Delayed Applications, 105-106 [2014-30557]

Download as PDF 105 Federal Register / Vol. 80, No. 1 / Friday, January 2, 2015 / Notices Application No. Docket No. 16332–N ...... ..................... 16334–N ...... ..................... 16337–N ...... ..................... 16338–N ...... 16346–N ...... Applicant Regulation(s) affected Nature of special permits thereof Nalco Company, Naperville, IL. 49 CFR 172.302(c), 178.705(c)(1) .............. ICL Performance Products LP, St. Louis, MO. Volkswagen Group of America (VWGoA), Herndon, VA. 49 CFR 178.255–11, 178.274(h)(1) ............ ..................... Orion Polyurethanes, sp. z.o.o. S.K.A. Dzierzoniow. 49 CFR 173.306(a)(3)(v) ............................. ..................... FIBA Technologies, Inc., Littleton, MA. 49 CFR 173.301(a)(1), 178.71 .................... To authorize the transportation in commerce of certain existing UN 31A IBCs manufactured of stainless steel and modified with a lid manufactured of Linear Medium Density Polyethylene. (modes 1, 2, 3) To authorize the transportation in commerce of an ISO tank with a damaged frame. (mode 1) To authorize the transportation in commerce of certain lithium ion batteries each with a net weight greater than 35 kg by cargo aircraft only. (mode 4) To authorize the transportation in commerce of Division 2.1 hazardous materials in certain DOT Specification 2Q non-refillable inside containers which have been tested by an alternative method in lieu of the hot water bath test. (modes 1, 2, 3, 4, 5) To authorize the manufacture, mark, sale and use of Type 2, hoop-wrapped, refillable, composite reinforced UN pressure receptacles. (modes 1, 2, 3) [FR Doc. 2014–30538 Filed 12–31–14; 8:45 am] BILLING CODE 4909–60–M DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration of special permit applications that have been in process for 180 days or more. The reason(s) for delay and the expected completion date for action on each application is provided in association with each identified application. FOR FURTHER INFORMATION CONTACT: Delayed Applications Office of Hazardous Materials Safety, Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: List of application delayed more than 180 days. AGENCY: In accordance with the requirements of 49 U.S.C. 5117(c), PHMSA is publishing the following list SUMMARY: 49 CFR 172.102(c)(2), Special Provision A54, ICAO TI Special Provision A99. Ryan Paquet, Director, Office of Hazardous Materials Special Permits and Approvals, Pipeline and Hazardous Materials Safety Administration, U.S. Department of Transportation, East Building, PHH–30, 1200 New Jersey Avenue Southeast, Washington, DC 20590–0001, (202) 366–4535 Key to ‘‘Reason for Delay’’ 1. Awaiting additional information from applicant Application No. 2. Extensive public comment under review 3. Application is technically complex and is of significant impact or precedent-setting and requires extensive analysis 4. Staff review delayed by other priority issues or volume of special permit applications Meaning of Application Number Suffixes N—New application M—Modification request R—Renewal Request P—Party To Exemption Request Issued in Washington, DC, on December 8, 2014. Donald Burger, Chief, General Approvals and Permits. Reason for delay Applicant Estimated date of completion Modification to Special Permits 9847–M ............. 14617–M ........... 13359–M ........... 11903–M ........... 15832–M ........... FIBA Technologies, Inc. (FIBA), Millbury, MA .......................................................................... Western International Gas & Cylinders, Inc., Bellville, TX ....................................................... BASF Corporation, Florham Park, NJ ...................................................................................... Comptank Corporation Bothwell, ON ....................................................................................... Baker Petrolite Corporation (BPC), Sugar Land, TX ............................................................... 