Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals., 69977-69980 [2014-27804]
Download as PDF
Federal Register / Vol. 79, No. 226 / Monday, November 24, 2014 / Notices
Written comments should be
submitted by December 24, 2014.
ADDRESSES: Interested persons are
invited to submit written comments on
the proposed information collection to
the Office of Information and Regulatory
Affairs, Office of Management and
Budget. Comments should be addressed
to the attention of the Desk Officer,
Department of Transportation/FAA, and
sent via electronic mail to oira_
submission@omb.eop.gov, or faxed to
(202) 395–6974, or mailed to the Office
of Information and Regulatory Affairs,
Office of Management and Budget,
Docket Library, Room 10102, 725 17th
Street NW., Washington, DC 20503.
Public Comments Invited: You are
asked to comment on any aspect of this
information collection, including (a)
Whether the proposed collection of
information is necessary for FAA’s
performance; (b) the accuracy of the
estimated burden; (c) ways for FAA to
enhance the quality, utility and clarity
of the information collection; and (d)
ways that the burden could be
minimized without reducing the quality
of the collected information. The agency
will summarize and/or include your
comments in the request for OMB’s
clearance of this information collection.
FOR FURTHER INFORMATION CONTACT:
Kathy DePaepe at (405) 954–9362, or by
email at: Kathy.DePaepe@faa.gov.
SUPPLEMENTARY INFORMATION:
OMB Control Number: 2120–0005.
Title: General Operating and Flight
Rules.
Form Numbers: There are no FAA
forms associated with this collection.
Type of Review: Renewal of an
information collection.
Background: The Federal Register
Notice with a 60-day comment period
soliciting comments on this collection
of information was published on
September 3, 2014 (79 FR 52404). The
requirements of 14 CFR part 91, General
Operating and Flight Rules, are
authorized by Part A of Subtitle VII of
the Revised Title 49 United States Code.
14 CFR part 91 prescribes rules
governing the operation of aircraft (other
than moored balloons, kites, rockets and
unmanned free balloons) within the
United States. The reporting and
recordkeeping requirements prescribed
by various sections of 14 CFR part 91
are necessary for FAA to assure
compliance with these provisions.
Respondents: Approximately 21,200
airmen, state or local governments, and
businesses.
Frequency: Information is collected
on occasion.
Estimated Average Burden per
Response: 34 minutes.
asabaliauskas on DSK5VPTVN1PROD with NOTICES
DATES:
VerDate Sep<11>2014
20:32 Nov 21, 2014
Jkt 235001
Estimated Total Annual Burden:
241,949 hours.
Issued in Washington, DC, on November
18, 2014.
Yvette Landers,
Manager, IT Strategy, Policy, & Business
Planning Division, ASP–100.
[FR Doc. 2014–27797 Filed 11–21–14; 8:45 am]
BILLING CODE 4910–13–P
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
Notice of Passenger Facility Charge
(PFC) Approvals and Disapprovals.
Federal Aviation
Administration (FAA), DOT.
ACTION: Monthly Notice of PFC
Approvals and Disapprovals. In July
2014, there were seven applications
approved. Additionally, 12 approved
amendments to previously approved
applications are listed.
AGENCY:
The FAA publishes a monthly
notice, as appropriate, of PFC approvals
and disapprovals under the provisions
of the Aviation Safety and Capacity
Expansion Act of 1990 (Title IX of the
Omnibus Budget Reconciliation Act of
1990) (Pub. L. 101–508) and Part 158 of
the Federal Aviation Regulations (14
CFR part 158). This notice is published
pursuant to paragraph d of § 158.29.
SUMMARY:
PFC Applications Approved
PUBLIC AGENCY: Greater Orlando
Aviation Authority, Orlando, Florida.
APPLICATION NUMBER: 14–17–C–
00–MCO.
APPLICATION TYPE: Impose and use
a PFC.
PFC LEVEL: $3.00.
TOTAL PFC REVENUE APPROVED
IN THIS DECISION: $396,491,622.
EARLIEST CHARGE EFFECTIVE
DATE: July 1, 2034.
ESTIMATED CHARGE EXPIRATION
DATE: August 1, 2038.
CLASS OF AIR CARRIERS NOT
REQUIRED TO COLLECT PFC’S: None.
BRIEF DESCRIPTION OF PROJECTS
PARTIALLY APPROVED FOR
COLLECTION AND USE: South airport
automated people mover system,
stations, and associated facilities—
design and construction.
Determination: Partially approved.
The south airport station is planned to
be a multi-modal facility however PFC
eligibility is limited to that work that is
exclusively for airport use. The
approved amount was decreased from
that requested due to portions of the
project not being for exclusive airport
use. In addition, other components of
PO 00000
Frm 00156
Fmt 4703
Sfmt 4703
69977
the project, including but not limited to
roadway lighting and concession space,
were determined to be ineligible for PFC
funding.
South airport automated people
mover systems—roadways, curbs, and
infrastructure—design and construction.
Determination: Partially approved.
The FAA determined that three of the
four roadway segments requested in the
project were ineligible for PFC funding.
South airport automated people
mover ticketing baggage check-in
facility—design and construction.
Determination: Partially approved.
The FAA determined that certain
elements, including but not limited to
concession space and nonaeronautical
areas, were not PFC eligible.
DECISION DATE: July 11, 2014.
