Sunoco Pipeline L.P.; SunVit Pipeline LLC; ExxonMobil Pipeline Company; Notice of Petition for Declaratory Order, 75139 [2014-29544]

Download as PDF mstockstill on DSK4VPTVN1PROD with NOTICES Federal Register / Vol. 79, No. 242 / Wednesday, December 17, 2014 / Notices Lucerne Residue Pipeline (collectively, the Project). DCP asserts that Project will provide necessary capacity to DCP’s non-jurisdictional gathering system that delivers gas from the Niobrara Shale to DCP’s Lucerne Plants without impacting the certificated capacity of the Lucerne Residue Pipeline. DCP estimates the cost of the Project to be approximately $300,000, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions concerning this application may be directed to Katie Rice, DCP Midstream, LP, 370 17th Street, Suite 2500, Denver, Colorado 80202, by telephone at (303) 605–2166, by facsimile at (303) 605–2226, or by email at kerice@dcpmistream.com. Any person or the Commission’s staff may, within 60 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to section 157.205 of the regulations under the NGA (18 CFR 157.205), a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the allowed time for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Pursuant to section 157.9 of the Commission’s rules, 18 CFR 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding, or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the VerDate Sep<11>2014 19:49 Dec 16, 2014 Jkt 235001 completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenter’s will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenter’s will not be required to serve copies of filed documents on all other parties. However, the non-party commentary, will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https:// www.ferc.gov. Persons unable to file electronically should submit an original and 7 copies of the protest or intervention to the Federal Energy regulatory Commission, 888 First Street NE., Washington, DC 20426. Dated: December 10, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–29542 Filed 12–16–14; 8:45 am] BILLING CODE 6717–01–P 75139 pipeline project, as more fully explained in the petition. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Petitioner. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern Time on January 9, 2015. Dated: December 10, 2014. Kimberly D. Bose, Secretary. DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [FR Doc. 2014–29544 Filed 12–16–14; 8:45 am] [Docket No. OR15–5–000] BILLING CODE 6717–01–P Sunoco Pipeline L.P.; SunVit Pipeline LLC; ExxonMobil Pipeline Company; Notice of Petition for Declaratory Order DEPARTMENT OF ENERGY Take notice that on December 5, 2014, pursuant to Rule 207(a)(2) of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.207(a)(2) (2014), Sunoco Pipeline L.P., SunVit Pipeline LLC, and ExxonMobil Pipeline Company (collectively, the Petitioners) filed a petition for declaratory order approving the specified rate structures, terms of service, and prorationing methodology for the proposed Permian Longview and Louisiana Extension PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 Federal Energy Regulatory Commission [Docket No. CD15–9–000] Imperial Irrigation District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene On November 26, 2014, the Imperial Irrigation District filed a notice of intent to construct a qualifying conduit hydropower facility, pursuant to section E:\FR\FM\17DEN1.SGM 17DEN1

Agencies

[Federal Register Volume 79, Number 242 (Wednesday, December 17, 2014)]
[Notices]
[Page 75139]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-29544]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. OR15-5-000]


Sunoco Pipeline L.P.; SunVit Pipeline LLC; ExxonMobil Pipeline 
Company; Notice of Petition for Declaratory Order

    Take notice that on December 5, 2014, pursuant to Rule 207(a)(2) of 
the Federal Energy Regulatory Commission's (Commission) Rules of 
Practice and Procedure, 18 CFR 385.207(a)(2) (2014), Sunoco Pipeline 
L.P., SunVit Pipeline LLC, and ExxonMobil Pipeline Company 
(collectively, the Petitioners) filed a petition for declaratory order 
approving the specified rate structures, terms of service, and 
prorationing methodology for the proposed Permian Longview and 
Louisiana Extension pipeline project, as more fully explained in the 
petition.
    Any person desiring to intervene or to protest this filing must 
file in accordance with Rules 211 and 214 of the Commission's Rules of 
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be 
considered by the Commission in determining the appropriate action to 
be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a notice of 
intervention or motion to intervene, as appropriate. Such notices, 
motions, or protests must be filed on or before the comment date. 
Anyone filing a motion to intervene or protest must serve a copy of 
that document on the Petitioner.
    The Commission encourages electronic submission of protests and 
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an 
original and 5 copies of the protest or intervention to the Federal 
Energy Regulatory Commission, 888 First Street NE., Washington, DC 
20426.
    This filing is accessible on-line at https://www.ferc.gov, using the 
``eLibrary'' link and is available for review in the Commission's 
Public Reference Room in Washington, DC. There is an ``eSubscription'' 
link on the Web site that enables subscribers to receive email 
notification when a document is added to a subscribed docket(s). For 
assistance with any FERC Online service, please email 
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.
    Comment Date: 5:00 p.m. Eastern Time on January 9, 2015.

    Dated: December 10, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-29544 Filed 12-16-14; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.