Yuba County Water Agency; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests, 68880-68881 [2014-27326]

Download as PDF 68880 Federal Register / Vol. 79, No. 223 / Wednesday, November 19, 2014 / Notices processes with particular emphasis on STEM, the postsecondary academic and social experience, education financing, employment history including instances of unemployment and underemployment, job characteristics including income and benefits, job values, family formation, and civic engagement. The HSLS:09 data elements are designed to support research that speaks to the underlying dynamics and education processes that influence student achievement, growth, and personal development over time. This request is to conduct the HSLS:09 Second Follow-up Field Test data collections (April–August 2015) and main study panel maintenance. The field test will inform the survey and data collection procedures for the 2016 main study. Dated: November 14, 2014. Stephanie Valentine, Acting Director, Information Collection Clearance Division Privacy, Information and Records Management Services Office of Management. [FR Doc. 2014–27381 Filed 11–18–14; 8:45 am] BILLING CODE 4000–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2246–067] mstockstill on DSK4VPTVN1PROD with NOTICES Yuba County Water Agency; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Application for Temporary Variance of Minimum Flow Requirement. b. Project No.: 2246–067. c. Date Filed: November 10, 2014. d. Applicant: Yuba County Water Agency (licensee). e. Name of Project: Yuba River Project. f. Location: North Yuba River, Middle Yuba River, and Oregon Creek in Yuba, Nevada, and Sierra counties, CA. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)–825(r). h. Applicant Contact: Mr. Curt Aikens, General Manager, Yuba County Water Agency, 1200 F Street, Marysville, CA 95901–4740, (530) 741– 5015. i. FERC Contact: Mr. John Aedo, (415) 369–3335, or john.aedo@ferc.gov. j. Deadline for filing comments, motions to intervene, protests, and VerDate Sep<11>2014 16:16 Nov 18, 2014 Jkt 235001 recommendations is 30 days from the issuance date of this notice by the Commission (December 12, 2014). The Commission strongly encourages electronic filing. Please file motions to intervene, protests, comments, or recommendations using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Please include the project number (P– 2246–067) on any comments, motions to intervene, protests, or recommendations filed. k. Description of Request: The licensee requests a temporary variance of the minimum flow requirements in the lower Yuba River below Englebright Dam, which requires a minimum flow of 600 cubic feet per second (cfs) from October 16 through December 31 and from January 16 through March 31. In order to conserve water resources during the current drought and make best biological use of a limited water supply, the licensee proposes to instead, release 550 cfs from December 1 to 31, 2014 and from January 16 through March 31, 2015. In addition, the licensee requests that minimum flow compliance during this period be based on a 5-day running average of average daily streamflows, with instantaneous flows never less than 90 percent of the specified 550 cfs minimum flow and never less than 550 cfs for more than 48 hours. l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE., Room 2A, Washington, DC 20426, or by calling (202) 502–8371. This filing may also be viewed on the Commission’s Web site at https://www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at https://www.ferc.gov/docs-filing/ esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call 1–866–208- 3676 or email FERCOnlineSupport@ferc.gov, for PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 TTY, call (202) 502–8659. A copy is also available for inspection and reproduction at the address in item (h) above. m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission. n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application. o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title ‘‘COMMENTS’’, ‘‘PROTEST’’, or ‘‘MOTION TO INTERVENE’’ as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to project works which are the subject of the license surrender. