Texas Gas Transmission, LLC; Supplemental Notice of Intent To Prepare an Environmental Assessment for the Proposed Southern Indiana Market Lateral Project and Request for Comments on Environmental Issues, 8304-8306 [2015-03147]
Download as PDF
tkelley on DSK3SPTVN1PROD with NOTICES
8304
Federal Register / Vol. 80, No. 31 / Tuesday, February 17, 2015 / Notices
PacifiCorp, Agua Caliente Solar, LLC,
Pinyon Pines Wind I, LLC, Pinyon Pines
Wind II, LLC, Solar Star California XIX,
LLC, Solar Star California XX, LLC,
Topaz Solar Farms LLC, CalEnergy,
LLC, CE Leathers Company, Del Ranch
Company, Elmore Company, Fish Lake
Power LLC, Salton Sea Power
Generation Company, Salton Sea Power
L.L.C., Vulcan/BN Geothermal Power
Company, Yuma Cogeneration
Associates.
Description: Response to Show Cause
Order of the Berkshire Hathaway Energy
MBR Sellers.
Filed Date: 2/9/15.
Accession Number: 20150209–5120.
Comments Due: 5 p.m. ET 3/2/15.
Docket Numbers: ER10–1285–005.
Applicants: Craven County Wood
Energy Limited Partnership.
Description: Notice of Non-Material
Change in Status of Craven County
Wood Energy Limited Partnership.
Filed Date: 2/9/15.
Accession Number: 20150209–5177.
Comments Due: 5 p.m. ET 3/2/15.
Docket Numbers: ER13–1523–002;
ER12–1875–003.
Applicants: Blythe Energy Inc.,
AltaGas Renewable Energy Colorado
LLC.
Description: Notice of Change in
Status of Blythe Energy Inc. and AltaGas
Renewable Energy Colorado LLC.
Filed Date: 2/9/15.
Accession Number: 20150209–5186.
Comments Due: 5 p.m. ET 3/2/15.
Docket Numbers: ER15–372–001.
Applicants: PJM Interconnection,
L.L.C.
Description: Tariff Amendment per
35.17(b): Response to Request for
Additional Information and Errata, PJM
SA 1141 to be effective 10/10/2014.
Filed Date: 2/9/15.
Accession Number: 20150209–5202.
Comments Due: 5 p.m. ET 3/2/15.
Docket Numbers: ER15–1013–000.
Applicants: WSPP Inc.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): 2015 Normal to be
effective 4/10/2015.
Filed Date: 2/9/15.
Accession Number: 20150209–5087.
Comments Due: 5 p.m. ET 3/2/15.
Docket Numbers: ER15–1014–000.
Applicants: The Connecticut Light
and Power Company, Public Service
Company of New Hampshire, Western
Massachusetts Electric Company.
Description: Northeast Utilities
Service Company on behalf of The
Connecticut Light and Power Company,
et. al. submits Notice of Cancellation of
Service Agreements.
Filed Date: 2/9/15.
Accession Number: 20150209–5130.
VerDate Sep<11>2014
16:51 Feb 13, 2015
Jkt 235001
Comments Due: 5 p.m. ET 3/2/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 9, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–03108 Filed 2–13–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–14–000]
Texas Gas Transmission, LLC;
Supplemental Notice of Intent To
Prepare an Environmental Assessment
for the Proposed Southern Indiana
Market Lateral Project and Request for
Comments on Environmental Issues
On January 9, 2015, the Federal
Energy Regulatory Commission (FERC
or Commission) issued a ‘‘Notice of
Intent to Prepare an Environmental
Assessment for the Proposed Southern
Indiana Market Lateral Project and
Request for Comments on
Environmental Issues’’ (NOI). The entire
environmental mailing list was not
provided copies of the NOI; therefore,
the Commission is issuing this
Supplemental NOI to extend the
scoping period and provide additional
time for interested parties to file
comments on environmental issues.
