Duke Energy Progress Inc; Combined License Applications for Shearon Harris Nuclear Plant Units 1 and 2, 71793-71795 [2014-28458]

Download as PDF Federal Register / Vol. 79, No. 232 / Wednesday, December 3, 2014 / Notices tkelley on DSK3SPTVN1PROD with NOTICES (ii) There is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite; The proposed action involves only a schedule change which is administrative in nature, and does not involve any changes to be made in the types or significant increase in the amounts of effluents that may be released offsite. (iii) There is no significant increase in individual or cumulative public or occupational radiation exposure; Since the proposed action involves only a schedule change which is administrative in nature, it does not contribute to any significant increase in occupational or public radiation exposure. (iv) There is no significant construction impact; The proposed action involves only a schedule change which is administrative in nature; the application review is suspended until further notice, and there is no consideration of any construction at this time, and hence the proposed action does not involve any construction impact. (v) There is no significant increase in the potential for or consequences from radiological accidents; and The proposed action involves only a schedule change which is administrative in nature, and does not impact the probability or consequences of accidents. (vi) The requirements from which an exemption is sought involve: (B) Reporting requirements; The exemption request involves submitting an updated FSAR by DEP and (G) Scheduling requirements; The proposed exemption relates to the schedule for submitting FSAR updates to the NRC. IV. Conclusion Accordingly, the Commission has determined that, pursuant to 10 CFR 50.12(a), the exemption is authorized by law, will not present an undue risk to the public health and safety, and is consistent with the common defense and security. Also special circumstances are present. Therefore, the Commission hereby grants DEP a one-time exemption from the requirements of 10 CFR 50.71(e)(3)(iii) pertaining to the Shearon Harris Nuclear Power Plant Units 2 and 3 COL application to allow submittal of the next FSAR update prior to any request to the NRC to resume the review, and in any event no later than December 31, 2015. Pursuant to 10 CFR 51.22, the Commission has determined that the VerDate Sep<11>2014 18:42 Dec 02, 2014 Jkt 235001 exemption request meets the applicable categorical exclusion criteria set forth in 10 CFR 51.22(c)(25), and the granting of this exemption will not have a significant effect on the quality of the human environment. This exemption is effective upon issuance. Dated at Rockville, Maryland, this 24 day of November 2014. For The Nuclear Regulatory Commission. Frank Akstulewicz, Director, Division of New Reactor Licensing, Office of New Reactors. [FR Doc. 2014–28456 Filed 12–2–14; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [Docket Nos. 52–022 and 52–023; NRC– 2013–0261] Duke Energy Progress Inc; Combined License Applications for Shearon Harris Nuclear Plant Units 1 and 2 Nuclear Regulatory Commission. ACTION: Exemption; issuance. AGENCY: The U.S. Nuclear Regulatory Commission (NRC) is issuing an exemption in response to an August 1, 2014, letter from Duke Energy Progress (DEP). On May 2, 2013, DEP requested that the NRC suspend review of its combined license (COL) application until further notice. On August 1, 2014, DEP requested an exemption from certain regulatory requirements which, if granted, would allow them to revise their COL application in order to address enhancements to the Emergency Preparedness (EP) rules by December 31, 2015, rather than by December 31, 2013, as the regulations currently require. The NRC staff reviewed this request and determined that it is appropriate to grant the exemption to the EP update requirements until December 31, 2015, but stipulated that the updates to the Final Safety Analysis Report (FSAR) must be submitted prior to requesting the NRC resume its review of the COL application, or by December 31, 2015, whichever comes first. DATES: The exemption is effective on December 3, 2014. ADDRESSES: Please refer to Docket ID NRC–2013–0261 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document using any of the following methods: • Federal Rulemaking Web site: Go to https://www.regulations.gov and search SUMMARY: PO 00000 Frm 00054 Fmt 4703 Sfmt 4703 71793 for Docket ID NRC–2013–0261. Address questions about NRC dockets to Carol Gallagher; telephone: 301–287–3422; email: Carol.Gallagher@nrc.gov. For technical questions, contact the individual(s) listed in the FOR FURTHER INFORMATION CONTACT section of this document. