Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Gulf Trace Expansion Project and Request for Comments on Environmental Issues, 7455-7457 [2015-02684]
Download as PDF
rljohnson on DSK3VPTVN1PROD with NOTICES
Federal Register / Vol. 80, No. 27 / Tuesday, February 10, 2015 / Notices
Power, LLC, CR Clearing, LLC, Criterion
Power Partners, LLC, Exelon
Framingham, LLC, Exelon Generation
Company, LLC, Exelon New Boston,
LLC, Exelon West Medway, LLC, Exelon
Wind 4, LLC, Exelon Wyman, LLC,
Fourmile Wind Energy, LLC, Handsome
Lake Energy, LLC, Harvest II Windfarm,
LLC, Harvest WindFarm, LLC, High
Mesa Energy, LLC, Integrys Energy
Services of New York, Inc., Integrys
Energy Services, Inc., Michigan Wind 1,
LLC, Michigan Wind 2, LLC, Nine Mile
Point Nuclear Station, LLC, PECO
Energy Company, R.E. Ginna Nuclear
Power Plant, LLC, Shooting Star Wind
Project, LLC, Tuana Springs Energy,
LLC, Wildcat Wind, LLC, Wind Capital
Holdings, LLC.
Description: Notice of Change in
Status of the Exelon MBR Entities.
Filed Date: 2/2/15.
Accession Number: 20150202–5343.
Comments Due: 5 p.m. ET 2/23/15.
Docket Numbers: ER14–2326–001.
Applicants: Entergy Nuclear
FitzPatrick, LLC.
Description: Compliance filing per
35.37: Entergy Nuclear Fitzpatrick, LLC,
Tariff Update to be effective 8/29/2014.
Filed Date: 2/3/15.
Accession Number: 20150203–5042.
Comments Due: 5 p.m. ET 2/24/15.
Docket Numbers: ER14–2327–001.
Applicants: Entergy Nuclear
Generation Company.
Description: Compliance filing per
35.37: Entergy Nuclear Generating
Company Tariff Update to be effective
8/29/2014.
Filed Date: 2/3/15.
Accession Number: 20150203–5044.
Comments Due: 5 p.m. ET 2/24/15.
Docket Numbers: ER14–2328–001.
Applicants: Entergy Nuclear Indian
Point 2, LLC.
Description: Compliance filing per
35.37: Entergy Nuclear Indian Point 2,
LLC, Tariff Update to be effective 8/29/
2014.
Filed Date: 2/3/15.
Accession Number: 20150203–5050.
Comments Due: 5 p.m. ET 2/24/15.
Docket Numbers: ER14–2329–001.
Applicants: Entergy Nuclear Indian
Point 3, LLC.
Description: Compliance filing per
35.37: Entergy Nuclear Indian Point 3,
LLC, Tariff Update to be effective 8/29/
2014.
Filed Date: 2/3/15.
Accession Number: 20150203–5053.
Comments Due: 5 p.m. ET 2/24/15.
Docket Numbers: ER14–2330–001.
Applicants: Entergy Nuclear Power
Marketing, LLC.
Description: Compliance filing per
35.37: Entergy Nuclear Power
VerDate Sep<11>2014
15:20 Feb 09, 2015
Jkt 235001
Marketing, LLC, Tariff Update to be
effective 8/29/2014.
Filed Date: 2/3/15.
Accession Number: 20150203–5047.
Comments Due: 5 p.m. ET 2/24/15.
Docket Numbers: ER14–2332–001.
Applicants: Entergy Rhode Island
State Energy, L.P.
Description: Compliance filing per
35.37: Entergy Rhode Island State
Energy, LP., Tariff Update to be effective
8/29/2014.
Filed Date: 2/3/15.
Accession Number: 20150203–5048.
Comments Due: 5 p.m. ET 2/24/15.
Docket Numbers: ER15–895–001.
Applicants: Kentucky Utilities
Company.
Description: Tariff Amendment per
35.17(b): Errata to 1_23_2015 recollation filing to be effective 1/24/2015.
Filed Date: 2/3/15.
Accession Number: 20150203–5059.
Comments Due: 5 p.m. ET 2/24/15.
