Drawbridge Operation Regulation; Bonfouca Bayou, Slidell, LA, 5457 [2015-01826]
Download as PDF
Federal Register / Vol. 80, No. 21 / Monday, February 2, 2015 / Rules and Regulations
incorporated by reference, contain additional
information about the subject of this AD. For
service information identified in this AD,
contact Airbus Helicopters, Inc., 2701 N.
Forum Drive, Grand Prairie, TX 75052;
telephone (972) 641–0000 or (800) 232–0323;
fax (972) 641–3775; or at https://
www.airbushelicopters.com/techpub. You
may review a copy of the service information
at the FAA, Office of the Regional Counsel,
Southwest Region, 2601 Meacham Blvd.,
Room 663, Fort Worth, Texas 76137.
(2) The subject of this AD is addressed in
European Aviation Safety Agency (EASA) AD
No. 2013–0138R1, dated July 15, 2013. You
may view the EASA AD at https://
www.regulations.gov in the Docket No. FAA–
2015–0049.
(i) Subject
Joint Aircraft Service Component (JASC)
Code: 6320 Main rotor gearbox.
Issued in Fort Worth, Texas, on January 16,
2015.
Lance T. Gant,
Acting Directorate Manager, Rotorcraft
Directorate, Aircraft Certification Service.
[FR Doc. 2015–01800 Filed 1–30–15; 8:45 am]
BILLING CODE 4910–13–P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2015–0003]
Drawbridge Operation Regulation;
Bonfouca Bayou, Slidell, LA
Coast Guard, DHS.
Notice of temporary deviation
from regulations.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the regulation
governing the operation of the State
Route 433 (SR433) Bridge across
Bonfouca Bayou, mile 7.0, at Slidell, St.
Tammany Parish, Louisiana. This
deviation provides for the bridge to
remain closed to navigation for five and
a half consecutive hours in the morning
and four and a half hours in the
afternoon with an opening in the middle
to pass vessels. There will be a two-hour
notice to pass vessels in the evenings
and a four-hour notice to pass vessels on
weekends. This deviation will last for
33 consecutive days. The purpose of the
closure is to conduct scheduled
maintenance and repairs to the
drawbridge.
wreier-aviles on DSK5TPTVN1PROD with RULES
SUMMARY:
This deviation is effective from
6:30 a.m. on February 2, 2015 through
5:30 p.m. on March 6, 2015.
ADDRESSES: The docket for this
deviation, [USCG–2015–0003] is
DATES:
VerDate Sep<11>2014
15:25 Jan 30, 2015
Jkt 235001
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this rulemaking. You
may also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Jim
Wetherington, Bridge Administration
Branch, Coast Guard, telephone
(504)671–2128, email
james.r.wetherington@uscg.mil. If you
have questions on viewing the docket,
call Cheryl F. Collins, Program Manager,
Docket Operations, telephone 202–366–
9826.
SUPPLEMENTARY INFORMATION: The
Louisiana Department of Transportation
and Development (LDOTD) requested a
temporary deviation from the normal
operation of the drawbridge at 33 CFR
117.433 in order to perform scheduled
maintenance and rehabilitation. This is
necessary for the continued operation of
the bridge. This deviation allows the
draw of the SR433 Bridge across
Bonfouca Bayou, mile 7.0, to remain
closed to navigation for five and a half
consecutive hours in the morning and
four and a half hours in the afternoon
with an opening in the middle to pass
vessels. This deviation is effective from
6:30 a.m. to noon and then again from
1 p.m. through 5:30 p.m. daily from
February 2 through March 6, 2015.
There will be two-hour notice required
in the evenings and a four-hour notice
all day on the weekends.
Broadcast Notice to Mariners will be
used to update mariners of any changes
in this deviation.
The bridge has a vertical clearance of
8 feet above high water in the closed-tonavigation position and unlimited
clearance above high water in the opento-navigation position. There is 125 feet
fender to fender horizontal clearance.
Navigation on the waterway consists of
tugs with tows, commercial fishing
vessels and mainly recreational craft.
There is no alternate route.
CEC (the contractor for the
maintenance and rehab) and the Coast
Guard have coordinated the closure
with waterway users, industry, and
other Coast Guard units. This date and
this schedule were chosen to minimize
the significant effects on vessel traffic.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
PO 00000
Frm 00007
Fmt 4700
Sfmt 4700
5457
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: January 27, 2015.
David M. Frank,
Bridge Administrator, Eighth District.
[FR Doc. 2015–01826 Filed 1–30–15; 8:45 am]
BILLING CODE 9110–04–P
ENVIRONMENTAL PROTECTION
AGENCY
40 CFR Parts 9 and 721
[EPA–HQ–OPPT–2014–0714; FRL–9919–68]
RIN 2070–AB27
Significant New Use Rules on Certain
Chemical Substances
Environmental Protection
Agency (EPA).
