Drawbridge Operation Regulation; Bonfouca Bayou, Slidell, LA, 5457 [2015-01826]

Download as PDF Federal Register / Vol. 80, No. 21 / Monday, February 2, 2015 / Rules and Regulations incorporated by reference, contain additional information about the subject of this AD. For service information identified in this AD, contact Airbus Helicopters, Inc., 2701 N. Forum Drive, Grand Prairie, TX 75052; telephone (972) 641–0000 or (800) 232–0323; fax (972) 641–3775; or at https:// www.airbushelicopters.com/techpub. You may review a copy of the service information at the FAA, Office of the Regional Counsel, Southwest Region, 2601 Meacham Blvd., Room 663, Fort Worth, Texas 76137. (2) The subject of this AD is addressed in European Aviation Safety Agency (EASA) AD No. 2013–0138R1, dated July 15, 2013. You may view the EASA AD at https:// www.regulations.gov in the Docket No. FAA– 2015–0049. (i) Subject Joint Aircraft Service Component (JASC) Code: 6320 Main rotor gearbox. Issued in Fort Worth, Texas, on January 16, 2015. Lance T. Gant, Acting Directorate Manager, Rotorcraft Directorate, Aircraft Certification Service. [FR Doc. 2015–01800 Filed 1–30–15; 8:45 am] BILLING CODE 4910–13–P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG–2015–0003] Drawbridge Operation Regulation; Bonfouca Bayou, Slidell, LA Coast Guard, DHS. Notice of temporary deviation from regulations. AGENCY: ACTION: The Coast Guard has issued a temporary deviation from the regulation governing the operation of the State Route 433 (SR433) Bridge across Bonfouca Bayou, mile 7.0, at Slidell, St. Tammany Parish, Louisiana. This deviation provides for the bridge to remain closed to navigation for five and a half consecutive hours in the morning and four and a half hours in the afternoon with an opening in the middle to pass vessels. There will be a two-hour notice to pass vessels in the evenings and a four-hour notice to pass vessels on weekends. This deviation will last for 33 consecutive days. The purpose of the closure is to conduct scheduled maintenance and repairs to the drawbridge. wreier-aviles on DSK5TPTVN1PROD with RULES SUMMARY: This deviation is effective from 6:30 a.m. on February 2, 2015 through 5:30 p.m. on March 6, 2015. ADDRESSES: The docket for this deviation, [USCG–2015–0003] is DATES: VerDate Sep<11>2014 15:25 Jan 30, 2015 Jkt 235001 available at https://www.regulations.gov. Type the docket number in the ‘‘SEARCH’’ box and click ‘‘SEARCH.’’ Click on Open Docket Folder on the line associated with this rulemaking. You may also visit the Docket Management Facility in Room W12–140 on the ground floor of the Department of Transportation West Building, 1200 New Jersey Avenue SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays. FOR FURTHER INFORMATION CONTACT: If you have questions on this temporary deviation, call or email Jim Wetherington, Bridge Administration Branch, Coast Guard, telephone (504)671–2128, email james.r.wetherington@uscg.mil. If you have questions on viewing the docket, call Cheryl F. Collins, Program Manager, Docket Operations, telephone 202–366– 9826. SUPPLEMENTARY INFORMATION: The Louisiana Department of Transportation and Development (LDOTD) requested a temporary deviation from the normal operation of the drawbridge at 33 CFR 117.433 in order to perform scheduled maintenance and rehabilitation. This is necessary for the continued operation of the bridge. This deviation allows the draw of the SR433 Bridge across Bonfouca Bayou, mile 7.0, to remain closed to navigation for five and a half consecutive hours in the morning and four and a half hours in the afternoon with an opening in the middle to pass vessels. This deviation is effective from 6:30 a.m. to noon and then again from 1 p.m. through 5:30 p.m. daily from February 2 through March 6, 2015. There will be two-hour notice required in the evenings and a four-hour notice all day on the weekends. Broadcast Notice to Mariners will be used to update mariners of any changes in this deviation. The bridge has a vertical clearance of 8 feet above high water in the closed-tonavigation position and unlimited clearance above high water in the opento-navigation position. There is 125 feet fender to fender horizontal clearance. Navigation on the waterway consists of tugs with tows, commercial fishing vessels and mainly recreational craft. There is no alternate route. CEC (the contractor for the maintenance and rehab) and the Coast Guard have coordinated the closure with waterway users, industry, and other Coast Guard units. This date and this schedule were chosen to minimize the significant effects on vessel traffic. In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular PO 00000 Frm 00007 Fmt 4700 Sfmt 4700 5457 operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35. Dated: January 27, 2015. David M. Frank, Bridge Administrator, Eighth District. [FR Doc. 2015–01826 Filed 1–30–15; 8:45 am] BILLING CODE 9110–04–P ENVIRONMENTAL PROTECTION AGENCY 40 CFR Parts 9 and 721 [EPA–HQ–OPPT–2014–0714; FRL–9919–68] RIN 2070–AB27 Significant New Use Rules on Certain Chemical Substances Environmental Protection Agency (EPA). ACTION: Direct final rule. AGENCY: EPA is promulgating significant new use rules (SNURs) under the Toxic Substances Control Act (TSCA) for 27 chemical substances which were the subject of premanufacture notices (PMNs). Two of these chemical substances are subject to TSCA section 5(e) consent orders issued by EPA. This action requires persons who intend to manufacture (including import) or process any of these 27 chemical substances for an activity that is designated as a significant new use by this rule to notify EPA at least 90 days before commencing that activity. The required notification will provide EPA with the opportunity to evaluate the intended use and, if necessary, to prohibit or limit that activity before it occurs. SUMMARY: This rule is effective on April 3, 2015. For purposes of judicial review, this rule shall be promulgated at 1 p.m. (e.s.t.) on February 17, 2015. Written adverse or critical comments, or notice of intent to submit adverse or critical comments, on one or more of these SNURs must be received on or before March 4, 2015 (see Unit VI. of the SUPPLEMENTARY INFORMATION). If EPA receives written adverse or critical comments, or notice of intent to submit adverse or critical comments, on one or more of these SNURs before March 4, 2015, EPA will withdraw the relevant sections of this direct final rule before its effective date. For additional information on related reporting requirement dates, see Units I.A., VI., and VII. of the SUPPLEMENTARY INFORMATION. DATES: E:\FR\FM\02FER1.SGM 02FER1

