Yuba County Water Agency; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 71990-71991 [2014-28492]
Download as PDF
71990
Federal Register / Vol. 79, No. 233 / Thursday, December 4, 2014 / Notices
oversupply management protocol,
Attachment P to BPA’s OATT.
Other charges that may apply include
a Delivery Charge for the use of lowvoltage delivery substations; a
Reservation Fee for customers that
postpone their service commencement
dates; incremental rates for transmission
requests that require new facilities; a
penalty charge for failure to comply
with dispatch, curtailment, redispatch,
or load shedding orders; and an
Unauthorized Increase Charge for
customers that exceed their contracted
amounts. BPA is proposing to eliminate
the Power Factor Penalty Charge.
Part V—Proposed BP–16 Rate
Schedules
BPA’s proposed BP–16 Power Rate
Schedules and Transmission Rate
Schedules are a part of this notice and
are available for viewing and
downloading on BPA’s Web site at
https://www.bpa.gov/goto/BP16. Copies
of the proposed rate schedules also are
available for viewing in BPA’s Public
Reference Room at the BPA
Headquarters, 1st Floor, 905 NE 11th
Avenue, Portland, OR 97232.
Issued this 19th day of November, 2014.
Elliot E. Mainzer,
Administrator and Chief Executive Officer.
[FR Doc. 2014–28463 Filed 12–3–14; 8:45 am]
BILLING CODE 6450–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2246–069]
mstockstill on DSK4VPTVN1PROD with NOTICES
Yuba County Water Agency; Notice of
Application Accepted for Filing,
Soliciting Comments, Motions To
Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Application
for Temporary Variance of Minimum
Flow Requirement.
b. Project No.: 2246–069.
c. Date Filed: November 25, 2014.
d. Applicant: Yuba County Water
Agency (licensee).
e. Name of Project: Yuba River
Project.
f. Location: North Yuba River, Middle
Yuba River, and Oregon Creek in Yuba,
Nevada, and Sierra counties, CA.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791(a)–825(r).
h. Applicant Contact: Mr. Curt
Aikens, General Manager, Yuba County
VerDate Sep<11>2014
17:23 Dec 03, 2014
Jkt 235001
Water Agency, 1200 F Street,
Marysville, CA 95901–4740, (530) 741–
5015.
i. FERC Contact: Mr. John Aedo, (415)
369–3335, or john.aedo@ferc.gov.
j. Deadline for filing comments,
motions to intervene, protests, and
recommendations is 30 days from the
issuance date of this notice by the
Commission (December 26, 2014). The
Commission strongly encourages
electronic filing. Please file motions to
intervene, protests, comments, or
recommendations using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Please include the project number (P–
2246–069) on any comments, motions to
intervene, protests, or recommendations
filed.
k. Description of Request: The
licensee requests a temporary variance
of the minimum flow requirements in
the lower Yuba River below Englebright
Dam, which requires a minimum flow of
1,000 cubic feet per second (cfs) from
January 1 to 15. In order to conserve
water resources during the current
drought and make best biological use of
a limited water supply, the licensee
proposes to instead release 550 cfs from
January 1 to January 16, 2015. In
addition, the licensee requests that
minimum flow compliance during this
period be based on a 5-day running
average of average daily streamflows,
with instantaneous flows never less
than 90 percent of the specified 550 cfs
minimum flow and never less than 550
cfs for more than 48 hours. The
proposed variance would be in addition
to the one already requested variance for
December 1–31, 2014 and January 16 to
March 31, 2015 period. Take note that
the December 1–31 variance was
granted by Commission order dated
November 25, 2014.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
PO 00000
Frm 00011
Fmt 4703
Sfmt 4703
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’, or
‘‘MOTION TO INTERVENE’’ as
applicable; (2) set forth in the heading
the name of the applicant and the
project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. All
comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the variance.
Agencies may obtain copies of the
application directly from the applicant.
A copy of any protest or motion to
intervene must be served upon each
representative of the applicant specified
in the particular application. If an
intervener files comments or documents
with the Commission relating to the
merits of an issue that may affect the
responsibilities of a particular resource
agency, they must also serve a copy of
the document on that resource agency.
E:\FR\FM\04DEN1.SGM
04DEN1
Federal Register / Vol. 79, No. 233 / Thursday, December 4, 2014 / Notices
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: November 26, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–28492 Filed 12–3–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
mstockstill on DSK4VPTVN1PROD with NOTICES
Combined Notice of Filings #1
Take notice that the Commission
received the following electric corporate
filings:
Docket Numbers: EC15–36–000.
Applicants: Verso Androscoggin
Power LLC.
Description: Application for Approval
under Section 203 of the Federal Power
Act of Verso Androscoggin Power LLC.