The staff of the Commission will
prepare an environmental assessment
(EA) that will discuss the environmental
impacts of the Southern Indiana Market
Lateral Project involving construction
and operation of facilities by Texas Gas
Transmission, LLC (Texas Gas) in
Henderson County, Kentucky and Posey
County, Indiana. The Commission will
use this EA in its decision-making
PO 00000
Frm 00020
Fmt 4703
Sfmt 4703
process to determine whether the
project is in the public convenience and
necessity.
The Commission continues to gather
input from the public and interested
agencies on the project. This process is
referred to as scoping. Your input will
help the Commission staff determine
what issues they need to evaluate in the
EA. The NOI identified February 9, 2015
as the close of the scoping period.
Please note that the scoping period is
now extended and will close on March
12, 2015.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the Commission
approves the project, that approval
conveys with it the right of eminent
domain. Therefore, if easement
negotiations fail to produce an
agreement, the pipeline company could
initiate condemnation proceedings
where compensation would be
determined in accordance with state
law.
Texas Gas provided landowners with
a fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ This fact sheet addresses a
number of typically-asked questions,
including the use of eminent domain
and how to participate in the
Commission’s proceedings. It is also
available for viewing on the FERC Web
site (www.ferc.gov).
Summary of the Proposed Project
Texas Gas proposes to construct and
operate a new approximately 29.9-milelong, 20-inch-diameter natural gas
pipeline lateral and an approximate 0.9mile-long, 10-inch-diameter natural gas
pipeline lateral extending from Texas
Gas’ facilities in Henderson County,
Kentucky to interconnections with two
industrial facilities in Posey County,
Indiana. The Southern Indiana Market
Lateral Project would provide about
166,000 million British thermal units
per day of firm transportation capacity.
According to Texas Gas, its project
would provide two new customers with
natural gas service.
E:\FR\FM\17FEN1.SGM
17FEN1
Federal Register / Vol. 80, No. 31 / Tuesday, February 17, 2015 / Notices
The Southern Indiana Market Lateral
Project would consist of the following
facilities:
• About 29.9 miles of 20-inchdiameter natural gas pipeline lateral;
• about 0.9 mile of 10-inch-diameter
natural gas pipeline lateral; and
• a mainline inspection launcher,
mainline valve, and two meter and
regulator stations.
The general location of the project
facilities is shown in appendix 1.1
Land Requirements for Construction
Construction of the proposed facilities
would disturb about 611.2 acres of land
for the aboveground facilities and the
pipeline. Following construction, Texas
Gas would maintain about 198.4 acres
for permanent operation of the project’s
facilities; the remaining acreage would
be restored and revert to former uses.
About 6 percent of the proposed
pipeline route parallels existing
pipeline, utility, or road rights-of-way.
tkelley on DSK3SPTVN1PROD with NOTICES
The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. NEPA also requires us 2 to
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping.’’ The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of the issues to
address in the EA. We will consider all
filed comments during the preparation
of the EA.
In the EA we will discuss impacts that
could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils;
• land use;
• water resources, fisheries, and
wetlands;
• cultural resources;
• vegetation and wildlife;
• air quality and noise;
• endangered and threatened species;
and
1 The appendices referenced in this notice will
not appear in the Federal Register. Copies of
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’ or from the
Commission’s Public Reference Room, 888 First
Street NE., Washington, DC 20426, or call (202)
502–8371. For instructions on connecting to
eLibrary, refer to the last page of this notice.
2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
environmental staff of the Commission’s Office of
Energy Projects.
VerDate Sep<11>2014
16:51 Feb 13, 2015
Jkt 235001
• public safety.
We will also evaluate reasonable
alternatives to the proposed project or
portions of the project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
The EA will present our independent
analysis of the issues. The EA will be
available in the public record through
eLibrary. Depending on the comments
received during the scoping process, we
may also publish and distribute the EA
to the public for an allotted comment
period. We will consider all comments
on the EA before making our
recommendations to the Commission.
