Sunshine Act Meeting, 68680-68681 [2014-27335]

Download as PDF tkelley on DSK3SPTVN1PROD with NOTICES 68680 Federal Register / Vol. 79, No. 222 / Tuesday, November 18, 2014 / Notices Preliminary Determination: Based upon the above criteria, Commission staff preliminarily determines that the proposal satisfies the requirements for a qualifying conduit hydropower facility, which is not required to be licensed or exempted from licensing. Comments and Motions to Intervene: Deadline for filing comments contesting whether the facility meets the qualifying criteria is 45 days from the issuance date of this notice. Deadline for filing motions to intervene is 30 days from the issuance date of this notice. Anyone may submit comments or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210 and 385.214. Any motions to intervene must be received on or before the specified deadline date for the particular proceeding. Filing and Service of Responsive Documents: All filings must (1) bear in all capital letters the ‘‘COMMENTS CONTESTING QUALIFICATION FOR A CONDUIT HYDROPOWER FACILITY’’ or ‘‘MOTION TO INTERVENE,’’ as applicable; (2) state in the heading the name of the applicant and the project number of the application to which the filing responds; (3) state the name, address, and telephone number of the person filing; and (4) otherwise comply with the requirements of sections 385.2001 through 385.2005 of the Commission’s regulations.1 All comments contesting Commission staff’s preliminary determination that the facility meets the qualifying criteria must set forth their evidentiary basis. The Commission strongly encourages electronic filing. Please file motions to intervene and comments using the Commission’s eFiling system at https:// www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at https://www.ferc.gov/docs-filing/ ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208–3676 (toll free), or (202) 502–8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in 1 18 CFR 385.2001–2005 (2013). VerDate Sep<11>2014 17:27 Nov 17, 2014 Jkt 235001 accordance with 18 CFR 4.34(b) and 385.2010. Locations of Notice of Intent: Copies of the notice of intent can be obtained directly from the applicant or such copies can be viewed and reproduced at the Commission in its Public Reference Room, Room 2A, 888 First Street NE., Washington, DC 20426. The filing may also be viewed on the web at https:// www.ferc.gov/docs-filing/elibrary.asp using the ‘‘eLibrary’’ link. Enter the docket number (e.g., CD15–1–000) in the docket number field to access the document. For assistance, call toll-free 1–866–208–3676 or email FERCOnlineSupport@ferc.gov. For TTY, call (202) 502–8659. Dated: November 10, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–27244 Filed 11–17–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER15–255–000] Duke Energy Beckjord Storage, LLC, Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization This is a supplemental notice in the above-referenced proceeding of Duke Energy Beckjord Storage, LLC’s application for market-based rate authority, with an accompanying rate tariff, noting that such application includes a request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability. Any person desiring to intervene or to protest should file with the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426, in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211 and 385.214). Anyone filing a motion to intervene or protest must serve a copy of that document on the Applicant. Notice is hereby given that the deadline for filing protests with regard to the applicant’s request for blanket authorization, under 18 CFR part 34, of future issuances of securities and assumptions of liability, is November 25, 2014. The Commission encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links at https:// PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 www.ferc.gov. To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate an eRegistration account using the eRegistration link. Select the eFiling link to log on and submit the intervention or protests. Persons unable to file electronically should submit an original and 5 copies of the intervention or protest to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. The filings in the above-referenced proceeding are accessible in the Commission’s eLibrary system by clicking on the appropriate link in the above list. They are also available for electronic review in the Commission’s Public Reference Room in Washington, DC. There is an eSubscription link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov. or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: November 5, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–27245 Filed 