4 4 4 4 4 12–31–2014 01–31–2015 01–31–2015 01–31–2015 12–31–2014 1 4 4 4 4 4 4 4 4 4 12–31–2014 12–31–2014 12–31–2014 12–31–2014 12–31–2014 01–31–2015 12–31–2014 01–31–2015 12–31–2014 01–31–2015 asabaliauskas on DSK5VPTVN1PROD with NOTICES New Special Permit Applications 15767–N 16001–N 16039–N 16061–N 16137–N 16118–N 16155–N 16121–N 16154–N 16181–N ........... ........... ........... ........... ........... ........... ........... ........... ........... ........... VerDate Sep<11>2014 Union Pacific Railroad Company,Omaha, NE .......................................................................... VELTEK, Malvern, PA .............................................................................................................. UTLX Manufacturing LLC, Alexandria, LA ............................................................................... Battery Solutions, LLC, Howell, MI ........................................................................................... Diversified Laboratory Repair, Gaithersburg, MD .................................................................... Toyota Motor Sales, U.S.A., Inc., Torrance, CA ...................................................................... B.J. Alan Company dba Phantom Fireworks, Canfield, OH .................................................... U.S. Department of Defense (DOD), Scott AFB, IL ................................................................. Patriot Fireworks, LLC, Ann Arbor, MI ..................................................................................... Arc Process, Inc., Pflugerville, TX ............................................................................................ 17:50 Dec 31, 2014 Jkt 235001 PO 00000 Frm 00081 Fmt 4703 Sfmt 4703 E:\FR\FM\02JAN1.SGM 02JAN1 106 Federal Register / Vol. 80, No. 1 / Friday, January 2, 2015 / Notices Reason for delay Application No. Applicant 15991–N ........... Dockweiler, Neustadt-Glewe, Germany ................................................................................... Estimated date of completion 4 12–31–2014 4 4 4 4 12–31–2014 12–31–2014 12–31–2014 01–31–2015 Renewal Special Permits Applications 11602–R 11860–R 15580–R 15458–R ........... ........... ........... ........... East Tennessee Iron & Metal, Inc., Rogersville, TN ................................................................ GATX Corporation, Chicago, IL ................................................................................................ Wisconsin Central Ltd., Homewood, IL .................................................................................... Southern States LLC, Hampton, GA ........................................................................................ [FR Doc. 2014–30557 Filed 12–31–14; 8:45 am] BILLING CODE 4910–60–M DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35890] asabaliauskas on DSK5VPTVN1PROD with NOTICES TransDistribution Brookfield Railroad Company—Acquisition and Operation Exemption—Sweetener Supply Company, Inc. TransDistribution Brookfield Railroad Company (TDBR), a noncarrier, has filed a verified notice of exemption 1 under 49 CFR 1150.31 to acquire from Sweetener Supply Company, Inc. (SSC), a noncarrier, and to operate, pursuant to an operating agreement, approximately 2,450 feet (0.46 mile) of rail line referred to as the Brookfield Transload Facility trackage in Brookfield, Ill. There are no mileposts on the line. Spy Glass Illinois, Inc. currently owns the Brookfield Transload Facility trackage and leases the facility and trackage to SSC for the transloading of bulk sugar products. TDBR certifies that the proposed transaction does not contain any provision or agreement that may limit future interchange of traffic with a thirdparty connecting carrier. TDBR states that the line is being used to interchange with the BNSF Railway Company. TDBR also certifies that its projected annual revenues as a result of this transaction will not exceed those that would qualify it as a Class III rail carrier and will not exceed $5 million. TDBR states that it proposes to consummate the transaction on or about January 1, 2015. However, the earliest this transaction