Drawbridge Operation Regulation; Columbia River, Vancouver, WA, 6657-6658 [2015-02329]
Download as PDF
Federal Register / Vol. 80, No. 25 / Friday, February 6, 2015 / Rules and Regulations
regulations and TRIA, as amended by
the 2015 Reauthorization Act.
Interim Guidance Five (New Offers of
Coverage)
Interim Guidance One (Documentation)
(a) Except as described herein,
Treasury expects that an insurer will
make a new offer of coverage for insured
losses with respect to any in-force
policy that does not provide coverage
for insured losses.
(b) An insurer is not expected to make
a new offer of coverage for insured
losses if—
(i) the policy incorporates a
conditional exclusion or change of
terms and conditions relating to
coverage for insured losses and, because
the Program is in effect, the insurer
forbears effective January 1, 2015 (or as
of the effective date of the policy, if
later) on the exercise of the conditional
exclusion or change in terms and
conditions. Not later than April 13,
2015, an insurer should provide to the
policyholder written notice of the
insurer’s forbearance or written notice
of the insurer’s withdrawal of any
previous exercise of the conditional
exclusion or change in terms and
conditions. In the written notice, the
insurer should state that the insurer’s
forbearance or withdrawal, as
applicable, is effective January 1, 2015
(or as of the effective date of the policy,
if later); or
(ii) the policyholder declined
coverage for insured losses, so long as
the insurer’s offer did not materially
differ in price from that which the
insurer would have offered following
enactment of the 2015 Reauthorization
Act.
(c) If a policyholder declined coverage
for insured losses but the insurer’s offer
did materially differ in price from that
which the insurer would have offered
following enactment of the 2015
Reauthorization Act, then the insurer
should consider making a new offer to
that policyholder.
Due to requirements under state law
regulating rates and forms, an insurer
may need additional time to provide
disclosures and offers of coverage for
insured losses in compliance with the
Program regulations and TRIA, as
amended by the 2015 Reauthorization
Act. An insurer should provide
disclosures and offers that comply with
the Program regulations and TRIA, as
amended by the 2015 Reauthorization
Act, as soon as possible and not later
than April 13, 2015.
Interim Guidance Two (Form of
Disclosure)
Section 50.17(c) of the Program
regulations provides that an insurer may
use NAIC Model Disclosure Form No. 1
or NAIC Model Disclosure Form No. 2,
or other disclosures that meet the
requirements of the Program
regulations. NAIC Model Disclosure
Form No. 1 and NAIC Model Disclosure
Form No. 2, as amended in 2015, are
consistent with the disclosure
requirements of the Program regulations
and TRIA, as amended by the 2015
Reauthorization Act.
Interim Guidance Three (Timing of
Disclosure)
As amended by the 2015
Reauthorization Act, TRIA no longer
requires an insurer to provide to a
policyholder certain disclosures at the
time of a policy’s ‘‘purchase,’’ but still
requires the insurer to provide such
disclosures at the time of ‘‘offer’’ and
‘‘renewal.’’ The timing of an insurer’s
disclosures may conform with either
subpart B of the Program regulations or
Section 103(b)(2) of TRIA, as amended
by the 2015 Reauthorization Act.
Paperwork Reduction Act
asabaliauskas on DSK5VPTVN1PROD with RULES
Interim Guidance Four (Content of
Disclosure)
An insurer that offered coverage for
insured losses prior to January 12, 2015,
using the then-current NAIC Model
Disclosure Form No. 1, NAIC Model
Disclosure Form No. 2, or other
disclosures consistent with the Program
regulations, is not required to provide a
revised disclosure to the policyholder.
Subject to Interim Guidance One,
disclosures on or after January 12, 2015
provided in connection with a new or
mid-term offer of coverage for insured
losses should be based on the
requirements of the Program regulations
and TRIA, as amended by the 2015
Reauthorization Act.
VerDate Sep<11>2014
17:54 Feb 05, 2015
Jkt 235001
In accordance with the Paperwork
Reduction Act,7 the information
collections contained in this document
have been approved by the Office of
Management and Budget (OMB) under
control number 1505/0197. Any agency
may not conduct or sponsor and a
person is not required to respond to a
collection of information unless it
displays a valid OMB control number.
Dated: February 4, 2015.
Michael T. McRaith,
Director, Federal Insurance Office.
[FR Doc. 2015–02556 Filed 2–4–15; 4:15 pm]
BILLING CODE 4810–25–P
7 44
PO 00000
U.S.C. 3501 et seq.
Frm 00009
Fmt 4700
Sfmt 4700
6657
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2015–0034]
Drawbridge Operation Regulation;
Columbia River, Vancouver, WA
Coast Guard, DHS.
Notice of deviation from
drawbridge regulations.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Burlington
Northern Santa Fe (BNSF) Railway
Bridge across the Columbia River, mile
105.6, at Vancouver, WA. This deviation
is necessary to accommodate
maintenance to replace movable rail
joints. This deviation allows the bridge
to remain in the closed position during
maintenance activities.