To ensure we have the opportunity to
consider and address your comments,
please carefully follow the instructions
in the Public Participation section
below.
With this notice, we are asking
agencies with jurisdiction by law and/
or special expertise with respect to the
environmental issues of this project to
formally cooperate with us in the
preparation of the EA.3 Agencies that
would like to request cooperating
agency status should follow the
instructions for filing comments
provided under the Public Participation
section of this notice.
Consultations Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for Section
106 of the National Historic
Preservation Act, we are using this
notice to initiate consultation with the
applicable State Historic Preservation
Office (SHPO), and to solicit their views
and those of other government agencies,
interested Indian tribes, and the public
on the project’s potential effects on
historic properties.4 We will define the
project-specific Area of Potential Effects
(APE) in consultation with the SHPO as
the project develops. On natural gas
facility projects, the APE at a minimum
encompasses all areas subject to ground
disturbance (examples include
construction right-of-way, contractor/
pipe storage yards, compressor stations,
and access roads). Our EA for this
project will document our findings on
the impacts on historic properties and
3 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
4 The Advisory Council on Historic Preservation’s
regulations are at Title 36, Code of Federal
Regulations, Part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
PO 00000
Frm 00021
Fmt 4703
Sfmt 4703
8305
summarize the status of consultations
under Section 106.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
The more specific your comments, the
more useful they will be. To ensure that
your comments are timely and properly
recorded, please send your comments so
that the Commission receives them in
Washington, DC on or before March 12,
2015.
For your convenience, there are three
methods which you can use to submit
your comments to the Commission. In
all instances please reference the project
docket number (CP15–14–000) with
your submission. The Commission
encourages electronic filing of
comments and has expert staff available
to assist you at (202) 502–8258 or
efiling@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for interested persons to submit
brief, text-only comments on a project;
(2) You can file your comments
electronically using the eFiling feature
on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You must select
the type of filing you are making. If you
are filing a comment on a particular
project, please select ‘‘Comment on a
Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Room
1A, Washington, DC 20426.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
E:\FR\FM\17FEN1.SGM
17FEN1
8306
Federal Register / Vol. 80, No. 31 / Tuesday, February 17, 2015 / Notices
project purposes or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the proposed project.
If we publish and distribute the EA,
copies will be sent to the environmental
mailing list for public review and
comment. If you would prefer to receive
a paper copy of the document instead of
the CD version or would like to remove
your name from the mailing list, please
return the attached Information Request
(appendix 2).
tkelley on DSK3SPTVN1PROD with NOTICES
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are in the User’s Guide under
the ‘‘e-filing’’ link on the Commission’s
Web site.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site at www.ferc.gov using the
‘‘eLibrary’’ link. Click on the eLibrary
link, click on ‘‘General Search’’ and
enter the docket number, excluding the
last three digits in the Docket Number
field (i.e., CP15–14). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries, and direct links
to the documents. Go to www.ferc.gov/
docs-filing/esubscription.asp.
VerDate Sep<11>2014
16:51 Feb 13, 2015
Jkt 235001
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: February 10, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–03147 Filed 2–13–15; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–RCRA–2014–0925, FRL–9922–93–
OSWER]
Agency Information Collection
Activities; Proposed Collection;
Comment Request; Requirements for
Generators, Transporters, and Waste
Management Facilities Under the
RCRA Hazardous Waste Manifest
System
Environmental Protection
Agency.
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency (EPA) is planning to submit an
information collection request (ICR),
Requirements for Generators,
Transporters, and Waste Management
Facilities Under the RCRA Hazardous
Waste Manifest System (EPA ICR No.
0801.20, OMB Control No. 2050–0039)
to the Office of Management and Budget
(OMB) for review and approval in
accordance with the Paperwork
Reduction Act (PRA) (44 U.S.C. 3501 et
seq.). Before doing so, EPA is soliciting
public comments on specific aspects of
the proposed information collection as
described below. This is a proposed
extension of the ICR, which is currently
approved through May 31, 2015. An
Agency may not conduct or sponsor and
a person is not required to respond to
a collection of information unless it
displays a currently valid OMB control
number.