Agencies

[Federal Register Volume 80, Number 21 (Monday, February 2, 2015)]
[Rules and Regulations]
[Page 5457]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-01826]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF HOMELAND SECURITY

Coast Guard

33 CFR Part 117

[Docket No. USCG-2015-0003]


Drawbridge Operation Regulation; Bonfouca Bayou, Slidell, LA

AGENCY: Coast Guard, DHS.

ACTION: Notice of temporary deviation from regulations.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard has issued a temporary deviation from the 
regulation governing the operation of the State Route 433 (SR433) 
Bridge across Bonfouca Bayou, mile 7.0, at Slidell, St. Tammany Parish, 
Louisiana. This deviation provides for the bridge to remain closed to 
navigation for five and a half consecutive hours in the morning and 
four and a half hours in the afternoon with an opening in the middle to 
pass vessels. There will be a two-hour notice to pass vessels in the 
evenings and a four-hour notice to pass vessels on weekends. This 
deviation will last for 33 consecutive days. The purpose of the closure 
is to conduct scheduled maintenance and repairs to the drawbridge.

DATES: This deviation is effective from 6:30 a.m. on February 2, 2015 
through 5:30 p.m. on March 6, 2015.

ADDRESSES: The docket for this deviation, [USCG-2015-0003] is available 
at https://www.regulations.gov. Type the docket number in the ``SEARCH'' 
box and click ``SEARCH.'' Click on Open Docket Folder on the line 
associated with this rulemaking. You may also visit the Docket 
Management Facility in Room W12-140 on the ground floor of the 
Department of Transportation West Building, 1200 New Jersey Avenue SE., 
Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, 
except Federal holidays.

FOR FURTHER INFORMATION CONTACT: If you have questions on this 
temporary deviation, call or email Jim Wetherington, Bridge 
Administration Branch, Coast Guard, telephone (504)671-2128, email 
james.r.wetherington@uscg.mil. If you have questions on viewing the 
docket, call Cheryl F. Collins, Program Manager, Docket Operations, 
telephone 202-366-9826.

SUPPLEMENTARY INFORMATION: The Louisiana Department of Transportation 
and Development (LDOTD) requested a temporary deviation from the normal 
operation of the drawbridge at 33 CFR 117.433 in order to perform 
scheduled maintenance and rehabilitation. This is necessary for the 
continued operation of the bridge. This deviation allows the draw of 
the SR433 Bridge across Bonfouca Bayou, mile 7.0, to remain closed to 
navigation for five and a half consecutive hours in the morning and 
four and a half hours in the afternoon with an opening in the middle to 
pass vessels. This deviation is effective from 6:30 a.m. to noon and 
then again from 1 p.m. through 5:30 p.m. daily from February 2 through 
March 6, 2015. There will be two-hour notice required in the evenings 
and a four-hour notice all day on the weekends.
    Broadcast Notice to Mariners will be used to update mariners of any 
changes in this deviation.
    The bridge has a vertical clearance of 8 feet above high water in 
the closed-to-navigation position and unlimited clearance above high 
water in the open-to-navigation position. There is 125 feet fender to 
fender horizontal clearance. Navigation on the waterway consists of 
tugs with tows, commercial fishing vessels and mainly recreational 
craft. There is no alternate route.
    CEC (the contractor for the maintenance and rehab) and the Coast 
Guard have coordinated the closure with waterway users, industry, and 
other Coast Guard units. This date and this schedule were chosen to 
minimize the significant effects on vessel traffic.
    In accordance with 33 CFR 117.35(e), the drawbridge must return to 
its regular operating schedule immediately at the end of the effective 
period of this temporary deviation. This deviation from the operating 
regulations is authorized under 33 CFR 117.35.

    Dated: January 27, 2015.
David M. Frank,
Bridge Administrator, Eighth District.
[FR Doc. 2015-01826 Filed 1-30-15; 8:45 am]
BILLING CODE 9110-04-P