Commission Information Collection Activities (FERC-537, FERC-725F, and FERC-725I); Comment Request, 6067-6072 [2015-02115]

Download as PDF 6067 Federal Register / Vol. 80, No. 23 / Wednesday, February 4, 2015 / Notices and eliminate redundant or unnecessary requirements.3 Burden Statement: Commission staff analyzed the proposed and currently enforced Reliability Standards and has concluded that proposed Reliability Standards merely clarify or eliminate redundancies and thus, the information collection requirements have not changed. Accordingly, the net overall burden and respondent universe 4 remain unchanged, when compared to the burden of the existing standards being replaced.5 The Commission intends to submit a request for approval to OMB under the Paperwork Reduction Act (PRA) related to the proposed Reliability Standards. For PRA purposes, the information collection requirements in proposed Reliability Standards FAC–001–2 and FAC–002–2 are identified as FERC– 725D and OMB Control Number 1902– 0247. The annual reporting burden for the implementation of Reliability Standards FAC–001–2 and FAC–002–2 is estimated as follows. FERC–725D, MODIFICATIONS IN RD14–12 Number and type of respondent 6 Annual number of responses per respondent Total number of responses Average burden per response (hours) Total annual burden (hours) Total annual cost 7 (1) (2) (1)*(2)=(3) (4) (3)*(4)=(5) ($) FAC–001–2 Documentation & updates .. Record Retention ................ GO 5 ................................... TO 332 ............................... GO 5 ................................... TO 332 ............................... 1 1 1 1 5 332 5 332 16 16 1 1 80 5,312 5 332 $5,833.60 387,351.04 145.05 9,631.32 FAC–002–2 Study ................................... Record Retention ................ Coordination ........................ Record Retention ................ Total ............................. PC, PC, TO, TO, TP 183 ........................ TP 183 ........................ DP, LSE, GO 216 ....... DP, LSE, GO 216 ....... 1 1 1 1 183 183 216 216 32 1 16 1 5,856 183 3456 216 427,019.52 5,308.83 252,011.52 6,266.16 ............................................. ........................ ........................ ........................ ........................ 1,093,567.04 Dated: January 28, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–02112 Filed 2–3–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IC14–16–000] Commission Information Collection Activities (FERC–537, FERC–725F, and FERC–725I); Comment Request Federal Energy Regulatory Commission, Department of Energy. ACTION: Comment request. AGENCY: In compliance with the requirements of the Paperwork Reduction Act of 1995, 44 U.S.C. SUMMARY: mstockstill on DSK4VPTVN1PROD with NOTICES 3 Id. at 4. affected entities for FAC–001–2 are Transmission Owners (TO) and applicable Generator Owners (GO). The affected entities for FAC–002–2 are Transmission Planners (TP), Planning Coordinators (PC), Generator Owners (GO), Transmission Owners (TO), Distribution Providers (DP), and Load-Serving Entities (LSE). Note that Planning Coordinator (PC) is the new name for Planning Authority—a term still used in NERC’s Compliance Registry. 4 The VerDate Sep<11>2014 18:18 Feb 03, 2015 Jkt 235001 3507(a)(1)(D), the Federal Energy Regulatory Commission (Commission or FERC) is submitting its information collections FERC–537 (Gas Pipeline Certificates: Construction, Acquisition and Abandonment), FERC–725F (Mandatory Reliability Standards for Nuclear Plant Interface Coordination), and FERC–725I (Mandatory Reliability Standards for the Northeast Power Coordinating Council), to the Office of Management and Budget (OMB) for review of the information collection requirements. Any interested person may file comments directly with OMB and should address a copy of those comments to the Commission as explained below. The Commission previously issued a Notice in the Federal Register (79 FR 61068, 10/9/ 2014) requesting public comments. The Commission received no comments on the FERC–537, FERC–725F, and FERC– 5 The burden for the preceding versions of the standards being replaced was included in: (a) FERC–725M (OMB Control No. 1902–0263) for FAC–001–1, and (b) FERC–725A (OMB Control No. 1902–0244) for FAC–002–1. The corresponding burden will be transferred from FERC–725M and FERC–725A to FERC–725D. 6 The number of respondents is based on the NERC Compliance Registry as of September 24, 2014. Although 2,163 entities are registered as TO, DP, LSE, or GO, we expect at the most 216 entities (ten percent) will seek to interconnect and go PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 725I and is making this notation in its submittal to OMB. Comments on the collections of information are due by March 6, 2015. DATES: Comments filed with OMB, identified by the OMB Control Nos. 1902–0060 (FERC–537), 1902–0249 (FERC–725F), and 1902–0258 (FERC– 725I) should be sent via email to the Office of Information and Regulatory Affairs: oira_submission@omb.gov, Attention: Federal Energy Regulatory Commission Desk Officer. The Desk Officer may also be reached via telephone at 202–395–0710. A copy of the comments should also be sent to the Commission, in Docket No. IC14–16–000, by either of the following methods: • eFiling at Commission’s Web site: https://www.ferc.gov/docs-filing/ efiling.asp. ADDRESSES: through the study phase that may require coordination in any given year. 7 The estimates for cost per hour are derived as follows: • $72.92/hour, the average of the salary plus benefits for a manager ($84.96/hour) and an electrical engineer ($60.87/hour), from Bureau of Labor and Statistics at https://bls.gov/oes/current/ naics3_221000.htm, as of 9/4/2014 • $29.01/hour, based on a Commission staff study of record retention burden cost. E:\FR\FM\04FEN1.SGM 04FEN1 6068 Federal Register / Vol. 80, No. 23 / Wednesday, February 4, 2015 / Notices • Mail/Hand Delivery/Courier: Federal Energy Regulatory Commission, Secretary of the Commission, 888 First Street NE., Washington, DC 20426. Instructions: All submissions must be formatted and filed in accordance with submission guidelines at: https:// www.ferc.gov/help/submissionguide.asp. For user assistance contact FERC Online Support by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208–3676 (toll-free), or (202) 502–8659 for TTY. Docket: Users interested in receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do so at https://www.ferc.gov/docsfiling/docs-filing.asp. FOR FURTHER INFORMATION CONTACT: Ellen Brown may be reached by email at DataClearance@FERC.gov, by telephone at (202) 502–8663, and by fax at (202) 273–0873. SUPPLEMENTARY INFORMATION: Type of Request: Three-year extensions of the information collection requirements for all collections described below with no changes to the current reporting requirements. Please note that each collection is distinct from the next. Comments: Comments are invited on: (1) Whether the collections of information are necessary for the proper performance of the functions of the Commission, including whether the information will have practical utility; (2) the accuracy of the agency’s estimates of the burden and cost of the collections of information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and clarity of the information collections; and (4) ways to minimize the burden of the collections of information on those who are to respond, including the use of automated collection techniques or other forms of information technology. FERC–537, Gas Pipeline Certificates: Construction, Acquisition and Abandonment OMB Control No.:1902–0060 Abstract: The information collected under the requirements of FERC–537 is used by the Commission to implement the statutory provisions of the Natural Gas Policy Act of 1978 (NGPA) 1 and the Natural