DATES: This deviation is effective from
7 a.m. until 3 p.m. on February 25,
2015, and from 7 a.m. until 3 p.m. on
February 26, 2015.
ADDRESSES: The docket for this
deviation, [USCG–2015–0034] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Mr. Steven
Fischer, Bridge Administrator,
Thirteenth Coast Guard District;
telephone 206–220–7282, email d13-pfd13bridges@uscg.mil. If you have
questions on viewing the docket, call
Cheryl Collins, Program Manager,
Docket Operations, telephone 202–366–
9826.
SUPPLEMENTARY INFORMATION: BNSF has
requested that the BNSF Swing Bridge
across the Columbia River, mile 105.6,
remain closed to vessel traffic to
facilitate replacement of movable rail
joints. During this maintenance period
the swing span of the BNSF Railway
Bridge across the Columbia River at
Vancouver, WA, will be disabled and
the bridge will not be able to be open.
The BNSF Swing Bridge, mile 105.6,
provides 39 feet of vertical clearance
SUMMARY:
E:\FR\FM\06FER1.SGM
06FER1
6658
Federal Register / Vol. 80, No. 25 / Friday, February 6, 2015 / Rules and Regulations
above Columbia River Datum 0.0 while
in the closed position. Vessels able to
pass through the bridge in the closed
positions may do so at anytime. The
current operating schedule for the
bridge is set out in 33 CFR 117.5. The
normal operating schedule for the BNSF
Swing Bridge states that the bridge must
open promptly and fully on request.
This deviation allows the swing span of
the BNSF Railway Bridge across the
Columbia River, mile 105.6, to remain
in the closed position, and need not
open for maritime traffic from 7 a.m.
until 3 p.m. on February 25, 2015, and
7 a.m. until 3 p.m. on February 26,
2015. The bridge shall operate in
accordance to 33 CFR 117.5 at all other
times. Waterway usage on this part of
the Columbia River includes vessels
ranging from commercial tug and tow
vessels to recreational pleasure craft
including cabin cruisers and sailing
vessels. The bridge will not be able to
open for emergencies and there is no
immediate alternate route for vessels to
pass. The Coast Guard will also inform
the users of the waterways through our
Local and Broadcast Notices to Mariners
of the change in operating schedule for
the bridge so that vessels can arrange
their transits to minimize any impact
caused by the temporary deviation.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: January 22, 2015.
Steven M. Fischer,
Bridge Administrator, Thirteenth Coast Guard
District.
[FR Doc. 2015–02329 Filed 2–5–15; 8:45 am]
BILLING CODE 9110–04–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2015–0052]
Drawbridge Operation Regulation;
Atlantic Intracoastal Waterway,
Wrightsville Beach, NC
Coast Guard, DHS.
Notice of deviation from
drawbridge regulation.
asabaliauskas on DSK5VPTVN1PROD with RULES
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the S.R. 74
Bridge, across the Atlantic Intracoastal
Waterway (AIWW), mile 283.1, at
Wrightsville Beach, NC. This deviation
SUMMARY:
VerDate Sep<11>2014
17:54 Feb 05, 2015
Jkt 235001
is necessary to accommodate the 6th
Annual Quintiles Wrightsville Beach
Marathon. This deviation allows the
bridge to remain in the closed position
during the race.
DATES: This deviation is effective from
5 a.m. to 10:30 a.m. on Sunday, March
22, 2015.
ADDRESSES: The docket for this
deviation, [USCG–2015–0052] is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Kashanda
Booker, Bridge Administration Branch,
Fifth Coast Guard District; telephone
(757) 398–6227, email
Kashanda.l.booker@uscg.mil. If you
have questions on viewing the docket,
call Cheryl Collins, Program Manager,
Docket Operations, telephone 202–366–
9826.
SUPPLEMENTARY INFORMATION: The 6th
Annual Quintiles Wrightsville Beach
Marathon committee on behalf of the
North Carolina Department of
Transportation (NCDOT) has requested
a temporary deviation from the current
operating schedule for the S.R. 74
Bascule Drawbridge across the AIWW
mile 283.1, at Wrightsville Beach, NC.
The requested deviation will
accommodate the 6th Annual Quintiles
Wrightsville Beach Marathon scheduled
for Sunday, March 22, 2015. To
facilitate this event, the draw of the
bridge will be maintained in the closedto-navigation position from 5 a.m. to
10:30 a.m. to allow race participants to
cross during the scheduled event.
The current operating schedule for the
bridge is set out in 33 CFR 117.821(a)(4).
The regulation requires the bridge to
open on signal for vessels at all times
except that from 7 a.m. until 7 p.m. the
bridge shall open on the hour; every
third and fourth Saturday in September
the bridge shall remain closed from 7
a.m. until 11 a.m.; and the last Saturday
of October or the first or second
Saturday of November the bridge shall
remain closed from 7 a.m. until 10:30
a.m. The bascule drawbridge has a
vertical clearance of 20 feet above mean
high water (MHW) in the closed
position. Vessels that can pass through
PO 00000
Frm 00010
Fmt 4700
Sfmt 4700
the bridge in the closed position may do
so at any time.