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘ADAMS Public Documents’’ and then select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301–415–4737, or by email to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced in this document (if that document is available in ADAMS) is provided the first time that a document is referenced. • NRC’s PDR: You may examine and purchase copies of public documents at the NRC’s PDR, Room O1–F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. FOR FURTHER INFORMATION CONTACT: Brian Hughes, Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555–0001; telephone: 301–415–6582; email: Brian.Hughes@ nrc.gov. SUPPLEMENTARY INFORMATION: I. Background On February 18, 2008 (ADAMS Accession No. ML080580078), DEP submitted to the NRC a COL application for two units of Westinghouse Electric Company’s AP1000 advanced pressurized water reactors to be constructed and operated at the existing Shearon Harris Nuclear Plant (Harris) site (Docket Numbers 52–22 and 52–23). The NRC docketed the Harris Units 2 and 3 COL application on April 23, 2008. On May 2, 2013 (ADAMS Accession No. ML13123A344), DEP requested that the NRC suspend review of the Harris Units 2 and 3 COL application. The NRC granted DEP’s request for suspension and all review activities related to the Harris Units 2 and 3 COL application were suspended while the application remained docketed. On July 29, 2013 (ADAMS Accession No. ML13212A361), DEP requested an exemption from the requirements in Part 50 Appendix E Section I.5 of Title 10 of the Code of Federal Regulations (10 CFR), as referenced by 10 CFR 52.79(a)(21), to E:\FR\FM\03DEN1.SGM 03DEN1 71794 Federal Register / Vol. 79, No. 232 / Wednesday, December 3, 2014 / Notices submit an update to the COL application, addressing the enhancements to the EP rules by December 31, 2013, which the NRC granted through December 31, 2014. On August 1, 2014, DEP requested another exemption to December 31, 2015, from the requirements of 10 CFR part 50, Appendix E, Section I.5, as referenced by 10 CFR 52.79(a)(21), to submit an update to the COL application, addressing the enhancements to the EP rules by December 31, 2013. tkelley on DSK3SPTVN1PROD with NOTICES II. Request/Action Appendix E of 10 CFR part 50 requires that an applicant for a COL under Subpart C of 10 CFR part 52 whose application was docketed prior to December 23, 2011, must revise their COL application to comply with the EP rules published in the Federal Register on November 23, 2011 (76 FR 72560). An applicant that does not receive a COL before December 31, 2013, shall revise its COL application to comply with these changes no later than December 31, 2013. Since DEP will not hold a COL prior to December 31, 2013, it is therefore required to revise its application to be compliant with the new EP rules by December 31, 2013. Similar to an earlier exemption request it submitted, as described above, by letter dated August 1, 2014 (ADAMS Accession No. ML14216A432), DEP requested another exemption from the requirements of 10 CFR part 50, Appendix E, Section I.5, to submit the required COL application revision to comply with the new EP rules. The requested exemption would allow DEP to revise its COL application, and comply with the new EP rules on or before December 31, 2015, rather than the initial December 31, 2013, date required by 10 CFR part 50, Appendix E, Section I.5. The current requirement to comply with the new EP rule by December 31, 2013, could not be changed, absent the exemption. III. Discussion Pursuant to 10 CFR 50.12(a), the Commission may, upon application by any interested person or upon its own initiative, grant exemptions from the requirements of 10 CFR part 50, including 10 CFR part 50, Appendix E, Section I.5, when: (1) The exemption(s) are authorized by law, will not present an undue risk to public health or safety, and are consistent with the common defense and security; and (2) special circumstances are present. As relevant to the requested exemption, special circumstances exist if: ‘‘Application of the regulation in the particular circumstances would not serve the VerDate Sep<11>2014 18:42 Dec 02, 2014 Jkt 235001 underlying purpose of the rule or is not necessary to achieve the underlying purpose of the rule’’ (10 CFR 50.12(a)(2)(ii)). Authorized by Law The exemption is a one-time schedule exemption from the requirements of 10 CFR part 50, Appendix E, Section I.5. The exemption would allow DEP to revise its COL application, and comply with the new EP rules on or before December 31, 2015, in lieu of the initial December 31, 2013, the date required by 10 CFR part 50, Appendix E, Section I.5. As stated above, 10 CFR 50.12 allows the NRC to grant exemptions from the requirements of 10 CFR part 50. The NRC staff has determined that granting DEP the requested one-time exemption from the requirements of 10 CFR 50, Appendix E, Section I.5 will not result in a violation of the Atomic Energy Act of 1954, as amended, or NRC regulations. Therefore, the exemption is authorized by law. No Undue Risk to Public Health and Safety The underlying purpose of the enhancements to Emergency Preparedness