Gas Act (NGA).2 Under Section 7(c) of the NGA, natural gas pipeline companies must obtain Commission authorization to undertake the construction or extension of any facilities, or to acquire or operate any such facilities or extensions. A natural gas company must also obtain Commission approval under Section 7(b) of the NGA prior to abandoning any jurisdictional facility or service. Under the NGA and the NGPA, interstate and intrastate pipelines must also obtain authorization for certain transportation and storage services and arrangements, particularly a Part 284, Subpart G— Blanket Certificate.3 The information collected is necessary to certificate interstate pipelines engaged in the transportation and sale of natural gas, and the construction, acquisition, and operation of facilities to be used in those activities, to authorize the abandonment of facilities and services, and to authorize certain NGPA transactions. If a certificate is granted, the natural gas company can construct, acquire, or operate facilities, plus engage in interstate transportation or sale of natural gas. Conversely, approval of an abandonment application permits the pipeline to cease service and/or discontinue the operation of such facilities. Authorization under NGPA Section 311(a) allows the interstate or intrastate pipeline applicants to render certain transportation services. The data required to be submitted consists of identification of the company and responsible officials, factors considered in the location of the facilities and the detailed impact on the project area for environmental considerations. The following will also be submitted: • Flow diagrams showing proposed design capacity for engineering design verification and safety determination; • Commercial and economic data presenting the basis for the proposed action; and • Cost of the proposed facilities, plans for financing, and estimated revenues and expenses related to the proposed facility for accounting and financial evaluation. The Commission implements these filing requirements in the Code of Federal Regulations (CFR) under 18 CFR 157.5–.11; 157.13–.20; 157.53; 157.201– .209; 157.211; 157.214–.218; 284.8; 284.11; 284.126; 284.221; 284.224. Type of Respondent: Natural Gas Pipelines. Estimate of Annual Burden: The Commission estimates the annual public reporting burden for the information collection as: 4 FERC–537—GAS PIPELINE CERTIFICATES: CONSTRUCTION, ACQUISITION, AND ABANDONMENT Number of respondents Annual number of responses per respondent Total number of responses Average burden hours & cost per response 5 Total annual burden hours & total annual cost Cost per respondent ($) (1) (2) (1)*(2)=(3) (4) (3)*(4)=(5) (5)÷(1) 204 ....................................................................................... 2.24 458 146 $10,293 66,868 $4,714,194 $23,109 mstockstill on DSK4VPTVN1PROD with NOTICES A more granular breakdown of the average burden hour figure (i.e., 146 average hours per response) follows: 1 15 U.S.C. 3301–3432. U.S.C. 717–717w. 3 18 CFR 284.8. 4 The annual public reporting burden of the FERC–537 has changed since the publication of the 2 15 VerDate Sep<11>2014 18:18 Feb 03, 2015 Jkt 235001 60-day notice. The current estimate of annual burden has been updated and is reflected in this notice. Figures in the table have been rounded. The reporting requirements have not changed. 5 The estimates for cost per response are derived using the following formula: Average Burden Hours PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 per Response * $70.50 per Hour = Average Cost per Response. The cost per hour figure is the FERC average salary plus benefits. Subject matter experts found that industry employment costs closely resemble FERC’s regarding the FERC–537 information collection. E:\FR\FM\04FEN1.SGM 04FEN1 6069 Federal Register / Vol. 80, No. 23 / Wednesday, February 4, 2015 / Notices Number of respondents (distinct entities) Average hours per response (average, weighted) Number of responses 18 CFR Section Regulation topic 157.5–.11; & 157.13–.20 ................................ Interstate certificate and abandonment applications. Exemptions ..................................................... Blanket Certificates prior notice filings ........... Blanket Certificates—annual reports ............. NGPA Sec. 311 Construction—annual reports. Capacity Release—record keeping ............... Intrastate bypass, semi-annual transportation Blanket Certificates—one time filing, inc. new tariff and rate design proposal. Hinshaw Blanket Certificates ......................... Non-facility certificate or abandonment applications. 159 82 500 39 62 159 93 3 46 159 93 50 200 50 50 0 37 14 N/A 48 14 75 30 100 8 5 8 5 75 75 ......................................................................... 204 458 146 157.53 ............................................................. 157.201–.209; 157.211; 157.214–.218 ........... 157.201–.209; 157.211; 157.214–.218 ........... 284.11 ............................................................. 284.8 ............................................................... 284.126(a) ....................................................... 284.221 ........................................................... 284.224 ........................................................... 157.5–.11; & 157.13–.20 ................................ Totals ....................................................... FERC–725F, Mandatory Reliability Standards for Nuclear Plant Interface Coordination OMB Control No.: 1902–0249 mstockstill on DSK4VPTVN1PROD with NOTICES Abstract: The Commission requires the information collected by the FERC– 725F to implement the statutory provisions of section 215 of the Federal Power Act (FPA) (16 U.S.C. 824o). On August 8, 2005, the Electricity Modernization Act of 2005, which is Title XII, Subtitle A, of the Energy Policy Act of 2005 (EPAct 2005), was enacted into law.6 EPAct 2005 added a new section 215 to the FPA, which required a Commission-certified Electric Reliability Organization (ERO) to develop mandatory and enforceable Reliability Standards, which are subject to Commission review and approval. Once approved, the Reliability Standards may be enforced by the ERO subject to Commission oversight, or the Commission can independently enforce Reliability Standards.7 On February 3, 2006, the Commission issued Order No. 672, implementing section 215 of the FPA.8 Pursuant to Order No. 672, the Commission certified one organization, North American Electric Reliability Corporation (NERC), as the ERO. The Reliability Standards developed by the ERO and approved by the Commission apply to users, owners and operators of the Bulk-Power System as set forth in each Reliability Standard. 6 Energy Policy Act of 2005, Public Law 109–58, Title XII, Subtitle A, 119 Stat. 594, 941 (2005), 16 U.S.C. 824o. 7 16 U.S.C. 824o(e)(3). 8 Rules Concerning Certification of the Electric Reliability Organization; and Procedures for the Establishment, Approval, and Enforcement of Electric Reliability Standards, Order No. 672, FERC Stats. & Regs. ¶ 31,204, order on reh’g, Order No. 672–A, FERC Stats. & Regs. ¶ 31,212 (2006). VerDate Sep<11>2014 18:18 Feb 03, 2015 Jkt 235001 On November 19, 2007, NERC filed its petition for Commission approval of the Nuclear Plant Interface Coordination Reliability Standard, designated NUC– 001–1. In Order No. 716, issued October 16, 2008, the Commission approved the standard while also directing certain revisions.9 Revised Reliability Standard, NUC–001–2, was filed with the Commission by NERC in August 2009 and subsequently approved by the Commission January 21, 2010.10 The purpose of Reliability Standard NUC–001–2 is to require ‘‘coordination between nuclear plant generator operators and transmission entities for the purpose of ensuring nuclear plant safe operation and shutdown.’’ 