For Further Information Contact:
Marisol Elliott, Orlando Airports
District Office, (407) 812–6331.
PUBLIC AGENCY: New Hanover
County Airport Authority, Wilmington,
North Carolina.
APPLICATION NUMBER: 14–06–C–
00–ILM.
APPLICATION TYPE: Impose and use
a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED
IN THIS DECISION: $7,947,596.
EARLIEST CHARGE EFFECTIVE
DATE: October 1, 2019.
ESTIMATED CHARGE EXPIRATION
DATE: August 1, 2024.
CLASS OF AIR CARRIERS NOT
REQUIRED TO COLLECT PFC’S: Air
taxi/commercial operators filing FAA
Form 1800–31 and operating at
Wilmington International Airport (ILM).
DETERMINATION: Approved. Based
on information contained in the public
agency’s application, the FAA has
determined that the proposed class
accounts for less than 1 percent of the
total annual enplanements at ILM.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AND
USE:
Passenger loading bridge acquisition
Gate 5.
Rehabilitate air carrier apron.
Terminal heating, ventilation, and air
conditioning upgrade.
Storm water phase II.
International customs ramp
rehabilitation.
Drainage pipe rehabilitation.
Aircraft rescue and firefighting
truck—1,500 gallon.
Light emitting diode signs.
Runway 24 pipe ditches—design and
permitting.
Taxiways A, D, H and F
rehabilitation.
Taxiways B, C, and J shoulders and
tapers rehabilitation.
E:\FR\FM\24NON1.SGM
24NON1
asabaliauskas on DSK5VPTVN1PROD with NOTICES
69978
Federal Register / Vol. 79, No. 226 / Monday, November 24, 2014 / Notices
Passenger loading bridge
acquisition—Gate 7.
Passenger loading bridge retrofit—
Gate 8.
Security checkpoint rehabilitation.
Light emitting diode taxiway lighting.
Runway 17 extension.
Kerr Avenue security fencing.
Runway 17/35 rehabilitation.
Land acquisition—runway 17
approach.
Master plan update.
Airfield lighting vault upgrade.
Security vehicle.
Digital safety sign.
Passenger loading bridge safety
upgrades.
PFC application development.
PFC program administration.
Passenger loading bridge Gate 1.
Access control and closed circuit
television replacement and
enhancements.
Terminal complex rehabilitation.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION:
Runway 24 pipe ditches—
construction.
Security fence replacement.
Safety boat ramp.
BRIEF DESCRIPTION OF
WITHDRAWN PROJECTS:
Air stair truck.
Triturator.
Date of withdrawal: July 9, 2014.
DECISION DATE: July 11, 2014.
For Further Information Contact:
Tommy DuPree, Memphis Airports
District Office, (901) 322–8185.
PUBLIC AGENCY: Aerostar Airport
Holdings LLC, San Juan, Puerto Rico.
APPLICATION NUMBER: 14–07–C–
00–SJU.
APPLICATION TYPE: Impose and use
a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED
IN THIS DECISION: $156,436,007.
EARLIEST CHARGE EFFECTIVE
DATE: May 1, 2020.
ESTIMATED CHARGE EXPIRATION
DATE: September 1, 2027.
CLASSES OF AIR CARRIERS NOT
REQUIRED TO COLLECT PFC’S:
(1) Air taxi/commercial operators
filing FAA Form 1800–31 and operating
at Luis Munoz Marin International
Airport (SJU); and
(2) certificated route air carriers filing
DOT Form T–100 that operate on a nonscheduled basis at SJU and enplane less
than 750 annual passengers.
DETERMINATION: Approved. Based
on information contained in the public
agency’s application, the FAA has
determined that each of the proposed
classes accounts for less than 1 percent
of the total annual enplanements at SJU.
VerDate Sep<11>2014
20:32 Nov 21, 2014
Jkt 235001
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AND
USE AT A $4.50 PFC LEVEL:
Airport perimeter security system.
Airfield signage improvements.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AND
USE AT A $3.00 PFC LEVEL:
Environmental assessment for runway
8/26 runway object free area and
drainage system rehabilitation.
PFC application development.
Airport master plan update.
BRIEF DESCRIPTION OF PROJECTS
PARTIALLY APPROVED FOR
COLLECTION AND USE AT A $4.50
PFC LEVEL:
Terminal capacity enhancement
program.
DETERMINATION: Partially
approved. The FAA determined that
several proposed components were not
eligible for PFC funding, including:
Design and construction contingencies;
Transportation Security Administration
break room and office space; explosive
detection system machines; concessions
and airline ticket office relocations;
tenant build-out and finishes; and a prorated amount of the building
mechanical systems.
Replacement aircraft rescue and
firefighting trucks and equipment.
DETERMINATION: Partially
approved. The public agency requested
replacement of two 1,500-gallon
vehicles with two 3,000-gallon vehicles
however the FAA determined that the
airport only qualified for replacement of
a single 1,500-gallon vehicle.
Runway 8/26 overlay.
DETERMINATION: The FAA
determined that the contingency and
escalation costs included in the project
cost estimate were not PFC eligible.
Taxiway N reconstruction.
DETERMINATION: The FAA
determined that the contingency and
escalation costs included in the project
cost estimate were not PFC eligible.
Taxiway S reconstruction.
