Trafalgar Power, Inc.; Ampersand Cranberry Lake Hydro, LLC; Notice of Application for Transfer of License and Soliciting Comments and Motions To Intervene, 5747 [2015-01998]
Download as PDF
Federal Register / Vol. 80, No. 22 / Tuesday, February 3, 2015 / Notices
(1) You can file your comments
electronically using the eComment
feature located on the Commission’s
Web site (www.ferc.gov) under the link
to Documents and Filings. This is an
easy method for interested persons to
submit brief, text-only comments on a
project;
(2) You can file your comments
electronically using the eFiling feature
located on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You must select
the type of filing you are making. If you
are filing a comment on a particular
project, please select ‘‘Comment on a
Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
following address:
Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Room 1A,
Washington, DC 20426.
rljohnson on DSK3VPTVN1PROD with NOTICES
Environmental Mailing List
The environmental mailing list
includes: Federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; Native American Tribes; other
interested parties; and local libraries
and newspapers. This list also includes
all affected landowners (as defined in
the Commission’s regulations) who are
potential right-of-way grantors, whose
property may be used temporarily for
project purposes, or who own homes
within certain distances of aboveground
facilities, and anyone who submits
comments on the Project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the planned Project.
Copies of the completed draft EIS will
be sent to the environmental mailing list
for public review and comment. If you
would prefer to receive a paper copy of
the document instead of the CD version
or would like to remove your name from
the mailing list, please return the
attached Information Request (appendix
3).
Becoming an Intervenor
Once PennEast files its application
with the Commission, you may want to
become an ‘‘intervenor,’’ which is an
VerDate Sep<11>2014
14:46 Feb 02, 2015
Jkt 235001
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are in the User’s Guide under
the ‘‘e-filing’’ link on the Commission’s
Web site. Please note that the
Commission will not accept requests for
intervenor status at this time. You must
wait until the Commission receives a
formal application for the Project.
Additional Information
Additional information about the
Project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site (www.ferc.gov) using the eLibrary
link. Click on the eLibrary link, click on
‘‘General Search’’ and enter the docket
number, excluding the last three digits
in the Docket Number field (i.e., PF15–
1). Be sure you have selected an
appropriate date range. For assistance,
please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free
at (866) 208–3676, or for TTY, contact
(202) 502–8659. The eLibrary link also
provides access to the texts of formal
documents issued by the Commission,
such as orders, notices, and
rulemakings.
In addition, the Commission offers a
free service called eSubscription that
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/
esubscribenow.htm. Public meetings or
site visits will be posted on the
Commission’s calendar located at
www.ferc.gov/EventCalendar/
EventsList.aspx along with other related
information.
Finally, PennEast has established a
toll-free phone number (1–844–347–
7119) and an email support address
(answers@penneastpipeline.com) so that
parties can contact it directly with
questions about the Project. PennEast
has also established a Project Web site
(https://penneastpipeline.com) where
additional information on the Project is
available.
5747
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 9685–030]
Trafalgar Power, Inc.; Ampersand
Cranberry Lake Hydro, LLC; Notice of
Application for Transfer of License and
Soliciting Comments and Motions To
Intervene
On December 5, 2014 and
supplemented on January 13, 2015,
Trafalgar Power, Inc. (transferor) and
Ampersand Cranberry Lake Hydro, LLC
(transferee) filed an application for
transfer of license of the Cranberry Lake
Hydroelectric Project, FERC No. 9685.
The project is located on the
Oswegatchie River in St. Lawrence,
County, New York.
The transferor and transferee seek
Commission approval to transfer the
license for the Cranberry Lake
Hydroelectric Project from the transferor
to the transferee.
Applicant Contact: For Transferor:
Mr. Arthur Steckler, President, Trafalgar
Power, Inc., 11010 Lake Grove Blvd.,
Suite 100, Box 353, Morrisville, NC
27560–7392. For Transferee: Mr. Lutz
Loegters, Ampersand Cranberry Lake
Hydro LLC, c/o Ampersand Hydro, LLC,
717 Atlantic Avenue, Suite 1A, Boston,
MA 02111.
FERC Contact: Patricia W. Gillis, (202)
502–8735.
Deadline for filing comments and
motions to intervene: 30 days from the
issuance date of this notice, by the
Commission. The Commission strongly
encourages electronic filing. Please file
motions to intervene and comments
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–9685–030.
Kimberly D. Bose,
Secretary.
Dated: January 27, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–01999 Filed 2–2–15; 8:45 am]
[FR Doc. 2015–01998 Filed 2–2–15; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
PO 00000
Frm 00020
Fmt 4703
Sfmt 9990
E:\FR\FM\03FEN1.SGM
03FEN1
Agencies
[Federal Register Volume 80, Number 22 (Tuesday, February 3, 2015)]
[Notices]
[Page 5747]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-01998]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 9685-030]
Trafalgar Power, Inc.; Ampersand Cranberry Lake Hydro, LLC;
Notice of Application for Transfer of License and Soliciting Comments
and Motions To Intervene
On December 5, 2014 and supplemented on January 13, 2015, Trafalgar
Power, Inc. (transferor) and Ampersand Cranberry Lake Hydro, LLC
(transferee) filed an application for transfer of license of the
Cranberry Lake Hydroelectric Project, FERC No. 9685. The project is
located on the Oswegatchie River in St. Lawrence, County, New York.
The transferor and transferee seek Commission approval to transfer
the license for the Cranberry Lake Hydroelectric Project from the
transferor to the transferee.
Applicant Contact: For Transferor: Mr. Arthur Steckler, President,
Trafalgar Power, Inc., 11010 Lake Grove Blvd., Suite 100, Box 353,
Morrisville, NC 27560-7392. For Transferee: Mr. Lutz Loegters,
Ampersand Cranberry Lake Hydro LLC, c/o Ampersand Hydro, LLC, 717
Atlantic Avenue, Suite 1A, Boston, MA 02111.
FERC Contact: Patricia W. Gillis, (202) 502-8735.
Deadline for filing comments and motions to intervene: 30 days from
the issuance date of this notice, by the Commission. The Commission
strongly encourages electronic filing. Please file motions to intervene
and comments using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-9685-030.
Dated: January 27, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-01998 Filed 2-2-15; 8:45 am]
BILLING CODE 6717-01-P