11 The Nuclear Reliability Standard applies to nuclear plant generator operators (generally nuclear power plant owners and operators, including licensees) and ‘‘transmission entities,’’ defined in the Reliability Standard as including a nuclear plant’s suppliers of off-site power and related transmission and distribution services. To account for the variations in nuclear plant design and grid interconnection characteristics, the Reliability Standard defines transmission entities as ‘‘all entities that are responsible for providing services related to Nuclear Plant Interface Requirements (NPIRs),’’ and lists eleven types of functional entities (heretofore 9 Mandatory Reliability Standard for Nuclear Plant Interface Coordination, Order No. 716, 125 FERC ¶ 61,065, at P 189 & n.90 (2008), order on reh’g, Order No. 716–A, 126 FERC ¶ 61,122 (2009). 10 North American Electric Reliability Corporation, 130 FERC ¶ 61,051 (2010). When the revised Reliability Standard was approved the Commission did not go to OMB for approval. It is assumed that the changes made did not substantively affect the information collection and therefore a formal submission to OMB was not needed. 11 See Reliability Standard NUC–001–2 at https:// www.nerc.com/files/NUC–001–2.pdf. PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 described as ‘‘transmission entities’’) that could provide services related to NPIRs.12 FERC–725F information collection requirements include establishing and maintaining interface agreements, including record retention requirements. These agreements are not filed with FERC but with the appropriate entities as established by the Reliability Standard. Type of Respondent: Nuclear operators, nuclear plants, transmission entities. Estimate of Annual Burden: The Commission estimates the average annual burden for this information collection as: 12 The list of functional entities consists of transmission operators, transmission owners, transmission planners, transmission service providers, balancing authorities, reliability coordinators, planning authorities, distribution providers, load-serving entities, generator owners and generator operators. 13 The cost for reporting requirements is $73.83/ hour and is based on a composite loaded (wage plus benefits) average wage for an electrical engineer, attorney, and administrative staff. The cost for record keeping is $29.01/hour and is based on wages plus benefits for a file clerk. The wages are generated from Bureau of Labor Statistics data retrieved September, 2014 from https://www.bls.gov/ oes/current/naics2_22.htm. The loaded wage is calculated using BLS data indicating, as of Sept 1, 2014, that wages make up 69.9% of total salary (https://www.bls.gov/news.release/ecec.nr0.htm). 14 This figure of 130 transmission entities is based on the assumption that each agreement will be between 1 nuclear plant and 2 transmission entities (65 times 2 = 130). However, there is some double counting in this figure because some transmission entities may be party to multiple agreements with multiple nuclear plants. The double counting does not affect the burden estimate and the correct number of unique respondents will be reported to OMB. The actual number of unique entities subject to this collection is 143. 15 The recordkeeping ‘‘responses’’ are considered to be part of (i.e., to be contained within the same quantity as) the Reporting responses leading to a total number of unique responses of 420 (390 + 30 = 420). E:\FR\FM\04FEN1.SGM 04FEN1 6070 Federal Register / Vol. 80, No. 23 / Wednesday, February 4, 2015 / Notices ERC–725F Number of respondents New agreements (Reporting). New Agreements (Record Keeping). Modifications to agreements (Reporting). Modifications to Agreements (Record Keeping). Total ............................. Annual number of responses per respondent Total number of responses Average burden hours & cost per response 13 Total annual burden hours & total annual cost Cost per respondent ($) (1) FERC–725F (2) (1)*(2)=(3) (4) (3)*(4)=(5) (5)÷(1) 10 nuclear operators + 20 transmission entities. 10 nuclear operators + 20 transmission entities. 65 nuclear plants + 130 transmission entities 14. 65 nuclear plants + 130 transmission entities. ............................................. FERC–725I, Mandatory Reliability Standards for the Northeast Power Coordinating Council OMB Control No.: 1902–0258 Abstract: This information collection relates to two FERC-approved Protection and Control (PRC) regional Reliability Standards: PRC–002–NPCC–01— Disturbance Monitoring, and PRC–006– NPCC–1—Automatic Under frequency Load-Shedding. These Northeast Power Coordinating Council (NPCC) regional Reliability Standards require respondents to provide recording capability necessary to monitor the response of the Bulk-Power System to system disturbances, including scheduled and unscheduled outages; require each reliability coordinator to establish requirements for its area’s dynamic disturbance recording needs; establish disturbance data reporting requirements; and require planning coordinators to incrementally gather data, run studies, and analyze study results to design or update the UFLS programs that are required in the regional Reliability Standard in addition 1 30 1 30 2 390 2 390 ........................ 15 420 1,080 $79,736 108 $3,133 66.67 $4,922 6.67 $193 ........................ to the requirements of the NERC Reliability Standard PRC–006–1.16 Reliability Standard PRC–002–NPCC– 01 introduced several new mandatory and enforceable requirements for the applicable entities. However, when FERC approved this standard, NPCC had (and continues to have) criteria 17 and published guidance 18 addressing similar requirements that the Reliability Standard made mandatory. Thus, it is usual and customary for affected entities within NPCC to create, maintain and store some of the same or equivalent information identified in Reliability Standard PRC–002–NPCC–01. Therefore, many of the requirements contained in PRC–002–NPCC–01 do not impose new burdens on the affected entities.19 Several requirements contained in regional Reliability Standard PRC–002– NPCC–01 were entirely new responsibilities for the applicable entities when the Commission approved the standard and each of these is listed in the estimated annual burden section below. 32,400 $2,392,092 3,240 $93,992 26,000 $1,919,581 2,600 $75,426 64,240 $4,481,091 $79,736 $3,133 $9,844 $387 ........................ Information collection burden for Reliability Standard PRC–006–NPCC–01 is based on the time needed for planning coordinators and generator owners to incrementally gather data, run studies, and analyze study results to design or update the UFLS programs that are required in the regional Reliability Standard in addition to the requirements of the NERC Reliability Standard PRC–006–1. There is also burden on the generator owners to maintain data. Type of Respondent: Entities registered with the North American Electric Reliability Corporation (NERC) as Generator Owners, Transmission Owners, Reliability Coordinators and Planning Coordinators Estimate of Annual Burden: The number of respondents is based on NERC’s registry as of August 27, 2014. Entities registered for more than one applicable function type have been accounted for in the figures below. The Commission estimates the annual public reporting burden for the information collection as: Number of respondents Annual number of responses per respondent Total number of responses Average burden hours & cost per response 20 Total annual burden hours & total annual cost Cost per respondent ($) (1) Reliability Standard PRC–002–NPCC– 01, information collection requirements (2) (1)*(2)=(3) (4) (3)*(4)=(5) (5)÷(1) mstockstill on DSK4VPTVN1PROD with NOTICES R13: GO 21 and TO to have evidence it acquired and installed dynamic disturbance recorders and a mutually agreed upon implementation schedule with the RC (record retention) ........................... 