found in 10 CFR part 50, Appendix E, is to amend certain EP requirements to enhance protective measures in the event of a radiological emergency; address, in part, enhancements identified after the terrorist events of September 11, 2001; clarify regulations to effect consistent Emergency Plan implementation among licensees; and modify certain requirements to be more effective and efficient. Since plant construction cannot proceed until the NRC review of the application is completed, a mandatory hearing is completed and a license is issued, the exemption does not increase the probability of postulated accidents. Additionally, based on the nature of the requested exemption as described above, no new accident precursors are created by the exemption; thus neither the probability, nor the consequences of postulated accidents are increased. Therefore, there is no undue risk to public health and safety. Consistent With Common Defense and Security The requested exemption would allow DEP to submit the revised COL application prior to requesting the NRC to resume the review and, in any event, on or before December 31, 2015. This schedule change has no relation to security issues. Therefore, the common defense and security is not impacted. PO 00000 Frm 00055 Fmt 4703 Sfmt 4703 Special Circumstances Special Circumstances, in accordance with 10 CFR 50.12(a)(2)(ii) are present whenever: (1) Application of the regulation in the particular circumstances would not serve the underlying purpose of the rule or is not necessary to achieve the underlying purpose of the rule (10 CFR 50.12(a)(ii); or (2) The exemption would only provide temporary relief from the applicable regulation or the applicant has made good faith efforts to comply with the regulation (10 CFR 50.12(a)(2)(v)). The purpose of 10 CFR part 50, Appendix E, Section I.5 is to ensure that applicants and new COL holders updated their COL applications or COLs to allow the NRC to review them efficiently and effectively, and to bring the applicants or licensees into compliance prior to receiving a license, or, for licensees, prior to operating the plant. The targets of Section I.5 of the rule were those applications that were being actively reviewed by the NRC staff when the rule went into effect on November 23, 2011. Since the Harris Units 2 and 3 COL application is now suspended compelling DEP to revise its COL application in order to meet the compliance deadline would result in unnecessary burden and hardship for the applicant to meet the compliance date. If the NRC were to grant this exemption, and DEP were then required to update its application to comply with the EP rule enhancements by December 31, 2015, or prior to any request to restart their review, the purpose of the rule would still be achieved. For this reason, the application of 10 CFR part 50, Appendix E, Section I.5, for the suspended Harris 2 and 3 COL application is deemed unnecessary and, therefore, special circumstances are present. Eligibility for Categorical Exclusion From Environmental Review With respect to the exemption’s impact on the quality of the human environment, the NRC has determined that this specific exemption request is eligible for categorical exclusion as identified in 10 CFR 51.22(c)(25) and justified by the NRC staff as follows: (c) The following categories of actions are categorical exclusions: provided that: (i) There is no significant hazards consideration; The criteria for determining whether there is no significant hazards consideration are found in 10 CFR 50.92. The proposed action involves only a schedule change regarding the E:\FR\FM\03DEN1.SGM 03DEN1 tkelley on DSK3SPTVN1PROD with NOTICES Federal Register / Vol. 79, No. 232 / Wednesday, December 3, 2014 / Notices submission of an update to the application for which the licensing review has been suspended. Therefore, there are no significant hazards considerations because granting the proposed exemption would not: (1) Involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) Create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) Involve a significant reduction in a margin of safety. (ii) There is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite; The proposed action involves only a schedule change which is administrative in nature, and does not involve any changes to be made in the types or significant increase in the amounts of effluents that may be released offsite. (iii) There is no significant increase in individual or cumulative public or occupational radiation exposure; Since the proposed action involves only a schedule change which is administrative in nature, it does not contribute to any significant increase in occupational or public radiation exposure. (iv) There is no significant construction impact; The proposed action involves only a schedule change which is administrative in nature; the application review is suspended until further notice, and there is no consideration of any