Advisory Committee on Reactor Safeguards (ACRS), Meeting of the ACRS Subcommittee on Planning and Procedures; Notice of Meeting, 70220-70221 [2014-27961]

Download as PDF 70220 Federal Register / Vol. 79, No. 227 / Tuesday, November 25, 2014 / Notices The Commission’s related evaluation of the amendment is contained in a safety evaluation dated November 6, 2014. No significant hazards consideration comments received: No. wreier-aviles on DSK4TPTVN1PROD with NOTICES South Carolina Electric & Gas, Docket Nos. 52–027 and 52–028, Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3, Fairfield County, South Carolina Date of amendment request: March 13, September 25 (two letters for Licensing Amendment Request (LAR) 13–16 and LAR 13–17) and October 3, 2013 (two letters for LAR 13–18 and LAR 13–19), as supplemented by letters dated October 3, 2013, and February 10 and June 6, 2014. Brief description of amendment: The proposed amendment involves changes to the five Human Factors Engineering (HFE) Reports (Westinghouse Electric Company and the U.S. Nuclear Regulatory Commission reviewed these reports as part of the AP1000 Design Certification Rule) that are incorporated by reference in the VCSNS Updated Final Safety Analysis Report. These are: • HFE Design Verification Plan (APP– OCS–GEH–120) (LAR 13–16) • HFE Task Support Verification Plan (APP–OCS–GEH–220) (LAR 13–17) • HFE Integrated System Validation (APP–OCS–GEH–320) (LAR 13–10) • Human Engineering Discrepancy Resolution Process (APP–OCS–GEH– 420) (LAR 13–18) • Plant Startup HFE Design Verification Plan (APP–OCS–GEH–520) (LAR 13– 19) Date of issuance: July 31, 2014. Effective date: As of the date of issuance and shall be implemented within 30 days of issuance. Amendment No.: 16. A publiclyavailable version is in ADAMS under Accession No. ML14177A486; documents related to this amendment are listed in the Safety Evaluation enclosed with the amendment. Facility Combined Licenses No. NPF– 93 and NPF–94: Amendment revised the Facility Combined Licenses. Date of initial notice in Federal Register: May 28, 2013 (78 FR 31984 for LAR 13–10), November 12, 2013 (78 FR 67412 for LAR 13–16, 78 FR 67411 for LAR 13–17, 78 FR 67413 for LAR 13–18, and 78 FR 67413 for LAR 13–19). The Commission’s related evaluation of the amendment is contained in a Safety Evaluation dated July 31, 2014. No significant hazards consideration comments received: No. VerDate Sep<11>2014 14:41 Nov 24, 2014 Jkt 235001 South Carolina Electric and Gas, Inc. Docket Nos. 52–027 and 52–028, Virgil C. Summer Nuclear Station (VCSNS) Units 2 and 3, Fairfield County, South Carolina Date of amendment request: July 17, 2013, as supplemented by letters dated July 8, and July 11, 2014. Brief description of amendment: The amendment revises Tier 2* and associated Tier 2 information, incorporated into the VCSNS Units 2 and 3 Updated Final Safety Analysis Report (UFSAR). Specifically, the amendment revises the following information related to fire area boundaries: (1) Various Annex Building and Turbine Building layout changes, (2) Turbine Building Stairwell S08 changes to support egress functions, and (3) an Annex Building Heating, Ventilation and Air Conditioning shaft UFSAR figure clarification. Date of issuance: September 9, 2014. Effective date: As of the date of issuance and shall be implemented within 30 days of issuance. Amendment No.: 17. A publiclyavailable version is in ADAMS under Accession No. ML14218A687; documents related to this amendment are listed in the Safety Evaluation enclosed with the amendment. Facility Combined Licenses No. NPF– 93 and NPF–94: Amendment revised the Facility Combined Licenses. Date of initial notice in Federal Register: October 1, 2013 (78 FR 60321). The supplements dated July 8 and July 11, 2014, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staff’s original proposed no significant hazards consideration determination as published in the Federal Register. The Commission’s related evaluation of the amendment is contained in a Safety Evaluation dated September 9, 2014. No significant hazards consideration comments received: No. Tennessee Valley Authority, Docket Nos. 50–259, 50–260, and 50–296, Browns Ferry Nuclear Plant, Units 1, 2, and 3, Limestone County, Alabama Date of amendment request: April 29, 2014, as supplemented by letter dated May 27, 2014. Brief description of amendment: The amendments