Notice of Availability (NOA) for Finding of No Significant Impact (FONSI) for the Environmental Assessment (EA) Addressing Implementation of the Real Property Master Plan at Defense Distribution Center, Susquehanna, Pennsylvania, 4908-4909 [2015-01641]
Download as PDF
4908
Federal Register / Vol. 80, No. 19 / Thursday, January 29, 2015 / Notices
therefore, it contains built-in safeguards
to limit access and visibility of this
information. DMHRSi uses role-based
security so a user sees only the
information for which permission has
been granted. It uses state-of-the-market
128-bit encryption security for our
transactions. It is DIACAP certified
having been subjected to and passed
thorough security testing and evaluation
by independent parties. It meets
safeguards specified by the Privacy Act
of 1974 in that it maintains a published
Department of Defense (DoD) Privacy
Impact Assessment and System of
Record covering Active Duty Military,
Reserve, National Guard, and
government civilian employees, to
include non-appropriated fund
employees and foreign nationals, DoD
contractors, and volunteers. DMHRSi is
hosted in a secure facility managed by
the Defense Information Systems
Agency. A detailed Privacy Act
Statement appears prior to system
access. As an HR system, DMHRSi will
collect and store Social Security
Numbers (SSN). Although DMHRSi
issues each individual a distinctive
employee number, collection of SSNs is
required for successful continuity of
operations within DoD and
interoperability with federal
organizations external to DoD. As the
DoD and other federal organizations
migrate from the use of the SSN as a
primary means of identification in
accordance with executive guidelines,
DMHRSi will reduce usage. Protection
of personally identifiable information
(PII) is required by federal statues and
policy and DoD guidelines and
regulations. Future capabilities include
an even greater reduction in access and
full encryption of PII.
Dated: January 26, 2015.
Aaron Siegel,
Alternate OSD Federal Register Liaison
Officer, Department of Defense.
[FR Doc. 2015–01657 Filed 1–28–15; 8:45 am]
BILLING CODE 5001–06–P
DEPARTMENT OF DEFENSE
Office of the Secretary
[Docket ID: DoD–2015–OS–0007]
mstockstill on DSK4VPTVN1PROD with NOTICES
Proposed Collection; Comment
Request
Office of the Under Secretary of
Defense for Acquisition, Technology,
and Logistics/Defense Standardization
Program Office, DoD.
ACTION: Notice.
AGENCY:
In compliance with the
Paperwork Reduction Act of 1995, the
SUMMARY:
VerDate Sep<11>2014
18:16 Jan 28, 2015
Jkt 235001
Office of the Under Secretary of Defense
for Acquisition, Technology, and
Logistics announces a proposed public
information collection and seeks public
comment on the provisions thereof.
Comments are invited on: (a) Whether
the proposed collection of information
is necessary for the proper performance
of the functions of the agency, including
whether the information shall have
practical utility; (b) the accuracy of the
agency’s estimate of the burden of the
proposed information collection; (c)
ways to enhance the quality, utility, and
clarity of the information to be
collected; and (d) ways to minimize the
burden of the information collection on
respondents, including through the use
of automated collection techniques or
other forms of information technology.
DATES: Consideration will be given to all
comments received by March 30, 2015.
ADDRESSES: You may submit comments,
identified by docket number and title,
by any of the following methods:
• Federal eRulemaking Portal: https://
www.regulations.gov. Follow the
instructions for submitting comments.
• Mail: Federal Docket Management
System Office, 4800 Mark Center Drive,
East Tower, Suite 02G09, Alexandria,
VA 22350–3100.
Instructions: All submissions received
must include the agency name, docket
number and title for this Federal
Register document. The general policy
for comments and other submissions
from members of the public is to make
these submissions available for public
viewing on the Internet at https://
www.regulations.gov as they are
received without change, including any
personal identifiers or contact
information.
