Sage Grouse Energy Project, LLC v. PacificCorp; Notice of Complaint, 8636-8637 [2015-03261]

Download as PDF emcdonald on DSK67QTVN1PROD with NOTICES 8636 Federal Register / Vol. 80, No. 32 / Wednesday, February 18, 2015 / Notices Filed Date: 2/4/15. Accession Number: 20150204–5125. Comments Due: 5 p.m. ET 2/17/15. Docket Numbers: RP15–434–000. Applicants: Northwest Pipeline LLC. Description: Section 4(d) rate filing per 154.204: 2015 Miscellaneous and Housekeeping Filing to be effective 4/1/ 2015. Filed Date: 2/4/15. Accession Number: 20150204–5160. Comments Due: 5 p.m. ET 2/17/15. Docket Numbers: RP15–435–000. Applicants: Southern Star Central Gas Pipeline, Inc. Description: Section 4(d) rate filing per 154.204: Vol 2—Expiration—NonConforming Agreement-Chesapeake Energy Marketing, Inc. to be effective 2/ 6/2015. Filed Date: 2/5/15. Accession Number: 20150205–5061. Comments Due: 5 p.m. ET 2/17/15. Docket Numbers: RP15–436–000. Applicants: Rockies Express Pipeline LLC. Description: Section 4(d) rate filing per 154.204: Neg Rate 2015–02–05 Tenaska IT to be effective 2/6/2015. Filed Date: 2/5/15. Accession Number: 20150205–5192. Comments Due: 5 p.m. ET 2/17/15. Docket Numbers: RP15–437–000. Applicants: Iroquois Gas Transmission System, L.P. Description: Section 4(d) rate filing per 154.204: 02/06/15 Negotiated Rates—Mercuria Energy Gas Trading LLC (HUB) 7540–89 to be effective 2/5/ 2015. Filed Date: 2/6/15. Accession Number: 20150206–5069. Comments Due: 5 p.m. ET 2/18/15. Docket Numbers: RP15–438–000. Applicants: Iroquois Gas Transmission System, L.P. Description: Section 4(d) rate filing per 154.204: 02/06/15 Negotiated Rates—ConEdison Energy Inc. (HUB) 2275–89 to be effective 2/5/2015. Filed Date: 2/6/15. Accession Number: 20150206–5099. Comments Due: 5 p.m. ET 2/18/15. Docket Numbers: RP15–439–000. Applicants: Iroquois Gas Transmission System, L.P. Description: Section 4(d) rate filing per 154.204: 02/06/15 Negotiated Rates—Sequent Energy Management (HUB) 3075–89 to be effective 2/5/2015. Filed Date: 2/6/15. Accession Number: 20150206–5108. Comments Due: 5 p.m. ET 2/18/15. Docket Numbers: RP15–440–000. Applicants: Texas Gas Transmission, LLC. Description: Section 4(d) rate filing per 154.204: New Firm and Interruptible VerDate Sep<11>2014 19:32 Feb 17, 2015 Jkt 235001 Lateral Service (FLS and ILS) to be effective 4/1/2015. Filed Date: 2/6/15. Accession Number: 20150206–5197. Comments Due: 5 p.m. ET 2/18/15. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified date(s). Protests may be considered, but intervention is necessary to become a party to the proceeding. Filings in Existing Proceedings Docket Numbers: RP14–1272–002. Applicants: National Grid LNG, LLC. Description: Compliance filing per 154.203: Section 36 to be effective 3/1/ 2015 under RP14–1272 Filing Type: 580. Filed Date: 2/6/15. Accession Number: 20150206–5134. Comments Due: 5 p.m. ET 2/18/15. Any person desiring to protest in any of the above proceedings must file in accordance with Rule 211 of the Commission’s Regulations (18 CFR 385.211) on or before 5:00 p.m. Eastern time on the specified comment date. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: February 9, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–03199 Filed 2–17–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL15–44–000] Sage Grouse Energy Project, LLC v. PacificCorp; Notice of Complaint Take notice that on February 9, 2015, pursuant to section 206 of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.206, Sage Grouse Energy Project, LLC (Complainant) filed a formal complaint against the PacificCorp (Respondent) alleging that PO 00000 Frm 00048 Fmt 4703 Sfmt 4703 PacifiCorp has implemented actions and activities to: (1) Ignore the Commission’s regulatory authority; (2) circumvent the Commission’s December 16, 2013 Order in Docket No. EL–14–1– 000; 1 (3) violate the Respondent’s Open Access Transmission Tariff, FERC Electric Tariff, Volume No. 11 (OATT); (4) violate FERC Orders for the Standardization of Generator Interconnection Agreements and Procedures, including FERC Order 2003; (5) engage in trickery including the submission of subtle misrepresentations of tariff language sufficient to alter and change the original meaning and intent of the tariff; (6) engage in activities and practices that include acts against individuals in protected classes such as race, color, religion, sex and even citizenship and immigration status as defined in Civil Rights and AntiDiscrimination Laws; (7) disparaging treatment with respect to the Respondent requiring the Complainant to produce additional information in excess of the mandated requirements in order to process the Complainants’ Interconnection Request; (8) the processing of an invalid Interconnection Request for a Respondent favored Interconnection Customer, Blue Mountain Power Partners, LLC on parcels of land whereby the developmental rights for said parcels of land belong to the Complainant; and (9) the processing of an invalid Interconnection Request for a Respondent favored Interconnection Customer, Latigo Wind Park, LLC on land where a transmission cable from the Interconnection Customer’s Generating Facility Collector Substation to the Point of Interconnection, Pinto Substation crosses land whereby the developmental rights belong to the Complainant, as more fully explained in the complaint. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. The Respondent’s answer and all interventions, or protests must be filed on or before the comment date. The Respondent’s answer, motions to intervene, and protests must be served on the Complainants. 1 Pioneer Wind Park I, LLC, 145 FERC ¶ 61,215 (2013). E:\FR\FM\18FEN1.SGM 18FEN1 Federal Register / Vol. 80, No. 32 / Wednesday, February 18, 2015 / Notices The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on March 11, 2015. Dated: February 11, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–03261 Filed 2–17–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Dated: February 10, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [Docket No. ER15–1016–000] emcdonald on DSK67QTVN1PROD with NOTICES Shafter Solar, LLC; Supplemental Notice that Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization [FR Doc. 2015–03201 Filed 2–17–15; 8:45 am] BILLING CODE 6717–01–P This is a supplemental notice in the above-referenced proceeding, of Shafter Solar, LLC’s application for marketbased rate authority, with an accompanying rate schedule, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and VerDate Sep<11>2014 19:32 Feb 17, 2015 Jkt 235001 assumptions of liability is March 2, 2015. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding(s) are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER15–1019–000] Fowler Ridge IV Wind Farm LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding, of Fowler Ridge IV Wind Farm LLC’s application for market-based rate authority, with an accompanying rate schedule, noting that such application includes a request for blanket authorization, under 18 CFR 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 PO 00000 Frm 00049 Fmt 4703 Sfmt 4703 8637 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR 34, of future issuances of securities and assumptions of liability is March 2, 2015. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding(s) are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: February 10, 2015. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2015–03202 Filed 2–17–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER15–936–000] Benson Power, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding, of Benson E:\FR\FM\18FEN1.SGM 18FEN1

