements between the EPA
and the agencies limit the scope of the delegated standards. Copies of
delegation agreements are available from the state agencies, or from
this office.
5. With respect to 40 CFR part 63, subpart A, General Provisions
(see Table III), EPA has determined that sections 63.6(g), 63.6(h)(9),
63.7(e)(2)(ii) and (f), 63.8(f), and 63.10(f) cannot be delegated.
Additional information is contained in an EPA memorandum titled
``Delegation of 40 CFR part 63 General Provisions Authorities to State
and Local Air Pollution Control Agencies'' from John Seitz, Director,
Office of Air Quality Planning and Standards, dated July 10, 1998.
List of Delegation Tables
Table I--Delegation of Authority--Part 60 NSPS--Region 7
----------------------------------------------------------------------------------------------------------------
State of
Sub[dash]Part Source category State of Iowa State of Kansas State of Missouri Nebraska
----------------------------------------------------------------------------------------------------------------
A................. General 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Provisions. 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Except 60.4; Except 60.4;
60.9; 60.10; 60.9; and 60.10..
60.16..
[[Page 10598]]
D................. Fossil-Fuel Fired 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Steam Generators 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
for Which
Construction is
Commenced After
August 17, 1971.
Da................ Electric Utility 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Steam Generating 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Units for Which
Construction is
Commenced After
September 18,
1978.
Db................ Industrial- 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Commercial- 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Institutional
Steam Generating
Units.
Dc................ Small Industrial- 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Commercial- 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Institutional
Steam Generating
Units.
E................. Incinerators..... 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Ea................ Municipal Waste 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Combustors for 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Which
Construction is
Commenced After
December 20,
1989, and on or
before September
20 1994.
Eb................ Large Municipal 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Waste Combustors 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
for Which
Construction is
Commenced after
September 20,
1994, or for
Which
Modification or
Reconstruction
is Commenced
After June 19,
1996.
Ec................ Hospital/Medical/ 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Infectious Waste 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Incinerators for
Which
Construction
Commenced after
June 20, 1996.
F................. Portland Cement 10/17/00......... 07/01/08......... 6/30/12.......... 07/01/13.
Plants. 10/21/12......... 11/05/10......... 12/30/13......... 05/13/14.
G................. Nitric Acid 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Plants. 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Ga................ Nitric Acid ................. ................. 6/30/12.......... 07/01/13.
Plants for Which 12/30/13......... 05/13/14.
Construction,
Reconstruction,
or Modification
Commenced After
October 14, 2011.
H................. Sulfuric Acid 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Plants. 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
I................. Hot Mix Asphalt 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Facilities. 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
J................. Petroleum 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Refineries. 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Except provisions
in Ja:
60.100a(c); in
60.101a, the
definition of
``flare'';
60.102a(g); and
60.107a(d) and
(e)..
Ja................ Standards of ................. ................. 6/30/12.......... 07/01/13.
Performance for 12/30/13......... 05/13/14.
Petroleum
Refineries for
Which
Construction,
Reconstruction,
or Modification
Commenced After
May 14, 2007.
[[Page 10599]]
K................. Storage Vessels 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
for Petroleum 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Liquids for
Which
Construction,
Reconstruction,
or Modification
Commenced After
June 11, 1973,
and Prior to May
19, 1978.
Ka................ Storage Vessels 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
for Petroleum 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Liquids for
Which
Construction,
Reconstruction,
or Modification
Commenced After
May 18, 1978,
and Prior to
July 23, 1984.
Kb................ Volatile Organic 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Liquid Storage 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Vessels
(including
Petroleum Liquid
Storage Vessels)
for Which
Construction,
Reconstruction,
or Modification
Commenced After
July 23, 1984.
L................. Secondary Lead 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Smelters. 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
M................. Secondary Brass 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
and Bronze 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Production
Plants.
N................. Basic Oxygen 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Process Furnaces 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
for Which
Construction is
Commenced After
June 11, 1973.
Na................ Basic Oxygen 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Process 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Steelmaking
Facilities for
Which
Construction is
Commenced After
January 20, 1983.