1 16 The burden estimates for Reliability Standard PRC–006–1 are included in Order No. 763 (Final Rule in RM11–20) and covered in FERC–725A (OMB Control No. 1902–0244). OMB approved those requirements on 7/9/2012 (ICR Reference No. 201204–1902–001). VerDate Sep<11>2014 18:18 Feb 03, 2015 Jkt 235001 1 1 17 Disturbance Monitoring Equipment Criteria (Aug. 2007), available at https://www.npcc.org/ Standards/Criteria/A-15.pdf (Disturbance Monitoring Criteria). PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 10 $290 10 $290 $290 18 Guide for Application of Disturbance Recording Equipment (Sept. 2006), available at https://www.npcc.org/Standards/Guides/B-26.pdf (Application Guide). 19 5 CFR 1320.3(b)(2) (2011). E:\FR\FM\04FEN1.SGM 04FEN1 6071 Federal Register / Vol. 80, No. 23 / Wednesday, February 4, 2015 / Notices Number of respondents Annual number of responses per respondent Total number of responses Average burden hours & cost per response 20 Total annual burden hours & total annual cost Cost per respondent ($) (1) Reliability Standard PRC–002–NPCC– 01, information collection requirements (2) (1)*(2)=(3) (4) (3)*(4)=(5) (5)÷(1) R14.5: GO and TO to have evidence of a maintenance and testing program for stand-alone disturbance monitoring equipment including monthly verification of active analog quantities 169 12 2028 R14.7: GO and TO to record efforts to return failed units to service if it takes longer than 90 days 22 .......................... 33 1 33 1 9,960 $618,540 $3,660 10 $610 10 $290 330 $20,130 330 $9,570 $610 5 $305 10 $290 10,705 $657,605 25 $7,625 50 $1,450 ........................ 33 R14.7: GO and TO record retention ........ 5 $305 33 R17: RC provide certain disturbance monitoring equipment data to the Regional Entity upon request ................... 5 1 5 R17: RC record retention ......................... 5 1 5 TOTAL .............................................. ........................ 2,105 ........................ $290 $305 $290 FERC–725I Number of espondents Annual number of responses per respondent Total number of responses Average burden hours & cost per response Total annual burden hours & total annual cost Cost per respondent ($) (1) Reliability standard PRC–006–NPCC–01, information collection requirements (2) (1)*(2)=(3) (4) (3)*(4)=(5) (5)÷(1) PCs Design and document automatic UFLS program ...................................... 6 PCs update and maintain UFLS program database ............................................... 1 6 1 6 145 1 145 GOs: record retention .............................. 145 1 145 TOTAL .............................................. ........................ ........................ 302 mstockstill on DSK4VPTVN1PROD with NOTICES estimates for cost per response are derived using the following formula: Average Burden Hours per Response * XX per Hour = Average Cost per Response. The hourly cost figure comes from the Bureau of Labor Statistics (https://www.bls.gov/oes/ current/naics2_22.htm and https://www.bls.gov/ VerDate Sep<11>2014 18:18 Feb 03, 2015 Jkt 235001 news.release/ecec.nr0.htm). Record retention (wage plus benefits) cost is $29/hour, and the remaining costs (wage plus benefits for an electrical engineer are $61/hour. 21 For purposes of these charts, generation owner is abbreviated to GO, transmission owner is abbreviated to TO, reliability coordinator is PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 48 $2,928 $488 16 $976 96 $5,856 $976 16 $976 4 $116 ........................ 2,320 $141,520 580 $16,820 3,044 $167,124 6 GOs provide documentation and data to the planning coordinator ....................... 20 The 8 $488 $976 $116 ........................ abbreviated to RC, and planning coordinator is abbreviated to PC. 22 We estimate that an entity will experience a unit failure greater than 90 days once every five years. Therefore, 20 percent of NPCC’s 166 generator owners and transmission owners will experience a unit failure of this duration each year. E:\FR\FM\04FEN1.SGM 04FEN1 6072 Federal Register / Vol. 80, No. 23 / Wednesday, February 4, 2015 / Notices Dated: January 28, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–02115 Filed 2–3–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 9842–006] mstockstill on DSK4VPTVN1PROD with NOTICES Mr. Ray F. Ward; Notice of Application Accepted for Filing and Soliciting Motions to Intervene and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of Application: Minor New License. b. Project No.: 9842–006. c. Date filed: August 28, 2014. d. Applicant: Mr. Ray F. Ward. e. Name of Project: Ward Mill Hydroelectric Project. f. Location: On the Watauga River, in the Township of Laurel Creek, Watauga County, North Carolina. The project does not occupy lands of the United States. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Andrew C. Givens, Cardinal Energy Service, Inc., 620 N. West St., Suite 103, Raleigh, North Carolina 27603, (919) 834–0909. i. FERC Contact: Adam Peer (202) 502–8449, adam.peer@ferc.gov. j. Deadline for filing motions to intervene and protests and requests for cooperating agency status: 60 days from the issuance date of this notice. The Commission strongly encourages electronic filing. Please file motions to intervene and protests and requests for cooperating agency status using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The first page of any filing should include docket number P–9842–006. The Commission’s Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that VerDate Sep<11>2014 18:18 Feb 03, 2015 Jkt 235001 may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. This application has been accepted, but is not ready for environmental analysis at this time. l. The Ward Mill Project consists of: (1) A 130-foot-long by 20-foot-high dam; (2) a 4.6 acre reservoir with an estimated gross storage capacity of 16.3 acre-feet; (3) a 14-foot-long, 5-foot-wide, and 7.5foot-tall penstock made of rock, concrete and reinforced steel; (4) a powerhouse containing two generating units for a total installed capacity of 168 kilowatts; (5) a 45-foot-long, 12-kilovolt transmission line; and (6) appurtenant facilities. The project is estimated to generate from below 290,000 to over 599,000 kilowatt-hours annually. The dam and existing facilities are owned by the applicant. No new project facilities are proposed. m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application. All filings must (1) bear in all capital letters the title ‘‘PROTEST’’ or ‘‘MOTION TO INTERVENE;’’ (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain copies of the PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. Dated: January 28, 2015. Kimberly D. Bose, Secretary. [FR Doc. 2015–02114 Filed 2–3–15; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL00–95–281] San Diego Gas & Electric Company v. Sellers of Energy and Ancillary Services Into Markets Operated by the California Independent System Operator Corporation and the California Power Exchange; Notice of Compliance Filing Take notice that on January 23, 2015, Hafslund Energy Trading LLC submitted a compliance filing pursuant to the Commission’s Opinion No. 536.1 Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant and all the parties in this proceeding. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for electronic review in the Commission’s Public Reference Room in Washington, 1 San Diego Gas & Elec. Co. v. Sellers of Energy and Ancillary Services Into Markets Operated by the California Independent System Operator and the California Power Exchange., 149 FERC ¶ 61,116 (2014) (Opinion No. 536). E:\FR\FM\04FEN1.SGM 04FEN1