DETERMINATION: The FAA
determined that a portion of the project
was completed before control of the
airport was transferred to Aerostar
Airport Holdings LLC and, therefore,
Aerostar is not entitled to
reimbursement for costs incurred prior
to the transfer.
BRIEF DESCRIPTION OF PROJECT
PARTIALLY APPROVED FOR
COLLECTION AND USE AT A $3.00
PFC LEVEL:
Wildlife management equipment.
DETERMINATION: Partially
approved. The FAA determined that the
two operations vehicles were not
eligible for PFC funding.
BRIEF DESCRIPTION OF
WITHDRAWN PROJECTS:
PO 00000
Frm 00157
Fmt 4703
Sfmt 4703
Aircraft rescue and firefighting access
road and demolition of building No. 29.
Taxiway M widening and vehicle
service road—phase I design.
DATE OF WITHDRAWAL: March 28,
2014.
DECISION DATE: July 11, 2014.
For Further Information Contact:
Parks Preston, Atlanta Airports District
Office, (404) 305–7149.
PUBLIC AGENCY: Metropolitan
Washington Airports Authority,
Washington, District of Columbia.
APPLICATION NUMBER: 14–09–C–
00–DCA.
APPLICATION TYPE: Impose and use
a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED
IN THIS DECISION: $425,514,274.
EARLIEST CHARGE EFFECTIVE
DATE: March 1, 2015.
ESTIMATED CHARGE EXPIRATION
DATE: February 1, 2023.
CLASS OF AIR CARRIERS NOT
REQUIRED TO COLLECT PFC’S: Air
taxi/commercial operators filing FAA
Form 1800–31.
DETERMINATION: Approved. Based
on information contained in the public
agency’s application, the FAA has
determined that the proposed class
accounts for less than 1 percent of the
total annual enplanements at Ronald
Reagan Washington National Airport
(DCA).
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AT DCA
AND USE AT DCA AT A $4.50 PFC
LEVEL:
Runway 1/19 runway safety area
improvements.
Runway 1/19 overlay.
Runway 15/33 overlay.
Runway 4/22 overlay.
Runway 15/33 runway safety area
improvements.
Runway 4/22 runway safety area
improvements.
Taxiways B, K and P resurfacing.
River rescue north boat house.
Aircraft rescue and firefighting
building.
BRIEF DESCRIPTION OF PROJECT
APPROVED FOR COLLECTION AT DCA
AND USE AT DCA AT A $3.00 PFC
LEVEL: New apron at demolished
aircraft rescue and firefighting site.
BRIEF DESCRIPTION OF PROJECT
APPROVED FOR COLLECTION AT DCA
AND USE AT WAHINGTON DULLES
INTERNATIONAL AIRPORT (IAD) AT
A $3.00 PFC LEVEL: IAD metrorail
station.
DECISION DATE: July 11, 2014.
For Further Information Contact:
Jeffrey Breeden, Washington Airports
District Office, (703) 661–1363.
E:\FR\FM\24NON1.SGM
24NON1
Federal Register / Vol. 79, No. 226 / Monday, November 24, 2014 / Notices
PUBLIC AGENCY: Cheyenne Airport
Board, Cheyenne, Wyoming.
APPLICATION NUMBER: 14–03–C–
00–CYS.
APPLICATION TYPE: Impose and use
a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED
IN THIS DECISION: $439,896.
EARLIEST CHARGE EFFECTIVE
DATE: September 1, 2014.
ESTIMATED CHARGE EXPIRATION
DATE: September 1, 2024.
CLASS OF AIR CARRIERS NOT
REQUIRED TO COLLECT PFC’S: None.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AND
USE:
Rehabilitate taxiway A1.
Rehabilitate apron.
Construct apron.
Conduct wildlife hazard management
study.
Rehabilitate runway 13/31.
Safety management system program.
Update airport master plan study.
Conduct environmental assessment
for new terminal building.
Rehabilitate taxiways B, B2, A3, and
A.
Rehabilitate airfield pavement
markings.
New lighting control system.
Airport sustainability plan.
Acquire snow removal equipment—
snow plow and broom head.
Acquire snow removal equipment—
plow truck and broom.
PFC administration.
DECISION DATE: July 18, 2014.
For Further Information Contact: Jesse
Lyman, Denver Airports District Office,
(303) 342–1262.
PUBLIC AGENCY: South Jersey
Transportation Authority, Egg Harbor
Township, New Jersey.
APPLICATION NUMBER: 14–08–C–
00–ACY.
APPLICATION TYPE: Impose and use
a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED
IN THIS DECISION: $27,459,848.
EARLIEST CHARGE EFFECTIVE
DATE: September 1, 2014.
ESTIMATED CHARGE EXPIRATION
DATE: March 1, 2025.
CLASS OF AIR CARRIERS NOT
REQUIRED TO COLLECT PFC’S: Air
taxi/commercial operators—nonscheduled/on-demand air carriers filing
FAA Form 1800–31.
DETERMINATION: Approved. Based
on information contained in the public
agency’s application, the FAA has
determined that the proposed class
accounts for less than 1 percent of the
total annual enplanements at Atlantic
City International Airport.
BRIEF DESCRIPTION OF PROJECT
APPROVED FOR COLLECTION AND
USE:
Terminal expansion and Federal
Inspection Services.
Environmental mitigation—phase VII.
Construct aircraft rescue and
firefighting building.
