South Carolina Electric & Gas Company; Notice of Intent To File License Application, Filing of Pre-Application Document, and Approving Use of the Traditional Licensing Process, 10477 [2015-03997]

Download as PDF Federal Register / Vol. 80, No. 38 / Thursday, February 26, 2015 / Notices The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: February 19, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–04003 Filed 2–25–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 1894–207] rmajette on DSK2VPTVN1PROD with NOTICES South Carolina Electric & Gas Company; Notice of Intent To File License Application, Filing of PreApplication Document, and Approving Use of the Traditional Licensing Process a. Type of Filing: Notice of Intent To File License Application and Request To Use the Traditional Licensing Process. b. Project No.: 1894–207. c. Date Filed: January 5, 2015. d. Submitted By: South Carolina Electric & Gas Company. e. Name of Project: Parr Hydroelectric Project. f. Location: On the Broad River, in Newberry and Fairfield Counties, South Carolina. No federal lands are occupied by the project works or located within the project boundary. g. Filed Pursuant to: 18 CFR 5.3 of the Commission’s regulations. h. Potential Applicant Contact: Mr. William Argentieri, P.E., Manager of Civil Engineering, South Carolina Electric & Gas Company, 220 Operation Way, Mail Code A221, Cayce, SC 29033–3701; (803) 217–9162; email— bargentieri@scana.com. i. FERC Contact: Monte TerHaar at (202) 502–6035; or email at monte.terhaar@ferc.gov. j. South Carolina Electric & Gas Company filed its request to use the Traditional Licensing Process on January 5, 2015 13, 2000. South Carolina Electric & Gas Company VerDate Sep<11>2014 15:27 Feb 25, 2015 Jkt 235001 provided public notice of its request on December 28, 2014 and January 14, 2015. In a letter dated February 20, 2015, the Director of the Division of Hydropower Licensing approved South Carolina Electric & Gas Company’s request to use the Traditional Licensing Process. k. With this notice, we are initiating informal consultation with the U.S. Fish and Wildlife Service and/or NOAA Fisheries under section 7 of the Endangered Species Act and the joint agency regulations thereunder at 50 CFR, Part 402; and NOAA Fisheries under section 305(b) of the MagnusonStevens Fishery Conservation and Management Act and implementing regulations at 50 CFR 600.920. We are also initiating consultation with the South Carolina State Historic Preservation Officer, as required by section 106, National Historical Preservation Act, and the implementing regulations of the Advisory Council on Historic Preservation at 36 CFR 800.2. l. With this notice, we are designating South Carolina Electric & Gas Company as the Commission’s non-federal representative for carrying out informal consultation pursuant to section 7 of the Endangered Species Act and section 305(b) of the Magnuson-Stevens Fishery Conservation and Management Act; and consultation pursuant to section 106 of the National Historic Preservation Act. m. South Carolina Electric & Gas Company filed a Pre-Application Document (PAD; including a proposed process plan and schedule) with the Commission, pursuant to 18 CFR 5.6 (d) of the Commission’s regulations. n. A copy of the PAD is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site (https:// www.ferc.gov), using the ‘‘eLibrary’’ link. Enter the docket number, excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCONlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). A copy is also available for inspection and reproduction at the address in paragraph h. o. The licensee states its unequivocal intent to submit an application for a new license for Project No. 1894. Pursuant to 18 CFR 16.8, 16.9, and 16.10 each application for a new license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by June 29, 2018. PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 10477 p. Register online at https:// www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filing and issuances related to this or other pending projects. For assistance, contact FERC Online Support. Dated: February 20, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–03997 Filed 2–25–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR15–15–000] Belle Fourche Pipeline Company, Bridger Pipeline LLC; Notice of Petition for Declaratory Order Take notice that on February 12, 2015, pursuant to Rule 207(a)(2) of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.207(a)(2) (2014), Belle Fourche Pipeline Company (Belle Fourche) and Bridger Pipeline LLC (Bridger), filed a petition for declaratory order seeking approval of the overall tariff and rate structure for an expansion pipeline system involving the coordinated expansions of both Belle Fourche’s and Bridger’s pipeline systems in Wyoming. The coordinated expansions will provide additional capacity for the transportation of crude oil for the Powder River Basin formation near Converse and Campbell Counties, Wyoming to Guernsey, Wyoming, all as more fully explained in the petition. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Petitioner. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the E:\FR\FM\26FEN1.SGM 26FEN1

