Notice of Commission Staff Attendance, 77476 [2014-30206]

Download as PDF 77476 Federal Register / Vol. 79, No. 247 / Wednesday, December 24, 2014 / Notices DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP15–28–000] mstockstill on DSK4VPTVN1PROD with NOTICES Cadeville Gas Storage LLC; Notice of Request Under Blanket Authorization Take notice that on December 12, 2014, Cadeville Gas Storage LLC (Cadeville), Three Riverway, Suite 1350, Houston, Texas 77056, filed in Docket No. CP15–28–000, a prior notice request pursuant to section 157.214 of the Commission’s regulations under the Natural Gas Act (NGA) as amended, requesting authorization to increase the maximum average bottomhole pressure to 3,124 psia, thereby increasing maximum storage capacity by 1.9 Bcf to a total of 23.7 Bcf, and working gas capacity by 1.7 Bcf to 18.7 Bcf at Cadeville’s natural gas storage facility in Ouachita Parish, Louisiana, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions concerning this application may be directed to Robert B. Raines, Jr., Senior Vice President, Engineering and Operations, Cadeville Gas Storage LLC, Three Riverway, Suite 1350, Houston, Texas 77056, by telephone at (713) 350–2506, by facsimile at (713) 350–2550, or by email at bobby.raines@cardinalgs.com. Any person or the Commission’s staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and protest to the request, pursuant to section 157.205 of the regulations under the NGA (18 CFR 157.205). If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the VerDate Sep<11>2014 16:34 Dec 23, 2014 Jkt 235001 Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding, or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenter’s will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenter’s will not be required to serve copies of filed documents on all other parties. However, the non-party commentary, will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Dated: December 17, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–30055 Filed 12–23–14; 8:45 am] Federal Energy Regulatory Commission Notice of Commission Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission’s staff may attend the following meeting related to the transmission planning activities of the Southern Company Services, Inc. The Southeastern Regional Transmission Planning (SERTP) Process 4th Quarter Meeting December 18, 2014, 10:00 a.m.–3:00 p.m. (EST) The above-referenced meeting will be via web conference. The above-referenced meeting is open to stakeholders. Further information may be found at: www.southeasternrtp.com. The discussions at the meeting described above may address matters at issue in the following proceedings: Docket Nos. ER13–83, ER13–1928, Duke Energy Carolinas/Carolina Power & Light Docket Nos. ER13–908, ER13–1941, Alabama Power Company et al. Docket Nos. ER13–913, ER13–1940, Ohio Valley Electric Corporation Docket Nos. ER13–897, ER13–1930, Louisville Gas and Electric Company and Kentucky Utilities Company Docket Nos. ER13–107, ER13–1935, South Carolina Electric & Gas Company Docket Nos. ER13–80, ER13–1932, Tampa Electric Company Docket No. ER13–86, Florida Power Corporation Docket Nos. ER13–104, ER13–1929, Florida Power & Light Company Docket No. ER13–1922, Duke Energy Florida (Progress Energy Florida) Docket Nos. ER13–195, ER13–198, ER13–1927, ER13–1936, PJM Interconnection, L.L.C. Docket No. ER13–90, Public Service Electric and Gas Company and PJM Interconnection, L.L.C. For more information, contact Valerie Martin, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (202) 502–6139 or Valerie.Martin@ferc.gov. Dated: December 12, 2014. Nathaniel J. Davis, Sr., Deputy Secretary. BILLING CODE 6717–01–P PO 00000 DEPARTMENT OF ENERGY [FR Doc. 2014–30206 Filed 12–23–14; 8:45 am] BILLING CODE 6717–01–P Frm 00036 Fmt 4703 Sfmt 9990 E:\FR\FM\24DEN1.SGM 24DEN1

Agencies

[Federal Register Volume 79, Number 247 (Wednesday, December 24, 2014)]
[Notices]
[Page 77476]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-30206]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Notice of Commission Staff Attendance

    The Federal Energy Regulatory Commission (Commission) hereby gives 
notice that members of the Commission's staff may attend the following 
meeting related to the transmission planning activities of the Southern 
Company Services, Inc.

The Southeastern Regional Transmission Planning (SERTP) Process 4th 
Quarter Meeting

December 18, 2014, 10:00 a.m.-3:00 p.m. (EST)
    The above-referenced meeting will be via web conference.
    The above-referenced meeting is open to stakeholders.
    Further information may be found at: www.southeasternrtp.com.
    The discussions at the meeting described above may address matters 
at issue in the following proceedings:
Docket Nos. ER13-83, ER13-1928, Duke Energy Carolinas/Carolina Power & 
Light
Docket Nos. ER13-908, ER13-1941, Alabama Power Company et al.
Docket Nos. ER13-913, ER13-1940, Ohio Valley Electric Corporation
Docket Nos. ER13-897, ER13-1930, Louisville Gas and Electric Company 
and Kentucky Utilities Company
Docket Nos. ER13-107, ER13-1935, South Carolina Electric & Gas Company
Docket Nos. ER13-80, ER13-1932, Tampa Electric Company
Docket No. ER13-86, Florida Power Corporation
Docket Nos. ER13-104, ER13-1929, Florida Power & Light Company
Docket No. ER13-1922, Duke Energy Florida (Progress Energy Florida)
Docket Nos. ER13-195, ER13-198, ER13-1927, ER13-1936, PJM 
Interconnection, L.L.C.
Docket No. ER13-90, Public Service Electric and Gas Company and PJM 
Interconnection, L.L.C.
    For more information, contact Valerie Martin, Office of Energy 
Market Regulation, Federal Energy Regulatory Commission at (202) 502-
6139 or Valerie.Martin@ferc.gov.

    Dated: December 12, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014-30206 Filed 12-23-14; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.