Sage Grouse Energy Project, LLC v. PacificCorp; Notice of Complaint, 8636-8637 [2015-03261]
Download as PDF
emcdonald on DSK67QTVN1PROD with NOTICES
8636
Federal Register / Vol. 80, No. 32 / Wednesday, February 18, 2015 / Notices
Filed Date: 2/4/15.
Accession Number: 20150204–5125.
Comments Due: 5 p.m. ET 2/17/15.
Docket Numbers: RP15–434–000.
Applicants: Northwest Pipeline LLC.
Description: Section 4(d) rate filing
per 154.204: 2015 Miscellaneous and
Housekeeping Filing to be effective 4/1/
2015.
Filed Date: 2/4/15.
Accession Number: 20150204–5160.
Comments Due: 5 p.m. ET 2/17/15.
Docket Numbers: RP15–435–000.
Applicants: Southern Star Central Gas
Pipeline, Inc.
Description: Section 4(d) rate filing
per 154.204: Vol 2—Expiration—NonConforming Agreement-Chesapeake
Energy Marketing, Inc. to be effective 2/
6/2015.
Filed Date: 2/5/15.
Accession Number: 20150205–5061.
Comments Due: 5 p.m. ET 2/17/15.
Docket Numbers: RP15–436–000.
Applicants: Rockies Express Pipeline
LLC.
Description: Section 4(d) rate filing
per 154.204: Neg Rate 2015–02–05
Tenaska IT to be effective 2/6/2015.
Filed Date: 2/5/15.
Accession Number: 20150205–5192.
Comments Due: 5 p.m. ET 2/17/15.
Docket Numbers: RP15–437–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: Section 4(d) rate filing
per 154.204: 02/06/15 Negotiated
Rates—Mercuria Energy Gas Trading
LLC (HUB) 7540–89 to be effective 2/5/
2015.
Filed Date: 2/6/15.
Accession Number: 20150206–5069.
Comments Due: 5 p.m. ET 2/18/15.
Docket Numbers: RP15–438–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: Section 4(d) rate filing
per 154.204: 02/06/15 Negotiated
Rates—ConEdison Energy Inc. (HUB)
2275–89 to be effective 2/5/2015.
Filed Date: 2/6/15.
Accession Number: 20150206–5099.
Comments Due: 5 p.m. ET 2/18/15.
Docket Numbers: RP15–439–000.
Applicants: Iroquois Gas
Transmission System, L.P.
Description: Section 4(d) rate filing
per 154.204: 02/06/15 Negotiated
Rates—Sequent Energy Management
(HUB) 3075–89 to be effective 2/5/2015.
Filed Date: 2/6/15.
Accession Number: 20150206–5108.
Comments Due: 5 p.m. ET 2/18/15.
Docket Numbers: RP15–440–000.
Applicants: Texas Gas Transmission,
LLC.
Description: Section 4(d) rate filing
per 154.204: New Firm and Interruptible
VerDate Sep<11>2014
19:32 Feb 17, 2015
Jkt 235001
Lateral Service (FLS and ILS) to be
effective 4/1/2015.
Filed Date: 2/6/15.
Accession Number: 20150206–5197.
Comments Due: 5 p.m. ET 2/18/15.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified date(s). Protests
may be considered, but intervention is
necessary to become a party to the
proceeding.
Filings in Existing Proceedings
Docket Numbers: RP14–1272–002.
Applicants: National Grid LNG, LLC.
Description: Compliance filing per
154.203: Section 36 to be effective 3/1/
2015 under RP14–1272 Filing Type:
580.
Filed Date: 2/6/15.
Accession Number: 20150206–5134.
Comments Due: 5 p.m. ET 2/18/15.
Any person desiring to protest in any
of the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 9, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–03199 Filed 2–17–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. EL15–44–000]
Sage Grouse Energy Project, LLC v.
PacificCorp; Notice of Complaint
Take notice that on February 9, 2015,
pursuant to section 206 of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.206, Sage Grouse
Energy Project, LLC (Complainant) filed
a formal complaint against the
PacificCorp (Respondent) alleging that
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
PacifiCorp has implemented actions and
activities to: (1) Ignore the
Commission’s regulatory authority; (2)
circumvent the Commission’s December
16, 2013 Order in Docket No. EL–14–1–
000; 1 (3) violate the Respondent’s Open
Access Transmission Tariff, FERC
Electric Tariff, Volume No. 11 (OATT);
(4) violate FERC Orders for the
Standardization of Generator
Interconnection Agreements and
Procedures, including FERC Order 2003;
(5) engage in trickery including the
submission of subtle misrepresentations
of tariff language sufficient to alter and
change the original meaning and intent
of the tariff; (6) engage in activities and
practices that include acts against
individuals in protected classes such as
race, color, religion, sex and even
citizenship and immigration status as
defined in Civil Rights and AntiDiscrimination Laws; (7) disparaging
treatment with respect to the
Respondent requiring the Complainant
to produce additional information in
excess of the mandated requirements in
order to process the Complainants’
Interconnection Request; (8) the
processing of an invalid Interconnection
Request for a Respondent favored
Interconnection Customer, Blue
Mountain Power Partners, LLC on
parcels of land whereby the
developmental rights for said parcels of
land belong to the Complainant; and (9)
the processing of an invalid
Interconnection Request for a
Respondent favored Interconnection
Customer, Latigo Wind Park, LLC on
land where a transmission cable from
the Interconnection Customer’s
Generating Facility Collector Substation
to the Point of Interconnection, Pinto
Substation crosses land whereby the
developmental rights belong to the
Complainant, as more fully explained in
the complaint.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. The Respondent’s answer
and all interventions, or protests must
be filed on or before the comment date.