Agencies

[Federal Register Volume 80, Number 23 (Wednesday, February 4, 2015)]
[Notices]
[Pages 6067-6072]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-02115]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. IC14-16-000]


Commission Information Collection Activities (FERC-537, FERC-
725F, and FERC-725I); Comment Request

AGENCY: Federal Energy Regulatory Commission, Department of Energy.

ACTION: Comment request.

-----------------------------------------------------------------------

SUMMARY: In compliance with the requirements of the Paperwork Reduction 
Act of 1995, 44 U.S.C. 3507(a)(1)(D), the Federal Energy Regulatory 
Commission (Commission or FERC) is submitting its information 
collections FERC-537 (Gas Pipeline Certificates: Construction, 
Acquisition and Abandonment), FERC-725F (Mandatory Reliability 
Standards for Nuclear Plant Interface Coordination), and FERC-725I 
(Mandatory Reliability Standards for the Northeast Power Coordinating 
Council), to the Office of Management and Budget (OMB) for review of 
the information collection requirements. Any interested person may file 
comments directly with OMB and should address a copy of those comments 
to the Commission as explained below. The Commission previously issued 
a Notice in the Federal Register (79 FR 61068, 10/9/2014) requesting 
public comments. The Commission received no comments on the FERC-537, 
FERC-725F, and FERC-725I and is making this notation in its submittal 
to OMB.

DATES: Comments on the collections of information are due by March 6, 
2015.

ADDRESSES: Comments filed with OMB, identified by the OMB Control Nos. 
1902-0060 (FERC-537), 1902-0249 (FERC-725F), and 1902-0258 (FERC-725I) 
should be sent via email to the Office of Information and Regulatory 
Affairs: oira_submission@omb.gov, Attention: Federal Energy Regulatory 
Commission Desk Officer. The Desk Officer may also be reached via 
telephone at 202-395-0710.
    A copy of the comments should also be sent to the Commission, in 
Docket No. IC14-16-000, by either of the following methods:
     eFiling at Commission's Web site: https://www.ferc.gov/docs-filing/efiling.asp.

[[Page 6068]]

     Mail/Hand Delivery/Courier: Federal Energy Regulatory 
Commission, Secretary of the Commission, 888 First Street NE., 
Washington, DC 20426.
    Instructions: All submissions must be formatted and filed in 
accordance with submission guidelines at: https://www.ferc.gov/help/submission-guide.asp. For user assistance contact FERC Online Support 
by email at ferconlinesupport@ferc.gov, or by phone at: (866) 208-3676 
(toll-free), or (202) 502-8659 for TTY.
    Docket: Users interested in receiving automatic notification of 
activity in this docket or in viewing/downloading comments and 
issuances in this docket may do so at https://www.ferc.gov/docs-filing/docs-filing.asp.

FOR FURTHER INFORMATION CONTACT:  Ellen Brown may be reached by email 
at DataClearance@FERC.gov, by telephone at (202) 502-8663, and by fax 
at (202) 273-0873.

SUPPLEMENTARY INFORMATION:
    Type of Request: Three-year extensions of the information 
collection requirements for all collections described below with no 
changes to the current reporting requirements. Please note that each 
collection is distinct from the next.
    Comments: Comments are invited on: (1) Whether the collections of 
information are necessary for the proper performance of the functions 
of the Commission, including whether the information will have 
practical utility; (2) the accuracy of the agency's estimates of the 
burden and cost of the collections of information, including the 
validity of the methodology and assumptions used; (3) ways to enhance 
the quality, utility and clarity of the information collections; and 
(4) ways to minimize the burden of the collections of information on 
those who are to respond, including the use of automated collection 
techniques or other forms of information technology.

