Drawbridge Operation Regulation; Mississippi River, Clinton, IA, 73842 [2014-29212]
Download as PDF
73842
Federal Register / Vol. 79, No. 239 / Friday, December 12, 2014 / Rules and Regulations
authorization of the agency, shall be
liable to the Federal Government for the
amount of the transaction, plus interest.
The Service may collect such funds
using procedures established in the
applicable ACH Rules or by instructing
a Federal Reserve Bank to debit the
ODFI’s account at the Federal Reserve
Bank of the account of its designated
correspondent. The interest charge shall
be at a rate equal to the Federal funds
rate plus two percent, and shall be
assessed for each calendar day, from the
day the Treasury General Account
(TGA) was debited to the day the TGA
is recredited with the full amount due.
(2) An RDFI that accepts an
authorization in violation of § 210.4(a)
shall be liable to the Federal
Government for all credits or debits
made in reliance on the authorization.
An RDFI that transmits to an agency an
authorization containing an incorrect
account number shall be liable to the
Federal Government for any resulting
loss, up to the amount of the payment(s)
made on the basis of the incorrect
number. If an agency determines, after
appropriate investigation, that a loss has
occurred because an RDFI transmitted
an authorization or notification of
change containing an incorrect account
number, the agency may instruct the
Service to direct a Federal Reserve Bank
to debit the RDFI’s account for the
amount of the payment(s) made on the
basis of the incorrect number. The
agency shall notify the RDFI of the
results of its investigation and provide
the RDFI with a reasonable opportunity
to respond before initiating such a debit.
*
*
*
*
*
Dated: December 9, 2014.
Margaret Marquette,
Chief Counsel, Bureau of the Fiscal Service.
[FR Doc. 2014–29198 Filed 12–11–14; 8:45 am]
BILLING CODE P
DEPARTMENT OF HOMELAND
SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG–2014–0875]
rljohnson on DSK3VPTVN1PROD with RULES
Drawbridge Operation Regulation;
Mississippi River, Clinton, IA
Coast Guard, DHS.
Notice of deviation from
drawbridge regulations.
AGENCY:
ACTION:
The Coast Guard has issued a
temporary deviation from the operating
schedule that governs the Clinton
Railroad Drawbridge, across the Upper
SUMMARY:
VerDate Sep<11>2014
14:38 Dec 11, 2014
Jkt 235001
Mississippi River, mile 518.0, at
Clinton, Iowa. The deviation is
necessary to allow the bridge owner
time to perform preventive maintenance
that is essential to the continued safe
operation of the drawbridge.
Maintenance is scheduled in the winter
when there is less impact on navigation;
instead of scheduling work in the
summer, when river traffic increases.
This deviation allows the bridge to open
on signal if at least 24-hours advance
notice is given. It further allows the
bridge to open on signal if at least 72hours advance notice is given from
January 5, 2015 to February 13, 2015.
DATES: This deviation is effective from
5 p.m., December 15, 2014 until 9 a.m.,
March 1, 2015.
ADDRESSES: The docket for this
deviation, (USCG–2014–0875) is
available at https://www.regulations.gov.
Type the docket number in the
‘‘SEARCH’’ box and click ‘‘SEARCH.’’
Click on Open Docket Folder on the line
associated with this deviation. You may
also visit the Docket Management
Facility in Room W12–140 on the
ground floor of the Department of
Transportation, West Building, 1200
New Jersey Avenue SE., Washington,
DC 20590, between 9 a.m. and 5 p.m.,
Monday through Friday, except Federal
Holidays.
FOR FURTHER INFORMATION CONTACT: If
you have questions on this temporary
deviation, call or email Eric A.
Washburn, Bridge Administrator,
Western Rivers, Coast Guard; telephone
314–269–2378, email Eric.Washburn@
uscg.mil. If you have questions on
viewing the docket, call Cheryl F.
Collins, Program Manager, Docket
Operations, telephone 202–366–9826.
SUPPLEMENTARY INFORMATION: The Union
Pacific Railroad requested a temporary
deviation for the Clinton Railroad
Drawbridge, across the Upper
Mississippi River, mile 518.0, at
Clinton, Iowa to open on signal if at
least 24-hours advance notice is given
for 76 days from 5 p.m., December 15,
2014 to 9 a.m., March 1, 2015 for
scheduled maintenance on the bridge.
The deviation further allows the bridge
to open on signal if at least 72-hours
advance notice from 8 a.m. January 5,
2015 until 5 p.m. February 13, 2015.
The Clinton Railroad Drawbridge
currently operates in accordance with
33 CFR 117.5, which states the general
requirement that drawbridge shall open
on signal.
There are no alternate routes for
vessels transiting this section of the
Upper Mississippi River.
Winter conditions on the Upper
Mississippi River coupled with the
PO 00000
Frm 00042
Fmt 4700
Sfmt 4700
closure of Army Corps of Engineer’s
Lock No. 17 (Mile 437.1 UMR) and Lock
No. 20 (Mile 343.2 UMR) from 7 a.m.
January 5, 2015 until 12 p.m., March 6,
2015 will preclude any significant
navigation demands for the drawspan
opening. In addition, Army Corps Lock
No. 12 (Mile 556.7 UMR) and Lock No.
13 (Mile 522.5 UMR) will be closed
from 7:30 a.m., December 15, 2014 until
11 a.m. March 4, 2015.