revised the Cyber Security Plan Implementation Milestone No. 8 completion date and the physical protection license condition. Date of issuance: September 29, 2014. PO 00000 Frm 00065 Fmt 4703 Sfmt 4703 Effective date: As of its date of issuance and shall be implemented within 90 days. Amendment Nos.: Unit 1–286, Unit 2–312, and Unit 3–217. A publiclyavailable version is in ADAMS under Accession No. ML14247A536; documents related to these amendments are listed in the Safety Evaluation (SE) enclosed with the amendments. Renewed Facility Operating License Nos. DPR–33, DPR–52, and DPR–68. The amendments revised the Operating Licenses. Date of initial notice in Federal Register: July 8, 2014 (79 FR 38582). The supplemental letter dated May 27, 2014, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staff’s original proposed no significant hazards consideration determination as published in the Federal Register. The Commission’s related evaluation of the amendment is contained in the SE dated September 29, 2014. No significant hazards consideration comments received: No. Dated at Rockville, Maryland, this 17th day of November 2014. For the Nuclear Regulatory Commission. Michele G. Evans, Director, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. [FR Doc. 2014–27630 Filed 11–24–14; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION Advisory Committee on Reactor Safeguards (ACRS), Meeting of the ACRS Subcommittee on Planning and Procedures; Notice of Meeting The ACRS Subcommittee on Planning and Procedures will hold a meeting on December 3, 2014, Room T–2B3, 11545 Rockville Pike, Rockville, Maryland. The meeting will be open to public attendance with the exception of a portion that may be closed pursuant to 5 U.S.C. 552b(c)(2) and (6) to discuss organizational and personnel matters that relate solely to the internal personnel rules and practices of the ACRS, and information the release of which would constitute a clearly unwarranted invasion of personal privacy. The agenda for the subject meeting shall be as follows: E:\FR\FM\25NON1.SGM 25NON1 Federal Register / Vol. 79, No. 227 / Tuesday, November 25, 2014 / Notices NUCLEAR REGULATORY COMMISSION The Subcommittee will discuss proposed ACRS activities and related matters. The Subcommittee will gather information, analyze relevant issues and facts, and formulate proposed positions and actions, as appropriate, for deliberation by the Full Committee. Members of the public desiring to provide oral statements and/or written comments should notify the Designated Federal Official (DFO), Quynh Nguyen (Telephone 301–415–5844 or Email: Quynh.Nguyen@nrc.gov) five days prior to the meeting, if possible, so that arrangements can be made. Thirty-five hard copies of each presentation or handout should be provided to the DFO thirty minutes before the meeting. In addition, one electronic copy of each presentation should be emailed to the DFO one day before the meeting. If an electronic copy cannot be provided within this timeframe, presenters should provide the DFO with a CD containing each presentation at least thirty minutes before the meeting. Electronic recordings will be permitted only during those portions of the meeting that are open to the public. Detailed procedures for the conduct of and participation in ACRS meetings were published in the Federal Register on October 14, 2014 (79 FR 59307– 59308). Information regarding changes to the agenda, whether the meeting has been canceled or rescheduled, and the time allotted to present oral statements can be obtained by contacting the identified DFO. Moreover, in view of the possibility that the schedule for ACRS meetings may be adjusted by the Chairman as necessary to facilitate the conduct of the meeting, persons planning to attend should check with the DFO if such rescheduling would result in a major inconvenience. If attending this meeting, please enter through the One White Flint North building, 11555 Rockville Pike, Rockville, MD. After registering with security, please contact Mr. Theron Brown (240–888–9835) to be escorted to the meeting room. wreier-aviles on DSK4TPTVN1PROD with NOTICES Wednesday, December 3, 2014—12:00 p.m. until 1:00 p.m. Advisory Committee on Reactor Safeguards (ACRS), Meeting of the ACRS Subcommittee on Metallurgy & Reactor Fuels; Notice of Meeting Dated: November 19, 2014. Kathy D. Weaver, Acting Chief, Technical Support Branch, Advisory Committee on Reactor Safeguards. [FR Doc. 2014–27961 Filed 11–24–14; 8:45 am] BILLING CODE 7590–01–P VerDate Sep<11>2014 14:41 Nov 24, 2014 Jkt 235001 The ACRS Subcommittee on Metallurgy & Reactor Fuels will hold a meeting on December 2, 2014, Room T– 2B1, 11545 Rockville Pike, Rockville, Maryland. The meeting will be open to public attendance. The agenda for the subject meeting shall be as follows: Tuesday, December 2, 2014—1:00 p.m.