NiGen, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization, 73293-73294 [2014-28948]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 79, No. 237 / Wednesday, December 10, 2014 / Notices
Filed Date: 12/3/14.
Accession Number: 20141203–5188.
Comments Due: 5 p.m. ET 12/24/14.
Docket Numbers: ER15–567–000.
Applicants: NiGen, LLC.
Description: Initial rate filing per
35.12 Market Based Rate Tariff to be
effective 12/4/2014.
Filed Date: 12/3/14.
Accession Number: 20141203–5149.
Comments Due: 5 p.m. ET 12/24/14.
Docket Numbers: ER15–568–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): 2045R3 Westar Energy,
Inc. NITSA and NOA to be effective 8/
1/2014.
Filed Date: 12/3/14.
Accession Number: 20141203–5203.
Comments Due: 5 p.m. ET 12/24/14.
Docket Numbers: ER15–569–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): 1895R3 Westar Energy,
Inc. NITSA and NOA to be effective 8/
1/2014.
Filed Date: 12/3/14.
Accession Number: 20141203–5205.
Comments Due: 5 p.m. ET 12/24/14.
Docket Numbers: ER15–570–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): 1978R3 Westar Energy,
Inc. NITSA and NOA to be effective 8/
1/2014.
Filed Date: 12/3/14
Accession Number: 20141203–5207.
Comments Due: 5 p.m. ET 12/24/14.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 4, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014–28945 Filed 12–9–14; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
17:48 Dec 09, 2014
Jkt 235001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings
Take notice that the Commission has
received the following Natural Gas
Pipeline Rate and Refund Report filings:
Filings Instituting Proceedings
Docket Numbers: RP15–239–000.
Applicants: Transcontinental Gas
Pipe Line Company.
Description: § 4(d) rate filing per
154.403: S–2 Tracker Effective 2014–12–
01 to be effective 12/1/2014.
Filed Date: 12/3/14.
Accession Number: 20141203–5134.
Comments Due: 5 p.m. ET 12/15/14.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
§ 385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
Filings in Existing Proceedings
Docket Numbers: RP14–952–002.
Applicants: Destin Pipeline Company,
L.L.C.
Description: Compliance filing per
154.203: Show Cause Order Amended to
be effective 10/16/2014.
Filed Date: 11/26/14.
Accession Number: 20141126–5062.
Comments Due: 5 p.m. ET 12/8/14.
Docket Numbers: RP14–1077–001.
Applicants: Chandeleur Pipe Line,
LLC.
Description: Compliance filing per
154.203: Chandeleur Section 8.7.7 Order
Effective Date to be effective 10/16/
2014.
Filed Date: 12/3/14.
Accession Number: 20141203–5204.
Comments Due: 5 p.m. ET 12/15/14.
Docket Numbers: RP14–942–001.
Applicants: Sabine Pipe Line LLC.
Description: Compliance filing per
154.203: Sabine Section 7.10 Order
Effective Date to be effective 10/16/
2014.
Filed Date: 12/3/14.
Accession Number: 20141203–5206.
Comments Due: 5 p.m. ET 12/15/14.
Docket Numbers: RP15–122–001.
Applicants: Texas Eastern
Transmission, LP.
Description: Compliance filing per
154.203: Errata Filing for TETLP 2014
ASA Filing Docket RP15–122–000 to be
effective 12/1/2014.
Filed Date: 12/3/14.
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
73293
Accession Number: 20141203–5002.
Comments Due: 5 p.m. ET 12/15/14.
Any person desiring to protest in any
of the above proceedings must file in
accordance with Rule 211 of the
Commission’s Regulations (18 CFR
385.211) on or before 5:00 p.m. Eastern
time on the specified comment date.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: December 4, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014–28947 Filed 12–9–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. ER15–567–000]
NiGen, LLC; Supplemental Notice That
Initial Market-Based Rate Filing
Includes Request for Blanket Section
204 Authorization
This is a supplemental notice in the
above-referenced proceeding, of Great
Bay Energy VII, LLC’s application for
market-based rate authority, with an
accompanying rate schedule, noting that
such application includes a request for
blanket authorization, under 18 CFR
part 34, of future issuances of securities
and assumptions of liability.
Any person desiring to intervene or to
protest should file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
in accordance with Rules 211 and 214
of the Commission’s Rules of Practice
and Procedure (18 CFR 385.211 and
385.214). Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant.