Any associated form(s) for this
collection may be located within this
same electronic docket and downloaded
for review/testing. Follow the
instructions at https://
www.regulations.gov for submitting
comments. Please submit comments on
any given form identified by docket
number, form number, and title.
FOR FURTHER INFORMATION CONTACT: To
request more information on this
proposed information collection or to
obtain a copy of the proposal and
associated collection instruments,
please write to the Defense
Standardization Program Office, Defense
Logistics Agency, 8725 John J. Kingman
Road, STOP 5100, ATTN: Mr. Tim
Koczanski, Fort Belvoir, VA 22060, or
call the Defense Standardization
Program Office at (703) 767–6870.
SUPPLEMENTARY INFORMATION:
Title; Associated Form; and OMB
Number: Certification of Qualified
PO 00000
Frm 00056
Fmt 4703
Sfmt 4703
Products; DD Form 1718; OMB Control
Number 0704–0487.
Needs and Uses: The information
collection requirement is necessary to
obtain, certify and record qualification
of products or processes falling under
the DoD Qualification Program. This
form is included as an exhibit in an
appeal or hearing case file as evidence
of the reviewer’s products or process
qualifications in advance of, and
independent of an acquisition.
Affected Public: Business or other for
profit.
Annual Burden Hours: 638.
Number of Respondents: 1,276.
Responses per Respondent: 1.
Annual Responses: 1,276.
Average Burden per Response: 0.30
minutes.
Frequency: Biennially.
Respondents are individuals who
supply products to the Department of
Defense that are listed on Qualified
Products Lists (QPLs) or Qualified
Manufacturers List (QMLs). DD Form
1718, ‘‘Certification of Qualified
Products’’ records and certifies, from the
manufacturers, distributor, or reseller
that the products still conforms to the
specification. If the form is not included
in the contract file, individuals
procuring these items cannot be assured
that the products conform to the
specification and therefore are qualified
products from qualified sources. The
use of the DD Form 1718 is essential in
maintaining the integrity of the
qualification program.
Dated: January 26, 2015.
Aaron Siegel,
Alternate OSD Federal Register Liaison
Officer, Department of Defense.
[FR Doc. 2015–01676 Filed 1–28–15; 8:45 am]
BILLING CODE 5001–06–P
DEPARTMENT OF DEFENSE
Office of the Secretary
[Docket ID DoD–2014–OS–0129]
Notice of Availability (NOA) for Finding
of No Significant Impact (FONSI) for
the Environmental Assessment (EA)
Addressing Implementation of the Real
Property Master Plan at Defense
Distribution Center, Susquehanna,
Pennsylvania
Defense Logistics Agency
(DLA), Department of Defense.
ACTION: Notice of Availability (NOA) for
Finding of No Significant Impact
(FONSI) for the Environmental
Assessment (EA) Addressing
Implementation of the Real Property
AGENCY:
E:\FR\FM\29JAN1.SGM
29JAN1
Federal Register / Vol. 80, No. 19 / Thursday, January 29, 2015 / Notices
Master Plan at Defense Distribution
Center, Susquehanna, Pennsylvania.
On August 26, 2014, DLA
published an NOA in the Federal
Register (79 FR 50895) announcing the
publication of the EA Addressing
Implementation of the Real Property
Master Plan (RPMP) at Defense
Distribution Center, Susquehanna,
Pennsylvania. The EA was available for
a 30-day public comment period that
ended September 25, 2014. The EA was
prepared as required under the National
Environmental Policy Act (NEPA) of
1969. In addition, the EA complied with
DLA Regulation (DLAR) 1000.22. No
comments were received during the
public comment period. This FONSI
documents the decision of DLA to
implement the RPMP and its component
plans at Defense Distribution Center,
Susquehanna, Pennsylvania. DLA has
determined that the Proposed Action is
not a major Federal action significantly
affecting the quality of the human
environment within the context of
NEPA and that no significant impacts
on the human environment are
associated with this decision.
FOR FURTHER INFORMATION CONTACT: Ira
Silverberg at 703–767–0705 during
normal business hours Monday through
Friday, from 8:00 a.m. to 4:30 p.m.