Agencies

[Federal Register Volume 80, Number 32 (Wednesday, February 18, 2015)]
[Notices]
[Pages 8636-8637]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-03261]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EL15-44-000]


Sage Grouse Energy Project, LLC v. PacificCorp; Notice of 
Complaint

    Take notice that on February 9, 2015, pursuant to section 206 of 
the Federal Energy Regulatory Commission's (Commission) Rules of 
Practice and Procedure, 18 CFR 385.206, Sage Grouse Energy Project, LLC 
(Complainant) filed a formal complaint against the PacificCorp 
(Respondent) alleging that PacifiCorp has implemented actions and 
activities to: (1) Ignore the Commission's regulatory authority; (2) 
circumvent the Commission's December 16, 2013 Order in Docket No. EL-
14-1-000; \1\ (3) violate the Respondent's Open Access Transmission 
Tariff, FERC Electric Tariff, Volume No. 11 (OATT); (4) violate FERC 
Orders for the Standardization of Generator Interconnection Agreements 
and Procedures, including FERC Order 2003; (5) engage in trickery 
including the submission of subtle misrepresentations of tariff 
language sufficient to alter and change the original meaning and intent 
of the tariff; (6) engage in activities and practices that include acts 
against individuals in protected classes such as race, color, religion, 
sex and even citizenship and immigration status as defined in Civil 
Rights and Anti-Discrimination Laws; (7) disparaging treatment with 
respect to the Respondent requiring the Complainant to produce 
additional information in excess of the mandated requirements in order 
to process the Complainants' Interconnection Request; (8) the 
processing of an invalid Interconnection Request for a Respondent 
favored Interconnection Customer, Blue Mountain Power Partners, LLC on 
parcels of land whereby the developmental rights for said parcels of 
land belong to the Complainant; and (9) the processing of an invalid 
Interconnection Request for a Respondent favored Interconnection 
Customer, Latigo Wind Park, LLC on land where a transmission cable from 
the Interconnection Customer's Generating Facility Collector Substation 
to the Point of Interconnection, Pinto Substation crosses land whereby 
the developmental rights belong to the Complainant, as more fully 
explained in the complaint.
---------------------------------------------------------------------------

    \1\ Pioneer Wind Park I, LLC, 145 FERC ] 61,215 (2013).
---------------------------------------------------------------------------

    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. The Respondent's 
answer and all interventions, or protests must be filed on or before 
the comment date. The Respondent's answer, motions to intervene, and 
protests must be served on the Complainants.

[[Page 8637]]

    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 5 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for electronic review in the 
Commission's Public Reference Room in Washington, DC. There is an 
``eSubscription'' link on the Web site that enables subscribers to 
receive email notification when a document is added to a subscribed 
docket(s). For assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on March 11, 2015.

    Dated: February 11, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015-03261 Filed 2-17-15; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.