Filed Date: 11/25/14.
Accession Number: 20141125–5397.
Comments Due: 5 p.m. ET 12/16/14.
Take notice that the Commission
received the following exempt
wholesale generator filings:
Docket Numbers: EG15–18–000.
Applicants: Spinning Spur Wind
Three, LLC.
Description: Notice of SelfCertification of Exempt Wholesale
Generator Status of Spinning Spur Wind
Three, LLC.
Filed Date: 11/26/14.
Accession Number: 20141126–5093.
Comments Due: 5 p.m. ET 12/17/14.
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER14–2574–003.
Applicants: California Independent
System Operator Corporation.
Description: Compliance filing per 35:
2014–11–25_Errata_FRAC–MOO to be
effective 11/1/2014.
Filed Date: 11/25/14.
Accession Number: 20141125–5338.
Comments Due: 5 p.m. ET 12/16/14.
Docket Numbers: ER15–15–001.
Applicants: California Independent
System Operator Corporation.
Description: Tariff Amendment per
35.17(b): 2014–11–25_
DeficiencyResponse_CommitmentCosts
to be effective 12/1/2014.
Filed Date: 11/25/14.
Accession Number: 20141125–5313.
Comments Due: 5 p.m. ET 12/5/14.
VerDate Sep<11>2014
17:23 Dec 03, 2014
Jkt 235001
Docket Numbers: ER15–142–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: Report Filing: 2014–11–
26_Marshall—MRES Attachment O
Supplement to be effective N/A.
Filed Date: 11/26/14.
Accession Number: 20141126–5143.
Comments Due: 5 p.m. ET 12/17/14.
Docket Numbers: ER15–359–001.
Applicants: Samchully Power &
Utilities 1 LLC.
Description: Tariff Amendment per
35.17(b): Supplement to MBR
Application to be effective 12/15/2014.
Filed Date: 11/25/14.
Accession Number: 20141125–5335.
Comments Due: 5 p.m. ET 12/16/14.
Docket Numbers: ER15–482–000.
Applicants: South Carolina Electric &
Gas Company.
Description: Compliance filing per 35:
Order 676 H Compliance filing to be
effective 2/2/2015.
Filed Date: 11/25/14.
Accession Number: 20141125–5285.
Comments Due: 5 p.m. ET 12/16/14.
Docket Numbers: ER15–483–000.
Applicants: New York Independent
System Operator, Inc.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): 205 filing MST revision
to clarify eligibility for DAMAP and
BPCG payments to be effective 1/25/
2015.
Filed Date: 11/25/14.
Accession Number: 20141125–5306.
Comments Due: 5 p.m. ET 12/16/14.
Docket Numbers: ER15–484–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): 1891R3 Westar Energy,
Inc. NITSA and NOA to be effective 8/
1/2014.
Filed Date: 11/25/14.
Accession Number: 20141125–5312.
Comments Due: 5 p.m. ET 12/16/14.
Docket Numbers: ER15–485–000.
Applicants: New York Independent
System Operator, Inc.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): 205 filing re: graduated
transmission demand curve—
transmission shortage costs to be
effective 12/31/9998.
Filed Date: 11/25/14.
Accession Number: 20141125–5334.
Comments Due: 5 p.m. ET 12/16/14.
Docket Numbers: ER15–486–000.
Applicants: Peninsula Power, LLC.
Description: Initial rate filing per
35.12 Peninsula Power,LLC (FERC
Electric Tariff) to be effective 1/1/2015.
Filed Date: 11/26/14.
Accession Number: 20141126–5001.
Comments Due: 5 p.m. ET 12/17/14.
PO 00000
Frm 00012
Fmt 4703
Sfmt 4703
71991
Docket Numbers: ER15–487–000;
ER15–488–000; ER15–489–000.
Applicants: Peetz Logan Interconnect,
LLC, Sagebrush, a California
partnership, Sky River LLC.
Description: Request for Waiver of
Order No. 676–H Compliance
Requirements of Peetz Logan
Interconnect, LLC, Sagebrush, a
California partnership, and Sky River
LLC.
Filed Date: 11/25/14.
Accession Number: 20141125–5383.
Comments Due: 5 p.m. ET 12/16/14.
Docket Numbers: ER15–490–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): 1892R3 Westar Energy,
Inc. NITSA and NOA to be effective 8/
1/2014.
Filed Date: 11/26/14.
Accession Number: 20141126–5040.
Comments Due: 5 p.m. ET 12/17/14.
Docket Numbers: ER15–491–000.
Applicants: Southwest Power Pool,
Inc.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): 1893R3 Westar Energy,
Inc. (Savonburg) NITSA and NOA to be
effective 8/1/2014.