(EST) or by email: ira.silverberg@
dla.mil.
SUMMARY:
DLA
completed an EA to address the
potential environmental consequences
associated with the proposed
implementation of the RPMP and its
component plans at Defense
Distribution Center, Susquehanna,
Pennsylvania. This FONSI incorporates
the EA by reference and summarizes the
results of the analyses in the EA.
Purpose and Need for Action: The
purpose of the Proposed Action is to
implement the installation’s RPMP and
its component plans to establish a
foundation providing direction for the
future development of the facilities,
infrastructure, transportation system,
and environmental conditions at
Defense Distribution Center,
Susquehanna, Pennsylvania. The
Proposed Action is needed to ensure
that the installation is able to meet its
current and future mission requirements
while protecting its natural resources
and ensuring the energy efficiency and
sustainability of the installation.
Proposed Action and Alternatives:
Under the Proposed Action, the DLA
would implement the installation’s
RPMP and its component plans. The
RPMP provides the direction for the
future development of the installation
mstockstill on DSK4VPTVN1PROD with NOTICES
SUPPLEMENTARY INFORMATION:
VerDate Sep<11>2014
18:16 Jan 28, 2015
Jkt 235001
over the next 20 to 30 years and
identifies a series of building,
infrastructure, and transportation
projects that would ensure that the
installation is able to meet its current
and future mission requirements in a
sustainable and environmentally
conscious manner.
Implementing the projects in the
RPMP would replace undersized,
outdated buildings and infrastructure
with modern, energy-efficient,
sustainable buildings and infrastructure.
The proposed projects include the
construction of 4,201,966 square feet of
buildings and the demolition of
2,503,790 square feet of buildings,
which would result in an increase in
impervious surface, including more
parking spaces. Additionally, the
proposed projects include a transit and
non-motorized transportation system
consisting of two transit hubs; multiple
bus stops; a variety of bus, pedestrian,
and bicycle routes; and rail access to
reduce truck conveyance.
Component plans of the RPMP
include the Net-Zero Energy Plan
(NZEP), Sustainability Plan (SP),
Integrated Natural Resources
Management Plan (INRMP), and
Integrated Pest Management Plan
(IPMP) for the installation. The NZEP
balances the installation’s future energy
demand from buildings, industrial
processes, fleet vehicles, and equipment
with onsite and offsite renewable energy
production. The SP provides a pathway
for the installation to move toward
compliance with relevant Federal
mandates regarding sustainability. The
INRMP is the installation’s plan for
managing its natural resources while
ensuring the success of the military
mission. The IPMP is the installation’s
plan for its pest management program.
Implementation of the NZEP, SP,
INRMP, and IPMP would enable the
installation to reduce energy and fossil
fuel use, increase alternative fuel use,
achieve a net-zero energy footprint,
meet or exceed relevant Federal
sustainability mandates, practice sound
natural resources stewardship, comply
with environmental policies and
regulations, and reduce reliance on
pesticides while reducing real property
damage and maintenance costs.
Description of the No Action
Alternative: Under the No Action
Alternative, DLA would not implement
the installation’s RPMP or its
component plans. In general,
implementation of the No Action
Alternative would require that DLA
continue to use the existing outdated,
undersized, and inefficient facilities and
abandon the proposed infrastructure
enhancements, sustainability
PO 00000
Frm 00057
Fmt 4703
Sfmt 9990
4909
improvements, and natural resources
projects of the component plans, which
would hamper the ability of the
installation to meet its current and
future mission requirements. The No
Action Alternative would not meet the
purpose of and need for the Proposed
Action.
Potential Environmental Impacts: No
significant effects on environmental
resources would be expected from the
Proposed Action. Insignificant, adverse
effects on recreation, geological
resources, water resources, and
transportation and infrastructure would
be expected. Insignificant, beneficial
effects on airspace management and
safety, land use and recreation, noise,
air quality, geological resources, water
resources, biological resources,
transportation and infrastructure, and
hazardous materials and wastes also
would be expected. Details of the
environmental consequences are
discussed in the EA, which is hereby
incorporated by reference.