construction at this time, and hence the proposed action does not involve any construction impact. (v) There is no significant increase in the potential for or consequences from radiological accidents; and The proposed action involves only a schedule change which is administrative in nature, and does not impact the probability or consequences of accidents. (vi) The requirements from which an exemption is sought involve: (B) Reporting requirements; The exemption request involves submitting an updated COL application by DEP and (G) Scheduling requirements; The proposed exemption relates to the schedule for submitting a COL application update to the NRC. IV. Conclusion Accordingly, the Commission has determined that, pursuant to 10 CFR 50.12(a), the exemption is authorized by law, will not present an undue risk to the public health and safety, and is VerDate Sep<11>2014 18:42 Dec 02, 2014 Jkt 235001 consistent with the common defense and security. Also special circumstances are present. Therefore, the Commission hereby grants DEP a one-time exemption from the requirements of 10 CFR part 50, Appendix E, Section I.5 pertaining to the Harris Units 2 and 3 COL application to allow submittal of the revised COL application that complies with the enhancements to the EP rules prior to any request to the NRC to resume the review, and in any event, no later than December 31, 2015. Pursuant to 10 CFR 51.22, the Commission has determined that the exemption request meets the applicable categorical exclusion criteria set forth in 10 CFR 51.22(c)(25), and the granting of this exemption will not have a significant effect on the quality of the human environment. This exemption is effective upon issuance. Dated at Rockville, Maryland, this 25 day of November 2014. For The Nuclear Regulatory Commission. Frank Akstulewicz, Director, Division of New Reactor Licensing, Office of New Reactors. [FR Doc. 2014–28458 Filed 12–2–14; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION [Docket No. 70–0036; NRC–2012–0054] Westinghouse Electric Company, LLC; Decommissioning Project, Hematite, Missouri Nuclear Regulatory Commission. ACTION: License amendment application; request for exemption; opportunity to request a hearing and to petition for leave to intervene; order. AGENCY: The U.S. Nuclear Regulatory Commission (NRC) has received an application from Westinghouse Electric Company, LLC dated July 11, 2014, and subsequently modified by submittal dated September 25, 2014, for amendment of the Hematite Fuel Cycle Facility license (License No. SNM–33), which authorizes decommissioning of the facility. The amendment would allow disposal of an additional 87,100 m3 (cubic meters) of debris and contaminated soil, concrete and asphalt, filter media, ion exchange resin and piping containing NRC-licensed source, byproduct and special nuclear material at U.S. Ecology Idaho, Inc. DATES: A request for a hearing or petition for leave to intervene must be filed by February 2, 2015. Any potential SUMMARY: PO 00000 Frm 00056 Fmt 4703 Sfmt 4703 71795 party as defined in § 2.4 of Title 10 of the Code of Federal Regulations (10 CFR) who believes access to Sensitive Unclassified Non-Safeguards Information (SUNSI) and/or Safeguards Information (SGI) is necessary to respond to this notice must request document access by December 15, 2014. ADDRESSES: Please refer to Docket ID NRC–2012–0054 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document using any of the following methods: • Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC–2012–0054. Address questions about NRC dockets to Carol Gallagher; telephone: 301–287–3422; email: Carol.Gallagher@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document. • NRC’s Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/ adams.html. To begin the search, select ‘‘ADAMS Public Documents’’ and then select ‘‘Begin Web-based ADAMS Search.’’ For problems with ADAMS, please contact the NRC’s Public Document Room (PDR) reference staff at 1–800–397–4209, 301–415–4737, or by email to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced in this document (if that document is available in ADAMS) is provided the first time that a document is referenced. • NRC’s PDR: You may examine and purchase copies of public documents at the NRC’s PDR, Room O1–F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland, 20852. FOR FURTHER INFORMATION CONTACT: John J. Hayes, Office of Nuclear Materials and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555– 0001; telephone: 301–415–5928; email: John.Hayes@nrc.gov. SUPPLEMENTARY INFORMATION: I. Introduction The NRC has received a license amendment application from Westinghouse Electric Company, LLC (WEC or the licensee), dated July 11, 2014 (ADAMS Accession No. ML14193A008). The licensee holds NRC License No. SNM–33 and is authorized to conduct decommissioning activities at the facility. The licensee requests NRC authorization under 10 CFR E:\FR\FM\03DEN1.SGM 03DEN1