FERC-537, Gas Pipeline Certificates: Construction, Acquisition and 
Abandonment

OMB Control No.:1902-0060

    Abstract: The information collected under the requirements of FERC-
537 is used by the Commission to implement the statutory provisions of 
the Natural Gas Policy Act of 1978 (NGPA) \1\ and the Natural Gas Act 
(NGA).\2\ Under Section 7(c) of the NGA, natural gas pipeline companies 
must obtain Commission authorization to undertake the construction or 
extension of any facilities, or to acquire or operate any such 
facilities or extensions. A natural gas company must also obtain 
Commission approval under Section 7(b) of the NGA prior to abandoning 
any jurisdictional facility or service. Under the NGA and the NGPA, 
interstate and intrastate pipelines must also obtain authorization for 
certain transportation and storage services and arrangements, 
particularly a Part 284, Subpart G--Blanket Certificate.\3\
---------------------------------------------------------------------------

    \1\ 15 U.S.C. 3301-3432.
    \2\ 15 U.S.C. 717-717w.
    \3\ 18 CFR 284.8.
---------------------------------------------------------------------------

    The information collected is necessary to certificate interstate 
pipelines engaged in the transportation and sale of natural gas, and 
the construction, acquisition, and operation of facilities to be used 
in those activities, to authorize the abandonment of facilities and 
services, and to authorize certain NGPA transactions. If a certificate 
is granted, the natural gas company can construct, acquire, or operate 
facilities, plus engage in interstate transportation or sale of natural 
gas. Conversely, approval of an abandonment application permits the 
pipeline to cease service and/or discontinue the operation of such 
facilities. Authorization under NGPA Section 311(a) allows the 
interstate or intrastate pipeline applicants to render certain 
transportation services.
    The data required to be submitted consists of identification of the 
company and responsible officials, factors considered in the location 
of the facilities and the detailed impact on the project area for 
environmental considerations. The following will also be submitted:
     Flow diagrams showing proposed design capacity for 
engineering design verification and safety determination;
     Commercial and economic data presenting the basis for the 
proposed action; and
     Cost of the proposed facilities, plans for financing, and 
estimated revenues and expenses related to the proposed facility for 
accounting and financial evaluation.
    The Commission implements these filing requirements in the Code of 
Federal Regulations (CFR) under 18 CFR 157.5-.11; 157.13-.20; 157.53; 
157.201-.209; 157.211; 157.214-.218; 284.8; 284.11; 284.126; 284.221; 
284.224.
    Type of Respondent: Natural Gas Pipelines.
    Estimate of Annual Burden: The Commission estimates the annual 
public reporting burden for the information collection as: \4\
---------------------------------------------------------------------------

    \4\ The annual public reporting burden of the FERC-537 has 
changed since the publication of the 60-day notice. The current 
estimate of annual burden has been updated and is reflected in this 
notice. Figures in the table have been rounded. The reporting 
requirements have not changed.
    \5\ The estimates for cost per response are derived using the 
following formula: Average Burden Hours per Response * $70.50 per 
Hour = Average Cost per Response. The cost per hour figure is the 
FERC average salary plus benefits. Subject matter experts found that 
industry employment costs closely resemble FERC's regarding the 
FERC-537 information collection.

                 FERC-537--Gas Pipeline Certificates: Construction, Acquisition, and Abandonment
----------------------------------------------------------------------------------------------------------------
                                                                      Average      Total annual
                                   Annual number   Total number    burden hours   burden hours &     Cost per
      Number of respondents        of responses    of responses     & cost per     total annual     respondent
                                  per respondent                   response \5\        cost             ($)
(1)                                          (2)     (1)*(2)=(3)             (4)     (3)*(4)=(5)         (5)/(1)
----------------------------------------------------------------------------------------------------------------
204.............................            2.24             458             146          66,868         $23,109
                                                                         $10,293      $4,714,194
----------------------------------------------------------------------------------------------------------------

    A more granular breakdown of the average burden hour figure (i.e., 
146 average hours per response) follows:

[[Page 6069]]



----------------------------------------------------------------------------------------------------------------
                                                                     Number of                     Average hours
                                                                    respondents      Number of     per response
            18 CFR Section                  Regulation topic         (distinct       responses       (average,
                                                                     entities)                       weighted)
----------------------------------------------------------------------------------------------------------------
157.5-.11; & 157.13-.20...............  Interstate certificate               159              82             500
                                         and abandonment
                                         applications.
157.53................................  Exemptions..............              39               3              50
157.201-.209; 157.211; 157.214-.218...  Blanket Certificates                  62              46             200
                                         prior notice filings.
157.201-.209; 157.211; 157.214-.218...  Blanket Certificates--               159             159              50
                                         annual reports.
284.11................................  NGPA Sec. 311                         93              93              50
                                         Construction--annual
                                         reports.
284.8.................................  Capacity Release--record               0             N/A              75
                                         keeping.
284.126(a)............................  Intrastate bypass, semi-              37              48              30
                                         annual transportation.
284.221...............................  Blanket Certificates--                14              14             100
                                         one time filing, inc.
                                         new tariff and rate
                                         design proposal.
284.224...............................  Hinshaw Blanket                        8               8              75
                                         Certificates.
157.5-.11; & 157.13-.20...............  Non-facility certificate               5               5              75
                                         or abandonment
                                         applications.
                                       -------------------------------------------------------------------------
    Totals............................  ........................             204             458             146
----------------------------------------------------------------------------------------------------------------

FERC-725F, Mandatory Reliability Standards for Nuclear Plant Interface 
Coordination

OMB Control No.: 1902-0249

    Abstract: The Commission requires the information collected by the 
FERC-725F to implement the statutory provisions of section 215 of the 
Federal Power Act (FPA) (16 U.S.C. 824o). On August 8, 2005, the 
Electricity Modernization Act of 2005, which is Title XII, Subtitle A, 
of the Energy Policy Act of 2005 (EPAct 2005), was enacted into law.\6\ 
EPAct 2005 added a new section 215 to the FPA, which required a 
Commission-certified Electric Reliability Organization (ERO) to develop 
mandatory and enforceable Reliability Standards, which are subject to 
Commission review and approval. Once approved, the Reliability 
Standards may be enforced by the ERO subject to Commission oversight, 
or the Commission can independently enforce Reliability Standards.\7\
---------------------------------------------------------------------------

    \6\ Energy Policy Act of 2005, Public Law 109-58, Title XII, 
Subtitle A, 119 Stat. 594, 941 (2005), 16 U.S.C. 824o.
    \7\ 16 U.S.C. 824o(e)(3).
---------------------------------------------------------------------------

    On February 3, 2006, the Commission issued Order No. 672, 
implementing section 215 of the FPA.\8\ Pursuant to Order No. 672, the 
Commission certified one organization, North American Electric 
Reliability Corporation (NERC), as the ERO. The Reliability Standards 
developed by the ERO and approved by the Commission apply to users, 
owners and operators of the Bulk-Power System as set forth in each 
Reliability Standard.
---------------------------------------------------------------------------