Determination: DLA has determined
that implementation of the Proposed
Action will not have a significant effect
on the human environment. Human
environment was interpreted
comprehensively to include the natural
and physical environment and the
relationship of people with that
environment. Specifically, no highly
uncertain or controversial impacts,
unique or unknown risks, or
cumulatively significant effects were
identified. Implementation of the
Proposed Action will not violate any
Federal, state, or local laws. Based on
the results of the analyses performed
during preparation of the EA, Mr.
Marvin Wenberg, Acting Director, DLA
Installation Support, concludes that
implementation of the RPMP and its
component plans at Defense
Distribution Center, Susquehanna,
Pennsylvania, does not constitute a
major Federal action significantly
affecting the quality of the human
environment within the context of
NEPA. Therefore, an environmental
impact statement for the Proposed
Action is not required.
Dated: January 23, 2015.
Aaron Siegel,
Alternate OSD Federal Register Liaison
Officer, Department of Defense.
[FR Doc. 2015–01641 Filed 1–28–15; 8:45 am]
BILLING CODE 5001–06–P
E:\FR\FM\29JAN1.SGM
29JAN1
Agencies
[Federal Register Volume 80, Number 19 (Thursday, January 29, 2015)]
[Notices]
[Pages 4908-4909]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-01641]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Office of the Secretary
[Docket ID DoD-2014-OS-0129]
Notice of Availability (NOA) for Finding of No Significant Impact
(FONSI) for the Environmental Assessment (EA) Addressing Implementation
of the Real Property Master Plan at Defense Distribution Center,
Susquehanna, Pennsylvania
AGENCY: Defense Logistics Agency (DLA), Department of Defense.
ACTION: Notice of Availability (NOA) for Finding of No Significant
Impact (FONSI) for the Environmental Assessment (EA) Addressing
Implementation of the Real Property
[[Page 4909]]
Master Plan at Defense Distribution Center, Susquehanna, Pennsylvania.
-----------------------------------------------------------------------
SUMMARY: On August 26, 2014, DLA published an NOA in the Federal
Register (79 FR 50895) announcing the publication of the EA Addressing
Implementation of the Real Property Master Plan (RPMP) at Defense
Distribution Center, Susquehanna, Pennsylvania. The EA was available
for a 30-day public comment period that ended September 25, 2014. The
EA was prepared as required under the National Environmental Policy Act
(NEPA) of 1969. In addition, the EA complied with DLA Regulation (DLAR)
1000.22. No comments were received during the public comment period.
This FONSI documents the decision of DLA to implement the RPMP and its
component plans at Defense Distribution Center, Susquehanna,
Pennsylvania. DLA has determined that the Proposed Action is not a
major Federal action significantly affecting the quality of the human
environment within the context of NEPA and that no significant impacts
on the human environment are associated with this decision.
FOR FURTHER INFORMATION CONTACT: Ira Silverberg at 703-767-0705 during
normal business hours Monday through Friday, from 8:00 a.m. to 4:30
p.m. (EST) or by email: ira.silverberg@dla.mil.
SUPPLEMENTARY INFORMATION: DLA completed an EA to address the potential
environmental consequences associated with the proposed implementation
of the RPMP and its component plans at Defense Distribution Center,
Susquehanna, Pennsylvania. This FONSI incorporates the EA by reference
and summarizes the results of the analyses in the EA.
Purpose and Need for Action: The purpose of the Proposed Action is
to implement the installation's RPMP and its component plans to
establish a foundation providing direction for the future development
of the facilities, infrastructure, transportation system, and
environmental conditions at Defense Distribution Center, Susquehanna,
Pennsylvania. The Proposed Action is needed to ensure that the
installation is able to meet its current and future mission
requirements while protecting its natural resources and ensuring the
energy efficiency and sustainability of the installation.