Agencies

[Federal Register Volume 79, Number 232 (Wednesday, December 3, 2014)]
[Notices]
[Pages 71793-71795]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-28458]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 52-022 and 52-023; NRC-2013-0261]


Duke Energy Progress Inc; Combined License Applications for 
Shearon Harris Nuclear Plant Units 1 and 2

AGENCY: Nuclear Regulatory Commission.

ACTION: Exemption; issuance.

-----------------------------------------------------------------------

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing an 
exemption in response to an August 1, 2014, letter from Duke Energy 
Progress (DEP). On May 2, 2013, DEP requested that the NRC suspend 
review of its combined license (COL) application until further notice. 
On August 1, 2014, DEP requested an exemption from certain regulatory 
requirements which, if granted, would allow them to revise their COL 
application in order to address enhancements to the Emergency 
Preparedness (EP) rules by December 31, 2015, rather than by December 
31, 2013, as the regulations currently require. The NRC staff reviewed 
this request and determined that it is appropriate to grant the 
exemption to the EP update requirements until December 31, 2015, but 
stipulated that the updates to the Final Safety Analysis Report (FSAR) 
must be submitted prior to requesting the NRC resume its review of the 
COL application, or by December 31, 2015, whichever comes first.

DATES: The exemption is effective on December 3, 2014.

ADDRESSES: Please refer to Docket ID NRC-2013-0261 when contacting the 
NRC about the availability of information regarding this document. You 
may obtain publicly-available information related to this document 
using any of the following methods:
     Federal Rulemaking Web site: Go to https://www.regulations.gov and search for Docket ID NRC-2013-0261. Address 
questions about NRC dockets to Carol Gallagher; telephone: 301-287-
3422; email: Carol.Gallagher@nrc.gov. For technical questions, contact 
the individual(s) listed in the FOR FURTHER INFORMATION CONTACT section 
of this document.
     NRC's Agencywide Documents Access and Management System 
(ADAMS): You may obtain publicly available documents online in the 
ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select ``ADAMS Public Documents'' and 
then select ``Begin Web-based ADAMS Search.'' For problems with ADAMS, 
please contact the NRC's Public Document Room (PDR) reference staff at 
1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The 
ADAMS accession number for each document referenced in this document 
(if that document is available in ADAMS) is provided the first time 
that a document is referenced.
     NRC's PDR: You may examine and purchase copies of public 
documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 
Rockville Pike, Rockville, Maryland 20852.

FOR FURTHER INFORMATION CONTACT: Brian Hughes, Office of New Reactors, 
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; 
telephone: 301-415-6582; email: Brian.Hughes@nrc.gov.

SUPPLEMENTARY INFORMATION:

I. Background

    On February 18, 2008 (ADAMS Accession No. ML080580078), DEP 
submitted to the NRC a COL application for two units of Westinghouse 
Electric Company's AP1000 advanced pressurized water reactors to be 
constructed and operated at the existing Shearon Harris Nuclear Plant 
(Harris) site (Docket Numbers 52-22 and 52-23). The NRC docketed the 
Harris Units 2 and 3 COL application on April 23, 2008. On May 2, 2013 
(ADAMS Accession No. ML13123A344), DEP requested that the NRC suspend 
review of the Harris Units 2 and 3 COL application. The NRC granted 
DEP's request for suspension and all review activities related to the 
Harris Units 2 and 3 COL application were suspended while the 
application remained docketed. On July 29, 2013 (ADAMS Accession No. 
ML13212A361), DEP requested an exemption from the requirements in Part 
50 Appendix E Section I.5 of Title 10 of the Code of Federal 
Regulations (10 CFR), as referenced by 10 CFR 52.79(a)(21), to

[[Page 71794]]

submit an update to the COL application, addressing the enhancements to 
the EP rules by December 31, 2013, which the NRC granted through 
December 31, 2014. On August 1, 2014, DEP requested another exemption 
to December 31, 2015, from the requirements of 10 CFR part 50, Appendix 
E, Section I.5, as referenced by 10 CFR 52.79(a)(21), to submit an 
update to the COL application, addressing the enhancements to the EP 
rules by December 31, 2013.