    \8\ Rules Concerning Certification of the Electric Reliability 
Organization; and Procedures for the Establishment, Approval, and 
Enforcement of Electric Reliability Standards, Order No. 672, FERC 
Stats. & Regs. ] 31,204, order on reh'g, Order No. 672-A, FERC 
Stats. & Regs. ] 31,212 (2006).
---------------------------------------------------------------------------

    On November 19, 2007, NERC filed its petition for Commission 
approval of the Nuclear Plant Interface Coordination Reliability 
Standard, designated NUC-001-1. In Order No. 716, issued October 16, 
2008, the Commission approved the standard while also directing certain 
revisions.\9\ Revised Reliability Standard, NUC-001-2, was filed with 
the Commission by NERC in August 2009 and subsequently approved by the 
Commission January 21, 2010.\10\
---------------------------------------------------------------------------

    \9\ Mandatory Reliability Standard for Nuclear Plant Interface 
Coordination, Order No. 716, 125 FERC ] 61,065, at P 189 & n.90 
(2008), order on reh'g, Order No. 716-A, 126 FERC ] 61,122 (2009).
    \10\ North American Electric Reliability Corporation, 130 FERC ] 
61,051 (2010). When the revised Reliability Standard was approved 
the Commission did not go to OMB for approval. It is assumed that 
the changes made did not substantively affect the information 
collection and therefore a formal submission to OMB was not needed.
---------------------------------------------------------------------------

    The purpose of Reliability Standard NUC-001-2 is to require 
``coordination between nuclear plant generator operators and 
transmission entities for the purpose of ensuring nuclear plant safe 
operation and shutdown.'' \11\ The Nuclear Reliability Standard applies 
to nuclear plant generator operators (generally nuclear power plant 
owners and operators, including licensees) and ``transmission 
entities,'' defined in the Reliability Standard as including a nuclear 
plant's suppliers of off-site power and related transmission and 
distribution services. To account for the variations in nuclear plant 
design and grid interconnection characteristics, the Reliability 
Standard defines transmission entities as ``all entities that are 
responsible for providing services related to Nuclear Plant Interface 
Requirements (NPIRs),'' and lists eleven types of functional entities 
(heretofore described as ``transmission entities'') that could provide 
services related to NPIRs.\12\
---------------------------------------------------------------------------

    \11\ See Reliability Standard NUC-001-2 at https://www.nerc.com/files/NUC-001-2.pdf.
    \12\ The list of functional entities consists of transmission 
operators, transmission owners, transmission planners, transmission 
service providers, balancing authorities, reliability coordinators, 
planning authorities, distribution providers, load-serving entities, 
generator owners and generator operators.
---------------------------------------------------------------------------

    FERC-725F information collection requirements include establishing 
and maintaining interface agreements, including record retention 
requirements. These agreements are not filed with FERC but with the 
appropriate entities as established by the Reliability Standard.
    Type of Respondent: Nuclear operators, nuclear plants, transmission 
entities.
    Estimate of Annual Burden: The Commission estimates the average 
annual burden for this information collection as:
---------------------------------------------------------------------------

    \13\ The cost for reporting requirements is $73.83/hour and is 
based on a composite loaded (wage plus benefits) average wage for an 
electrical engineer, attorney, and administrative staff. The cost 
for record keeping is $29.01/hour and is based on wages plus 
benefits for a file clerk. The wages are generated from Bureau of 
Labor Statistics data retrieved September, 2014 from https://www.bls.gov/oes/current/naics2_22.htm. The loaded wage is calculated 
using BLS data indicating, as of Sept 1, 2014, that wages make up 
69.9% of total salary (https://www.bls.gov/news.release/ecec.nr0.htm).
    \14\ This figure of 130 transmission entities is based on the 
assumption that each agreement will be between 1 nuclear plant and 2 
transmission entities (65 times 2 = 130). However, there is some 
double counting in this figure because some transmission entities 
may be party to multiple agreements with multiple nuclear plants. 
The double counting does not affect the burden estimate and the 
correct number of unique respondents will be reported to OMB. The 
actual number of unique entities subject to this collection is 143.
    \15\ The recordkeeping ``responses'' are considered to be part 
of (i.e., to be contained within the same quantity as) the Reporting 
responses leading to a total number of unique responses of 420 (390 
+ 30 = 420).

[[Page 6070]]



 
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                          Average burden   Total annual
                                                                           Annual number   Total number    hours & cost   burden hours &     Cost per
                 FERC-725F                      Number of respondents      of responses    of responses    per response    total annual   respondent ($)
                                                                          per respondent                       \13\            cost
                                            (1).........................             (2)     (1)*(2)=(3)             (4)     (3)*(4)=(5)         (5)/(1)
--------------------------------------------------------------------------------------------------------------------------------------------------------
New agreements (Reporting)................  10 nuclear operators + 20                  1              30           1,080          32,400         $79,736
                                             transmission entities.                                              $79,736      $2,392,092
New Agreements (Record Keeping)...........  10 nuclear operators + 20                  1              30             108           3,240          $3,133
                                             transmission entities.                                               $3,133         $93,992
Modifications to agreements (Reporting)...  65 nuclear plants + 130                    2             390           66.67          26,000          $9,844
                                             transmission entities \14\.                                          $4,922      $1,919,581
Modifications to Agreements (Record         65 nuclear plants + 130                    2             390            6.67           2,600            $387
 Keeping).                                   transmission entities.                                                 $193         $75,426
    Total.................................  ............................  ..............        \15\ 420  ..............          64,240  ..............
                                                                                                                              $4,481,091
--------------------------------------------------------------------------------------------------------------------------------------------------------

FERC-725I, Mandatory Reliability Standards for the Northeast Power 
Coordinating Council

OMB Control No.: 1902-0258

    Abstract: This information collection relates to two FERC-approved 
Protection and Control (PRC) regional Reliability Standards: PRC-002-
NPCC-01--Disturbance Monitoring, and PRC-006-NPCC-1--Automatic Under 
frequency Load-Shedding. These Northeast Power Coordinating Council 
(NPCC) regional Reliability Standards require respondents to provide 
recording capability necessary to monitor the response of the Bulk-
Power System to system disturbances, including scheduled and 
unscheduled outages; require each reliability coordinator to establish 
requirements for its area's dynamic disturbance recording needs; 
establish disturbance data reporting requirements; and require planning 
coordinators to incrementally gather data, run studies, and analyze 
study results to design or update the UFLS programs that are required 
in the regional Reliability Standard in addition to the requirements of 
the NERC Reliability Standard PRC-006-1.\16\
---------------------------------------------------------------------------