O................. Sewage Treatment 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Plants. 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
P................. Primary Copper 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Smelters. 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Q................. Primary Zinc 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Smelters. 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
R................. Primary Lead 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Smelters. 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
S................. Primary Aluminum 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Reduction Plants. 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
T................. Phosphate 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Fertilizer 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Industry: Wet
Process
Phosphoric Acid
Plants.
U................. Phosphate 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Fertilizer 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Industry:
Superphosphoric
Acid Plants.
V................. Phosphate 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Fertilizer 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Industry:
Diammonium
Phosphate Plants.
W................. Phosphate 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Fertilizer 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Industry: Triple
Superphosphate
Plants.
X................. Phosphate 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Fertilizer 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Industry:
Granular Triple
Superphosphate
Storage
Facilities.
Y................. Coal Preparation 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Plants. 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
[[Page 10600]]
Z................. Ferroalloy 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Production 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Facilities.
AA................ Steel Plants: 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Electric Arc 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Furnaces
Constructed
After October
21, 1974, and on
or Before August
17, 1983.
AAa............... Steel Plants: 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Electric Arc 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Furnaces and
Argon-Oxygen
Decarburization
Vessels
Constructed
After August 17,
1983.
BB................ Kraft Pulp Mills. 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
CC................ Glass 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Manufacturing 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Plants.
DD................ Grain Elevators.. 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
EE................ Surface Coating 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
of Metal 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Furniture.
GG................ Stationary Gas 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Turbines. 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
HH................ Lime 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Manufacturing 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Plants.
KK................ Lead-Acid Battery 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Manufacturing 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Plants.
LL................ Metallic Mineral 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Processing 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Plants.
MM................ Automobile and 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Light Duty Truck 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Surface Coating
Operations.
NN................ Phosphate Rock 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Plants. 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
PP................ Ammonium Sulfate 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Manufacture. 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
QQ................ Graphic Arts 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Industry: 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Publication
Rotogravure
Printing.
RR................ Pressure 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Sensitive Tape 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
and Label
Surface Coating
Operations.
SS................ Industrial 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Surface Coating: 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Large Appliances.
TT................ Metal Coil 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Surface Coating. 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
UU................ Asphalt 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Processing and 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Asphalt Roofing
Manufacture.
VV................ Equipment Leaks 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
of VOC in the 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Synthetic
Organic
Chemicals
Manufacturing
Industry.
VVa............... Equipment Leaks ................. ................. 6/30/12.......... 07/01/13.
of VOC in the 12/30/13......... 05/13/14.
Synthetic
Organic
Chemicals
Manufacturing
Industry for
Which
Construction,
Reconstruction,
or Modification
Commenced After
November 7, 2006.
WW................ Beverage Can 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Surface Coating 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Industry.
XX................ Bulk Gasoline 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Terminals. 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
AAA............... New Residential ................. 07/01/08......... 6/30/12.......... 07/01/13.
Wood Heaters. 11/05/10......... 12/30/13......... 05/13/14.
[[Page 10601]]
BBB............... Rubber Tire 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Manufacturing 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Industry.
DDD............... Volatile Organic 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Compound (VOC) 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Emissions from
the Polymer
Manufacturing
Industry.
FFF............... Flexible Vinyl 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
and Urethane 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Coating and
Printing.
GGG............... Equipment Leaks 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
of VOC in 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Petroleum
Refineries.
GGGa.............. Equipment Leaks ................. ................. 6/30/12.......... 07/01/13.
of VOC in 12/30/13......... 05/13/14.
Petroleum
Refineries for
Which
Construction,
Reconstruction,
or Modification
Commenced After
November 7, 2006.
HHH............... Synthetic Fiber 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Production 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Facilities.
III............... Volatile Organic 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Compound (VOC) 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Emissions From
the Synthetic
Organic Chemical
Manufacturing
Industry (SOCMI)
AIR Oxidation
Unit Processes.
JJJ............... Petroleum Dry 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Cleaners. 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
KKK............... Equipment Leaks 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
of VOC from 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Onshore Natural
Gas Processing
Plants.