can be consummated is January 17, 2015, the effective date of the exemption (30 days after the exemption was officially filed). If the verified notice contains false or misleading information, the exemption is void ab initio. Petitions to revoke the exemption under 49 U.S.C. 10502(d) 1 The notice was originally filed on December 11, 2014, but was supplemented on December 18, 2014. Therefore, December 18, 2014, will be the official filing date and the basis for all subsequent dates. VerDate Sep<11>2014 17:50 Dec 31, 2014 Jkt 235001 may be filed at any time. The filing of a petition to revoke will not automatically stay the effectiveness of the exemption. Petitions to stay must be filed no later than January 9, 2015 (at least seven days before the exemption becomes effective). An original and 10 copies of all pleadings, referring to Docket No. FD 35890, must be filed with the Surface Transportation Board, 395 E Street SW., Washington, DC 20423–0001. In addition, a copy of each pleading must be served on David C. Dillon, Dillon & Nash, Ltd., 111 West Washington Street Suite 1023, Chicago, IL 60602. Board decisions and notices are available on our Web site at ‘‘www.stb.dot.gov.’’ Decided: December 23, 2014. By the Board, Joseph H. Dettmar, Acting Director, Office of Proceedings. Jeffrey Herzig, Clearance Clerk. [FR Doc. 2014–30632 Filed 12–31–14; 8:45 am] BILLING CODE 4915–01–P DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35891] TransDistribution Ridgeland Railroad Company—Acquisition and Operation Exemption—Sweetener Supply Company, Inc. TransDistribution Ridgeland Railroad Company (TDRR), a noncarrier, has filed a verified notice of exemption 1 under 49 CFR 1150.31 to acquire from Sweetener Supply Company, Inc. (SSC), a noncarrier, and to operate, pursuant to an operating agreement, approximately 1,230 feet (0.23 mile) of rail line referred to as the Berwyn Transload Facility trackage in Berwyn, Ill. There are no mileposts on the line. The BNSF Railway Company (BNSF) owns the Berwyn Transload Facility trackage and currently leases the facility and trackage 1 The notice was originally filed on December 11, 2014, but was supplemented on December 18, 2014. Therefore, December 18, 2014, will be the official filing date and the basis for all subsequent dates. PO 00000 Frm 00082 Fmt 4703 Sfmt 9990 to SSC for the transloading of bagged sugar products. TDRR certifies that the proposed transaction does not contain any provision or agreement that may limit future interchange of traffic with a thirdparty connecting carrier. TDRR states that the line is being used to interchange with BNSF. TDRR also certifies that its projected annual revenues as a result of this transaction will not exceed those that would qualify it as a Class III rail carrier and will not exceed $5 million. TDRR states that it proposes to consummate the transaction on or about January 1, 2015. However, the earliest this transaction can be consummated is January 17, 2015, the effective date of the exemption (30 days after the exemption was officially filed). If the verified notice contains false or misleading information, the exemption is void ab initio. Petitions to revoke the exemption under 49 U.S.C. 10502(d) may be filed at any time. The filing of a petition to revoke will not automatically stay the effectiveness of the exemption. Petitions to stay must be filed no later than January 9, 2015 (at least seven days before the exemption becomes effective). An original and 10 copies of all pleadings, referring to Docket No. FD 35891, must be filed with the Surface Transportation Board, 395 E Street SW., Washington, DC 20423–0001. In addition, a copy of each pleading must be served on David C. Dillon, Dillon & Nash, Ltd., 111 West Washington Street Suite 1023, Chicago, IL 60602. Board decisions and notices are available on our Web site at www.stb.dot.gov. Decided: December 23, 2014. By the Board, Joseph H. Dettmar, Acting Director, Office of Proceedings. Jeffrey Herzig, Clearance Clerk. [FR Doc. 2014–30637 Filed 12–31–14; 8:45 am] BILLING CODE 4915–01–P E:\FR\FM\02JAN1.SGM 02JAN1