Notice is hereby given that the
deadline for filing protests with regard
to the applicant’s request for blanket
authorization, under 18 CFR part 34, of
future issuances of securities and
assumptions of liability is December 24,
2014.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper, using the
FERC Online links at https://
E:\FR\FM\10DEN1.SGM
10DEN1
73294
Federal Register / Vol. 79, No. 237 / Wednesday, December 10, 2014 / Notices
www.ferc.gov. To facilitate electronic
service, persons with Internet access
who will eFile a document and/or be
listed as a contact for an intervenor
must create and validate an
eRegistration account using the
eRegistration link. Select the eFiling
link to log on and submit the
intervention or protests.
Persons unable to file electronically
should submit an original and 5 copies
of the intervention or protest to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
The filings in the above-referenced
proceeding(s) are accessible in the
Commission’s eLibrary system by
clicking on the appropriate link in the
above list. They are also available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an eSubscription link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov. or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Dated: December 4, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014–28948 Filed 12–9–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Southwestern Power Administration
Robert D. Willis Hydropower Power
Rate
Southwestern Power
Administration, DOE.
ACTION: Notice of Rate Order.
AGENCY:
Pursuant to Delegation Order
Nos. 00–037.00A, effective October 25,
2013, and 00–001.0OE, effective June 6,
2013, the Deputy Secretary has
approved and placed into effect on an
interim basis Rate Order No. SWPA–68,
which increases the power rate for the
Robert D. Willis Hydropower Project
(Willis) pursuant to the Willis Rate
Schedule which supersedes the existing
rate schedule.
DATES: The effective period for the rate
schedule specified in Rate Order No.
SWPA–68 is January 1, 2015, through
September 30, 2018.
FOR FURTHER INFORMATION CONTACT: Mr.
Marshall Boyken, Acting Vice President,
Chief Operating Office, Southwestern
Power Administration, Department of
Energy, Williams Center Tower I, One
mstockstill on DSK4VPTVN1PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
17:48 Dec 09, 2014
Jkt 235001
West Third Street, Tulsa, Oklahoma
74103, (918) 595–6646,
marshall.boyken@swpa.gov.
SUPPLEMENTARY INFORMATION: Rate Order
No. SWPA–68, which has been
approved and placed into effect on an
interim basis, increases the power rate
for the Willis Project pursuant to the
following Rate Schedule:
Rate Schedule RDW–14, Wholesale Rates for
Hydro Power and Energy Sold to Sam
Rayburn Municipal Power Agency
(Contract No. DE–PM75–85SW00117)
The rate schedule supersedes the
existing rate schedule shown below:
Rate Schedule RDW–12, Wholesale Rates for
Hydro Power and Energy Sold to Sam
Rayburn Municipal Power Agency
(Contract No. DE–PM75–85SW00117)
(superseded by RDW–14)
Southwestern Power Administration’s
(Southwestern) Administrator has
determined, based on the 2014 Willis
Current Power Repayment Study, that
the existing power rate will not satisfy
cost recovery criteria specified in DOE
Order No. RA 6120.2 and Section 5 of
the Flood Control Act of 1944. The
finalized 2014 Willis Power Repayment
Studies indicate that an increase in
annual revenue of $109,164, or 10.2
percent, beginning January 1, 2015, will
satisfy cost recovery criteria for the
Willis project. The proposed Willis rate
schedule would ultimately increase
annual revenues from $1,072,323 to
$1,181,496, to recover increased U.S.
Army’s Corps of Engineers (Corps)
investments and replacements in the
hydroelectric generating facility and
increased operations and maintenance
costs with one half (5.1 percent)
beginning January 1, 2015, and the
remaining one half (5.1 percent)
beginning on October 1, 2015.
The Administrator has followed title
10, part 903 subpart A, of the Code of
Federal Regulations (10 CFR part 903),
‘‘Procedures for Public Participation in
Power and Transmission Rate
Adjustments and Extensions’’ in
connection with the proposed rate
schedule. On September 4, 2014,
Southwestern published a notice in the
Federal Register, (79 FR 52646), of the
proposed power rate increase for the
Willis project. Southwestern provided a
30-day comment period as an
opportunity for customers and other
interested members of the public to
review and comment on the proposed
power rate increase with written
comments due by October 20, 2014.