LLL............... Onshore Natural 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Gas Processing: 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
SO2 Emissions.
NNN............... Volatile Organic 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Compound (VOC) 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Emissions from
Synthetic
Organic Chemical
Manufacturing
Industry (SOCMI)
Distillation
Operations.
OOO............... Nonmetallic 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Mineral 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Processing
Plants.
PPP............... Wool Fiberglass 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Insulation 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Manufacturing
Plants.
QQQ............... VOC Emissions 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
from Petroleum 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Refinery
Wastewater
Systems.
RRR............... Volatile Organic 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Compound 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Emissions from
Synthetic
Organic Chemical
Manufacturing
Industry (SOCMI)
Reactor
Processes.
SSS............... Magnetic Tape 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Coating 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Facilities.
TTT............... Industrial 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Surface Coating: 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Surface Coating
of Plastic Parts
for Business
Machines.
UUU............... Calciners and 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Dryers in 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Mineral
Industries.
[[Page 10602]]
VVV............... Polymeric Coating 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
of Supporting 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Substrates
Facilities.
WWW............... Municipal Solid 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Waste Landfills. 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
AAAA.............. Small Municipal 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Waste Combustion 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Units for Which
Construction is
Commenced After
August 30, 1999
or for Which
Modification or
Reconstruction
is Commenced
After June 6,
2001.
CCCC.............. Commercial and 06/28/11......... 07/01/05......... 6/30/12.......... 07/01/13.
Industrial Solid 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Waste
Incineration
Units for Which
Construction is
Commenced After
November 30,
1999 or for
Which
Modification or
Reconstruction
is Commenced on
or After June 1,
2001.
DDDD.............. Commercial and ................. 07/01/05......... Not delegated.... 07/01/13.
Industrial Solid 11/05/10......... 05/13/14.
Waste
Incineration
Units that
Commenced
Construction On
or Before
November 30,
1999.
EEEE.............. Other Solid Waste 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Incineration 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Units for Which
Construction
Commenced After
December 9, 2004
or Modification
or
Reconstruction
Commenced On or
After June 16,
2006.
FFFF.............. Other Solid Waste ................. 07/01/08......... Not delegated.... 07/01/13.
Incineration 11/05/10......... 05/13/14.
Units that
Commenced
Construction On
or Before
December 9, 2004.
IIII.............. Stationary 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Compression 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Ignition
Internal
Combustion
Engines.
JJJJ.............. Stationary Spark 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Ignition 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Internal
Combustion
Engines.
KKKK.............. Stationary 06/28/11......... 07/01/08......... 6/30/12.......... 07/01/13.
Combustion 10/24/12......... 11/05/10......... 12/30/13......... 05/13/14.
Turbines.
LLLL.............. New Sewage Sludge ................. ................. 6/30/12.......... 07/01/13.
Incinerator 12/30/13......... 05/13/14.
Units.
MMMM.............. Emission ................. ................. ................. 07/01/13.
Guidelines and 05/13/14.
Compliance Times
for Existing
Sewage Sludge
Incineration
Units.
OOOO.............. Crude Oil and ................. ................. 6/30/12.......... 07/01/13.
Natural Gas 12/30/13......... 05/13/14.
Production,
Transmission and
Distribution.
----------------------------------------------------------------------------------------------------------------
[[Page 10603]]
Table II--Delegation of Authority--Part 61 NESHAP--Region 7
--------------------------------------------------------------------------------------------------------------------------------------------------------
Lincoln[dash]
Sub[dash]Part Source category State of Iowa State of Kansas State of Missouri State of Nebraska Lancaster County City of Omaha
--------------------------------------------------------------------------------------------------------------------------------------------------------
A.................. General 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/01......... 07/01/13......... 07/01/09.
Provisions. 10/24/12......... 12/28/12......... 12/30/13......... 07/21/10......... 12/10/13......... 12/22/12.
Except 61.04, Except 61.04,
61.16 and 61.17.. 61.16 and 61.17..
