Environmental Impact Statements; Notice of Availability, 78088 [2014-30401]
Download as PDF
78088
Federal Register / Vol. 79, No. 248 / Monday, December 29, 2014 / Notices
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9018–6]
tkelley on DSK3SPTVN1PROD with NOTICES
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7146 or https://www.epa.gov/
compliance/nepa/.
Weekly receipt of Environmental Impact
Statements
Filed 12/15/2014 Through 12/19/2014
Pursuant to 40 CFR 1506.9.
Notice: Section 309(a) of the Clean Air
Act requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
www.epa.gov/compliance/nepa/
eisdata.html.
EIS No. 20140373, Draft EIS, USFS, AK,
Kake to Petersburg Transmission Line
Intertie Project, Comment Period
Ends: 02/11/2015, Contact: Tom
Parker 907–772–5974.
EIS No. 20140374, Final EIS, FHWA,
NY, Portageville Bridge Project,
Contact: Jonathan McDade 518–431–
4127.
Under MAP–21 section 1319, FHWA
has issued a single FEIS and ROD.
Therefore, the 30-day wait/review
period under NEPA does not apply to
the above action.
EIS No. 20140375, Final EIS, BLM, NM,
Prehistoric Trackways National
Monument Proposed Resource
Management Plan, review period
ends: 01/27/2015, Contact: Jennifer
Montoya 575–525–4316.
EIS No. 20140376, Final EIS, USFS, ID,
Golden Hand No. 1 and No. 2 Lode
Mining Claims Project, review period
ends: 01/27/2015, Contact: Anthony
Botello 208–634–0601.
EIS No. 20140377, Draft EIS, BLM, CA,
Proposed Land Exchange between
Bureau of Land Management and
Agua Caliente Band of Cahuilla
Indians, comment period ends: 03/29/
2015, Contact: Jim Foote 760–833–
7136.
EIS No. 20140378, Second Final
Supplement, FSA, 00,
PROGRAMMATIC—Conservation
Reserve Program, review period ends:
02/15/2015, Contact: Nell Fuller 202–
720–6303.
EIS No. 20140379, Final EIS, FERC, CA,
Relicensing the Upper DrumSpaulding Hydroelectric Project,
FERC No. 2310–193; Lower Drum
Hydroelectric Project, FERC No.
14531–000; Deer Creek Hydroelectric
Project, FERC No. 14530–000; and
VerDate Sep<11>2014
19:09 Dec 24, 2014
Jkt 235001
Yuba-Bear Hydroelectric Project,
FERC No. 2266–102, review period
ends: 02/11/2015, Contact: Alan
Mitchnick 202–502–6074.
Amended Notices
EIS No. 20140344, Final EIS, FHWA,
TX, U.S. 181 Harbor Bridge, Review
Period Ends: 01/20/2015, Contact:
Gregory S. Punske 512–536–5960.
Revision to FR Notice Published 12/
05/2014; Extending the Review Period
from 01/05/2015 to 01/20/2015.
EIS No. 20140372, Draft EIS, DOE, 00,
Plains and Eastern Clean Line
Transmission Project, Comment
Period Ends: 03/19/2015, Contact:
Jane Summerson, Ph.D. 505–845–
4091 Revision to FR Notice Published
12/19/2014; Correction to the
Comment Period from 02/02/2015 to
03/19/2015.
Dated: December 22, 2014.
Cliff Rader,
Director, NEPA Compliance Division, Office
of Federal Activities.
[FR Doc. 2014–30401 Filed 12–24–14; 8:45 am]
BILLING CODE 6560–50–P
FEDERAL COMMUNICATIONS
COMMISSION
[OMB 3060–0645]
Information Collection Being Reviewed
by the Federal Communications
Commission
Federal Communications
Commission.
ACTION: Notice and request for
comments.
AGENCY:
As part of its continuing effort
to reduce paperwork burdens, and as
required by the Paperwork Reduction
Act (PRA) of 1995 (44 U.S.C. 3501–
3520), the Federal Communications
Commission (FCC or Commission)
invites the general public and other
Federal agencies to take this
opportunity to comment on the
following information collections.
Comments are requested concerning:
Whether the proposed collection of
information is necessary for the proper
performance of the functions of the
Commission, including whether the
information shall have practical utility;
the accuracy of the Commission’s
burden estimate; ways to enhance the
quality, utility, and clarity of the
information collected; ways to minimize
the burden of the collection of
information on the respondents,
including the use of automated
collection techniques or other forms of
information technology; and ways to
further reduce the information
SUMMARY:
PO 00000
Frm 00064
Fmt 4703
Sfmt 4703
collection burden on small business
concerns with fewer than 25 employees.
The FCC may not conduct or sponsor a
collection of information unless it
displays a currently valid OMB control
number. No person shall be subject to
any penalty for failing to comply with
a collection of information subject to the
PRA that does not display a valid OMB
control number.
DATES: Written PRA comments should
be submitted on or before February 27,
2015. If you anticipate that you will be
submitting comments, but find it
difficult to do so within the period of
time allowed by this notice, you should
advise the contact listed below as soon
as possible.