DATES: Comments must be submitted on
or before April 20, 2015.
ADDRESSES: Submit your comments,
referencing by Docket ID No. EPA–HQ–
RCRA–2014–0925, online using
www.regulations.gov (our preferred
method), by email to rcra-docket@
epa.gov, or by mail to: EPA Docket
Center, Environmental Protection
Agency, Mail Code 28221T, 1200
Pennsylvania Ave. NW., Washington,
DC 20460.
EPA’s policy is that all comments
received will be included in the public
docket without change including any
personal information provided, unless
SUMMARY:
PO 00000
Frm 00022
Fmt 4703
Sfmt 4703
the comment includes profanity, threats,
information claimed to be Confidential
Business Information (CBI) or other
information whose disclosure is
restricted by statute.
FOR FURTHER INFORMATION CONTACT:
Bryan Groce, Office of Resource
Conservation and Recovery, Materials
Recovery and Waste Management
Division, (5304P), Environmental
Protection Agency, 1200 Pennsylvania
Ave. NW., Washington, DC 20460;
telephone number: (703) 308–8750; fax
number: (703) 308–0514; email address:
groce.bryan@epa.gov.
SUPPLEMENTARY INFORMATION:
Supporting documents which explain in
detail the information the EPA will be
collecting are available in the public
docket for this ICR. The docket can be
viewed online at www.regulations.gov
or in person at the EPA Docket Center,
EPA West, Room 3334, 1301
Constitution Ave. NW., Washington,
DC. The telephone number for the
Docket Center is 202–566–1744. For
additional information about EPA’s
public docket, visit https://www.epa.gov/
dockets.
Pursuant to section 3506(c)(2)(A) of
the PRA, the EPA is soliciting comments
and information to enable it to: (i)
Evaluate whether the proposed
collection of information is necessary
for the proper performance of the
functions of the Agency, including
whether the information will have
practical utility; (ii) evaluate the
accuracy of the Agency’s estimate of the
burden of the proposed collection of
information, including the validity of
the methodology and assumptions used;
(iii) enhance the quality, utility, and
clarity of the information to be
collected; and (iv) minimize the burden
of the collection of information on those
who are to respond, including through
the use of appropriate automated
electronic, mechanical, or other
technological collection techniques or
other forms of information technology,
e.g., permitting electronic submission of
responses. EPA will consider the
comments received and amend the ICR
as appropriate. The final ICR package
will then be submitted to OMB for
review and approval. At that time, EPA
will issue another Federal Register
notice to announce the submission of
the ICR to OMB and the opportunity to
submit additional comments to OMB.
Abstract: This ICR covers
recordkeeping and reporting activities
for the hazardous waste manifest paper
system, under the Resource
Conservation and Recovery Act (RCRA).
EPA’s authority to require use of a
manifest system stems primarily from
E:\FR\FM\17FEN1.SGM
17FEN1
Agencies
[Federal Register Volume 80, Number 31 (Tuesday, February 17, 2015)]
[Notices]
[Pages 8304-8306]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-03147]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP15-14-000]
Texas Gas Transmission, LLC; Supplemental Notice of Intent To
Prepare an Environmental Assessment for the Proposed Southern Indiana
Market Lateral Project and Request for Comments on Environmental Issues
On January 9, 2015, the Federal Energy Regulatory Commission (FERC
or Commission) issued a ``Notice of Intent to Prepare an Environmental
Assessment for the Proposed Southern Indiana Market Lateral Project and
Request for Comments on Environmental Issues'' (NOI). The entire
environmental mailing list was not provided copies of the NOI;
therefore, the Commission is issuing this Supplemental NOI to extend
the scoping period and provide additional time for interested parties
to file comments on environmental issues.