B.................. Radon Emissions Not delegated.... Not delegated.... Not delegated.... Not delegated.... Not delegated.... Not delegated.
from Underground
Uranium Mines.
C.................. Beryllium........ 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/01......... 07/01/13......... 07/01/09.
10/24/12......... 12/28/12......... 12/30/13......... 07/21/10......... 12/10/13......... 12/22/12.
D.................. Beryllium Rocket 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/01......... 07/01/13......... 07/01/09.
Motor Firing. 10/24/12......... 12/28/12......... 12/30/13......... 07/21/10......... 12/10/13......... 12/22/12.
E.................. Mercury.......... 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/01......... 07/01/13......... 07/01/09.
10/24/12......... 12/28/12......... 12/30/13......... 07/21/10......... 12/10/13......... 12/22/12.
F.................. Vinyl Chloride... 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/01......... 07/01/13......... 07/01/09.
10/24/12......... 12/28/12......... 12/30/13......... 07/21/10......... 12/10/13......... 12/22/12.
J.................. Equipment Leaks 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/01......... 07/01/13......... 07/01/09.
(Fugitive 10/24/12......... 12/28/12......... 12/30/13......... 07/21/10......... 12/10/13......... 12/22/12.
Emission
Sources) of
Benzene.
L.................. Benzene Emissions 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/01......... 07/01/13......... 07/01/09.
from Coke By- 10/24/12......... 12/28/12......... 12/30/13......... 07/21/10......... 12/10/13......... 12/22/12.
Product Recovery
Plants.
M.................. Asbestos......... 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/01......... 07/01/13......... 07/01/09.
10/24/12......... 12/28/12......... 12/30/13......... 07/21/10......... 12/10/13......... 12/22/12.
N.................. Inorganic Arsenic 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/01......... 07/01/13......... 07/01/09.
Emissions from 10/24/12......... 12/28/12......... 12/30/13......... 07/21/10......... 12/10/13......... 12/22/12.
Glass
Manufacturing
Plants.
O.................. Inorganic Arsenic 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/01......... 07/01/13......... 07/01/09.
Emissions From 10/24/12......... 12/28/12......... 12/30/13......... 07/21/10......... 12/10/13......... 12/22/12.
Primary Copper
Smelters.
P.................. Inorganic Arsenic 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/01......... 07/01/13......... 07/01/09.
Emissions From 10/24/12......... 12/28/12......... 12/30/13......... 07/21/10......... 12/10/13......... 12/22/12.
Arsenic Trioxide
and Metallic
Arsenic
Production
Facilities.
Q.................. Radon Emissions Not delegated.... Not delegated.... Not delegated.... Not delegated.... Not delegated.... Not delegated.
From Department
of Energy
Facilities.
R.................. Radon Emissions Not delegated.... Not delegated.... Not delegated.... Not delegated.... Not delegated.... Not delegated.
From
Phosphogypsum
Stacks.
T.................. Radon Emissions Not delegated.... Not delegated.... Not delegated.... Not delegated.... Not delegated.... Not delegated.
From the
Disposal of
Uranium Mill
Tailings.
V.................. Equipment Leaks 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/01......... 07/01/13......... 07/01/09.
(Fugitive 10/24/12......... 12/28/12......... 12/30/13......... 07/21/10......... 12/10/13......... 12/22/12.
Emission
Sources).
W.................. Radon Emissions Not delegated.... Not delegated.... Not delegated.... Not delegated.... Not delegated.... Not delegated.
From Operating
Mill Tailings.
Y.................. Benzene Emissions 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/01......... 07/01/13......... 07/01/09.
From Benzene 10/24/12......... 12/28/12......... 12/30/13......... 07/21/10......... 12/10/13......... 12/22/12.
Storage Vessels.
BB................. Benzene Emissions 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/01......... 07/01/13......... 07/01/09.
From Benzene 10/24/12......... 12/28/12......... 12/30/13......... 07/21/10......... 12/10/13......... 12/22/12.
Transfer
Operations.
FF................. Benzene Waste 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/01......... 07/01/13......... 07/01/09.