Southwestern did not hold the
combined Public Information and
Comment Forum (Forum) because
Southwestern did not receive any
requests to hold the Forum. One
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
comment was received from Gillis,
Borchardt & Barthel LLP, on behalf of
the Vinton Public Power Authority and
the Sam Rayburn Generation and
Transmission Cooperative which stated
they had no objection to the proposed
rate adjustment.
Information regarding this rate
proposal, including studies and other
supporting material, is available for
public review and comment in the
offices of Southwestern Power
Administration, Williams Center Tower
I, One West Third Street, Tulsa,
Oklahoma 74103. Following review of
Southwestern’s proposal within the
Department of Energy, I approved Rate
Order No. SWPA–68, on an interim
basis, which ultimately increases the
existing revenue requirement for the
Willis power rate to $1,181,496 per year
for the period January 1, 2015 through
September 30, 2018.
Dated: December 4, 2014.
Elizabeth Sherwood-Randall,
Deputy Secretary.
UNITED STATES OF AMERICA
DEPARTMENT OF ENERGY
DEPUTY SECRETARY OF ENERGY
Rate Order No. SWPA–68
In the matter of:
Southwestern Power Administration
Robert D. Willis Hydropower Project
Power Rate
ORDER CONFIRMING, APPROVING
AND PLACING INCREASED POWER
RATE SCHEDULE IN EFFECT ON AN
INTERIM BASIS
Pursuant to Sections 302(a) and
301(b) of the Department of Energy
Organization Act, Public Law 95–91, the
functions of the Secretary of the Interior
and the Federal Power Commission
under Section 5 of the Flood Control
Act of 1944, 16 U.S.C. 825s, relating to
the Southwestern Power Administration
(Southwestern) were transferred to and
vested in the Secretary of Energy. By
Delegation Order No. 00–037.00A, the
Secretary of Energy delegated to the
Administrator of Southwestern the
authority to develop power and
transmission rates, delegated to the
Deputy Secretary of the Department of
Energy the authority to confirm,
approve, and place in effect such rates
on an interim basis and delegated to the
Federal Energy Regulatory Commission
(FERC) the authority to confirm and
approve on a final basis or to disapprove
rates developed by the Administrator
under the delegation. The Deputy
Secretary issued this interim rate order
pursuant to that delegation.
E:\FR\FM\10DEN1.SGM
10DEN1
Agencies
[Federal Register Volume 79, Number 237 (Wednesday, December 10, 2014)]
[Notices]
[Pages 73293-73294]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-28948]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER15-567-000]
NiGen, LLC; Supplemental Notice That Initial Market-Based Rate
Filing Includes Request for Blanket Section 204 Authorization
This is a supplemental notice in the above-referenced proceeding,
of Great Bay Energy VII, LLC's application for market-based rate
authority, with an accompanying rate schedule, noting that such
application includes a request for blanket authorization, under 18 CFR
part 34, of future issuances of securities and assumptions of
liability.
Any person desiring to intervene or to protest should file with the
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426, in accordance with Rules 211 and 214 of the Commission's
Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone
filing a motion to intervene or protest must serve a copy of that
document on the Applicant.
Notice is hereby given that the deadline for filing protests with
regard to the applicant's request for blanket authorization, under 18
CFR part 34, of future issuances of securities and assumptions of
liability is December 24, 2014.
The Commission encourages electronic submission of protests and
interventions in lieu of paper, using the FERC Online links at https://
[[Page 73294]]
www.ferc.gov. To facilitate electronic service, persons with Internet
access who will eFile a document and/or be listed as a contact for an
intervenor must create and validate an eRegistration account using the
eRegistration link. Select the eFiling link to log on and submit the
intervention or protests.
Persons unable to file electronically should submit an original and
5 copies of the intervention or protest to the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426.
The filings in the above-referenced proceeding(s) are accessible in
the Commission's eLibrary system by clicking on the appropriate link in
the above list. They are also available for review in the Commission's
Public Reference Room in Washington, DC. There is an eSubscription link
on the Web site that enables subscribers to receive email notification
when a document is added to a subscribed docket(s). For assistance with
any FERC Online service, please email FERCOnlineSupport@ferc.gov. or
call (866) 208-3676 (toll free). For TTY, call (202) 502-8659.
Dated: December 4, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014-28948 Filed 12-9-14; 8:45 am]
BILLING CODE 6717-01-P