Public Service Company of Colorado; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 73057-73058 [2014-28758]

Download as PDF Federal Register / Vol. 79, No. 236 / Tuesday, December 9, 2014 / Notices rljohnson on DSK3VPTVN1PROD with NOTICES in the Public Reference Room or may be viewed on the Commission’s Web site at https://www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above. All filings must: (1) Bear in all capital letters the title ‘‘COMMENTS’’, ‘‘REPLY COMMENTS’’, ‘‘RECOMMENDATIONS,’’ ‘‘TERMS AND CONDITIONS,’’ or ‘‘PRESCRIPTIONS’’; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person submitting the filing; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Each filing must be accompanied by proof of service on all persons listed on the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support. n. Public notice of the filing of the initial development application, which has already been given, established the due date for filing competing applications or notices of intent. Under the Commission’s regulations, any competing development application must be filed in response to and in compliance with public notice of the initial development application. No competing applications or notices of intent may be filed in response to this notice. Dated: December 2, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–28757 Filed 12–8–14; 8:45 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 14:48 Dec 08, 2014 Jkt 235001 DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12589–020] Public Service Company of Colorado; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Application for Temporary Variance of Minimum Flow Requirement. b. Project No.: 12589–020. c. Date Filed: November 12, 2014. d. Applicant: Public Service Company of Colorado d.b.a. Xcel Energy (licensee). e. Name of Project: Tacoma Project. f. Location: Cascade Creek in San Juan and La Plata counties, Colorado. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Bruce Cotie, Hydro-West Manager, (303) 273–4917, or bruce.e.cotie@xcelenergy.com. i. FERC Contact: John Aedo, (415) 369–3335, or john.aedo@ferc.gov. j. Deadline for filing comments, motions to intervene, protests, and recommendations is 30 days from the issuance date of this notice by the Commission. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, comments, or recommendations using the Commission’s eFiling system at https://www.ferc.gov/docs-filing/ efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https:// www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. Please include the project number (P– 12589–020) on any comments, motions to intervene, protests, or recommendations filed. k. Description of Request: The licensee requests a temporary variance of the maximum flow diversion requirements in Cascade Creek. U.S. Forest Service Section 4(e) Condition No. 17 (found in the project license) limits diversions to the flowline of no PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 73057 greater than 2 cubic feet per second (cfs), when natural inflow is less than 9 cfs. However, the licensee requests that it be allowed to divert 4 cfs into the flowline from December 15, 2014 to April 15, 2015. The licensee states that the increased diversion is necessary to keep a temporary, above-ground flowline from freezing while it performs repairs to a damaged section of flowline during the winter. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208–3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All E:\FR\FM\09DEN1.SGM 09DEN1 73058 Federal Register / Vol. 79, No. 236 / Tuesday, December 9, 2014 / Notices comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the variance. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Dated: December 2, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–28758 Filed 12–8–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission rljohnson on DSK3VPTVN1PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC15–43–000. Applicants: Niagara Generation, LLC. Description: Application of Niagara Generation, LLC and NiGen, LLC for Expedited Approval of Intra-Corporate Transfer Under Section 203 of the Federal Power Act. Filed Date: 12/1/14. Accession Number: 20141201–5300. Comments Due: 5 p.m. ET 12/22/14. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–3301–005; ER10–2757–005; ER10–2756–005. Applicants: Arlington Valley, LLC, GWF Energy LLC, Griffith Energy LLC. Description: Notification of NonMaterial Change in Status of the Star West Companies. Filed Date: 12/1/14. Accession Number: 20141201–5302. Comments Due: 5 p.m. ET 12/22/14. Docket Numbers: ER14–2569–001. Applicants: Alabama Power Company. VerDate Sep<11>2014 18:13 Dec 08, 2014 Jkt 235001 Description: Compliance filing per 35: Attachment J–2 (SGIP) Filing to Comply with Errata relating to Order No. 792 to be effective 8/1/2014. Filed Date: 12/1/14. Accession Number: 20141201–5230. Comments Due: 5 p.m. ET 12/22/14. Docket Numbers: ER15–539–000. Applicants: Puget Sound Energy, Inc. Description: Compliance filing per 35: Order No. 676–H Compliance Filing to be effective 2/2/2015. Filed Date: 12/1/14. Accession Number: 20141201–5225. Comments Due: 5 p.m. ET 12/22/14. Docket Numbers: ER15–540–000. Applicants: Alabama Power Company. Description: Compliance filing per 35: OATT Attachment O Filing in Compliance with Order No. 676–H to be effective 2/2/2015. Filed Date: 12/1/14. Accession Number: 20141201–5226. Comments Due: 5 p.m. ET 12/22/14. Docket Numbers: ER15–541–000. Applicants: Alabama Power Company. Description: § 205(d) rate filing per 35.13(a)(2)(iii): OATT Attachment T Amdendment Filing to be effective 12/1/2014. Filed Date: 12/1/14. Accession Number: 20141201–5228. Comments Due: 5 p.m. ET 12/22/14. Docket Numbers: ER15–542–000. Applicants: Midcontinent Independent System Operator, Inc. Description: § 205(d) rate filing per 35.13(a)(2)(iii): 2014–12–01_Land Cost Recovery Filing to be effective 1/31/2015. Filed Date: 12/1/14. Accession Number: 20141201–5236. Comments Due: 5 p.m. ET 12/22/14. Docket Numbers: ER15–543–000. Applicants: Black Hills Power, Inc. Description: Compliance filing per 35: Order No. 676–H Compliance Filing to be effective 5/15/2015. Filed Date: 12/1/14. Accession Number: 20141201–5258. Comments Due: 5 p.m. ET 12/22/14. Docket Numbers: ER15–544–000. Applicants: Alcoa Power Generating Inc. Description: Compliance filing per 35: Order No. 676–H Compliance Filing to be effective 12/2/2014 under ER15–544 Filing Type: 80. Filed Date: 12/1/14. Accession Number: 20141201–5261. Comments Due: 5 p.m. ET 12/22/14. Docket Numbers: ER15–545–000. Applicants: Black Hills/Colorado Electric Utility Co. Description: Compliance filing per 35: Order No. 676–H Compliance Filing to be effective 5/15/2015. PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 Filed Date: 12/1/14. Accession Number: 20141201–5266. Comments Due: 5 p.m. ET 12/22/14. Docket Numbers: ER15–546–000. Applicants: Cheyenne Light, Fuel and Power Company. Description: Compliance filing per 35: Order No. 676–H Compliance Filing to be effective 5/15/2015. Filed Date: 12/1/14. Accession Number: 20141201–5271. Comments Due: 5 p.m. ET 12/22/14. Docket Numbers: ER15–547–000. Applicants: Avista Corporation. Description: Compliance filing per 35: Avista Corp OATT Order 676–H Compliance Filing to be effective 2/2/2015. Filed Date: 12/2/14. Accession Number: 20141202–5000. Comments Due: 5 p.m. ET 12/23/14. Docket Numbers: ER15–548–000. Applicants: Midcontinent Independent System Operator, Inc. Description: Request for Temporary Waiver of Midcontinent Independent System Operator, Inc. Filed Date: 12/1/14. Accession Number: 20141201–5287. Comments Due: 5 p.m. ET 12/22/14. Docket Numbers: ER15–549–000. Applicants: Southern Company Services, Inc. Description: Request for Waiver of Southern Company Services, Inc. (as Agent). Filed Date: 12/1/14. Accession Number: 20141201–5298. Comments Due: 5 p.m. ET 12/22/14. Docket Numbers: ER15–550–000. Applicants: New York Independent System Operator, Inc. Description: Request of the New York Independent System Operator for Waivers of North American Energy Standards Board Wholesale Electric Quadrant Standards under ER15–550. Filed Date: 12/1/14. Accession Number: 20141201–5299. Comments Due: 5 p.m. ET 12/22/14. Docket Numbers: ER15–551–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) rate filing per 35.13(a)(2)(iii): 2390R2 Westar Energy, Inc. NITSA and NOA to be effective 8/1/2014. Filed Date: 12/2/14. Accession Number: 20141202–5036. Comments Due: 5 p.m. ET 12/23/14. Docket Numbers: ER15–552–000. Applicants: Southwest Power Pool, Inc. Description: § 205(d) rate filing per 35.13(a)(2)(iii): 1894R3 Westar Energy, Inc. NITSA and NOA to be effective 8/1/2014. E:\FR\FM\09DEN1.SGM 09DEN1