Operations. 10/24/12......... 12/28/12......... 12/30/13......... 07/21/10......... 12/10/13......... 12/22/12.
--------------------------------------------------------------------------------------------------------------------------------------------------------
Table III--Delegation of Authority--Part 63 NESHAP--Region 7
--------------------------------------------------------------------------------------------------------------------------------------------------------
State of State of Lincoln[dash]
Sub[dash]Part Source category State of Iowa State of Kansas Missouri Nebraska Lancaster County City of Omaha
--------------------------------------------------------------------------------------------------------------------------------------------------------
A.................. General 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Provisions. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Except Except 63.13 &
63.6(f)(1), (g), 63.15(a)(2)..
(h)(1) and
(h)(9);
63.7(e)(2)(ii)
and (f);
63.8(f);
63.10(f); 63.12;
63.13;
63.14(b)(27) and
phrase ``and
table 5 to
subpart DDDDD of
this part'';
63.14(b)(35),
(39) through
(53), and (55)
through (62); in
63.14(i)(1), the
phrase ``table 5
to subpart DDDDD
of this part'';
and 63.15..
F.................. Organic Hazardous 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Air Pollutants 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
From the
Synthetic
Organic Chemical
Manufacturing
Industry.
[[Page 10604]]
G.................. Organic Hazardous 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Air Pollutants 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
From the
Synthetic
Organic Chemical
Manufacturing
Industry for
Process Vents,
Storage Vessels,
Transfer
Operations, and
Wastewater.
H.................. Organic Hazardous 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Air Pollutants 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
for Equipment
Leaks.
I.................. Organic Hazardous 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Air Pollutants 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
for Certain
Processes
Subject to the
Negotiated
Regulation for
Equipment Leaks.
J.................. Polyvinyl 9/19/11.......... 07/01/10......... Not delegated.... Not delegated.... 07/01/13......... Not delegated.
Chloride and 10/24/12......... 12/28/12......... 12/10/13.........
Copolymers
Production.
L.................. Coke Oven 9/19/11.......... 07/01/10......... 6/30/12.......... Not delegated.... 07/01/13......... Not delegated.
Batteries. 10/24/12......... 12/28/12......... 12/30/13......... 12/10/13.........
M.................. National 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Perchloroethylen 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
e Air Emission
Standards for
Dry Cleaning
Facilities.
N.................. Chromium 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Emissions From 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Hard and
Decorative
Chromium
Electroplating
and Chromium
Anodizing Tanks.
O.................. Ethylene Oxide 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Emissions 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Standards for
Sterilization
Facilities.
Q.................. Industrial 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Process Cooling 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Towers.
R.................. Gasoline 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Distribution 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Facilities (Bulk
Gasoline
Terminals and
Pipeline
Breakout
Stations).
S.................. Pulp and Paper 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Industry. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
T.................. Halogenated 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Solvent Cleaning. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
U.................. Polymers and 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Resins Group I. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
W.................. Epoxy Resins 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Production and 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Non-Nylon
Polyamides
Production.
X.................. Secondary Lead 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Smelting. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Y.................. Marine Tank 9/19/11.......... 07/01/10......... 6/30/12.......... Not delegated.... Not delegated.... Not delegated.
Vessel Loading 10/24/12......... 12/28/12......... 12/30/13.........
Operations.
AA/BB.............. Phosphoric Acid 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Manufacturing 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Plants/Phosphate
Fertilizers
Production
Plants.
CC................. Petroleum 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Refineries. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
DD................. Off-Site Waste 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
and Recovery 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Operations.
EE................. Magnetic Tape 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Manufacturing 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Operations.
GG................. Aerospace 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Industry Surface 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Coating
Manufacturing
and Rework
Facilities.
HH................. Oil and Natural 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Gas Production 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Facilities.
II................. Shipbuilding and 9/19/11.......... 07/01/10......... 6/30/12.......... Not delegated.... Not delegated.... Not delegated.
Ship Repair 10/24/12......... 12/28/12......... 12/30/13.........
(Surface
Coating).
JJ................. Wood Furniture 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Manufacturing 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Operations.