– 5:00 p.m. The Subcommittee will review Draft Regulatory Guide DG–1309, ‘‘Guidelines for Evaluating the Effects of Light-Water Reactor Coolant Environments in Fatigue Analyses of Metal Components.’’ The Subcommittee will gather information, analyze relevant issues and facts, and formulate proposed positions and actions, as appropriate, for deliberation by the Full Committee. Members of the public desiring to provide oral statements and/or written comments should notify the Designated Federal Official (DFO), Christopher Brown (Telephone 301–415–7111 or Email: Christopher.Brown@nrc.gov) five days prior to the meeting, if possible, so that appropriate arrangements can be made. Thirty-five hard copies of each presentation or handout should be provided to the DFO thirty minutes before the meeting. In addition, one electronic copy of each presentation should be emailed to the DFO one day before the meeting. If an electronic copy cannot be provided within this timeframe, presenters should provide the DFO with a CD containing each presentation at least thirty minutes before the meeting. Electronic recordings will be permitted only during those portions of the meeting that are open to the public. Detailed procedures for the conduct of and participation in ACRS meetings were published in the Federal Register on October 13, 2014 (79 FR 59307–59308). Detailed meeting agendas and meeting transcripts are available on the NRC Web site at https://www.nrc.gov/readingrm/doc-collections/acrs. Information regarding topics to be discussed, changes to the agenda, whether the meeting has been canceled or rescheduled, and the time allotted to present oral statements can be obtained from the Web site cited above or by contacting the identified DFO. PO 00000 Frm 00066 Fmt 4703 Sfmt 4703 70221 Moreover, in view of the possibility that the schedule for ACRS meetings may be adjusted by the Chairman as necessary to facilitate the conduct of the meeting, persons planning to attend should check with these references if such rescheduling would result in a major inconvenience. If attending this meeting, please enter through the One White Flint North building, 11555 Rockville Pike, Rockville, MD. After registering with security, please contact Mr. Theron Brown (Telephone 240–888–9835) to be escorted to the meeting room. Dated: November 19, 2014. Kathy D. Weaver, Acting Chief, Technical Support Branch, Advisory Committee on Reactor Safeguards. [FR Doc. 2014–27962 Filed 11–24–14; 8:45 am] BILLING CODE 7590–01–P NUCLEAR REGULATORY COMMISSION Advisory Committee on Reactor Safeguards; Notice of Meeting In accordance with the purposes of Sections 29 and 182b of the Atomic Energy Act (42 U.S.C. 2039, 2232b), the Advisory Committee on Reactor Safeguards (ACRS) will hold a meeting on December 4–6, 2014, 11545 Rockville Pike, Rockville, Maryland. Thursday, December 4, 2014, Conference Room T2–B1, 11545 Rockville Pike, Rockville, Maryland 8:30 a.m.–8:35 a.m.: Opening Remarks by the ACRS Chairman (Open)—The ACRS Chairman will make opening remarks regarding the conduct of the meeting. 8:35 a.m.–10:30 a.m.: Proposed Rule for Mitigation of Beyond-Design-Basis Events (Open/Closed)—The Committee will hear presentations by and hold discussions with representatives of the staff regarding the proposed rule for mitigation of beyond-design-basis events (Near Term Task Force Recommendations 4, 7, 8, 9.1, 9.2, and 9.3). [Note: A portion of this meeting may be closed to protect unclassified safeguards information pursuant to 5 U.S.C. 552b(c)(3)] 10:45 a.m.–12:15 p.m.: Integration of Mitigating Strategies for Beyond-DesignBasis External Events and the Reevaluation of Flooding Hazards (Open)—The Committee will hear presentations by and hold discussions with representatives of the staff regarding the integration of mitigating strategies for beyond-design-basis external events and the reevaluation of flooding hazards. E:\FR\FM\25NON1.SGM 25NON1