Docket Numbers: ER15–959–000.
Applicants: PJM Interconnection,
L.L.C., Commonwealth Edison
Company, Commonwealth Edison
Company of Indiana, Inc.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): ComEd submits
revisions to OATT Att H–13A re PBOP
Expense to be effective 3/30/2015.
Filed Date: 2/2/15.
Accession Number: 20150202–5276.
Comments Due: 5 p.m. ET 2/23/15.
Docket Numbers: ER15–960–000.
Applicants: CPV Biomass Holdings,
LLC.
Description: Initial rate filing per
35.12 Application for Market-Based Rate
Authority to be effective 3/3/2015.
Filed Date: 2/2/15.
Accession Number: 20150202–5280.
Comments Due: 5 p.m. ET 2/23/15.
Docket Numbers: ER15–961–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): 1630R5 The Empire
District Electric Company NITSA and
NOA to be effective 1/1/2015.
Filed Date: 2/2/15.
Accession Number: 20150202–5283.
Comments Due: 5 p.m. ET 2/23/15.
Docket Numbers: ER15–962–000.
Applicants: ISO New England Inc.,
Emera Maine.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): Cancellation of Howland
LSA to be effective 1/6/2015.
Filed Date: 2/3/15.
Accession Number: 20150203–5086.
Comments Due: 5 p.m. ET 2/24/15.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
PO 00000
Frm 00054
Fmt 4703
Sfmt 4703
7455
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: February 3, 2015.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2015–02633 Filed 2–9–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP15–29–000]
Transcontinental Gas Pipe Line
Company, LLC; Notice of Intent To
Prepare an Environmental Assessment
for the Proposed Gulf Trace Expansion
Project and Request for Comments on
Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Gulf Trace Expansion Project
involving construction and operation of
facilities by Transcontinental Gas Pipe
Line company, LLC (Transco) in
Cameron, Calcasieu, Beauregard,
Evangeline, and East Feliciana Parishes,
Louisiana. The Commission will use
this EA in its decisionmaking process to
determine whether the project is in the
public convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help the Commission
staff determine what issues they need to
evaluate in the EA. Please note that the
scoping period will close on March 6,
2015.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
E:\FR\FM\10FEN1.SGM
10FEN1
7456
Federal Register / Vol. 80, No. 27 / Tuesday, February 10, 2015 / Notices
rljohnson on DSK3VPTVN1PROD with NOTICES
proposed project and encourage them to
comment on their areas of concern.
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the Commission
approves the project, that approval
conveys with it the right of eminent
domain. Therefore, if easement
negotiations fail to produce an
agreement, the pipeline company could
initiate condemnation proceedings
where compensation would be
determined in accordance with state
law.
Transco provided landowners with a
fact sheet prepared by the FERC entitled
‘‘An Interstate Natural Gas Facility On
My Land? What Do I Need To Know?’’
This fact sheet addresses a number of
typically-asked questions, including the
use of eminent domain and how to
participate in the Commission’s
proceedings. It is also available for
viewing on the FERC Web site
(www.ferc.gov).
Summary of the Proposed Project
The Gulf Trace Expansion Project
would provide about 1.2 million
standard cubic feet of natural gas per
day from its Station 65 Zone 3 Pool in
St. Helena Parish, Louisiana, southward
along its existing mainline, existing
Southwest Louisiana Lateral, and the
proposed project facilities to Sabine
Pass Liquefaction, LLC liquefied natural
gas terminal (SPLNG Terminal) in
Cameron Parish, Louisiana. The
pipeline would extend from a tie-in
with the existing NHI Laterals C and D
to SPLNG Terminal.