The staff of the Commission will prepare an environmental
assessment (EA) that will discuss the environmental impacts of the
Southern Indiana Market Lateral Project involving construction and
operation of facilities by Texas Gas Transmission, LLC (Texas Gas) in
Henderson County, Kentucky and Posey County, Indiana. The Commission
will use this EA in its decision-making process to determine whether
the project is in the public convenience and necessity.
The Commission continues to gather input from the public and
interested agencies on the project. This process is referred to as
scoping. Your input will help the Commission staff determine what
issues they need to evaluate in the EA. The NOI identified February 9,
2015 as the close of the scoping period. Please note that the scoping
period is now extended and will close on March 12, 2015.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives should notify their constituents of this proposed
project and encourage them to comment on their areas of concern.
If you are a landowner receiving this notice, a pipeline company
representative may contact you about the acquisition of an easement to
construct, operate, and maintain the proposed facilities. The company
would seek to negotiate a mutually acceptable agreement. However, if
the Commission approves the project, that approval conveys with it the
right of eminent domain. Therefore, if easement negotiations fail to
produce an agreement, the pipeline company could initiate condemnation
proceedings where compensation would be determined in accordance with
state law.
Texas Gas provided landowners with a fact sheet prepared by the
FERC entitled ``An Interstate Natural Gas Facility On My Land? What Do
I Need To Know?'' This fact sheet addresses a number of typically-asked
questions, including the use of eminent domain and how to participate
in the Commission's proceedings. It is also available for viewing on
the FERC Web site (www.ferc.gov).
Summary of the Proposed Project
Texas Gas proposes to construct and operate a new approximately
29.9-mile-long, 20-inch-diameter natural gas pipeline lateral and an
approximate 0.9-mile-long, 10-inch-diameter natural gas pipeline
lateral extending from Texas Gas' facilities in Henderson County,
Kentucky to interconnections with two industrial facilities in Posey
County, Indiana. The Southern Indiana Market Lateral Project would
provide about 166,000 million British thermal units per day of firm
transportation capacity. According to Texas Gas, its project would
provide two new customers with natural gas service.
[[Page 8305]]
The Southern Indiana Market Lateral Project would consist of the
following facilities:
About 29.9 miles of 20-inch-diameter natural gas pipeline
lateral;
about 0.9 mile of 10-inch-diameter natural gas pipeline
lateral; and
a mainline inspection launcher, mainline valve, and two
meter and regulator stations.
The general location of the project facilities is shown in appendix
1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of appendices were sent to all those
receiving this notice in the mail and are available at www.ferc.gov
using the link called ``eLibrary'' or from the Commission's Public
Reference Room, 888 First Street NE., Washington, DC 20426, or call
(202) 502-8371. For instructions on connecting to eLibrary, refer to
the last page of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the proposed facilities would disturb about 611.2
acres of land for the aboveground facilities and the pipeline.
Following construction, Texas Gas would maintain about 198.4 acres for
permanent operation of the project's facilities; the remaining acreage
would be restored and revert to former uses. About 6 percent of the
proposed pipeline route parallels existing pipeline, utility, or road
rights-of-way.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
\2\ to discover and address concerns the public may have about
proposals. This process is referred to as ``scoping.'' The main goal of
the scoping process is to focus the analysis in the EA on the important
environmental issues. By this notice, the Commission requests public
comments on the scope of the issues to address in the EA. We will
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------
\2\ ``We,'' ``us,'' and ``our'' refer to the environmental staff
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------
In the EA we will discuss impacts that could occur as a result of
the construction and operation of the proposed project under these
general headings:
Geology and soils;
land use;
water resources, fisheries, and wetlands;
cultural resources;
vegetation and wildlife;
air quality and noise;
endangered and threatened species; and
public safety.
We will also evaluate reasonable alternatives to the proposed
project or portions of the project, and make recommendations on how to
lessen or avoid impacts on the various resource areas.