Acquire aircraft rescue and
firefighting vehicles.
Rehabilitate terminal apron—phase II.
Environmental and design for
perimeter fence.
Rehabilitate taxiway D.
Construct deicing containment
facility—design.
DECISION DATE: July 23, 2014.
For Further Information Contact: Lori
Ledebohm, Harrisburg Airports District
Office, (717) 730–2835.
Public Agency: Board of Trustees—
University of Illinois, Savoy, Illinois.
APPLICATION NUMBER: 14–05–C–
00–CMI.
69979
APPLICATION TYPE: Impose and use
a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED
IN THIS DECISION: $1,662,600.
EARLIEST CHARGE EFFECTIVE
DATE: September 1, 2014.
ESTIMATED CHARGE EXPIRATION
DATE: June 1, 2019.
CLASS OF AIR CARRIERS NOT
REQUIRED TO COLLECT PFC’S: Nonscheduled/on-demand air carriers filing
FAA Form 1800–31 and operating at
University of Illinois—Willard Airport
(CMI).
DETERMINATION: Approved. Based
on information contained in the public
agency’s application, the FAA has
determined that the proposed class
accounts for less than 1 percent of the
total annual enplanements at CMI.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AND
USE:
Re-alignment of taxiway C.
Improve taxiway A/B geometry and
widen taxiway A (reimbursement).
Snow removal equipment—salt
spreader.
Snow removal equipment—small
snow broom.
Rehabilitate general aviation apron.
Rehabilitate general aviation
taxiways.
Snow removal equipment—18-foot
snow broom.
Snow removal equipment—snow
blower.
Prepare PFC application.
DECISION DATE: July 24, 2014.
For Further Information Contact:
Michael Brown, Chicago Airports
District Office, (847) 294–7195.
AMENDMENTS TO PFC APPROVALS
asabaliauskas on DSK5VPTVN1PROD with NOTICES
Amendments No.
city, state
Amendment
approved date
95–02–C–05–BUF Buffalo, NY ............................................
07–06–C–03–BUF Buffalo, NY ............................................
09–07–C–02–BUF Buffalo, NY ............................................
10–08–C–01–BUF Buffalo, NY ............................................
11–09–C–01–BUF Buffalo, NY ............................................
04–06–C–01–ATL Atlanta, GA ............................................
06–08–C–03–ATL Atlanta, GA ............................................
10–08–C–01–ATL Atlanta, GA ............................................
11–04–C–01–RDD Redding, CA .........................................
08–04–C–01–ELP El Paso, TX ...........................................
03–02–C–04–LGB Long Beach, CA ....................................
10–05–C–01–LGB Long Beach, CA ....................................
VerDate Sep<11>2014
20:32 Nov 21, 2014
Jkt 235001
PO 00000
Frm 00158
07/10/14
07/10/14
07/10/14
07/10/14
07/10/14
07/11/14
07/11/14
07/11/14
07/18/14
07/22/14
07/25/14
07/25/14
Fmt 4703
Original
approved net
PFC revenue
$2,528,721
77,745,807
14,262,010
1,844,274
1,702,533
18,462,000
227,606,163
25,166,712
553,103
10,098,221
62,344,903
10,845,000
Sfmt 4703
Amended
approved net
PFC revenue
$2,626,057
78,223,520
14,263,552
1,849,371
1,983,013
22,550,861
168,388,941
30,758,063
664,592
8,622,031
62,344,903
11,695,000
E:\FR\FM\24NON1.SGM
24NON1
Original
estimated
charge exp.
date
06/01/05
11/01/12
03/01/14
06/01/14
08/01/14
09/01/18
01/01/20
06/01/20
09/01/14
06/01/09
10/01/14
07/01/30
Amended
estimated
charge exp.
date
06/01/05
11/01/12
03/01/14
06/01/14
09/01/14
09/01/18
10/01/19
02/01/20
02/01/18
06/01/09
02/01/15
06/01/32
69980
Federal Register / Vol. 79, No. 226 / Monday, November 24, 2014 / Notices
Issued in Washington, DC, on November
17, 2014.
Joe Hebert,
Manager, Financial Analysis and Passenger
Facility Charge Branch.
[FR Doc. 2014–27804 Filed 11–21–14; 8:45 am]
BILLING CODE 4910–13–P
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
Notice of Passenger Facility Charge
(PFC) Approvals and Disapprovals
Federal Aviation
Administration (FAA), DOT.
ACTION: Monthly Notice of PFC
Approvals and Disapprovals. In August
2014, there were five applications
approved. Additionally, 12 approved
amendments to previously approved
applications are listed.
AGENCY:
The FAA publishes a monthly
notice, as appropriate, of PFC approvals
and disapprovals under the provisions
of the Aviation Safety and Capacity
Expansion Act of 1990 (Title IX of the
Omnibus Budget Reconciliation Act of
1990) (Pub. L. 101–508) and Part 158 of
the Federal Aviation Regulations (14
CFR part 158). This notice is published
pursuant to paragraph d of § 158.29.
asabaliauskas on DSK5VPTVN1PROD with NOTICES
SUMMARY:
PFC Applications Approved
PUBLIC AGENCY: Massachusetts Port
Authority, Boston, Massachusetts.
APPLICATION NUMBER: 13–08–C–
00–BOS.
APPLICATION TYPE: Impose and use
a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED
IN THIS DECISION: $99,959,096.