Filed Date: 11/26/14.
Accession Number: 20141126–5043.
Comments Due: 5 p.m. ET 12/17/14.
Docket Numbers: ER15–493–000.
Applicants: Duke Energy Conesville,
LLC.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): Amendment to Reactive
Rate Schedule to be effective 12/1/2014.
Filed Date: 11/26/14.
Accession Number: 20141126–5063.
Comments Due: 5 p.m. ET 12/17/14.
Docket Numbers: ER15–494–000.
Applicants: Duke Energy Dicks Creek,
LLC.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): Amendment to Reactive
Rate Schedule to be effective 12/1/2014.
Filed Date: 11/26/14.
Accession Number: 20141126–5064.
Comments Due: 5 p.m. ET 12/17/14.
Docket Numbers: ER15–495–000.
Applicants: Duke Energy Killen, LLC.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): Amendment to Reactive
Rate Schedule to be effective 12/1/2014.
Filed Date: 11/26/14.
Accession Number: 20141126–5068.
Comments Due: 5 p.m. ET 12/17/14.
Docket Numbers: ER15–496–000.
Applicants: Duke Energy Zimmer,
LLC.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): Amendment to Reactive
Rate Schedule to be effective 12/1/2014.
Filed Date: 11/26/14.
E:\FR\FM\04DEN1.SGM
04DEN1
Agencies
[Federal Register Volume 79, Number 233 (Thursday, December 4, 2014)]
[Notices]
[Pages 71990-71991]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-28492]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2246-069]
Yuba County Water Agency; Notice of Application Accepted for
Filing, Soliciting Comments, Motions To Intervene, and Protests
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Application for Temporary Variance of
Minimum Flow Requirement.
b. Project No.: 2246-069.
c. Date Filed: November 25, 2014.
d. Applicant: Yuba County Water Agency (licensee).
e. Name of Project: Yuba River Project.
f. Location: North Yuba River, Middle Yuba River, and Oregon Creek
in Yuba, Nevada, and Sierra counties, CA.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Curt Aikens, General Manager, Yuba County
Water Agency, 1200 F Street, Marysville, CA 95901-4740, (530) 741-5015.
i. FERC Contact: Mr. John Aedo, (415) 369-3335, or
john.aedo@ferc.gov.
j. Deadline for filing comments, motions to intervene, protests,
and recommendations is 30 days from the issuance date of this notice by
the Commission (December 26, 2014). The Commission strongly encourages
electronic filing. Please file motions to intervene, protests,
comments, or recommendations using the Commission's eFiling system at
https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit
brief comments up to 6,000 characters, without prior registration,
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the
end of your comments. For assistance, please contact FERC Online
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper
copy to: Secretary, Federal Energy Regulatory Commission, 888 First
Street NE., Washington, DC 20426. Please include the project number (P-
2246-069) on any comments, motions to intervene, protests, or
recommendations filed.
k. Description of Request: The licensee requests a temporary
variance of the minimum flow requirements in the lower Yuba River below
Englebright Dam, which requires a minimum flow of 1,000 cubic feet per
second (cfs) from January 1 to 15. In order to conserve water resources
during the current drought and make best biological use of a limited
water supply, the licensee proposes to instead release 550 cfs from
January 1 to January 16, 2015. In addition, the licensee requests that
minimum flow compliance during this period be based on a 5-day running
average of average daily streamflows, with instantaneous flows never
less than 90 percent of the specified 550 cfs minimum flow and never
less than 550 cfs for more than 48 hours. The proposed variance would
be in addition to the one already requested variance for December 1-31,
2014 and January 16 to March 31, 2015 period. Take note that the
December 1-31 variance was granted by Commission order dated November
25, 2014.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits
in the docket number field to access the document. You may also
register online at https://www.ferc.gov/docs-filing/esubscription.asp to
be notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filing must (1)
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the
name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. All
comments, motions to intervene, or protests must set forth their
evidentiary basis and otherwise comply with the requirements of 18 CFR
4.34(b). All comments, motions to intervene, or protests should relate
to project works which are the subject of the variance. Agencies may
obtain copies of the application directly from the applicant. A copy of
any protest or motion to intervene must be served upon each
representative of the applicant specified in the particular
application. If an intervener files comments or documents with the
Commission relating to the merits of an issue that may affect the
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency.
[[Page 71991]]
A copy of all other filings in reference to this application must be
accompanied by proof of service on all persons listed in the service
list prepared by the Commission in this proceeding, in accordance with
18 CFR 4.34(b) and 385.2010.
Dated: November 26, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-28492 Filed 12-3-14; 8:45 am]