The Gulf Trace Expansion Project
would consist of the following facilities:
• About 6.97 miles of 36-inchdiameter pipeline (the Gulf Trace
Lateral) in Cameron Parish;
• addition of two 16,000 horsepower
(hp) gas turbine-driven compressor
units at Transco’s existing Compressor
Station 44 in Cameron Parish;
• two 16,000 hp gas turbine-driven
compressor units at the new Compressor
Station 42 at the junction of the
Transco’s mainline and its Southwest
Louisiana Lateral in Calcasieu Parish;
• piping and valve modifications on
Transco’s mainline at existing
Compressor Stations 45, 50, and 60 in
Beauregard, Evangeline, and East
Feliciana Parishes to allow for bidirectional flow;
• two new meter stations, one
adjacent to the SPLNG Terminal in
Cameron Parish (SPLNG Meter Station)
VerDate Sep<11>2014
15:20 Feb 09, 2015
Jkt 235001
and one adjacent to the Texas Gas
Interconnection in Evangeline Parish
(Duralde Meter Station);
• piping and valve modifications, and
pig launcher and receivers required to
tie-in the Gulf Trace Lateral with the
existing NHI Laterals C and D at the
milepost 6.8 valve site 1 in Cameron
Parish; and
• appurtenant underground and
aboveground facilities.
The general location of the project
facilities is shown in appendix 1.2
Land Requirements for Construction
Construction of the proposed facilities
would disturb about 263.4 acres of land
for the aboveground facilities and the
pipeline. Following construction,
Transco would maintain about 75.6
acres for permanent operation of the
project’s facilities; the remaining
acreage would be restored and revert to
former uses. About 17 percent of the
proposed pipeline route parallels
existing pipeline, utility, or road rightsof-way.
The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. NEPA also requires us 3 to
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping.’’ The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of the issues to
address in the EA. We will consider all
filed comments during the preparation
of the EA.
In the EA we will discuss impacts that
could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils;
• land use;
1 A ‘‘pig’’ is a tool that the pipeline company
inserts into and pushes through the pipeline for
cleaning the pipeline, conducting internal
inspections, or other purposes.
2 The appendices referenced in this notice will
not appear in the Federal Register. Copies of
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’ or from the
Commission’s Public Reference Room, 888 First
Street NE., Washington, DC 20426, or call (202)
502–8371. For instructions on connecting to
eLibrary, refer to the last page of this notice.
3 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
environmental staff of the Commission’s Office of
Energy Projects.
PO 00000
Frm 00055
Fmt 4703
Sfmt 4703
• water resources, fisheries, and
wetlands;
• cultural resources;
• vegetation and wildlife including
migratory birds;
• air quality and noise;
• endangered and threatened species;
and
• public safety.
We will also evaluate reasonable
alternatives to the proposed project or
portions of the project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
The EA will present our independent
analysis of the issues. The EA will be
available in the public record through
eLibrary. Depending on the comments
received during the scoping process, we
may also publish and distribute the EA
to the public for an allotted comment
period. We will consider all comments
on the EA before making our
recommendations to the Commission.
To ensure we have the opportunity to
consider and address your comments,
please carefully follow the instructions
in the Public Participation section
beginning on page 5.
With this notice, we are asking
agencies with jurisdiction by law and/
or special expertise with respect to the
environmental issues of this project to
formally cooperate with us in the
preparation of the EA.4 Agencies that
would like to request cooperating
agency status should follow the
instructions for filing comments
provided under the Public Participation
section of this notice.
Consultations Under Section 106 of the
National Historic Preservation Act
In accordance with the Advisory
Council on Historic Preservation’s
implementing regulations for section
106 of the National Historic
Preservation Act, we are using this
notice to initiate consultation with the
applicable State Historic Preservation
Office (SHPO), and to solicit their views
and those of other government agencies,
interested Indian tribes, and the public
on the project’s potential effects on
historic properties.5 We will define the
project-specific Area of Potential Effects
(APE) in consultation with the SHPO as
the project develops. On natural gas
4 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, part 1501.6.
5 The Advisory Council on Historic Preservation’s
regulations are at Title 36, Code of Federal
Regulations, part 800. Those regulations define
historic properties as any prehistoric or historic
district, site, building, structure, or object included
in or eligible for inclusion in the National Register
of Historic Places.
E:\FR\FM\10FEN1.SGM
10FEN1
Federal Register / Vol. 80, No. 27 / Tuesday, February 10, 2015 / Notices
facility projects, the APE at a minimum
encompasses all areas subject to ground
disturbance (examples include
construction right-of-way, contractor/
pipe storage yards, compressor stations,
and access roads). Our EA for this
project will document our findings on
the impacts on historic properties and
summarize the status of consultations
under section 106.