The Clinton Railroad Drawbridge, in
the closed-to-navigation position,
provides a vertical clearance of 18.7 feet
above normal pool. Navigation on the
waterway consists primarily of
commercial tows and recreational
watercraft and will not be significantly
impacted. This temporary deviation has
been coordinated with waterway users
and will not be significantly impacted.
No objections were received.
In accordance with 33 CFR 117.35(e),
the drawbridge must return to its regular
operating schedule immediately at the
end of the effective period of this
temporary deviation. This deviation
from the operating regulations is
authorized under 33 CFR 117.35.
Dated: November 25, 2014.
Eric A. Washburn,
Bridge Administrator, Western Rivers.
[FR Doc. 2014–29212 Filed 12–11–14; 8:45 am]
BILLING CODE 9110–04–P
ENVIRONMENTAL PROTECTION
AGENCY
40 CFR Part 52
[EPA–R06–OAR–2005–TX–0002; FRL–9920–
34–Region 6]
Approval and Promulgation of Air
Quality Implementation Plans; Texas;
Repeal of Lead Emission Rules for
Stationary Sources in El Paso and
Dallas County
Environmental Protection
Agency (EPA).
ACTION: Direct final rule.
AGENCY:
The Environmental Protection
Agency (EPA) is taking direct final
action to approve a revision to the State
Implementation Plan (SIP) for Texas
which repeals lead emission rules
which cover stationary sources in El
Paso and Dallas county that are no
longer in existence. This action is being
taken under section 110(k) and part D of
the Clean Air Act (CAA).
DATES: This rule is effective on February
10, 2015 without further notice, unless
EPA receives relevant adverse comment
by January 12, 2015. If EPA receives
such comment, EPA will publish a
SUMMARY:
E:\FR\FM\12DER1.SGM
12DER1
Agencies
[Federal Register Volume 79, Number 239 (Friday, December 12, 2014)]
[Rules and Regulations]
[Page 73842]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-29212]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2014-0875]
Drawbridge Operation Regulation; Mississippi River, Clinton, IA
AGENCY: Coast Guard, DHS.
ACTION: Notice of deviation from drawbridge regulations.
-----------------------------------------------------------------------
SUMMARY: The Coast Guard has issued a temporary deviation from the
operating schedule that governs the Clinton Railroad Drawbridge, across
the Upper Mississippi River, mile 518.0, at Clinton, Iowa. The
deviation is necessary to allow the bridge owner time to perform
preventive maintenance that is essential to the continued safe
operation of the drawbridge. Maintenance is scheduled in the winter
when there is less impact on navigation; instead of scheduling work in
the summer, when river traffic increases. This deviation allows the
bridge to open on signal if at least 24-hours advance notice is given.
It further allows the bridge to open on signal if at least 72-hours
advance notice is given from January 5, 2015 to February 13, 2015.
DATES: This deviation is effective from 5 p.m., December 15, 2014 until
9 a.m., March 1, 2015.
ADDRESSES: The docket for this deviation, (USCG-2014-0875) is available
at https://www.regulations.gov. Type the docket number in the ``SEARCH''
box and click ``SEARCH.'' Click on Open Docket Folder on the line
associated with this deviation. You may also visit the Docket
Management Facility in Room W12-140 on the ground floor of the
Department of Transportation, West Building, 1200 New Jersey Avenue
SE., Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through
Friday, except Federal Holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this
temporary deviation, call or email Eric A. Washburn, Bridge
Administrator, Western Rivers, Coast Guard; telephone 314-269-2378,
email Eric.Washburn@uscg.mil. If you have questions on viewing the
docket, call Cheryl F. Collins, Program Manager, Docket Operations,
telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The Union Pacific Railroad requested a
temporary deviation for the Clinton Railroad Drawbridge, across the
Upper Mississippi River, mile 518.0, at Clinton, Iowa to open on signal
if at least 24-hours advance notice is given for 76 days from 5 p.m.,
December 15, 2014 to 9 a.m., March 1, 2015 for scheduled maintenance on
the bridge. The deviation further allows the bridge to open on signal
if at least 72-hours advance notice from 8 a.m. January 5, 2015 until 5
p.m. February 13, 2015.
The Clinton Railroad Drawbridge currently operates in accordance
with 33 CFR 117.5, which states the general requirement that drawbridge
shall open on signal.
There are no alternate routes for vessels transiting this section
of the Upper Mississippi River.
Winter conditions on the Upper Mississippi River coupled with the
closure of Army Corps of Engineer's Lock No. 17 (Mile 437.1 UMR) and
Lock No. 20 (Mile 343.2 UMR) from 7 a.m. January 5, 2015 until 12 p.m.,
March 6, 2015 will preclude any significant navigation demands for the
drawspan opening. In addition, Army Corps Lock No. 12 (Mile 556.7 UMR)
and Lock No. 13 (Mile 522.5 UMR) will be closed from 7:30 a.m.,
December 15, 2014 until 11 a.m. March 4, 2015.
The Clinton Railroad Drawbridge, in the closed-to-navigation
position, provides a vertical clearance of 18.7 feet above normal pool.
Navigation on the waterway consists primarily of commercial tows and
recreational watercraft and will not be significantly impacted. This
temporary deviation has been coordinated with waterway users and will
not be significantly impacted. No objections were received.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the effective
period of this temporary deviation. This deviation from the operating
regulations is authorized under 33 CFR 117.35.
Dated: November 25, 2014.
Eric A. Washburn,
Bridge Administrator, Western Rivers.
[FR Doc. 2014-29212 Filed 12-11-14; 8:45 am]
BILLING CODE 9110-04-P