II. Request/Action

    Appendix E of 10 CFR part 50 requires that an applicant for a COL 
under Subpart C of 10 CFR part 52 whose application was docketed prior 
to December 23, 2011, must revise their COL application to comply with 
the EP rules published in the Federal Register on November 23, 2011 (76 
FR 72560). An applicant that does not receive a COL before December 31, 
2013, shall revise its COL application to comply with these changes no 
later than December 31, 2013.
    Since DEP will not hold a COL prior to December 31, 2013, it is 
therefore required to revise its application to be compliant with the 
new EP rules by December 31, 2013. Similar to an earlier exemption 
request it submitted, as described above, by letter dated August 1, 
2014 (ADAMS Accession No. ML14216A432), DEP requested another exemption 
from the requirements of 10 CFR part 50, Appendix E, Section I.5, to 
submit the required COL application revision to comply with the new EP 
rules. The requested exemption would allow DEP to revise its COL 
application, and comply with the new EP rules on or before December 31, 
2015, rather than the initial December 31, 2013, date required by 10 
CFR part 50, Appendix E, Section I.5. The current requirement to comply 
with the new EP rule by December 31, 2013, could not be changed, absent 
the exemption.

III. Discussion

    Pursuant to 10 CFR 50.12(a), the Commission may, upon application 
by any interested person or upon its own initiative, grant exemptions 
from the requirements of 10 CFR part 50, including 10 CFR part 50, 
Appendix E, Section I.5, when: (1) The exemption(s) are authorized by 
law, will not present an undue risk to public health or safety, and are 
consistent with the common defense and security; and (2) special 
circumstances are present. As relevant to the requested exemption, 
special circumstances exist if: ``Application of the regulation in the 
particular circumstances would not serve the underlying purpose of the 
rule or is not necessary to achieve the underlying purpose of the 
rule'' (10 CFR 50.12(a)(2)(ii)).

Authorized by Law

    The exemption is a one-time schedule exemption from the 
requirements of 10 CFR part 50, Appendix E, Section I.5. The exemption 
would allow DEP to revise its COL application, and comply with the new 
EP rules on or before December 31, 2015, in lieu of the initial 
December 31, 2013, the date required by 10 CFR part 50, Appendix E, 
Section I.5. As stated above, 10 CFR 50.12 allows the NRC to grant 
exemptions from the requirements of 10 CFR part 50. The NRC staff has 
determined that granting DEP the requested one-time exemption from the 
requirements of 10 CFR 50, Appendix E, Section I.5 will not result in a 
violation of the Atomic Energy Act of 1954, as amended, or NRC 
regulations. Therefore, the exemption is authorized by law.

No Undue Risk to Public Health and Safety

    The underlying purpose of the enhancements to Emergency 
Preparedness found in 10 CFR part 50, Appendix E, is to amend certain 
EP requirements to enhance protective measures in the event of a 
radiological emergency; address, in part, enhancements identified after 
the terrorist events of September 11, 2001; clarify regulations to 
effect consistent Emergency Plan implementation among licensees; and 
modify certain requirements to be more effective and efficient. Since 
plant construction cannot proceed until the NRC review of the 
application is completed, a mandatory hearing is completed and a 
license is issued, the exemption does not increase the probability of 
postulated accidents. Additionally, based on the nature of the 
requested exemption as described above, no new accident precursors are 
created by the exemption; thus neither the probability, nor the 
consequences of postulated accidents are increased. Therefore, there is 
no undue risk to public health and safety.

Consistent With Common Defense and Security

    The requested exemption would allow DEP to submit the revised COL 
application prior to requesting the NRC to resume the review and, in 
any event, on or before December 31, 2015. This schedule change has no 
relation to security issues. Therefore, the common defense and security 
is not impacted.