KK................. Printing and 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Publishing 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Industry.
LL................. Primary Aluminum 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Reduction Plants. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
MM................. Chemical Recovery 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Combustion 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Sources at
Kraft, Soda,
Sulfite, and
Stand-Along
Semichemical
Pulp Mills.
OO................. Tanks-Level 1.... 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
[[Page 10605]]
PP................. Containers....... 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
QQ................. Surface 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Impoundments. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
RR................. Individual Drain 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Systems. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
SS................. Closed Vent 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Systems, Control 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Devices,
Recovery Devices
and Routing to a
Fuel Gas System
or a Process.
TT................. Equipment Leaks-- 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Control Level 1 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Standards.
UU................. Equipment Leaks-- 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Control Level 2 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Standards.
VV................. Oil-Water 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Separators and 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Organic-Water
Separators.
WW................. Storage Vessel 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
(Tanks)--Control 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Level 2.
XX................. Ethylene 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Manufacturing 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Process Units:
Heat Exchange
Systems and
Waste Operations.
YY................. Generic Maximum 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Achievable 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Control
Technology
Standards.
CCC................ Steel Pickling- 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
HCL Process 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Facilities and
Hydrochloric
Acid
Regeneration
Plants.
DDD................ Mineral Wool 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Production. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
EEE................ Hazardous Waste 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Combustors. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
GGG................ Pharmaceutical 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Production. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
HHH................ Natural Gas 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Transmission and 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Storage
Facilities.
III................ Flexible 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Polyurethane 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Foam Production.
JJJ................ Polymers and 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Resins Group IV. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
LLL................ Portland Cement 12/20/06......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Manufacturing 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Industry.
MMM................ Pesticide Active 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Ingredient 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Production.
NNN................ Wool Fiberglass 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Manufacturing. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
OOO................ Manufacture of 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Amino/Phenolic 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Resins.
PPP................ Polyether Polyols 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Production. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
QQQ................ Primary Copper 9/19/11.......... 07/01/10......... 6/30/12.......... Not delegated.... 07/01/13......... Not delegated.
Smelting. 10/24/12......... 12/28/12......... 12/30/13......... 12/10/13.........
RRR................ Secondary 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Aluminum 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Production.
TTT................ Primary Lead 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Smelting. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
UUU................ Petroleum 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Refineries. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
VVV................ Publicly Owned 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Treatment Works. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
XXX................ Ferroalloys 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Production. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
AAAA............... Municipal Solid 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Waste Landfills. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
CCCC............... Manufacturing of 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Nutritional 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Yeast.
DDDD............... Plywood and 9/19/11.......... 07/01/10......... 6/30/12.......... Not delegated.... 07/01/13......... Not delegated.
Composite Wood 10/24/12......... 12/28/12......... 12/30/13......... 12/10/13.........
Products.
EEEE............... Organic Liquids 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Distribution 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
(Non-Gasoline).
FFFF............... Misc. Organic 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Chemical 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Manufacturing.
GGGG............... Solvent 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Extraction for 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Vegetable Oil
Production.
HHHH............... Wet Formed 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Fiberglass Mat 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Production.
[[Page 10606]]
IIII............... Surface Coating 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
of Automobiles 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
and Light-Duty
Trucks.
JJJJ............... Paper and Other 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Web Coating. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
KKKK............... Surface Coating 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
of Metal Cans. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
MMMM............... Surface Coating 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
of Misc. Metal 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Parts and
Products.
NNNN............... Surface Coating 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
of Large 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Appliances.
OOOO............... Printing, Coating 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
and Dyeing of 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Fabrics and
Other Textiles.
PPPP............... Surface Coating 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
of Plastic Parts 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
and Products.
QQQQ............... Surface Coating 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
of Wood Building 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Products.
RRRR............... Surface Coating 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
of Metal 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Furniture.
SSSS............... Surface Coating 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
of Metal Coil. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
TTTT............... Leather Finishing 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Operations. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
UUUU............... Cellulose 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Products 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Manufacturing.