ADDRESSES: Direct all PRA comments to
Cathy Williams, FCC, via email PRA@
fcc.gov and to Cathy.Williams@ fcc.gov.
FOR FURTHER INFORMATION CONTACT: For
additional information about the
information collection, contact Cathy
Williams at (202) 418–2918.
SUPPLEMENTARY INFORMATION: OMB
Control Number: 3060–0645.
Title: Sections 17.4, 17.48 and 17.49,
Antenna Structure Registration
Requirements.
Form Number: N/ A.
Type of Review: Revision of a
currently approved collection.
Respondents: Business or other forprofit entities, not-for-profit institutions
and state, local or tribal government.
Number of Respondents: 20,000
respondents; 475,134 responses.
Estimated Time per Response: .1–.25
hours.
Frequency of Response: On occasion
reporting requirement, recordkeeping
requirement and third party disclosure
requirement.
Obligation to Respond: Required to
obtain or retain benefits. Statutory
authority for this information collection
is contained in Sections 4, 303, 48 Stat.
1066, 1082, as amended; 47 U.S.C. 154,
303.
Total Annual Burden: 50,198 hours.
Total Annual Cost: $64,380.
Privacy Impact Assessment: N/A.
Nature and Extent of Confidentiality:
There is no need for confidentiality.
However, respondents may request
materials or information submitted to
the Commission be withheld from
public inspection under 47 CFR 0.459 of
the Commission’s rules.
Needs and Uses: The Commission is
seeking Office of Management and
Budget (OMB) approval for a revision of
this information collection in order to
obtain the full three year approval
pursuant to FCC 14–117. The
Commission initiated this proceeding to
update and modernize the
E:\FR\FM\29DEN1.SGM
29DEN1
Agencies
[Federal Register Volume 79, Number 248 (Monday, December 29, 2014)]
[Notices]
[Page 78088]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-30401]
[[Page 78088]]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9018-6]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7146 or https://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed 12/15/2014 Through 12/19/2014
Pursuant to 40 CFR 1506.9.
Notice: Section 309(a) of the Clean Air Act requires that EPA make
public its comments on EISs issued by other Federal agencies. EPA's
comment letters on EISs are available at: https://www.epa.gov/compliance/nepa/eisdata.html.
EIS No. 20140373, Draft EIS, USFS, AK, Kake to Petersburg Transmission
Line Intertie Project, Comment Period Ends: 02/11/2015, Contact: Tom
Parker 907-772-5974.
EIS No. 20140374, Final EIS, FHWA, NY, Portageville Bridge Project,
Contact: Jonathan McDade 518-431-4127.
Under MAP-21 section 1319, FHWA has issued a single FEIS and ROD.
Therefore, the 30-day wait/review period under NEPA does not apply to
the above action.
EIS No. 20140375, Final EIS, BLM, NM, Prehistoric Trackways National
Monument Proposed Resource Management Plan, review period ends: 01/27/
2015, Contact: Jennifer Montoya 575-525-4316.
EIS No. 20140376, Final EIS, USFS, ID, Golden Hand No. 1 and No. 2 Lode
Mining Claims Project, review period ends: 01/27/2015, Contact: Anthony
Botello 208-634-0601.
EIS No. 20140377, Draft EIS, BLM, CA, Proposed Land Exchange between
Bureau of Land Management and Agua Caliente Band of Cahuilla Indians,
comment period ends: 03/29/2015, Contact: Jim Foote 760-833-7136.
EIS No. 20140378, Second Final Supplement, FSA, 00, PROGRAMMATIC--
Conservation Reserve Program, review period ends: 02/15/2015, Contact:
Nell Fuller 202-720-6303.
EIS No. 20140379, Final EIS, FERC, CA, Relicensing the Upper Drum-
Spaulding Hydroelectric Project, FERC No. 2310-193; Lower Drum
Hydroelectric Project, FERC No. 14531-000; Deer Creek Hydroelectric
Project, FERC No. 14530-000; and Yuba-Bear Hydroelectric Project, FERC
No. 2266-102, review period ends: 02/11/2015, Contact: Alan Mitchnick
202-502-6074.
Amended Notices
EIS No. 20140344, Final EIS, FHWA, TX, U.S. 181 Harbor Bridge, Review
Period Ends: 01/20/2015, Contact: Gregory S. Punske 512-536-5960.
Revision to FR Notice Published 12/05/2014; Extending the Review
Period from 01/05/2015 to 01/20/2015.
EIS No. 20140372, Draft EIS, DOE, 00, Plains and Eastern Clean Line
Transmission Project, Comment Period Ends: 03/19/2015, Contact: Jane
Summerson, Ph.D. 505-845-4091 Revision to FR Notice Published 12/19/
2014; Correction to the Comment Period from 02/02/2015 to 03/19/2015.
Dated: December 22, 2014.
Cliff Rader,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2014-30401 Filed 12-24-14; 8:45 am]
BILLING CODE 6560-50-P