EARLIEST CHARGE EFFECTIVE
DATE: December 1, 2023.
ESTIMATED CHARGE EXPIRATION
DATE: May 1, 2025.
CLASS OF AIR CARRIERS NOT
REQUIRED TO COLLECT PFC’S: Nonscheduled/on-demand air carriers.
DETERMINATION: Approved. Based
on information contained in the public
agency’s application, the FAA has
determined that the proposed class
accounts for less than 1 percent of the
total annual enplanements at Boston
Logan International Airport.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AND
USE AT A $4.50 PFC LEVEL:
Runway protection zone land
acquisition.
Renovations and improvements to
terminal B.
Light pier and CAT III.
Terminal B apron improvement.
BRIEF DESCRIPTION OF PROJECT
APPROVED FOR COLLECTION AND
VerDate Sep<11>2014
20:32 Nov 21, 2014
Jkt 235001
USE AT A $3.00 PFC LEVEL: Terminal
B gate electrification equipment.
DECISION DATE: August 13, 2014.
For Further Information Contact:
Priscilla Scott, New England Region
Airports Division, (781) 238–7614.
PUBLIC AGENCY: City of Lebanon,
New Hampshire.
APPLICATION NUMBER: 14–08–C–
00–LEB.
APPLICATION TYPE: Impose and use
a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED
IN THIS DECISION: $167,203.
EARLIEST CHARGE EFFECTIVE
DATE: October 1, 2014.
ESTIMATED CHARGE EXPIRATION
DATE: June 1, 2018.
CLASS OF AIR CARRIERS NOT
REQUIRED TO COLLECT PFC’S: Air
taxi/commercial operators.
DETERMINATION: Approved. Based
on information contained in the public
agency’s application, the FAA has
determined that the proposed class
accounts for less than 1 percent of the
total annual enplanements at Lebanon
Municipal Airport.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AND
USE AT A $4.50 PFC LEVEL:
Update master plan study.
Analyze and rehabilitate (design only)
obstruction lights, runway 36.
Crack sealing airfield pavement
surfaces.
Obstruction removal and replace with
hazard beacons.
Design only—construct addition to
snow removal equipment building.
Environmental assessment, permitting
and mitigation for obstruction removal.
Replace terminal building boiler and
rooftop air conditioning units.
DECISION DATE: August 13, 2014.
For Further Information Contact:
Priscilla Scott, New England Region
Airports Division, (781) 238–7614.
PUBLIC AGENCY: City of Wichita
Falls, Texas.
APPLICATION NUMBER: 14–02–C–
00–SPS.
APPLICATION TYPE: Impose and use
a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED
IN THIS DECISION: $7,961,241.
EARLIEST CHARGE EFFECTIVE
DATE: December 1, 2017.
ESTIMATED CHARGE EXPIRATION
DATE: August 1, 2058.
CLASS OF AIR CARRIERS NOT
REQUIRED TO COLLECT PFC’S: None.
BRIEF DESCRIPTION OF PROJECT
PARTIALLY APPROVED FOR
COLLECTION AND USE AT A $4.50
PFC LEVEL: New passenger terminal
building.
PO 00000
Frm 00159
Fmt 4703
Sfmt 4703
DETERMINATION: Partially
approved. The FAA determined that one
component, rental car parking lot, was
not PFC eligible in accordance with
§ 158.15(b)(1).
DECISION DATE: August 15, 2014.
For Further Information Contact:
Anthony Mekhail, Texas Airports
Development Office, (817) 222–5663.
PUBLIC AGENCY: Pitt County—City
of Greenville Airport Authority,
Greenville, North Carolina.
APPLICATION NUMBER: 14–06–U–
00–PGV.
APPLICATION TYPE: Use PFC
revenue.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED
FOR USE IN THIS DECISION: $514,283.
CHARGE EFFECTIVE DATE: October
1, 2011.
ESTIMATED CHARGE EXPIRATION
DATE: October 1, 2014.
CLASS OF AIR CARRIERS NOT
REQUIRED TO COLLECT PFC’S: No
change from previous decision.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR USE AT A $4.50 PFC
LEVEL:
Land acquisition, runway 20
approach, professional services.
Runway 2/20 runway safety area
extension (design and construction).
Land acquisition, runway 20
extension (Lewis parcels).
Land acquisition, runway 20 runway
safety area and runway extension.
DECISION DATE: August 20, 2014.
For Further Information Contact:
Tommy DuPree, Memphis Airports
District Office, (901) 322–8185.
PUBLIC AGENCY: Pitt County—City
of Greenville Airport Authority,
Greenville, North Carolina.
APPLICATION NUMBER: 14–07–C–
00–PGV.
APPLICATION TYPE: Impose and use
a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED
IN THIS DECISION: $717,610.
EARLIEST CHARGE EFFECTIVE
DATE: October 1, 2014.
ESTIMATED CHARGE EXPIRATION
DATE: January 1, 2016.
CLASS OF AIR CARRIERS NOT
REQUIRED TO COLLECT PFC’S: Air
taxi/commercial operators filing FAA
Form 1800–31 and operating at PittGreenville Airport (PGV).
DETERMINATION: Approved. Based
on information contained in the public
agency’s application, the FAA has
determined that the proposed class
accounts for less than 1 percent of the
total annual enplanements at PGV.