Currently Identified Environmental
Issues
We have already identified several
issues that we think deserve attention
based on a preliminary review of the
proposed facilities and the
environmental information provided by
Transco. This preliminary list of issues
may be changed based on your
comments and our analysis. These
include impacts on:
• Wetlands and waterbodies;
• wildlife;
• migratory birds;
• vegetation;
• threatened or endangered species;
• land use;
• air quality;
• noise; and
• safety.
rljohnson on DSK3VPTVN1PROD with NOTICES
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
avoid or lessen environmental impacts.
The more specific your comments, the
more useful they will be. To ensure that
your comments are timely and properly
recorded, please send your comments so
that the Commission receives them in
Washington, DC on or before March 6,
2015.
For your convenience, there are three
methods which you can use to submit
your comments to the Commission. In
all instances please reference the project
docket number (CP15–29–000) with
your submission. The Commission
encourages electronic filing of
comments and has expert staff available
to assist you at (202) 502–8258 or
efiling@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for interested persons to submit
brief, text-only comments on a project;
(2) You can file your comments
electronically using the eFiling feature
on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
VerDate Sep<11>2014
15:20 Feb 09, 2015
Jkt 235001
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You must select
the type of filing you are making. If you
are filing a comment on a particular
project, please select ‘‘Comment on a
Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Room
1A, Washington, DC 20426.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the proposed project.
If we publish and distribute the EA,
copies will be sent to the environmental
mailing list for public review and
comment. If you would prefer to receive
a paper copy of the document instead of
the CD version or would like to remove
your name from the mailing list, please
return the attached Information Request
(appendix 2).
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are in the User’s Guide under
the ‘‘e-filing’’ link on the Commission’s
Web site.
PO 00000
Frm 00056
Fmt 4703
Sfmt 4703
7457
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site at www.ferc.gov using the
‘‘eLibrary’’ link. Click on the eLibrary
link, click on ‘‘General Search’’ and
enter the docket number, excluding the
last three digits in the Docket Number
field (i.e., CP15–29). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries, and direct links
to the documents. Go to www.ferc.gov/
docs-filing/esubscription.asp.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: February 4, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–02684 Filed 2–9–15; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. NJ15–2–001]
City of Vernon, California; Notice of
Filing
Take notice that on January 15, 2015,
City of Vernon, California submitted its
tariff filing per 35.28(e): Amendment to
205 (annual Transmission Revenue
Balancing Account Adjustment and
Transmission Revenue Requirement
filing), to be effective 1/1/2015.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
E:\FR\FM\10FEN1.SGM
10FEN1
Agencies
[Federal Register Volume 80, Number 27 (Tuesday, February 10, 2015)]
[Notices]
[Pages 7455-7457]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-02684]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP15-29-000]
Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To
Prepare an Environmental Assessment for the Proposed Gulf Trace
Expansion Project and Request for Comments on Environmental Issues
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Gulf Trace Expansion Project
involving construction and operation of facilities by Transcontinental
Gas Pipe Line company, LLC (Transco) in Cameron, Calcasieu, Beauregard,
Evangeline, and East Feliciana Parishes, Louisiana. The Commission will
use this EA in its decisionmaking process to determine whether the
project is in the public convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies on the project. Your input will help the Commission staff
determine what issues they need to evaluate in the EA. Please note that
the scoping period will close on March 6, 2015.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives should notify their constituents of this
[[Page 7456]]
proposed project and encourage them to comment on their areas of
concern.
If you are a landowner receiving this notice, a pipeline company
representative may contact you about the acquisition of an easement to
construct, operate, and maintain the proposed facilities. The company
would seek to negotiate a mutually acceptable agreement. However, if
the Commission approves the project, that approval conveys with it the
right of eminent domain. Therefore, if easement negotiations fail to
produce an agreement, the pipeline company could initiate condemnation
proceedings where compensation would be determined in accordance with
state law.
Transco provided landowners with a fact sheet prepared by the FERC
entitled ``An Interstate Natural Gas Facility On My Land? What Do I
Need To Know?'' This fact sheet addresses a number of typically-asked
questions, including the use of eminent domain and how to participate
in the Commission's proceedings. It is also available for viewing on
the FERC Web site (www.ferc.gov).