Agencies

[Federal Register Volume 79, Number 227 (Tuesday, November 25, 2014)]
[Notices]
[Pages 70220-70221]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-27961]


-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION


Advisory Committee on Reactor Safeguards (ACRS), Meeting of the 
ACRS Subcommittee on Planning and Procedures; Notice of Meeting

    The ACRS Subcommittee on Planning and Procedures will hold a 
meeting on December 3, 2014, Room T-2B3, 11545 Rockville Pike, 
Rockville, Maryland.
    The meeting will be open to public attendance with the exception of 
a portion that may be closed pursuant to 5 U.S.C. 552b(c)(2) and (6) to 
discuss organizational and personnel matters that relate solely to the 
internal personnel rules and practices of the ACRS, and information the 
release of which would constitute a clearly unwarranted invasion of 
personal privacy.
    The agenda for the subject meeting shall be as follows:

[[Page 70221]]

Wednesday, December 3, 2014--12:00 p.m. until 1:00 p.m.

    The Subcommittee will discuss proposed ACRS activities and related 
matters. The Subcommittee will gather information, analyze relevant 
issues and facts, and formulate proposed positions and actions, as 
appropriate, for deliberation by the Full Committee.
    Members of the public desiring to provide oral statements and/or 
written comments should notify the Designated Federal Official (DFO), 
Quynh Nguyen (Telephone 301-415-5844 or Email: Quynh.Nguyen@nrc.gov) 
five days prior to the meeting, if possible, so that arrangements can 
be made. Thirty-five hard copies of each presentation or handout should 
be provided to the DFO thirty minutes before the meeting. In addition, 
one electronic copy of each presentation should be emailed to the DFO 
one day before the meeting. If an electronic copy cannot be provided 
within this timeframe, presenters should provide the DFO with a CD 
containing each presentation at least thirty minutes before the 
meeting. Electronic recordings will be permitted only during those 
portions of the meeting that are open to the public. Detailed 
procedures for the conduct of and participation in ACRS meetings were 
published in the Federal Register on October 14, 2014 (79 FR 59307-
59308).
    Information regarding changes to the agenda, whether the meeting 
has been canceled or rescheduled, and the time allotted to present oral 
statements can be obtained by contacting the identified DFO. Moreover, 
in view of the possibility that the schedule for ACRS meetings may be 
adjusted by the Chairman as necessary to facilitate the conduct of the 
meeting, persons planning to attend should check with the DFO if such 
rescheduling would result in a major inconvenience.
    If attending this meeting, please enter through the One White Flint 
North building, 11555 Rockville Pike, Rockville, MD. After registering 
with security, please contact Mr. Theron Brown (240-888-9835) to be 
escorted to the meeting room.

    Dated: November 19, 2014.
Kathy D. Weaver,
Acting Chief, Technical Support Branch, Advisory Committee on Reactor 
Safeguards.
[FR Doc. 2014-27961 Filed 11-24-14; 8:45 am]
BILLING CODE 7590-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.