Agencies

[Federal Register Volume 80, Number 1 (Friday, January 2, 2015)]
[Notices]
[Pages 105-106]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-30557]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Pipeline and Hazardous Materials Safety Administration


Delayed Applications

AGENCY: Office of Hazardous Materials Safety, Pipeline and Hazardous 
Materials Safety Administration (PHMSA), DOT.

ACTION: List of application delayed more than 180 days.

-----------------------------------------------------------------------

SUMMARY: In accordance with the requirements of 49 U.S.C. 5117(c), 
PHMSA is publishing the following list of special permit applications 
that have been in process for 180 days or more. The reason(s) for delay 
and the expected completion date for action on each application is 
provided in association with each identified application.

FOR FURTHER INFORMATION CONTACT: Ryan Paquet, Director, Office of 
Hazardous Materials Special Permits and Approvals, Pipeline and 
Hazardous Materials Safety Administration, U.S. Department of 
Transportation, East Building, PHH-30, 1200 New Jersey Avenue 
Southeast, Washington, DC 20590-0001, (202) 366-4535

Key to ``Reason for Delay''

1. Awaiting additional information from applicant
2. Extensive public comment under review
3. Application is technically complex and is of significant impact or 
precedent-setting and requires extensive analysis
4. Staff review delayed by other priority issues or volume of special 
permit applications

Meaning of Application Number Suffixes

N--New application
M--Modification request
R--Renewal Request
P--Party To Exemption Request

     Issued in Washington, DC, on December 8, 2014.
Donald Burger,
Chief, General Approvals and Permits.

----------------------------------------------------------------------------------------------------------------
                                                                                    Reason for    Estimated date
            Application No.                             Applicant                      delay       of completion
----------------------------------------------------------------------------------------------------------------
                                         Modification to Special Permits
----------------------------------------------------------------------------------------------------------------
9847-M.................................  FIBA Technologies, Inc. (FIBA),                       4      12-31-2014
                                          Millbury, MA.
14617-M................................  Western International Gas & Cylinders,                4      01-31-2015
                                          Inc., Bellville, TX.
13359-M................................  BASF Corporation, Florham Park, NJ.....               4      01-31-2015
11903-M................................  Comptank Corporation Bothwell, ON......               4      01-31-2015
15832-M................................  Baker Petrolite Corporation (BPC),                    4      12-31-2014
                                          Sugar Land, TX.
----------------------------------------------------------------------------------------------------------------
                                         New Special Permit Applications
----------------------------------------------------------------------------------------------------------------
15767-N................................  Union Pacific Railroad Company,Omaha,                 1      12-31-2014
                                          NE.
16001-N................................  VELTEK, Malvern, PA....................               4      12-31-2014
16039-N................................  UTLX Manufacturing LLC, Alexandria, LA.               4      12-31-2014
16061-N................................  Battery Solutions, LLC, Howell, MI.....               4      12-31-2014
16137-N................................  Diversified Laboratory Repair,                        4      12-31-2014
                                          Gaithersburg, MD.
16118-N................................  Toyota Motor Sales, U.S.A., Inc.,                     4      01-31-2015
                                          Torrance, CA.
16155-N................................  B.J. Alan Company dba Phantom                         4      12-31-2014
                                          Fireworks, Canfield, OH.
16121-N................................  U.S. Department of Defense (DOD), Scott               4      01-31-2015
                                          AFB, IL.
16154-N................................  Patriot Fireworks, LLC, Ann Arbor, MI..               4      12-31-2014
16181-N................................  Arc Process, Inc., Pflugerville, TX....               4      01-31-2015

[[Page 106]]

 
15991-N................................  Dockweiler, Neustadt-Glewe, Germany....               4      12-31-2014
----------------------------------------------------------------------------------------------------------------
                                      Renewal Special Permits Applications
----------------------------------------------------------------------------------------------------------------
11602-R................................  East Tennessee Iron & Metal, Inc.,                    4      12-31-2014
                                          Rogersville, TN.
11860-R................................  GATX Corporation, Chicago, IL..........               4      12-31-2014
15580-R................................  Wisconsin Central Ltd., Homewood, IL...               4      12-31-2014
15458-R................................  Southern States LLC, Hampton, GA.......               4      01-31-2015
----------------------------------------------------------------------------------------------------------------

[FR Doc. 2014-30557 Filed 12-31-14; 8:45 am]
BILLING CODE 4910-60-M
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.