Special Circumstances

    Special Circumstances, in accordance with 10 CFR 50.12(a)(2)(ii) 
are present whenever: (1) Application of the regulation in the 
particular circumstances would not serve the underlying purpose of the 
rule or is not necessary to achieve the underlying purpose of the rule 
(10 CFR 50.12(a)(ii); or (2) The exemption would only provide temporary 
relief from the applicable regulation or the applicant has made good 
faith efforts to comply with the regulation (10 CFR 50.12(a)(2)(v)).
    The purpose of 10 CFR part 50, Appendix E, Section I.5 is to ensure 
that applicants and new COL holders updated their COL applications or 
COLs to allow the NRC to review them efficiently and effectively, and 
to bring the applicants or licensees into compliance prior to receiving 
a license, or, for licensees, prior to operating the plant. The targets 
of Section I.5 of the rule were those applications that were being 
actively reviewed by the NRC staff when the rule went into effect on 
November 23, 2011. Since the Harris Units 2 and 3 COL application is 
now suspended compelling DEP to revise its COL application in order to 
meet the compliance deadline would result in unnecessary burden and 
hardship for the applicant to meet the compliance date. If the NRC were 
to grant this exemption, and DEP were then required to update its 
application to comply with the EP rule enhancements by December 31, 
2015, or prior to any request to restart their review, the purpose of 
the rule would still be achieved. For this reason, the application of 
10 CFR part 50, Appendix E, Section I.5, for the suspended Harris 2 and 
3 COL application is deemed unnecessary and, therefore, special 
circumstances are present.

Eligibility for Categorical Exclusion From Environmental Review

    With respect to the exemption's impact on the quality of the human 
environment, the NRC has determined that this specific exemption 
request is eligible for categorical exclusion as identified in 10 CFR 
51.22(c)(25) and justified by the NRC staff as follows:
    (c) The following categories of actions are categorical exclusions:
    provided that:
    (i) There is no significant hazards consideration;
    The criteria for determining whether there is no significant 
hazards consideration are found in 10 CFR 50.92. The proposed action 
involves only a schedule change regarding the

[[Page 71795]]

submission of an update to the application for which the licensing 
review has been suspended. Therefore, there are no significant hazards 
considerations because granting the proposed exemption would not:
    (1) Involve a significant increase in the probability or 
consequences of an accident previously evaluated; or
    (2) Create the possibility of a new or different kind of accident 
from any accident previously evaluated; or
    (3) Involve a significant reduction in a margin of safety.
    (ii) There is no significant change in the types or significant 
increase in the amounts of any effluents that may be released offsite;
    The proposed action involves only a schedule change which is 
administrative in nature, and does not involve any changes to be made 
in the types or significant increase in the amounts of effluents that 
may be released offsite.
    (iii) There is no significant increase in individual or cumulative 
public or occupational radiation exposure;
    Since the proposed action involves only a schedule change which is 
administrative in nature, it does not contribute to any significant 
increase in occupational or public radiation exposure.
    (iv) There is no significant construction impact;
    The proposed action involves only a schedule change which is 
administrative in nature; the application review is suspended until 
further notice, and there is no consideration of any construction at 
this time, and hence the proposed action does not involve any 
construction impact.
    (v) There is no significant increase in the potential for or 
consequences from radiological accidents; and
    The proposed action involves only a schedule change which is 
administrative in nature, and does not impact the probability or 
consequences of accidents.
    (vi) The requirements from which an exemption is sought involve:
    (B) Reporting requirements;
    The exemption request involves submitting an updated COL 
application by DEP and
    (G) Scheduling requirements;
    The proposed exemption relates to the schedule for submitting a COL 
application update to the NRC.

IV. Conclusion

    Accordingly, the Commission has determined that, pursuant to 10 CFR 
50.12(a), the exemption is authorized by law, will not present an undue 
risk to the public health and safety, and is consistent with the common 
defense and security. Also special circumstances are present. 
Therefore, the Commission hereby grants DEP a one-time exemption from 
the requirements of 10 CFR part 50, Appendix E, Section I.5 pertaining 
to the Harris Units 2 and 3 COL application to allow submittal of the 
revised COL application that complies with the enhancements to the EP 
rules prior to any request to the NRC to resume the review, and in any 
event, no later than December 31, 2015.
    Pursuant to 10 CFR 51.22, the Commission has determined that the 
exemption request meets the applicable categorical exclusion criteria 
set forth in 10 CFR 51.22(c)(25), and the granting of this exemption 
will not have a significant effect on the quality of the human 
environment.
    This exemption is effective upon issuance.


    Dated at Rockville, Maryland, this 25 day of November 2014.
    For The Nuclear Regulatory Commission.
Frank Akstulewicz,
Director, Division of New Reactor Licensing, Office of New Reactors.
[FR Doc. 2014-28458 Filed 12-2-14; 8:45 am]
BILLING CODE 7590-01-P