BRIEF DESCRIPTION OF PROJECTS
APPROVED FOR COLLECTION AND
USE AT A $4.50 PFC LEVEL:
E:\FR\FM\24NON1.SGM
24NON1
Agencies
[Federal Register Volume 79, Number 226 (Monday, November 24, 2014)]
[Notices]
[Pages 69977-69980]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-27804]
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
Notice of Passenger Facility Charge (PFC) Approvals and
Disapprovals.
AGENCY: Federal Aviation Administration (FAA), DOT.
ACTION: Monthly Notice of PFC Approvals and Disapprovals. In July 2014,
there were seven applications approved. Additionally, 12 approved
amendments to previously approved applications are listed.
-----------------------------------------------------------------------
SUMMARY: The FAA publishes a monthly notice, as appropriate, of PFC
approvals and disapprovals under the provisions of the Aviation Safety
and Capacity Expansion Act of 1990 (Title IX of the Omnibus Budget
Reconciliation Act of 1990) (Pub. L. 101-508) and Part 158 of the
Federal Aviation Regulations (14 CFR part 158). This notice is
published pursuant to paragraph d of Sec. 158.29.
PFC Applications Approved
PUBLIC AGENCY: Greater Orlando Aviation Authority, Orlando,
Florida.
APPLICATION NUMBER: 14-17-C-00-MCO.
APPLICATION TYPE: Impose and use a PFC.
PFC LEVEL: $3.00.
TOTAL PFC REVENUE APPROVED IN THIS DECISION: $396,491,622.
EARLIEST CHARGE EFFECTIVE DATE: July 1, 2034.
ESTIMATED CHARGE EXPIRATION DATE: August 1, 2038.
CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S: None.
BRIEF DESCRIPTION OF PROJECTS PARTIALLY APPROVED FOR COLLECTION AND
USE: South airport automated people mover system, stations, and
associated facilities--design and construction.
Determination: Partially approved. The south airport station is
planned to be a multi-modal facility however PFC eligibility is limited
to that work that is exclusively for airport use. The approved amount
was decreased from that requested due to portions of the project not
being for exclusive airport use. In addition, other components of the
project, including but not limited to roadway lighting and concession
space, were determined to be ineligible for PFC funding.
South airport automated people mover systems--roadways, curbs, and
infrastructure--design and construction.
Determination: Partially approved. The FAA determined that three of
the four roadway segments requested in the project were ineligible for
PFC funding.
South airport automated people mover ticketing baggage check-in
facility--design and construction.
Determination: Partially approved. The FAA determined that certain
elements, including but not limited to concession space and
nonaeronautical areas, were not PFC eligible.
DECISION DATE: July 11, 2014.
For Further Information Contact: Marisol Elliott, Orlando Airports
District Office, (407) 812-6331.
PUBLIC AGENCY: New Hanover County Airport Authority, Wilmington,
North Carolina.
APPLICATION NUMBER: 14-06-C-00-ILM.
APPLICATION TYPE: Impose and use a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED IN THIS DECISION: $7,947,596.
EARLIEST CHARGE EFFECTIVE DATE: October 1, 2019.
ESTIMATED CHARGE EXPIRATION DATE: August 1, 2024.
CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S: Air taxi/
commercial operators filing FAA Form 1800-31 and operating at
Wilmington International Airport (ILM).
DETERMINATION: Approved. Based on information contained in the
public agency's application, the FAA has determined that the proposed
class accounts for less than 1 percent of the total annual enplanements
at ILM.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AND USE:
Passenger loading bridge acquisition Gate 5.
Rehabilitate air carrier apron.
Terminal heating, ventilation, and air conditioning upgrade.
Storm water phase II.
International customs ramp rehabilitation.
Drainage pipe rehabilitation.
Aircraft rescue and firefighting truck--1,500 gallon.
Light emitting diode signs.
Runway 24 pipe ditches--design and permitting.
Taxiways A, D, H and F rehabilitation.
Taxiways B, C, and J shoulders and tapers rehabilitation.
[[Page 69978]]
Passenger loading bridge acquisition--Gate 7.
Passenger loading bridge retrofit--Gate 8.
Security checkpoint rehabilitation.
Light emitting diode taxiway lighting.
Runway 17 extension.
Kerr Avenue security fencing.
Runway 17/35 rehabilitation.
Land acquisition--runway 17 approach.
Master plan update.
Airfield lighting vault upgrade.
Security vehicle.
Digital safety sign.
Passenger loading bridge safety upgrades.
PFC application development.
PFC program administration.
Passenger loading bridge Gate 1.
Access control and closed circuit television replacement and
enhancements.
Terminal complex rehabilitation.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION:
Runway 24 pipe ditches--construction.
Security fence replacement.
Safety boat ramp.
BRIEF DESCRIPTION OF WITHDRAWN PROJECTS:
Air stair truck.
Triturator.
Date of withdrawal: July 9, 2014.
DECISION DATE: July 11, 2014.
For Further Information Contact: Tommy DuPree, Memphis Airports
District Office, (901) 322-8185.
PUBLIC AGENCY: Aerostar Airport Holdings LLC, San Juan, Puerto
Rico.
APPLICATION NUMBER: 14-07-C-00-SJU.
APPLICATION TYPE: Impose and use a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED IN THIS DECISION: $156,436,007.
EARLIEST CHARGE EFFECTIVE DATE: May 1, 2020.