To ensure that waterway users are
aware of the closure, the Coast Guard
will issue a Local and Broadcast Notice
to Mariners to allow mariners to
schedule their transits accordingly.
There are no alternate routes available
to vessels. Most waterway traffic
consists of recreational boats with a few
barges and tugs during the daytime. The
bridge is able to open for emergencies.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the designated time period. This
deviation from the operating regulations
is authorized under 33 CFR 117.35.
Dated: January 27, 2015.
James L. Rousseau,
Bridge Program Manager, Fifth Coast Guard
District.
[FR Doc. 2015–02449 Filed 2–5–15; 8:45 am]
BILLING CODE 9110–04–P
ENVIRONMENTAL PROTECTION
AGENCY
40 CFR Part 80
[EPA–HQ–OAR–2014–0283; FRL 9921–82–
OAR]
RIN 2060–AS19
Regulation of Fuels and Fuel
Additives: Extension of the
Reformulated Gasoline Program to
Maine’s Southern Counties
Environmental Protection
Agency.
ACTION: Final rule.
AGENCY:
The Environmental Protection
Agency (EPA) is extending the Clean Air
Act’s (CAA) prohibition against the sale
of conventional gasoline in reformulated
gasoline (RFG) areas to the southern
Maine counties of York, Cumberland,
Sagadahoc, Androscoggin, Kennebec,
Knox, and Lincoln (hereinafter, the
‘‘Southern Maine Counties’’). This
action is based on a request from the
Governor of the State of Maine for areas
within the ozone transport region
established under the CAA. The CAA
does not give the EPA discretion to deny
a Governor’s request on this matter. The
scope of the EPA’s discretion is limited
to establishing the date that the
prohibition commences. Consistent with
the Governor’s request, the EPA is
finalizing as proposed a prohibition
commencement date of May 1, 2015 for
all refiners, importers, and distributors
in the Maine counties referenced in the
Governor’s request, and June 1, 2015 for
all retailers and wholesale purchaser-
SUMMARY:
E:\FR\FM\06FER1.SGM
06FER1
Agencies
[Federal Register Volume 80, Number 25 (Friday, February 6, 2015)]
[Rules and Regulations]
[Pages 6657-6658]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-02329]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2015-0034]
Drawbridge Operation Regulation; Columbia River, Vancouver, WA
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulations.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Burlington Northern Santa Fe (BNSF)
Railway Bridge across the Columbia River, mile 105.6, at Vancouver, WA.
This deviation is necessary to accommodate maintenance to replace
movable rail joints. This deviation allows the bridge to remain in the
closed position during maintenance activities.
DATES: This deviation is effective from 7 a.m. until 3 p.m. on February
25, 2015, and from 7 a.m. until 3 p.m. on February 26, 2015.
ADDRESSES: The docket for this deviation, [USCG-2015-0034] is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation. You may also visit the Docket
Management Facility in Room W12-140 on the ground floor of the
Department of Transportation West Building, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Mr. Steven Fischer, Bridge
Administrator, Thirteenth Coast Guard District; telephone 206-220-7282,
email d13-pf-d13bridges@uscg.mil. If you have questions on viewing the
docket, call Cheryl Collins, Program Manager, Docket Operations,
telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: BNSF has requested that the BNSF Swing
Bridge across the Columbia River, mile 105.6, remain closed to vessel
traffic to facilitate replacement of movable rail joints. During this
maintenance period the swing span of the BNSF Railway Bridge across the
Columbia River at Vancouver, WA, will be disabled and the bridge will
not be able to be open. The BNSF Swing Bridge, mile 105.6, provides 39
feet of vertical clearance
[[Page 6658]]
above Columbia River Datum 0.0 while in the closed position. Vessels
able to pass through the bridge in the closed positions may do so at
anytime. The current operating schedule for the bridge is set out in 33
CFR 117.5. The normal operating schedule for the BNSF Swing Bridge
states that the bridge must open promptly and fully on request. This
deviation allows the swing span of the BNSF Railway Bridge across the
Columbia River, mile 105.6, to remain in the closed position, and need
not open for maritime traffic from 7 a.m. until 3 p.m. on February 25,
2015, and 7 a.m. until 3 p.m. on February 26, 2015. The bridge shall
operate in accordance to 33 CFR 117.5 at all other times. Waterway
usage on this part of the Columbia River includes vessels ranging from
commercial tug and tow vessels to recreational pleasure craft including
cabin cruisers and sailing vessels. The bridge will not be able to open
for emergencies and there is no immediate alternate route for vessels
to pass. The Coast Guard will also inform the users of the waterways
through our Local and Broadcast Notices to Mariners of the change in
operating schedule for the bridge so that vessels can arrange their
transits to minimize any impact caused by the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: January 22, 2015.
Steven M. Fischer,
Bridge Administrator, Thirteenth Coast Guard District.
[FR Doc. 2015-02329 Filed 2-5-15; 8:45 am]
BILLING CODE 9110-04-P