Agencies

[Federal Register Volume 80, Number 38 (Thursday, February 26, 2015)]
[Notices]
[Page 10477]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-03997]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 1894-207]


South Carolina Electric & Gas Company; Notice of Intent To File 
License Application, Filing of Pre-Application Document, and Approving 
Use of the Traditional Licensing Process

    a. Type of Filing: Notice of Intent To File License Application and 
Request To Use the Traditional Licensing Process.
    b. Project No.: 1894-207.
    c. Date Filed: January 5, 2015.
    d. Submitted By: South Carolina Electric & Gas Company.
    e. Name of Project: Parr Hydroelectric Project.
    f. Location: On the Broad River, in Newberry and Fairfield 
Counties, South Carolina. No federal lands are occupied by the project 
works or located within the project boundary.
    g. Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations.
    h. Potential Applicant Contact: Mr. William Argentieri, P.E., 
Manager of Civil Engineering, South Carolina Electric & Gas Company, 
220 Operation Way, Mail Code A221, Cayce, SC 29033-3701; (803) 217-
9162; email_bargentieri@scana.com.
    i. FERC Contact: Monte TerHaar at (202) 502-6035; or email at 
monte.terhaar@ferc.gov.
    j. South Carolina Electric & Gas Company filed its request to use 
the Traditional Licensing Process on January 5, 2015 13, 2000. South 
Carolina Electric & Gas Company provided public notice of its request 
on December 28, 2014 and January 14, 2015. In a letter dated February 
20, 2015, the Director of the Division of Hydropower Licensing approved 
South Carolina Electric & Gas Company's request to use the Traditional 
Licensing Process.
    k. With this notice, we are initiating informal consultation with 
the U.S. Fish and Wildlife Service and/or NOAA Fisheries under section 
7 of the Endangered Species Act and the joint agency regulations 
thereunder at 50 CFR, Part 402; and NOAA Fisheries under section 305(b) 
of the Magnuson-Stevens Fishery Conservation and Management Act and 
implementing regulations at 50 CFR 600.920. We are also initiating 
consultation with the South Carolina State Historic Preservation 
Officer, as required by section 106, National Historical Preservation 
Act, and the implementing regulations of the Advisory Council on 
Historic Preservation at 36 CFR 800.2.
    l. With this notice, we are designating South Carolina Electric & 
Gas Company as the Commission's non-federal representative for carrying 
out informal consultation pursuant to section 7 of the Endangered 
Species Act and section 305(b) of the Magnuson-Stevens Fishery 
Conservation and Management Act; and consultation pursuant to section 
106 of the National Historic Preservation Act.
    m. South Carolina Electric & Gas Company filed a Pre-Application 
Document (PAD; including a proposed process plan and schedule) with the 
Commission, pursuant to 18 CFR 5.6 (d) of the Commission's regulations.
    n. A copy of the PAD is available for review at the Commission in 
the Public Reference Room or may be viewed on the Commission's Web site 
(https://www.ferc.gov), using the ``eLibrary'' link. Enter the docket 
number, excluding the last three digits in the docket number field to 
access the document. For assistance, contact FERC Online Support at 
FERCONlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). A copy is also available for inspection and reproduction at 
the address in paragraph h.
    o. The licensee states its unequivocal intent to submit an 
application for a new license for Project No. 1894. Pursuant to 18 CFR 
16.8, 16.9, and 16.10 each application for a new license and any 
competing license applications must be filed with the Commission at 
least 24 months prior to the expiration of the existing license. All 
applications for license for this project must be filed by June 29, 
2018.
    p. Register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing and issuances 
related to this or other pending projects. For assistance, contact FERC 
Online Support.

    Dated: February 20, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-03997 Filed 2-25-15; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.