ESTIMATED CHARGE EXPIRATION DATE: September 1, 2027.
CLASSES OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S:
(1) Air taxi/commercial operators filing FAA Form 1800-31 and
operating at Luis Munoz Marin International Airport (SJU); and
(2) certificated route air carriers filing DOT Form T-100 that
operate on a non-scheduled basis at SJU and enplane less than 750
annual passengers.
DETERMINATION: Approved. Based on information contained in the
public agency's application, the FAA has determined that each of the
proposed classes accounts for less than 1 percent of the total annual
enplanements at SJU.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AND USE AT A
$4.50 PFC LEVEL:
Airport perimeter security system.
Airfield signage improvements.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AND USE AT A
$3.00 PFC LEVEL:
Environmental assessment for runway 8/26 runway object free area
and drainage system rehabilitation.
PFC application development.
Airport master plan update.
BRIEF DESCRIPTION OF PROJECTS PARTIALLY APPROVED FOR COLLECTION AND
USE AT A $4.50 PFC LEVEL:
Terminal capacity enhancement program.
DETERMINATION: Partially approved. The FAA determined that several
proposed components were not eligible for PFC funding, including:
Design and construction contingencies; Transportation Security
Administration break room and office space; explosive detection system
machines; concessions and airline ticket office relocations; tenant
build-out and finishes; and a pro-rated amount of the building
mechanical systems.
Replacement aircraft rescue and firefighting trucks and equipment.
DETERMINATION: Partially approved. The public agency requested
replacement of two 1,500-gallon vehicles with two 3,000-gallon vehicles
however the FAA determined that the airport only qualified for
replacement of a single 1,500-gallon vehicle.
Runway 8/26 overlay.
DETERMINATION: The FAA determined that the contingency and
escalation costs included in the project cost estimate were not PFC
eligible.
Taxiway N reconstruction.
DETERMINATION: The FAA determined that the contingency and
escalation costs included in the project cost estimate were not PFC
eligible.
Taxiway S reconstruction.
DETERMINATION: The FAA determined that a portion of the project was
completed before control of the airport was transferred to Aerostar
Airport Holdings LLC and, therefore, Aerostar is not entitled to
reimbursement for costs incurred prior to the transfer.
BRIEF DESCRIPTION OF PROJECT PARTIALLY APPROVED FOR COLLECTION AND
USE AT A $3.00 PFC LEVEL:
Wildlife management equipment.
DETERMINATION: Partially approved. The FAA determined that the two
operations vehicles were not eligible for PFC funding.
BRIEF DESCRIPTION OF WITHDRAWN PROJECTS:
Aircraft rescue and firefighting access road and demolition of
building No. 29.
Taxiway M widening and vehicle service road--phase I design.
DATE OF WITHDRAWAL: March 28, 2014.
DECISION DATE: July 11, 2014.
For Further Information Contact: Parks Preston, Atlanta Airports
District Office, (404) 305-7149.
PUBLIC AGENCY: Metropolitan Washington Airports Authority,
Washington, District of Columbia.
APPLICATION NUMBER: 14-09-C-00-DCA.
APPLICATION TYPE: Impose and use a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED IN THIS DECISION: $425,514,274.
EARLIEST CHARGE EFFECTIVE DATE: March 1, 2015.
ESTIMATED CHARGE EXPIRATION DATE: February 1, 2023.
CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S: Air taxi/
commercial operators filing FAA Form 1800-31.
DETERMINATION: Approved. Based on information contained in the
public agency's application, the FAA has determined that the proposed
class accounts for less than 1 percent of the total annual enplanements
at Ronald Reagan Washington National Airport (DCA).
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AT DCA AND
USE AT DCA AT A $4.50 PFC LEVEL:
Runway 1/19 runway safety area improvements.
Runway 1/19 overlay.
Runway 15/33 overlay.
Runway 4/22 overlay.
Runway 15/33 runway safety area improvements.
Runway 4/22 runway safety area improvements.
Taxiways B, K and P resurfacing.
River rescue north boat house.
Aircraft rescue and firefighting building.
BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT DCA AND USE
AT DCA AT A $3.00 PFC LEVEL: New apron at demolished aircraft rescue
and firefighting site.
BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AT DCA AND USE
AT WAHINGTON DULLES INTERNATIONAL AIRPORT (IAD) AT A $3.00 PFC LEVEL:
IAD metrorail station.
DECISION DATE: July 11, 2014.
For Further Information Contact: Jeffrey Breeden, Washington
Airports District Office, (703) 661-1363.
[[Page 69979]]
PUBLIC AGENCY: Cheyenne Airport Board, Cheyenne, Wyoming.
APPLICATION NUMBER: 14-03-C-00-CYS.
APPLICATION TYPE: Impose and use a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED IN THIS DECISION: $439,896.
EARLIEST CHARGE EFFECTIVE DATE: September 1, 2014.
ESTIMATED CHARGE EXPIRATION DATE: September 1, 2024.
CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S: None.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AND USE:
Rehabilitate taxiway A1.
Rehabilitate apron.
Construct apron.
Conduct wildlife hazard management study.
Rehabilitate runway 13/31.
Safety management system program.
Update airport master plan study.
Conduct environmental assessment for new terminal building.
Rehabilitate taxiways B, B2, A3, and A.
Rehabilitate airfield pavement markings.