11–17–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sunshine Act Meeting The following notice of meeting is published pursuant to section 3(a) of the government in the Sunshine Act (Pub. L. 94–409), 5 U.S.C. 552b: AGENCY: Federal Energy Regulatory Commission, DOE. DATE AND TIME: November 20, 2014, 10:00 a.m. PLACE: Room 2C, 888 First Street NE., Washington, DC 20426. STATUS: Open. MATTERS TO BE CONSIDERED: Agenda * NOTE—Items listed on the agenda may be deleted without further notice. CONTACT PERSON FOR MORE INFORMATION: Kimberly D. Bose, Secretary, Telephone (202) 502–8400. For a recorded message listing items struck from or added to the meeting, call (202) 502–8627. This is a list of matters to be considered by the Commission. It does not include a listing of all documents E:\FR\FM\18NON1.SGM 18NON1 Federal Register / Vol. 79, No. 222 / Tuesday, November 18, 2014 / Notices relevant to the items on the agenda. All public documents, however, may be viewed on line at the Commission’s Web site at https://www.ferc.gov using Item No. the eLibrary link, or may be examined in the Commission’s Public Reference Room. 68681 1010TH—MEETING REGULAR MEETING November 20, 2014, 10:00 a.m. Docket No. Company ADMINISTRATIVE A–1 .................... A–2 .................... A–3 .................... AD02–1–000 .... AD02–7–000 .... AD07–13–008 .. Agency Business Matters. Customer Matters, Reliability, Security and Market Operations. 2014 Report on Enforcement. ELECTRIC E–1 .................... E–2 .................... EC14–96–000 .. AD13–7–000 .... AD14–8–000 ..... E–3 .................... E–4 .................... E–5 .................... E–6 .................... E–7 .................... E–8 .................... E–9 .................... E–10 .................. E–11 .................. AD14–16–000 .. RM14–15–000 .. OMITTED. RM14–10–000 .. ER14–2936–000 ER14–2963–000 OA14–3–000 .... RR14–5–000 .... EL15–15–000 ... Exelon Corporation and Pepco Holdings, Inc. Centralized Capacity Markets in Regional Transmission Organizations and Independent System Operators. Winter 2013–2014 Operations and Market Performance In Regional Transmission Organizations and Independent System Operators. Kansas City Board of Public Utilities. Physical Security Reliability Standard. Real Power Balancing Control Performance Reliability Standard. Sunbury Generation LP. California Independent System Operator Corporation. FPL Energy Oklahoma Wind, LLC. North American Electric Reliability Corporation. PJM Interconnection, L.L.C. GAS G–1 ................... G–2 ................... G–3 ................... G–4 ................... G–5 ................... PL15–1–000 ..... RM14–21–000 .. RP12–318–003 RP12–318–005. RP13–431–003 OR14–6–000 .... OR14–6–001 .... Cost Recovery Mechanisms for Modernization of Natural Gas Facilities. Natural Gas Act Pipeline Maps. Texas Eastern Transmission, LP. Dominion Transmission, Inc. BP Pipelines (Alaska) Inc., ConocoPhillips Transportation. Alaska, Inc. and ExxonMobil Pipeline Company. HYDRO H–1 .................... H–2 .................... H–3 .................... H–4 .................... P–12588–010 ... P–12690–007 ... P–12690–009. EL14–47–001. P–13997–002 ... P–2210–248 ..... Hydraco Power, Inc. and Warren David Long. Public Utility District No. 1 of Snohomish County, Washington. Richard A. Glover, Jr. Appalachian Power Company. CERTIFICATES tkelley on DSK3SPTVN1PROD with NOTICES C–1 .................... RM12–11–002 .. Revisions to Auxiliary Installations, Replacement Facilities, and Siting and Maintenance Regulations. A free webcast of this event is available through www.ferc.gov. Anyone with Internet access who desires to view this event can do so by navigating to www.ferc.gov’s Calendar of Events and locating this event in the Calendar. The event will contain a link to its Webcast. The Capitol Connection provides technical support for the free webcasts. It also offers access to this event via television in the DC area and via phone bridge for a fee. If you have any questions, visit www.CapitolConnection.org or contact Danelle Springer or David Reininger at 703–993–3100. Immediately following the conclusion of the Commission Meeting, a press briefing will be held in the Commission Meeting Room. Members of the public may view this briefing in the designated overflow room. This statement is intended to notify the public that the press briefings that follow Commission meetings may now be viewed remotely at Commission headquarters, but will not be telecast through the Capitol Connection service. Dated: November 13, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–27335 Filed 11–14–14; 11:15 am] BILLING CODE 6717–01–P VerDate Sep<11>2014 17:27 Nov 17, 2014 Jkt 235001 PO 00000 Frm 00022 Fmt 4703 Sfmt 9990 E:\FR\FM\18NON1.SGM 18NON1