Proposed Action and Alternatives: Under the Proposed Action, the
DLA would implement the installation's RPMP and its component plans.
The RPMP provides the direction for the future development of the
installation over the next 20 to 30 years and identifies a series of
building, infrastructure, and transportation projects that would ensure
that the installation is able to meet its current and future mission
requirements in a sustainable and environmentally conscious manner.
Implementing the projects in the RPMP would replace undersized,
outdated buildings and infrastructure with modern, energy-efficient,
sustainable buildings and infrastructure. The proposed projects include
the construction of 4,201,966 square feet of buildings and the
demolition of 2,503,790 square feet of buildings, which would result in
an increase in impervious surface, including more parking spaces.
Additionally, the proposed projects include a transit and non-motorized
transportation system consisting of two transit hubs; multiple bus
stops; a variety of bus, pedestrian, and bicycle routes; and rail
access to reduce truck conveyance.
Component plans of the RPMP include the Net-Zero Energy Plan
(NZEP), Sustainability Plan (SP), Integrated Natural Resources
Management Plan (INRMP), and Integrated Pest Management Plan (IPMP) for
the installation. The NZEP balances the installation's future energy
demand from buildings, industrial processes, fleet vehicles, and
equipment with onsite and offsite renewable energy production. The SP
provides a pathway for the installation to move toward compliance with
relevant Federal mandates regarding sustainability. The INRMP is the
installation's plan for managing its natural resources while ensuring
the success of the military mission. The IPMP is the installation's
plan for its pest management program.
Implementation of the NZEP, SP, INRMP, and IPMP would enable the
installation to reduce energy and fossil fuel use, increase alternative
fuel use, achieve a net-zero energy footprint, meet or exceed relevant
Federal sustainability mandates, practice sound natural resources
stewardship, comply with environmental policies and regulations, and
reduce reliance on pesticides while reducing real property damage and
maintenance costs.
Description of the No Action Alternative: Under the No Action
Alternative, DLA would not implement the installation's RPMP or its
component plans. In general, implementation of the No Action
Alternative would require that DLA continue to use the existing
outdated, undersized, and inefficient facilities and abandon the
proposed infrastructure enhancements, sustainability improvements, and
natural resources projects of the component plans, which would hamper
the ability of the installation to meet its current and future mission
requirements. The No Action Alternative would not meet the purpose of
and need for the Proposed Action.
Potential Environmental Impacts: No significant effects on
environmental resources would be expected from the Proposed Action.
Insignificant, adverse effects on recreation, geological resources,
water resources, and transportation and infrastructure would be
expected. Insignificant, beneficial effects on airspace management and
safety, land use and recreation, noise, air quality, geological
resources, water resources, biological resources, transportation and
infrastructure, and hazardous materials and wastes also would be
expected. Details of the environmental consequences are discussed in
the EA, which is hereby incorporated by reference.
Determination: DLA has determined that implementation of the
Proposed Action will not have a significant effect on the human
environment. Human environment was interpreted comprehensively to
include the natural and physical environment and the relationship of
people with that environment. Specifically, no highly uncertain or
controversial impacts, unique or unknown risks, or cumulatively
significant effects were identified. Implementation of the Proposed
Action will not violate any Federal, state, or local laws. Based on the
results of the analyses performed during preparation of the EA, Mr.
Marvin Wenberg, Acting Director, DLA Installation Support, concludes
that implementation of the RPMP and its component plans at Defense
Distribution Center, Susquehanna, Pennsylvania, does not constitute a
major Federal action significantly affecting the quality of the human
environment within the context of NEPA. Therefore, an environmental
impact statement for the Proposed Action is not required.
Dated: January 23, 2015.
Aaron Siegel,
Alternate OSD Federal Register Liaison Officer, Department of Defense.
[FR Doc. 2015-01641 Filed 1-28-15; 8:45 am]
BILLING CODE 5001-06-P