ACTION: Direct final rule.
AGENCY:
EPA is promulgating
significant new use rules (SNURs) under
the Toxic Substances Control Act
(TSCA) for 27 chemical substances
which were the subject of
premanufacture notices (PMNs). Two of
these chemical substances are subject to
TSCA section 5(e) consent orders issued
by EPA. This action requires persons
who intend to manufacture (including
import) or process any of these 27
chemical substances for an activity that
is designated as a significant new use by
this rule to notify EPA at least 90 days
before commencing that activity. The
required notification will provide EPA
with the opportunity to evaluate the
intended use and, if necessary, to
prohibit or limit that activity before it
occurs.
SUMMARY:
This rule is effective on April 3,
2015. For purposes of judicial review,
this rule shall be promulgated at 1 p.m.
(e.s.t.) on February 17, 2015.
Written adverse or critical comments,
or notice of intent to submit adverse or
critical comments, on one or more of
these SNURs must be received on or
before March 4, 2015 (see Unit VI. of the
SUPPLEMENTARY INFORMATION). If EPA
receives written adverse or critical
comments, or notice of intent to submit
adverse or critical comments, on one or
more of these SNURs before March 4,
2015, EPA will withdraw the relevant
sections of this direct final rule before
its effective date.
For additional information on related
reporting requirement dates, see Units
I.A., VI., and VII. of the SUPPLEMENTARY
INFORMATION.
DATES:
E:\FR\FM\02FER1.SGM
02FER1
Agencies
[Federal Register Volume 80, Number 21 (Monday, February 2, 2015)]
[Rules and Regulations]
[Page 5457]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-01826]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2015-0003]
Drawbridge Operation Regulation; Bonfouca Bayou, Slidell, LA
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
regulation governing the operation of the State Route 433 (SR433)
Bridge across Bonfouca Bayou, mile 7.0, at Slidell, St. Tammany Parish,
Louisiana. This deviation provides for the bridge to remain closed to
navigation for five and a half consecutive hours in the morning and
four and a half hours in the afternoon with an opening in the middle to
pass vessels. There will be a two-hour notice to pass vessels in the
evenings and a four-hour notice to pass vessels on weekends. This
deviation will last for 33 consecutive days. The purpose of the closure
is to conduct scheduled maintenance and repairs to the drawbridge.
DATES: This deviation is effective from 6:30 a.m. on February 2, 2015
through 5:30 p.m. on March 6, 2015.
ADDRESSES: The docket for this deviation, [USCG-2015-0003] is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this rulemaking. You may also visit the Docket
Management Facility in Room W12-140 on the ground floor of the
Department of Transportation West Building, 1200 New Jersey Avenue SE.,
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday,
except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Jim Wetherington, Bridge
Administration Branch, Coast Guard, telephone (504)671-2128, email
james.r.wetherington@uscg.mil. If you have questions on viewing the
docket, call Cheryl F. Collins, Program Manager, Docket Operations,
telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The Louisiana Department of Transportation
and Development (LDOTD) requested a temporary deviation from the normal
operation of the drawbridge at 33 CFR 117.433 in order to perform
scheduled maintenance and rehabilitation. This is necessary for the
continued operation of the bridge. This deviation allows the draw of
the SR433 Bridge across Bonfouca Bayou, mile 7.0, to remain closed to
navigation for five and a half consecutive hours in the morning and
four and a half hours in the afternoon with an opening in the middle to
pass vessels. This deviation is effective from 6:30 a.m. to noon and
then again from 1 p.m. through 5:30 p.m. daily from February 2 through
March 6, 2015. There will be two-hour notice required in the evenings
and a four-hour notice all day on the weekends.
Broadcast Notice to Mariners will be used to update mariners of any
changes in this deviation.
The bridge has a vertical clearance of 8 feet above high water in
the closed-to-navigation position and unlimited clearance above high
water in the open-to-navigation position. There is 125 feet fender to
fender horizontal clearance. Navigation on the waterway consists of
tugs with tows, commercial fishing vessels and mainly recreational
craft. There is no alternate route.
CEC (the contractor for the maintenance and rehab) and the Coast
Guard have coordinated the closure with waterway users, industry, and
other Coast Guard units. This date and this schedule were chosen to
minimize the significant effects on vessel traffic.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: January 27, 2015.
David M. Frank,
Bridge Administrator, Eighth District.
[FR Doc. 2015-01826 Filed 1-30-15; 8:45 am]
BILLING CODE 9110-04-P