The EA will present our independent analysis of the issues. The EA
will be available in the public record through eLibrary. Depending on
the comments received during the scoping process, we may also publish
and distribute the EA to the public for an allotted comment period. We
will consider all comments on the EA before making our recommendations
to the Commission. To ensure we have the opportunity to consider and
address your comments, please carefully follow the instructions in the
Public Participation section below.
With this notice, we are asking agencies with jurisdiction by law
and/or special expertise with respect to the environmental issues of
this project to formally cooperate with us in the preparation of the
EA.\3\ Agencies that would like to request cooperating agency status
should follow the instructions for filing comments provided under the
Public Participation section of this notice.
---------------------------------------------------------------------------
\3\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
---------------------------------------------------------------------------
Consultations Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for Section 106 of the National Historic
Preservation Act, we are using this notice to initiate consultation
with the applicable State Historic Preservation Office (SHPO), and to
solicit their views and those of other government agencies, interested
Indian tribes, and the public on the project's potential effects on
historic properties.\4\ We will define the project-specific Area of
Potential Effects (APE) in consultation with the SHPO as the project
develops. On natural gas facility projects, the APE at a minimum
encompasses all areas subject to ground disturbance (examples include
construction right-of-way, contractor/pipe storage yards, compressor
stations, and access roads). Our EA for this project will document our
findings on the impacts on historic properties and summarize the status
of consultations under Section 106.
---------------------------------------------------------------------------
\4\ The Advisory Council on Historic Preservation's regulations
are at Title 36, Code of Federal Regulations, Part 800. Those
regulations define historic properties as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register of Historic
Places.
---------------------------------------------------------------------------
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. Your comments should focus on
the potential environmental effects, reasonable alternatives, and
measures to avoid or lessen environmental impacts. The more specific
your comments, the more useful they will be. To ensure that your
comments are timely and properly recorded, please send your comments so
that the Commission receives them in Washington, DC on or before March
12, 2015.
For your convenience, there are three methods which you can use to
submit your comments to the Commission. In all instances please
reference the project docket number (CP15-14-000) with your submission.
The Commission encourages electronic filing of comments and has expert
staff available to assist you at (202) 502-8258 or efiling@ferc.gov.
(1) You can file your comments electronically using the eComment
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. This is an easy method for interested persons to
submit brief, text-only comments on a project;
(2) You can file your comments electronically using the eFiling
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. With eFiling, you can provide comments in a
variety of formats by attaching them as a file with your submission.
New eFiling users must first create an account by clicking on
``eRegister.'' You must select the type of filing you are making. If
you are filing a comment on a particular project, please select
``Comment on a Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the following address: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC
20426.
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for
[[Page 8306]]
project purposes or who own homes within certain distances of
aboveground facilities, and anyone who submits comments on the project.
We will update the environmental mailing list as the analysis proceeds
to ensure that we send the information related to this environmental
review to all individuals, organizations, and government entities
interested in and/or potentially affected by the proposed project.
If we publish and distribute the EA, copies will be sent to the
environmental mailing list for public review and comment. If you would
prefer to receive a paper copy of the document instead of the CD
version or would like to remove your name from the mailing list, please
return the attached Information Request (appendix 2).
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an ``intervenor'' which is an official party to the
Commission's proceeding. Intervenors play a more formal role in the
process and are able to file briefs, appear at hearings, and be heard
by the courts if they choose to appeal the Commission's final ruling.
An intervenor formally participates in the proceeding by filing a
request to intervene. Instructions for becoming an intervenor are in
the User's Guide under the ``e-filing'' link on the Commission's Web
site.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC Web site at www.ferc.gov using the ``eLibrary'' link. Click on the
eLibrary link, click on ``General Search'' and enter the docket number,
excluding the last three digits in the Docket Number field (i.e., CP15-
14). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.
Dated: February 10, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-03147 Filed 2-13-15; 8:45 am]
BILLING CODE 6717-01-P