New lighting control system.
Airport sustainability plan.
Acquire snow removal equipment--snow plow and broom head.
Acquire snow removal equipment--plow truck and broom.
PFC administration.
DECISION DATE: July 18, 2014.
For Further Information Contact: Jesse Lyman, Denver Airports
District Office, (303) 342-1262.
PUBLIC AGENCY: South Jersey Transportation Authority, Egg Harbor
Township, New Jersey.
APPLICATION NUMBER: 14-08-C-00-ACY.
APPLICATION TYPE: Impose and use a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED IN THIS DECISION: $27,459,848.
EARLIEST CHARGE EFFECTIVE DATE: September 1, 2014.
ESTIMATED CHARGE EXPIRATION DATE: March 1, 2025.
CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S: Air taxi/
commercial operators--non-scheduled/on-demand air carriers filing FAA
Form 1800-31.
DETERMINATION: Approved. Based on information contained in the
public agency's application, the FAA has determined that the proposed
class accounts for less than 1 percent of the total annual enplanements
at Atlantic City International Airport.
BRIEF DESCRIPTION OF PROJECT APPROVED FOR COLLECTION AND USE:
Terminal expansion and Federal Inspection Services.
Environmental mitigation--phase VII.
Construct aircraft rescue and firefighting building.
Acquire aircraft rescue and firefighting vehicles.
Rehabilitate terminal apron--phase II.
Environmental and design for perimeter fence.
Rehabilitate taxiway D.
Construct deicing containment facility--design.
DECISION DATE: July 23, 2014.
For Further Information Contact: Lori Ledebohm, Harrisburg Airports
District Office, (717) 730-2835.
Public Agency: Board of Trustees--University of Illinois, Savoy,
Illinois.
APPLICATION NUMBER: 14-05-C-00-CMI.
APPLICATION TYPE: Impose and use a PFC.
PFC LEVEL: $4.50.
TOTAL PFC REVENUE APPROVED IN THIS DECISION: $1,662,600.
EARLIEST CHARGE EFFECTIVE DATE: September 1, 2014.
ESTIMATED CHARGE EXPIRATION DATE: June 1, 2019.
CLASS OF AIR CARRIERS NOT REQUIRED TO COLLECT PFC'S: Non-scheduled/
on-demand air carriers filing FAA Form 1800-31 and operating at
University of Illinois--Willard Airport (CMI).
DETERMINATION: Approved. Based on information contained in the
public agency's application, the FAA has determined that the proposed
class accounts for less than 1 percent of the total annual enplanements
at CMI.
BRIEF DESCRIPTION OF PROJECTS APPROVED FOR COLLECTION AND USE:
Re-alignment of taxiway C.
Improve taxiway A/B geometry and widen taxiway A (reimbursement).
Snow removal equipment--salt spreader.
Snow removal equipment--small snow broom.
Rehabilitate general aviation apron.
Rehabilitate general aviation taxiways.
Snow removal equipment--18-foot snow broom.
Snow removal equipment--snow blower.
Prepare PFC application.
DECISION DATE: July 24, 2014.
For Further Information Contact: Michael Brown, Chicago Airports
District Office, (847) 294-7195.
Amendments to PFC Approvals
----------------------------------------------------------------------------------------------------------------
Original Amended
Amendment Original Amended estimated estimated
Amendments No. city, state approved date approved net approved net charge exp. charge exp.
PFC revenue PFC revenue date date
----------------------------------------------------------------------------------------------------------------
95-02-C-05-BUF Buffalo, NY...... 07/10/14 $2,528,721 $2,626,057 06/01/05 06/01/05
07-06-C-03-BUF Buffalo, NY...... 07/10/14 77,745,807 78,223,520 11/01/12 11/01/12
09-07-C-02-BUF Buffalo, NY...... 07/10/14 14,262,010 14,263,552 03/01/14 03/01/14
10-08-C-01-BUF Buffalo, NY...... 07/10/14 1,844,274 1,849,371 06/01/14 06/01/14
11-09-C-01-BUF Buffalo, NY...... 07/10/14 1,702,533 1,983,013 08/01/14 09/01/14
04-06-C-01-ATL Atlanta, GA...... 07/11/14 18,462,000 22,550,861 09/01/18 09/01/18
06-08-C-03-ATL Atlanta, GA...... 07/11/14 227,606,163 168,388,941 01/01/20 10/01/19
10-08-C-01-ATL Atlanta, GA...... 07/11/14 25,166,712 30,758,063 06/01/20 02/01/20
11-04-C-01-RDD Redding, CA...... 07/18/14 553,103 664,592 09/01/14 02/01/18
08-04-C-01-ELP El Paso, TX...... 07/22/14 10,098,221 8,622,031 06/01/09 06/01/09
03-02-C-04-LGB Long Beach, CA... 07/25/14 62,344,903 62,344,903 10/01/14 02/01/15
10-05-C-01-LGB Long Beach, CA... 07/25/14 10,845,000 11,695,000 07/01/30 06/01/32
----------------------------------------------------------------------------------------------------------------
[[Page 69980]]
Issued in Washington, DC, on November 17, 2014.
Joe Hebert,
Manager, Financial Analysis and Passenger Facility Charge Branch.
[FR Doc. 2014-27804 Filed 11-21-14; 8:45 am]
BILLING CODE 4910-13-P