Summary of the Proposed Project
The Gulf Trace Expansion Project would provide about 1.2 million
standard cubic feet of natural gas per day from its Station 65 Zone 3
Pool in St. Helena Parish, Louisiana, southward along its existing
mainline, existing Southwest Louisiana Lateral, and the proposed
project facilities to Sabine Pass Liquefaction, LLC liquefied natural
gas terminal (SPLNG Terminal) in Cameron Parish, Louisiana. The
pipeline would extend from a tie-in with the existing NHI Laterals C
and D to SPLNG Terminal.
The Gulf Trace Expansion Project would consist of the following
facilities:
About 6.97 miles of 36-inch-diameter pipeline (the Gulf
Trace Lateral) in Cameron Parish;
addition of two 16,000 horsepower (hp) gas turbine-driven
compressor units at Transco's existing Compressor Station 44 in Cameron
Parish;
two 16,000 hp gas turbine-driven compressor units at the
new Compressor Station 42 at the junction of the Transco's mainline and
its Southwest Louisiana Lateral in Calcasieu Parish;
piping and valve modifications on Transco's mainline at
existing Compressor Stations 45, 50, and 60 in Beauregard, Evangeline,
and East Feliciana Parishes to allow for bi-directional flow;
two new meter stations, one adjacent to the SPLNG Terminal
in Cameron Parish (SPLNG Meter Station) and one adjacent to the Texas
Gas Interconnection in Evangeline Parish (Duralde Meter Station);
piping and valve modifications, and pig launcher and
receivers required to tie-in the Gulf Trace Lateral with the existing
NHI Laterals C and D at the milepost 6.8 valve site \1\ in Cameron
Parish; and
---------------------------------------------------------------------------
\1\ A ``pig'' is a tool that the pipeline company inserts into
and pushes through the pipeline for cleaning the pipeline,
conducting internal inspections, or other purposes.
---------------------------------------------------------------------------
appurtenant underground and aboveground facilities.
The general location of the project facilities is shown in appendix
1.\2\
---------------------------------------------------------------------------
\2\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of appendices were sent to all those
receiving this notice in the mail and are available at www.ferc.gov
using the link called ``eLibrary'' or from the Commission's Public
Reference Room, 888 First Street NE., Washington, DC 20426, or call
(202) 502-8371. For instructions on connecting to eLibrary, refer to
the last page of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
Construction of the proposed facilities would disturb about 263.4
acres of land for the aboveground facilities and the pipeline.
Following construction, Transco would maintain about 75.6 acres for
permanent operation of the project's facilities; the remaining acreage
would be restored and revert to former uses. About 17 percent of the
proposed pipeline route parallels existing pipeline, utility, or road
rights-of-way.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
\3\ to discover and address concerns the public may have about
proposals. This process is referred to as ``scoping.'' The main goal of
the scoping process is to focus the analysis in the EA on the important
environmental issues. By this notice, the Commission requests public
comments on the scope of the issues to address in the EA. We will
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------
\3\ ``We,'' ``us,'' and ``our'' refer to the environmental staff
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------
In the EA we will discuss impacts that could occur as a result of
the construction and operation of the proposed project under these
general headings:
Geology and soils;
land use;
water resources, fisheries, and wetlands;
cultural resources;
vegetation and wildlife including migratory birds;
air quality and noise;
endangered and threatened species; and
public safety.
We will also evaluate reasonable alternatives to the proposed
project or portions of the project, and make recommendations on how to
lessen or avoid impacts on the various resource areas.
The EA will present our independent analysis of the issues. The EA
will be available in the public record through eLibrary. Depending on
the comments received during the scoping process, we may also publish
and distribute the EA to the public for an allotted comment period. We
will consider all comments on the EA before making our recommendations
to the Commission. To ensure we have the opportunity to consider and
address your comments, please carefully follow the instructions in the
Public Participation section beginning on page 5.
With this notice, we are asking agencies with jurisdiction by law
and/or special expertise with respect to the environmental issues of
this project to formally cooperate with us in the preparation of the
EA.\4\ Agencies that would like to request cooperating agency status
should follow the instructions for filing comments provided under the
Public Participation section of this notice.