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. E:\FR\FM\19NON1.SGM 19NON1 Federal Register / Vol. 79, No. 223 / Wednesday, November 19, 2014 / Notices Dated: November 12, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–27326 Filed 11–18–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission mstockstill on DSK4VPTVN1PROD with NOTICES Combined Notice of Filings #1 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC15–29–000. Applicants: Burley Butte Wind Park, LLC, Golden Valley Wind Park, LLC, Milner Dam Wind Park, LLC, Oregon Trail Wind Park, LLC, Pilgrim Stage Station Wind Park, LLC, Thousand Springs Wind Park, LLC, Tuana Gulch Wind Park, LLC, Camp Reed Wind Park, LLC, Payne’s Ferry Wind Park, LLC, Salmon Falls Wind Park, LLC, Yahoo Creek Wind Park, LLC. Description: Application for Authorization for Disposition of Jurisdictional Facilities and Request for Expedited Action and Abbreviated Comment Period of Burley Butte Wind Park, LLC, et. al. Filed Date: 11/10/14. Accession Number: 20141110–5278. Comments Due: 5 p.m. ET 12/1/14. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10–2480–003; ER10–2924–004; ER10–2964–005; ER11–2041–005; ER11–2042–005; ER10–3193–004; ER10–2959–005; ER10–2934–004; ER10–2961–004; ER10–2950–004; ER12–281–006; ER13– 821–006. Applicants: Berkshire Power Company, LLC, Kleen Energy Systems, LLC, Selkirk Cogen Partners, L.P., Innovative Energy Systems, LLC, Seneca Energy II, LLC, Brooklyn Navy Yard Cogeneration Partners, L.P., Chambers Cogeneration, Limited Partnership, Logan Generating Company, L.P., Edgecombe Genco, LLC, Spruance Genco, LLC, Northampton Generating Company, L.P., Scrubgrass Generating Company, L.P. Description: Supplement to June 30, 2014 Order No. 697 Triennial Compliance Filing of Berkshire Power Company, LLC, et. al. Filed Date: 11/10/14. Accession Number: 20141110–5089. Comments Due: 5 p.m. ET 12/1/14. Docket Numbers: ER14–2679–001. Applicants: Southern California Edison Company. VerDate Sep<11>2014 16:16 Nov 18, 2014 Jkt 235001 Description: Tariff Amendment per 35.17(b): SCE’s Response to Deficiency re Service Agmt with City of Moreno Valley to be effective 8/21/2014. Filed Date: 11/10/14. Accession Number: 20141110–5226. Comments Due: 5 p.m. ET 12/1/14. Docket Numbers: ER15–372–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) rate filing per 35.13(a)(2)(iii): Service Agreement No. 1141; Queue No. Y2–054 to be effective 10/10/2014. Filed Date: 11/10/14. Accession Number: 20141110–5270. Comments Due: 5 p.m. ET 12/1/14. Docket Numbers: ER15–373–000. Applicants: PacifiCorp. Description: § 205(d) rate filing per 35.13(a)(2)(iii): USBR NITSA Rev 2 to be effective 11/1/2014. Filed Date: 11/12/14. Accession Number: 20141112–5022. Comments Due: 5 p.m. ET 12/3/14. Docket Numbers: ER15–374–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) rate filing per 35.13(a)(2)(iii): Service Agreement No. 4039; Queue No. S37 to be effective 10/ 14/2014. Filed Date: 11/12/14. Accession Number: 20141112–5028. Comments Due: 5 p.m. ET 12/3/14. Docket Numbers: ER15–374–000. Applicants: PJM Interconnection, L.L.C. Description: Report Filing: Errata to Transmittal Letter for SA No. 4039; Queue No. S37 to be effective N/A. Filed Date: 11/12/14. Accession Number: 20141112–5031. Comments Due: 5 p.m. ET 12/3/14. Docket Numbers: ER15–375–000. Applicants: AEP Texas Central Company. Description: § 205(d) rate filing per 35.13(a)(2)(iii): TCC-Apex Midway Wind First Amended & Restated IA to be effective 10/20/2014. Filed Date: 11/12/14. Accession Number: 20141112–5156. Comments Due: 5 p.m. ET 12/3/14. Docket Numbers: ER15–376–000. Applicants: Calpine Energy Services, L.P. Description: Request for Limited Waiver of Calpine Energy Services, L.P. Filed Date: 11/12/14. Accession Number: 20141112–5166. Comments Due: 5 p.m. ET 12/3/14. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings PO 00000 Frm 00040 Fmt 4703 Sfmt 4703 68881 must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: November 12, 2014. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2014–27387 Filed 11–18–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings #2 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC15–30–000. Applicants: DTE Electric Company, Renaissance Power, L.L.C. Description: Application for Authorization for Disposition of Jurisdictional Facilities of DTE Electric Company and Renaissance Power, L.L.C. Filed Date: 11/12/14. Accession Number: 20141112–5352. Comments Due: 5 p.m. ET 12/3/14. Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG15–13–000. Applicants: Iberdrola Arizona Renewables, LLC. Description: Self-Certification of EWG Status of Iberdrola Arizona Renewables, LLC. Filed Date: 11/12/14. Accession Number: 20141112–5363. Comments Due: 5 p.m. ET 12/3/14. Docket Numbers: EG15–14–000. Applicants: Iberdrola Texas Renewables, LLC. Description: Self-Certification of EWG Status of Iberdrola Texas Renewables, LLC. Filed Date: 11/12/14. Accession Number: 20141112–5392. Comments Due: 5 p.m. ET 12/3/14. Docket Numbers: EG15–15–000. Applicants: Chief Conemaugh Power, LLC. E:\FR\FM\19NON1.SGM 19NON1