Agencies

[Federal Register Volume 79, Number 222 (Tuesday, November 18, 2014)]
[Notices]
[Pages 68680-68681]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-27335]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Sunshine Act Meeting

    The following notice of meeting is published pursuant to section 
3(a) of the government in the Sunshine Act (Pub. L. 94-409), 5 U.S.C. 
552b:
AGENCY: Federal Energy Regulatory Commission, DOE.

Date and Time: November 20, 2014, 10:00 a.m.

Place: Room 2C, 888 First Street NE., Washington, DC 20426.

Status: Open.

Matters To Be Considered: Agenda

* NOTE--Items listed on the agenda may be deleted without further 
notice.


Contact Person for More Information: Kimberly D. Bose, Secretary, 
Telephone (202) 502-8400.
    For a recorded message listing items struck from or added to the 
meeting, call (202) 502-8627.
    This is a list of matters to be considered by the Commission. It 
does not include a listing of all documents

[[Page 68681]]

relevant to the items on the agenda. All public documents, however, may 
be viewed on line at the Commission's Web site at https://www.ferc.gov 
using the eLibrary link, or may be examined in the Commission's Public 
Reference Room.

1010TH--MEETING

REGULAR MEETING

November 20, 2014, 10:00 a.m.

------------------------------------------------------------------------
        Item No.                Docket No.                Company
------------------------------------------------------------------------
                             ADMINISTRATIVE
------------------------------------------------------------------------
A-1....................  AD02-1-000.............  Agency Business
                                                   Matters.
A-2....................  AD02-7-000.............  Customer Matters,
                                                   Reliability, Security
                                                   and Market
                                                   Operations.
A-3....................  AD07-13-008............  2014 Report on
                                                   Enforcement.
------------------------------------------------------------------------
                                ELECTRIC
------------------------------------------------------------------------
E-1....................  EC14-96-000............  Exelon Corporation and
                                                   Pepco Holdings, Inc.
E-2....................  AD13-7-000.............  Centralized Capacity
                                                   Markets in Regional
                                                   Transmission
                                                   Organizations and
                                                   Independent System
                                                   Operators.
                         AD14-8-000.............  Winter 2013-2014
                                                   Operations and Market
                                                   Performance In
                                                   Regional Transmission
                                                   Organizations and
                                                   Independent System
                                                   Operators.
E-3....................  AD14-16-000............  Kansas City Board of
                                                   Public Utilities.
E-4....................  RM14-15-000............  Physical Security
                                                   Reliability Standard.
E-5....................  OMITTED................
E-6....................  RM14-10-000............  Real Power Balancing
                                                   Control Performance
                                                   Reliability Standard.
E-7....................  ER14-2936-000..........  Sunbury Generation LP.
E-8....................  ER14-2963-000..........  California Independent
                                                   System Operator
                                                   Corporation.
E-9....................  OA14-3-000.............  FPL Energy Oklahoma
                                                   Wind, LLC.
E-10...................  RR14-5-000.............  North American
                                                   Electric Reliability
                                                   Corporation.
E-11...................  EL15-15-000............  PJM Interconnection,
                                                   L.L.C.
------------------------------------------------------------------------
                                   GAS
------------------------------------------------------------------------
G-1....................  PL15-1-000.............  Cost Recovery
                                                   Mechanisms for
                                                   Modernization of
                                                   Natural Gas
                                                   Facilities.
G-2....................  RM14-21-000............  Natural Gas Act
                                                   Pipeline Maps.
G-3....................  RP12-318-003...........  Texas Eastern
                                                   Transmission, LP.
                         RP12-318-005...........
G-4....................  RP13-431-003...........  Dominion Transmission,
                                                   Inc.
G-5....................  OR14-6-000.............  BP Pipelines (Alaska)
                                                   Inc., ConocoPhillips
                                                   Transportation.
                         OR14-6-001.............  Alaska, Inc. and
                                                   ExxonMobil Pipeline
                                                   Company.
------------------------------------------------------------------------
                                  HYDRO
------------------------------------------------------------------------
H-1....................  P-12588-010............  Hydraco Power, Inc.
                                                   and Warren David
                                                   Long.
H-2....................  P-12690-007............  Public Utility
                                                   District No. 1 of
                                                   Snohomish County,
                                                   Washington.
                         P-12690-009............
                         EL14-47-001............
H-3....................  P-13997-002............  Richard A. Glover, Jr.
H-4....................  P-2210-248.............  Appalachian Power
                                                   Company.
------------------------------------------------------------------------
                              CERTIFICATES
------------------------------------------------------------------------
C-1....................  RM12-11-002............  Revisions to Auxiliary
                                                   Installations,
                                                   Replacement
                                                   Facilities, and
                                                   Siting and
                                                   Maintenance
                                                   Regulations.
                                                  A free webcast of this
                                                   event is available
                                                   through www.ferc.gov.
                                                   Anyone with Internet
                                                   access who desires to
                                                   view this event can
                                                   do so by navigating
                                                   to www.ferc.gov's
                                                   Calendar of Events
                                                   and locating this
                                                   event in the
                                                   Calendar.
                                                  The event will contain
                                                   a link to its
                                                   Webcast. The Capitol
                                                   Connection provides
                                                   technical support for
                                                   the free webcasts. It
                                                   also offers access to
                                                   this event via
                                                   television in the DC
                                                   area and via phone
                                                   bridge for a fee. If
                                                   you have any
                                                   questions, visit
                                                   www.CapitolConnection.org or contact
                                                   Danelle Springer or
                                                   David Reininger at
                                                   703-993-3100.
                                                  Immediately following
                                                   the conclusion of the
                                                   Commission Meeting, a
                                                   press briefing will
                                                   be held in the
                                                   Commission Meeting
                                                   Room. Members of the
                                                   public may view this
                                                   briefing in the
                                                   designated overflow
                                                   room. This statement
                                                   is intended to notify
                                                   the public that the
                                                   press briefings that
                                                   follow Commission
                                                   meetings may now be
                                                   viewed remotely at
                                                   Commission
                                                   headquarters, but
                                                   will not be telecast
                                                   through the Capitol
                                                   Connection service.
------------------------------------------------------------------------


    Dated: November 13, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-27335 Filed 11-14-14; 11:15 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.