El Paso Natural Gas Company, L.L.C.; Notice of Request Under Blanket Authorization, 10682 [2015-04125]
Download as PDF
10682
Federal Register / Vol. 80, No. 39 / Friday, February 27, 2015 / Notices
Impact Statement for the Planned
PennEast Pipeline Project, Requests for
Comments on Environmental Issues,
and Notice of Public Scoping Meetings.
The notice solicited comments on the
potential environmental impacts of the
planned project and announced the time
and location of five public scoping
meetings being held for the
environmental proceedings.
Due to unforeseen circumstances, the
Commission staff is postponing the
scoping meeting planned for
Wednesday, January 28, 2015 at Bucks
County Community College, Kevin and
Sima Zlock Performing Arts Center
Gateway Auditorium, 275 Swamp Road,
Newtown, Pennsylvania 18940. Once a
new venue is established and
scheduled, the Commission will issue
another notice advising of the new
location and time.
Dated: January 26, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–04049 Filed 2–26–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–86–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
El Paso Natural Gas Company, L.L.C.;
Notice of Request Under Blanket
Authorization
Take notice that on February 12, 2015,
El Paso Natural Gas Company, L.L.C.
(EPNG), P.O. Box 1087, Colorado
Springs, Colorado, 80944 filed a prior
notice request pursuant to sections
157.205 and 157.213 of the
Commission’s regulations under the
Natural Gas Act for authorization to
construct and operate certain natural gas
storage field facilities within EPNG’s
existing Washington Ranch Storage
Field located in Eddy County, New
Mexico. Specifically, EPNG proposes to:
(i) Drill and connect two new injection/
withdrawal wells, (ii) construct two
appurtenant six-inch outside diameter
storage pipelines totaling up to 2,400
feet, and (iii) install new well pad
measurements. The project is referred to
as the Washington Ranch Project. EPNG
states that the two new wells and
associated laterals are designed to better
access existing working capacity, all as
more fully set forth in the application
which is on file with the Commission
and open to public inspection. The
filing may also be viewed on the Web
at https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
VerDate Sep<11>2014
18:05 Feb 26, 2015
Jkt 235001
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
at FERCOnlineSupport@ferc.gov or call
toll-free, (866) 208–3676 or TTY, (202)
502–8659.
Any questions regarding this
Application should be directed to
Francisco Tarin, Director, Regulatory
Affairs Department, El Paso Natural Gas
Company, LLC, P.O. Box 1087, Colorado
Springs, Colorado, 80944, or by calling
(719) 667–7517.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
NGA (18 CFR 157.205) file a protest to
the request. If no protest is filed within
the time allowed therefore, the proposed
activity shall be deemed to be
authorized effective the day after the
time allowed for protest. If a protest is
filed and not withdrawn within 30 days
after the time allowed for filing a
protest, the instant request shall be
treated as an application for
authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenter’s will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
PO 00000
Frm 00023
Fmt 4703
Sfmt 4703
associated with the Commission’s
environmental review process.
Environmental commenter’s will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentary,
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the Internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link. Persons
unable to file electronically should
submit original and 5 copies of the
protest or intervention to the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Dated: February 23, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–04125 Filed 2–26–15; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPPT–2003–0004; FRL–9923–28]
Access to Confidential Business
Information by the Food and Drug
Administration, Office of Foods and
Veterinary Medicine
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
EPA has authorized, the Food
and Drug Administration, Office of
Foods and Veterinary Medicine (FDA),
to access information which has been
submitted to EPA under all sections of
the Toxic Substances Control Act
(TSCA) and Federal Insecticide,
Fungicide and Rodenticide Act (FIFRA).
Some of the information may be claimed
or determined to be Confidential
Business Information (CBI).
DATES: Access to the confidential data
will occur no sooner than March 9,
2015.
SUMMARY:
FOR FURTHER INFORMATION CONTACT:
For technical information contact:
Colby Lintner, Regulatory Coordinator,
Environmental Assistance Division
(7408M), Office of Pollution Prevention
and Toxics, Environmental Protection
Agency, 1200 Pennsylvania Ave. NW.,
Washington, DC 20460–0001; telephone
E:\FR\FM\27FEN1.SGM
27FEN1
Agencies
[Federal Register Volume 80, Number 39 (Friday, February 27, 2015)]
[Notices]
[Page 10682]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-04125]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP15-86-000]
El Paso Natural Gas Company, L.L.C.; Notice of Request Under
Blanket Authorization
Take notice that on February 12, 2015, El Paso Natural Gas Company,
L.L.C. (EPNG), P.O. Box 1087, Colorado Springs, Colorado, 80944 filed a
prior notice request pursuant to sections 157.205 and 157.213 of the
Commission's regulations under the Natural Gas Act for authorization to
construct and operate certain natural gas storage field facilities
within EPNG's existing Washington Ranch Storage Field located in Eddy
County, New Mexico. Specifically, EPNG proposes to: (i) Drill and
connect two new injection/withdrawal wells, (ii) construct two
appurtenant six-inch outside diameter storage pipelines totaling up to
2,400 feet, and (iii) install new well pad measurements. The project is
referred to as the Washington Ranch Project. EPNG states that the two
new wells and associated laterals are designed to better access
existing working capacity, all as more fully set forth in the
application which is on file with the Commission and open to public
inspection. The filing may also be viewed on the Web at https://www.ferc.gov using the ``eLibrary'' link. Enter the docket number
excluding the last three digits in the docket number field to access
the document. For assistance, contact FERC at
FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or TTY,
(202) 502-8659.
Any questions regarding this Application should be directed to
Francisco Tarin, Director, Regulatory Affairs Department, El Paso
Natural Gas Company, LLC, P.O. Box 1087, Colorado Springs, Colorado,
80944, or by calling (719) 667-7517.
Any person may, within 60 days after the issuance of the instant
notice by the Commission, file pursuant to Rule 214 of the Commission's
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of
intervention. Any person filing to intervene or the Commission's staff
may, pursuant to section 157.205 of the Commission's Regulations under
the NGA (18 CFR 157.205) file a protest to the request. If no protest
is filed within the time allowed therefore, the proposed activity shall
be deemed to be authorized effective the day after the time allowed for
protest. If a protest is filed and not withdrawn within 30 days after
the time allowed for filing a protest, the instant request shall be
treated as an application for authorization pursuant to section 7 of
the NGA.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenter's will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commenter's will not be required to serve copies of filed
documents on all other parties. However, the non-party commentary, will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests, and interventions via the Internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (www.ferc.gov) under the ``e-Filing'' link. Persons unable to file
electronically should submit original and 5 copies of the protest or
intervention to the Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426.
Dated: February 23, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-04125 Filed 2-26-15; 8:45 am]
BILLING CODE 6717-01-P