    \16\ The burden estimates for Reliability Standard PRC-006-1 are 
included in Order No. 763 (Final Rule in RM11-20) and covered in 
FERC-725A (OMB Control No. 1902-0244). OMB approved those 
requirements on 7/9/2012 (ICR Reference No. 201204-1902-001).
---------------------------------------------------------------------------

    Reliability Standard PRC-002-NPCC-01 introduced several new 
mandatory and enforceable requirements for the applicable entities. 
However, when FERC approved this standard, NPCC had (and continues to 
have) criteria \17\ and published guidance \18\ addressing similar 
requirements that the Reliability Standard made mandatory. Thus, it is 
usual and customary for affected entities within NPCC to create, 
maintain and store some of the same or equivalent information 
identified in Reliability Standard PRC-002-NPCC-01. Therefore, many of 
the requirements contained in PRC-002-NPCC-01 do not impose new burdens 
on the affected entities.\19\
---------------------------------------------------------------------------

    \17\ Disturbance Monitoring Equipment Criteria (Aug. 2007), 
available at https://www.npcc.org/Standards/Criteria/A-15.pdf 
(Disturbance Monitoring Criteria).
    \18\ Guide for Application of Disturbance Recording Equipment 
(Sept. 2006), available at https://www.npcc.org/Standards/Guides/B-26.pdf (Application Guide).
    \19\ 5 CFR 1320.3(b)(2) (2011).
---------------------------------------------------------------------------

    Several requirements contained in regional Reliability Standard 
PRC-002-NPCC-01 were entirely new responsibilities for the applicable 
entities when the Commission approved the standard and each of these is 
listed in the estimated annual burden section below.
    Information collection burden for Reliability Standard PRC-006-
NPCC-01 is based on the time needed for planning coordinators and 
generator owners to incrementally gather data, run studies, and analyze 
study results to design or update the UFLS programs that are required 
in the regional Reliability Standard in addition to the requirements of 
the NERC Reliability Standard PRC-006-1. There is also burden on the 
generator owners to maintain data.
    Type of Respondent: Entities registered with the North American 
Electric Reliability Corporation (NERC) as Generator Owners, 
Transmission Owners, Reliability Coordinators and Planning Coordinators
    Estimate of Annual Burden: The number of respondents is based on 
NERC's registry as of August 27, 2014. Entities registered for more 
than one applicable function type have been accounted for in the 
figures below. The Commission estimates the annual public reporting 
burden for the information collection as:

--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                          Average burden   Total annual
    Reliability Standard PRC-002-NPCC-01, information        Number of     Annual number   Total number    hours & cost   burden hours &     Cost per
                 collection requirements                    respondents    of responses    of responses    per response    total annual   respondent ($)
                                                                          per respondent                       \20\            cost
                                                                     (1)             (2)     (1)*(2)=(3)             (4)     (3)*(4)=(5)         (5)/(1)
--------------------------------------------------------------------------------------------------------------------------------------------------------
R13: GO \21\ and TO to have evidence it acquired and                   1               1               1              10              10  ..............
 installed dynamic disturbance recorders and a mutually                                                             $290            $290            $290
 agreed upon implementation schedule with the RC (record
 retention).............................................

[[Page 6071]]

 
R14.5: GO and TO to have evidence of a maintenance and               169              12            2028               5           9,960  ..............
 testing program for stand-alone disturbance monitoring                                                             $305        $618,540          $3,660
 equipment including monthly verification of active
 analog quantities......................................
R14.7: GO and TO to record efforts to return failed                   33               1              33              10             330  ..............
 units to service if it takes longer than 90 days \22\..                                                            $610         $20,130            $610
R14.7: GO and TO record retention.......................              33               1              33              10             330  ..............
                                                                                                                    $290          $9,570            $290
R17: RC provide certain disturbance monitoring equipment               5               1               5               5              25  ..............
 data to the Regional Entity upon request...............                                                            $305          $7,625            $305
R17: RC record retention................................               5               1               5              10              50  ..............
                                                                                                                    $290          $1,450            $290
    TOTAL...............................................  ..............           2,105  ..............          10,705  ..............
                                                                                                                $657,605
--------------------------------------------------------------------------------------------------------------------------------------------------------


                                                                        FERC-725I
--------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                           Total annual
    Reliability standard PRC-006-NPCC-01, information        Number of     Annual number   Total number   Average burden  burden hours &     Cost per
                 collection requirements                    respondents    of responses    of responses    hours & cost    total annual   respondent ($)
                                                                          per respondent                   per response        cost
                                                                     (1)             (2)     (1)*(2)=(3)             (4)     (3)*(4)=(5)         (5)/(1)
--------------------------------------------------------------------------------------------------------------------------------------------------------
PCs Design and document automatic UFLS program..........               6               1               6               8              48  ..............
                                                                                                                    $488          $2,928            $488
PCs update and maintain UFLS program database...........               6               1               6              16              96  ..............
                                                                                                                    $976          $5,856            $976
GOs provide documentation and data to the planning                   145               1             145              16           2,320  ..............
 coordinator............................................                                                            $976        $141,520            $976
GOs: record retention...................................             145               1             145               4             580  ..............
                                                                                                                    $116         $16,820            $116
    TOTAL...............................................  ..............  ..............             302  ..............           3,044  ..............
                                                                                                                                $167,124
--------------------------------------------------------------------------------------------------------------------------------------------------------

     
---------------------------------------------------------------------------

    \20\ The estimates for cost per response are derived using the 
following formula: Average Burden Hours per Response * XX per Hour = 
Average Cost per Response. The hourly cost figure comes from the 
Bureau of Labor Statistics (https://www.bls.gov/oes/current/naics2_22.htm and https://www.bls.gov/news.release/ecec.nr0.htm). 
Record retention (wage plus benefits) cost is $29/hour, and the 
remaining costs (wage plus benefits for an electrical engineer are 
$61/hour.
    \21\ For purposes of these charts, generation owner is 
abbreviated to GO, transmission owner is abbreviated to TO, 
reliability coordinator is abbreviated to RC, and planning 
coordinator is abbreviated to PC.
    \22\ We estimate that an entity will experience a unit failure 
greater than 90 days once every five years. Therefore, 20 percent of 
NPCC's 166 generator owners and transmission owners will experience 
a unit failure of this duration each year.


[[Page 6072]]


---------------------------------------------------------------------------

    Dated: January 28, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-02115 Filed 2-3-15; 8:45 am]
BILLING CODE 6717-01-P