Agencies

[Federal Register Volume 79, Number 236 (Tuesday, December 9, 2014)]
[Notices]
[Pages 73057-73058]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-28758]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 12589-020]


Public Service Company of Colorado; Notice of Application 
Accepted for Filing, Soliciting Comments, Motions To Intervene, and 
Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Application for Temporary Variance of 
Minimum Flow Requirement.
    b. Project No.: 12589-020.
    c. Date Filed: November 12, 2014.
    d. Applicant: Public Service Company of Colorado d.b.a. Xcel Energy 
(licensee).
    e. Name of Project: Tacoma Project.
    f. Location: Cascade Creek in San Juan and La Plata counties, 
Colorado.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Bruce Cotie, Hydro-West Manager, (303) 273-
4917, or bruce.e.cotie@xcelenergy.com.
    i. FERC Contact: John Aedo, (415) 369-3335, or john.aedo@ferc.gov.
    j. Deadline for filing comments, motions to intervene, protests, 
and recommendations is 30 days from the issuance date of this notice by 
the Commission. The Commission strongly encourages electronic filing. 
Please file motions to intervene, protests, comments, or 
recommendations using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief 
comments up to 6,000 characters, without prior registration, using the 
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to: 
Secretary, Federal Energy Regulatory Commission, 888 First Street NE., 
Washington, DC 20426. Please include the project number (P-12589-020) 
on any comments, motions to intervene, protests, or recommendations 
filed.
    k. Description of Request: The licensee requests a temporary 
variance of the maximum flow diversion requirements in Cascade Creek. 
U.S. Forest Service Section 4(e) Condition No. 17 (found in the project 
license) limits diversions to the flowline of no greater than 2 cubic 
feet per second (cfs), when natural inflow is less than 9 cfs. However, 
the licensee requests that it be allowed to divert 4 cfs into the 
flowline from December 15, 2014 to April 15, 2015. The licensee states 
that the increased diversion is necessary to keep a temporary, above-
ground flowline from freezing while it performs repairs to a damaged 
section of flowline during the winter.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits 
in the docket number field to access the document. You may also 
register online at https://www.ferc.gov/docs-filing/esubscription.asp to 
be notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208-3676 or email 
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All

[[Page 73058]]

comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, motions to intervene, or protests should relate 
to project works which are the subject of the variance. Agencies may 
obtain copies of the application directly from the applicant. A copy of 
any protest or motion to intervene must be served upon each 
representative of the applicant specified in the particular 
application. If an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.

    Dated: December 2, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-28758 Filed 12-8-14; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.