VVVV............... Boat 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Manufacturing. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
WWWW............... Reinforced 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Plastic 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Composites
Production.
XXXX............... Rubber Tire 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Manufacturing. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
YYYY............... Stationary 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Combustion 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Turbines.
ZZZZ............... Stationary 01/30/13......... 7/1/09........... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Reciprocating 10/23/13......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Internal
Combustion
Engines.
AAAAA.............. Lime 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Manufacturing 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Plants.
BBBBB.............. Semiconductor 9/19/11.......... 07/01/10......... 6/30/12.......... Not delegated.... 07/01/13......... Not delegated.
Manufacturing. 10/24/12......... 12/28/12......... 12/30/13......... 12/10/13.........
CCCCC.............. Coke Ovens: 9/19/11.......... 07/01/10......... 6/30/12.......... Not delegated.... 07/01/13......... Not delegated.
Pushing, 10/24/12......... 12/28/12......... 12/30/13......... 12/10/13.........
Quenching, and
Battery Stacks.
DDDDD.............. Industrial, Not delegated.... Not delegated.... 6/30/12.......... 07/01/13......... 07/01/13......... Not delegated.
Commercial and 12/30/13......... 05/13/14......... 12/10/13.........
Institutional
Boilers and
Process Heaters.
EEEEE.............. Iron and Steel 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Foundries. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
FFFFF.............. Integrated Iron 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
and Steel 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Manufacturing
Facilities.
GGGGG.............. Site Remediation. 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
HHHHH.............. Misc. Coating 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Manufacturing. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
IIIII.............. Mercury Cell 9/19/11.......... 07/01/10......... 6/30/12.......... Not delegated.... 07/01/13......... Not delegated.
Chlor-Alkali 10/24/12......... 12/28/12......... 12/30/13......... 12/10/13.........
Plants.
JJJJJ.............. Brick and Not delegated.... Not delegated.... Not delegated.... Not delegated.... 07/01/13......... Not delegated.
Structural Clay 12/10/13.........
Products
Manufacturing.
KKKKK.............. Clay Ceramics 9/19/11.......... Not delegated.... Not delegated.... Not delegated.... 07/01/13......... Not delegated.
Manufacturing. 10/24/12......... 12/10/13.........
LLLLL.............. Asphalt 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Processing and 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Asphalt Roofing
Manufacturing.
MMMMM.............. Flexible Poly- 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
urethane Foam 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Fabrication
Operation.
NNNNN.............. Hydrochloric Acid 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Production. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
PPPPP.............. Engine Test Cells/ 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Stands. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
QQQQQ.............. Friction 9/19/11.......... 07/01/10......... 6/30/12.......... Not delegated.... 07/01/13......... Not delegated.
Materials 10/24/12......... 12/28/12......... 12/30/13......... 12/10/13.........
Manufacturing
Facilities.
RRRRR.............. Taconite Iron Ore 9/19/11.......... 07/01/10......... 6/30/12.......... Not delegated.... 07/01/13......... Not delegated.
Processing. 10/24/12......... 12/28/12......... 12/30/13......... 12/10/13.........
SSSSS.............. Refractory 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Products 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Manufacturing.
TTTTT.............. Primary Magnesium 9/19/11.......... 07/01/10......... 6/30/12.......... Not delegated.... 07/01/13......... Not delegated.
Refining. 10/24/12......... 12/28/12......... 12/30/13......... 12/10/13.........
[[Page 10607]]
UUUUU.............. Coal and Oil- Not delegated.... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... Not delegated.
fired Electric 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13.........
Utility Steam
Generating Units.
WWWWW.............. Hospital Ethylene 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Oxide Sterilizer. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
YYYYY.............. Electric Arc 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Furnace 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Steelmaking
Facilities or
Stainless and
Non-stainless
Steel
Manufacturing
(EAFs).
ZZZZZ.............. Iron and Steel 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Foundries Area 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Sources.
BBBBBB............. Gasoline 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Distribution 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Bulk Terminal,
Bulk Plant and
Pipeline
Facilities.
CCCCCC............. Gasoline 1/24/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Distribution, 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Gasoline
Dispensing
Facilities.
