PJM Interconnection, L.L.C. American Transmission Systems, Inc.; Notice of Institution of Section 206 Proceeding and Refund Effective Date, 1501 [2015-00249]
Download as PDF
Federal Register / Vol. 80, No. 7 / Monday, January 12, 2015 / Notices
intervene, and protests must be served
on the Complainants.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
electronic review in the Commission’s
Public Reference Room in Washington,
DC. There is an ‘‘eSubscription’’ link on
the Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on January 15, 2015.
Dated: December 19, 2014.
Kimberly D. Bose,
Secretary.
DEPARTMENT OF ENERGY
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Federal Energy Regulatory
Commission
[Docket No. AD15–4–000]
[Docket No. ER15–303–000]
PJM Interconnection, L.L.C. American
Transmission Systems, Inc.; Notice of
Institution of Section 206 Proceeding
and Refund Effective Date
On December 31, 2014, the
Commission issued an order in Docket
No. ER15–303–000, pursuant to section
206 of the Federal Power Act (FPA), 16
U.S.C. 824e (2012), instituting an
investigation into the justness and
reasonableness of American
Transmission Systems, Inc.’s (ATSI)
12.38 percent return on equity in
conjunction with ATSI’s October 31,
2014 section 205 filing proposing
revisions to its with transmission
formula rate and Protocols. PJM
Interconnection, L.L.C. et al., 149 FERC
¶ 61,292 (2014).
The refund effective date in Docket
No. ER15–303–000, established
pursuant to section 206(b) of the FPA,
will be the date of publication of this
notice in the Federal Register.
Dated: January 6, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015–00254 Filed 1–9–15; 8:45 am]
BILLING CODE 6717–01–P
1501
[FR Doc. 2015–00249 Filed 1–9–15; 8:45 am]
BILLING CODE 6717–01–P
Technical Conference on
Environmental Regulations and
Electric Reliability, Wholesale
Electricity Markets, and Energy
Infrastructure
Supplemental Notice of Technical
Conferences
As announced in the Notice of
Technical Conferences issued on
December 9, 2014,1 the Federal Energy
Regulatory Commission (Commission)
will hold a series of technical
conferences to discuss implications of
compliance approaches to the Clean
Power Plan proposed rule, issued by the
Environmental Protection Agency (EPA)
on June 2, 2014.2 The technical
conferences will focus on issues related
to electric reliability, wholesale electric
markets and operations, and energy
infrastructure. The Commission will
hold a National Overview technical
conference on February 19, 2015, from
approximately 10:00 a.m. to 5:45 p.m. in
the Commission Meeting Room at the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426. This conference is free of charge
and open to the public. The agenda for
the National Overview technical
conference is attached to this
Supplemental Notice of Technical
Conferences.
Following the National Overview
technical conference, the Commission
will hold three regional technical
conferences on the following dates:
February 25, 2015 ............................................
March 11, 2015 ................................................
March 31, 2015 ................................................
Denver, CO.
Washington, DC.
St. Louis, MO.
The National Overview technical
conference will be Commission-led. The
regional technical conferences will be
staff-led. Commission members may
participate in the regional technical
conferences. The Commission will issue
subsequent notices detailing the list of
tkelley on DSK3SPTVN1PROD with NOTICES
Western Region 3 ...............................................
Eastern Region 4 ................................................
Central Region 5 .................................................
speakers at the National Overview
technical conference and the specific
location, agenda, and topics for
discussion at each regional technical
conference.
Registration for the National
Overview technical conference is
available at https://www.ferc.gov/whatsnew/registration/02-19-15-form.asp.
Those interested in attending the
National Overview conference are
encouraged to register by close of
business on February 13, 2015. The
Commission will provide details on
1 Technical Conference on Environmental
Regulations and Electric Reliability, Wholesale
Electricity Markets, and Energy Infrastructure,
Docket No. AD15–4–000, (Dec. 9, 2014) (Notice of
Technical Conferences), available at https://
www.ferc.gov/CalendarFiles/20141209165657AD15-4-000TC.pdf.
2 Carbon Pollution Emission Guidelines for
Existing Stationary Sources: Electric Utility
Generating Units, Federal Register, 79 FR 34,830
(2014) (Proposed Rule), available at https://
www.gpo.gov/fdsys/pkg/FR-2014-06-18/pdf/201413725.pdf.
3 For purposes of this conference, the Western
Region includes all the areas with the Western
Interconnection, including the California
Independent System Operator (CAISO).
4 For purposes of this conference, the Eastern
Region includes the following Commissionapproved Order No. 1000 planning regions: ISO
New England, Inc. (ISO–NE), PJM Interconnection,
LLC (PJM), New York Independent System Operator
(NYISO), Southeastern Regional Transmission
Planning (SERTP), South Carolina Regional
Transmission Planning (SCRTP), and Florida
Reliability Coordinating Council (FRCC). This
region also includes the Northern Maine
Independent System Administrator (NMISA).
5 For purposes of this conference, the Central
Region includes the following Commissionapproved Order No. 1000 planning regions:
Midcontinent Independent System Operator Inc.
(MISO) and Southwest Power Pool (SPP). This
region also includes the Electric Reliability Council
of Texas (ERCOT).
VerDate Sep<11>2014
17:35 Jan 09, 2015
Jkt 235001
PO 00000
Frm 00009
Fmt 4703
Sfmt 4703
E:\FR\FM\12JAN1.SGM
12JAN1
Agencies
[Federal Register Volume 80, Number 7 (Monday, January 12, 2015)]
[Notices]
[Page 1501]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2015-00249]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER15-303-000]
PJM Interconnection, L.L.C. American Transmission Systems, Inc.;
Notice of Institution of Section 206 Proceeding and Refund Effective
Date
On December 31, 2014, the Commission issued an order in Docket No.
ER15-303-000, pursuant to section 206 of the Federal Power Act (FPA),
16 U.S.C. 824e (2012), instituting an investigation into the justness
and reasonableness of American Transmission Systems, Inc.'s (ATSI)
12.38 percent return on equity in conjunction with ATSI's October 31,
2014 section 205 filing proposing revisions to its with transmission
formula rate and Protocols. PJM Interconnection, L.L.C. et al., 149
FERC ] 61,292 (2014).
The refund effective date in Docket No. ER15-303-000, established
pursuant to section 206(b) of the FPA, will be the date of publication
of this notice in the Federal Register.
Dated: January 6, 2015.
Kimberly D. Bose,
Secretary.
[FR Doc. 2015-00249 Filed 1-9-15; 8:45 am]
BILLING CODE 6717-01-P