---------------------------------------------------------------------------
\4\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at Title 40, Code of Federal
Regulations, part 1501.6.
---------------------------------------------------------------------------
Consultations Under Section 106 of the National Historic Preservation
Act
In accordance with the Advisory Council on Historic Preservation's
implementing regulations for section 106 of the National Historic
Preservation Act, we are using this notice to initiate consultation
with the applicable State Historic Preservation Office (SHPO), and to
solicit their views and those of other government agencies, interested
Indian tribes, and the public on the project's potential effects on
historic properties.\5\ We will define the project-specific Area of
Potential Effects (APE) in consultation with the SHPO as the project
develops. On natural gas
[[Page 7457]]
facility projects, the APE at a minimum encompasses all areas subject
to ground disturbance (examples include construction right-of-way,
contractor/pipe storage yards, compressor stations, and access roads).
Our EA for this project will document our findings on the impacts on
historic properties and summarize the status of consultations under
section 106.
---------------------------------------------------------------------------
\5\ The Advisory Council on Historic Preservation's regulations
are at Title 36, Code of Federal Regulations, part 800. Those
regulations define historic properties as any prehistoric or
historic district, site, building, structure, or object included in
or eligible for inclusion in the National Register of Historic
Places.
---------------------------------------------------------------------------
Currently Identified Environmental Issues
We have already identified several issues that we think deserve
attention based on a preliminary review of the proposed facilities and
the environmental information provided by Transco. This preliminary
list of issues may be changed based on your comments and our analysis.
These include impacts on:
Wetlands and waterbodies;
wildlife;
migratory birds;
vegetation;
threatened or endangered species;
land use;
air quality;
noise; and
safety.
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. Your comments should focus on
the potential environmental effects, reasonable alternatives, and
measures to avoid or lessen environmental impacts. The more specific
your comments, the more useful they will be. To ensure that your
comments are timely and properly recorded, please send your comments so
that the Commission receives them in Washington, DC on or before March
6, 2015.
For your convenience, there are three methods which you can use to
submit your comments to the Commission. In all instances please
reference the project docket number (CP15-29-000) with your submission.
The Commission encourages electronic filing of comments and has expert
staff available to assist you at (202) 502-8258 or efiling@ferc.gov.
(1) You can file your comments electronically using the eComment
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. This is an easy method for interested persons to
submit brief, text-only comments on a project;
(2) You can file your comments electronically using the eFiling
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. With eFiling, you can provide comments in a
variety of formats by attaching them as a file with your submission.
New eFiling users must first create an account by clicking on
``eRegister.'' You must select the type of filing you are making. If
you are filing a comment on a particular project, please select
``Comment on a Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the following address: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC
20426.
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; Native American Tribes; other
interested parties; and local libraries and newspapers. This list also
includes all affected landowners (as defined in the Commission's
regulations) who are potential right-of-way grantors, whose property
may be used temporarily for project purposes, or who own homes within
certain distances of aboveground facilities, and anyone who submits
comments on the project. We will update the environmental mailing list
as the analysis proceeds to ensure that we send the information related
to this environmental review to all individuals, organizations, and
government entities interested in and/or potentially affected by the
proposed project.
If we publish and distribute the EA, copies will be sent to the
environmental mailing list for public review and comment. If you would
prefer to receive a paper copy of the document instead of the CD
version or would like to remove your name from the mailing list, please
return the attached Information Request (appendix 2).
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an ``intervenor'' which is an official party to the
Commission's proceeding. Intervenors play a more formal role in the
process and are able to file briefs, appear at hearings, and be heard
by the courts if they choose to appeal the Commission's final ruling.
An intervenor formally participates in the proceeding by filing a
request to intervene. Instructions for becoming an intervenor are in
the User's Guide under the ``e-filing'' link on the Commission's Web
site.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC Web site at www.ferc.gov using the ``eLibrary'' link. Click on the
eLibrary link, click on ``General Search'' and enter the docket number,
excluding the last three digits in the Docket Number field (i.e., CP15-
29). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.
Dated: February 4, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-02684 Filed 2-9-15; 8:45 am]
BILLING CODE 6717-01-P