DDDDDD............. PVC & Copolymer Not delegated.... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Production. 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
EEEEEE............. Primary Copper Not delegated.... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Smelting. 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
FFFFFF............. Secondary Copper Not delegated.... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Smelting. 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
GGGGGG............. Primary Not delegated.... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Nonferrous Metal. 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
HHHHHH............. Paint Stripping 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Operations, 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Misc. Surface
Coating,
Autobody
Refinishing.
JJJJJJ............. Industrial, Not delegated.... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... Not delegated.
Commercial, and 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13.........
Institutional
Boilers.
LLLLLL............. Acrylic/ 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... Not delegated.
Modacrylic 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13.........
Fibers
Production.
MMMMMM............. Carbon Black 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... Not delegated.
Production. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13.........
NNNNNN............. Chromium 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... Not delegated.
Compounds. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13,........
OOOOOO............. Flexible 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... Not delegated.
Polyurethane 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13.........
Foam Fabrication
and Production.
PPPPPP............. Lead Acid Battery 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... Not delegated.
Manufacturing. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13.........
QQQQQQ............. Wood Preserving.. 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... Not delegated.
10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13.........
RRRRRR............. Clay Ceramics 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Manufacturing. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
SSSSSS............. Pressed & Blown 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Glass 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
Manufacturing.
TTTTTT............. Secondary Non- 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... 07/01/11.
Ferrous Metals. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13......... 12/22/12.
VVVVVV............. Chemical 12/21/12......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... Not delegated.
Manufacturing 09/10/14......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13.........
Area Sources.
WWWWWW............. Plating and 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... Not delegated.
Polishing. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13.........
XXXXXX............. Metal Fabrication 9/19/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... Not delegated.
and Finishing. 10/24/12......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13.........
YYYYYY............. Ferroalloys Not delegated.... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... Not delegated.
Production. 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13.........
ZZZZZZ............. Area Source 6/28/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... Not delegated.
Standards for 1/24/11.......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13.........
Aluminum, Copper
and Other
Nonferrous
Foundries.
AAAAAAA............ Asphalt Not delegated.... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... Not delegated.
Processing and 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13.........
Asphalt Roofing
Manufacturing.
BBBBBBB............ Chemical Not delegated.... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... Not delegated.
Preparations 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13.........
Industry.
CCCCCCC............ Paints and Allied 6/28/11.......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... Not delegated.
Products 1/24/11.......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13.........
Manufacturing.
DDDDDDD............ Prepared Foods 12/23/11......... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... Not delegated.
Manufacturing. 09/10/14......... 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13.........
EEEEEEE............ Gold Mine Ore Not delegated.... 07/01/10......... 6/30/12.......... 07/01/13......... 07/01/13......... Not delegated.
Processing and 12/28/12......... 12/30/13......... 05/13/14......... 12/10/13.........
Production Area
Source Category.
HHHHHHH............ Polyvinyl Not delegated.... ................. 6/30/12.......... 07/01/13......... 07/01/13......... Not delegated.
Chloride and 12/30/13......... 05/13/14......... 12/10/13.........
Copolymers
Production.
--------------------------------------------------------------------------------------------------------------------------------------------------------
[[Page 10608]]
Note: At this time, Missouri is temporarily not accepting
delegation for area source NESHAP requirements (40 CFR part 63,
subparts 5W-7H) within the State of Missouri as described in an August
24, 2010 letter from MDNR to the U.S. EPA, Region 7.
Summary of This Action
All sources subject to the requirements of 40 CFR parts 60, 61, and
63 are also subject to the equivalent requirements of the above-
mentioned state or local agencies.
This document informs the public of delegations to the above-
mentioned agencies of the above-referenced Federal regulations.
Authority
This document is issued under the authority of sections 101, 110,
112, and 301 of the CAA, as amended (42 U.S.C. 7401, 7410, 7412, and
7601).
Dated: February 13, 2015.
Karl Brooks,
Regional Administrator, Region 7.
[FR Doc. 2015-04171 Filed 2-26-15; 8:45 am]