The Respondent’s answer, motions to
intervene, and protests must be served
on the Complainants.
1 Pioneer Wind Park I, LLC, 145 FERC ¶ 61,215
(2013).
E:\FR\FM\18FEN1.SGM
18FEN1
Federal Register / Vol. 80, No. 32 / Wednesday, February 18, 2015 / Notices
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an ‘‘eSubscription’’ link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on March 11, 2015.
Dated: February 11, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–03261 Filed 2–17–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Dated: February 10, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[Docket No. ER15–1016–000]
emcdonald on DSK67QTVN1PROD with NOTICES
Shafter Solar, LLC; Supplemental
Notice that Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
[FR Doc. 2015–03201 Filed 2–17–15; 8:45 am]
BILLING CODE 6717–01–P
This is a supplemental notice in the
above-referenced proceeding, of Shafter
Solar, LLC’s application for marketbased rate authority, with an
accompanying rate schedule, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
VerDate Sep<11>2014
19:32 Feb 17, 2015
Jkt 235001
assumptions of liability is March 2,
2015.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding(s) are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER15–1019–000]
Fowler Ridge IV Wind Farm LLC;
Supplemental Notice That Initial
Market-Based Rate Filing Includes
Request for Blanket Section 204
Authorization
This is a supplemental notice in the
above-referenced proceeding, of Fowler
Ridge IV Wind Farm LLC’s application
for market-based rate authority, with an
accompanying rate schedule, noting that
such application includes a request for
blanket authorization, under 18 CFR 34,
of future issuances of securities and
assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
PO 00000
Frm 00049
Fmt 4703
Sfmt 4703
8637
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR 34, of
future issuances of securities and
assumptions of liability is March 2,
2015.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding(s) are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: February 10, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–03202 Filed 2–17–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER15–936–000]
Benson Power, LLC; Supplemental
Notice That Initial Market-Based Rate
Filing Includes Request for Blanket
Section 204 Authorization
This is a supplemental notice in the
above-referenced proceeding, of Benson
E:\FR\FM\18FEN1.SGM
18FEN1
Agencies
[Federal Register Volume 80, Number 32 (Wednesday, February 18, 2015)]
[Notices]
[Pages 8636-8637]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-03261]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EL15-44-000]
Sage Grouse Energy Project, LLC v. PacificCorp; Notice of
Complaint
Take notice that on February 9, 2015, pursuant to section 206 of
the Federal Energy Regulatory Commission's (Commission) Rules of
Practice and Procedure, 18 CFR 385.206, Sage Grouse Energy Project, LLC
(Complainant) filed a formal complaint against the PacificCorp
(Respondent) alleging that PacifiCorp has implemented actions and
activities to: (1) Ignore the Commission's regulatory authority; (2)
circumvent the Commission's December 16, 2013 Order in Docket No. EL-
14-1-000; \1\ (3) violate the Respondent's Open Access Transmission
Tariff, FERC Electric Tariff, Volume No. 11 (OATT); (4) violate FERC
Orders for the Standardization of Generator Interconnection Agreements
and Procedures, including FERC Order 2003; (5) engage in trickery
including the submission of subtle misrepresentations of tariff
language sufficient to alter and change the original meaning and intent
of the tariff; (6) engage in activities and practices that include acts
against individuals in protected classes such as race, color, religion,
sex and even citizenship and immigration status as defined in Civil
Rights and Anti-Discrimination Laws; (7) disparaging treatment with
respect to the Respondent requiring the Complainant to produce
additional information in excess of the mandated requirements in order
to process the Complainants' Interconnection Request; (8) the
processing of an invalid Interconnection Request for a Respondent
favored Interconnection Customer, Blue Mountain Power Partners, LLC on
parcels of land whereby the developmental rights for said parcels of
land belong to the Complainant; and (9) the processing of an invalid
Interconnection Request for a Respondent favored Interconnection
Customer, Latigo Wind Park, LLC on land where a transmission cable from
the Interconnection Customer's Generating Facility Collector Substation
to the Point of Interconnection, Pinto Substation crosses land whereby
the developmental rights belong to the Complainant, as more fully
explained in the complaint.
---------------------------------------------------------------------------
\1\ Pioneer Wind Park I, LLC, 145 FERC ] 61,215 (2013).
---------------------------------------------------------------------------
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. The Respondent's
answer and all interventions, or protests must be filed on or before
the comment date. The Respondent's answer, motions to intervene, and
protests must be served on the Complainants.
[[Page 8637]]
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for electronic review in the
Commission's Public Reference Room in Washington, DC. There is an
``eSubscription'' link on the Web site that enables subscribers to
receive email notification when a document is added to a subscribed
docket(s). For assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on March 11, 2015.
Dated: February 11, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-03261 Filed 2-17-15; 8:45 am]
BILLING CODE 6717-01-P