Agencies

[Federal Register Volume 79, Number 223 (Wednesday, November 19, 2014)]
[Notices]
[Pages 68880-68881]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-27326]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2246-067]


Yuba County Water Agency; Notice of Application Accepted for 
Filing, Soliciting Comments, Motions To Intervene, and Protests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Application for Temporary Variance of 
Minimum Flow Requirement.
    b. Project No.: 2246-067.
    c. Date Filed: November 10, 2014.
    d. Applicant: Yuba County Water Agency (licensee).
    e. Name of Project: Yuba River Project.
    f. Location: North Yuba River, Middle Yuba River, and Oregon Creek 
in Yuba, Nevada, and Sierra counties, CA.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
    h. Applicant Contact: Mr. Curt Aikens, General Manager, Yuba County 
Water Agency, 1200 F Street, Marysville, CA 95901-4740, (530) 741-5015.
    i. FERC Contact: Mr. John Aedo, (415) 369-3335, or 
john.aedo@ferc.gov.
    j. Deadline for filing comments, motions to intervene, protests, 
and recommendations is 30 days from the issuance date of this notice by 
the Commission (December 12, 2014). The Commission strongly encourages 
electronic filing. Please file motions to intervene, protests, 
comments, or recommendations using the Commission's eFiling system at 
https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit 
brief comments up to 6,000 characters, without prior registration, 
using the eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the 
end of your comments. For assistance, please contact FERC Online 
Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or 
(202) 502-8659 (TTY). In lieu of electronic filing, please send a paper 
copy to: Secretary, Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426. Please include the project number 
(P-2246-067) on any comments, motions to intervene, protests, or 
recommendations filed.
    k. Description of Request: The licensee requests a temporary 
variance of the minimum flow requirements in the lower Yuba River below 
Englebright Dam, which requires a minimum flow of 600 cubic feet per 
second (cfs) from October 16 through December 31 and from January 16 
through March 31. In order to conserve water resources during the 
current drought and make best biological use of a limited water supply, 
the licensee proposes to instead, release 550 cfs from December 1 to 
31, 2014 and from January 16 through March 31, 2015. In addition, the 
licensee requests that minimum flow compliance during this period be 
based on a 5-day running average of average daily streamflows, with 
instantaneous flows never less than 90 percent of the specified 550 cfs 
minimum flow and never less than 550 cfs for more than 48 hours.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street, NE., Room 2A, Washington, 
DC 20426, or by calling (202) 502-8371. This filing may also be viewed 
on the Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number excluding the last three digits 
in the docket number field to access the document. You may also 
register online at https://www.ferc.gov/docs-filing/esubscription.asp to 
be notified via email of new filings and issuances related to this or 
other pending projects. For assistance, call 1-866-208- 3676 or email 
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is 
also available for inspection and reproduction at the address in item 
(h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene: Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents: Any filing must (1) 
bear in all capital letters the title ``COMMENTS'', ``PROTEST'', or 
``MOTION TO INTERVENE'' as applicable; (2) set forth in the heading the 
name of the applicant and the project number of the application to 
which the filing responds; (3) furnish the name, address, and telephone 
number of the person protesting or intervening; and (4) otherwise 
comply with the requirements of 18 CFR 385.2001 through 385.2005. All 
comments, motions to intervene, or protests must set forth their 
evidentiary basis and otherwise comply with the requirements of 18 CFR 
4.34(b). All comments, motions to intervene, or protests should relate 
to project works which are the subject of the license surrender. 
Agencies may obtain copies of the application directly from the 
applicant. A copy of any protest or motion to intervene must be served 
upon each representative of the applicant specified in the particular 
application. If an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency. A copy of all other 
filings in reference to this application must be accompanied by proof 
of service on all persons listed in the service list prepared by the 
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 
385.2010.


[[Page 68881]]


    Dated: November 12, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-27326 Filed 11-18-14; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.