Notice of Effectiveness of Exempt Wholesale Generator Status, 68231 [2014-26962]

Download as PDF 68231 Federal Register / Vol. 79, No. 220 / Friday, November 14, 2014 / Notices and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: November 5, 2014. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2014–26927 Filed 11–13–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR15–3–000] JBBR Pipeline LLC; Notice of Petition for Declaratory Order Take notice that on November 3, 2014, pursuant to Rule 207(a)(2) of the Federal Energy Regulatory Commission’s (Commission) Rules of Practice and Procedure, 18 CFR 385.207(a)(2) (2014), JBBR Pipeline LLC (JBBR Pipeline), filed a petition for declaratory order approving overall tariff and rate structure for new crude oil pipeline system from Joliet rail terminal to Mobil’s Mokena-to-Joliet pipeline, and thence to Exxon Mobil’s Joliet refinery, all as more fully explained in the petition. Any person desiring to intervene or to protest this filing must file in accordance with Rules 211 and 214 of the Commission’s Rules of Practice and Procedure (18 CFR 385.211, 385.214). Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceeding. Any person wishing to become a party must file a notice of intervention or motion to intervene, as appropriate. Such notices, motions, or protests must be filed on or before the comment date. Anyone filing a motion to intervene or protest must serve a copy of that document on the Petitioner. The Commission encourages electronic submission of protests and interventions in lieu of paper using the ‘‘eFiling’’ link at https://www.ferc.gov. Persons unable to file electronically should submit an original and 5 copies of the protest or intervention to the Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426. This filing is accessible on-line at https://www.ferc.gov, using the ‘‘eLibrary’’ link and is available for review in the Commission’s Public Reference Room in Washington, DC. There is an ‘‘eSubscription’’ link on the Web site that enables subscribers to receive email notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please email FERCOnlineSupport@ferc.gov, or call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Comment Date: 5:00 p.m. Eastern time on November 25, 2014. Dated: November 6, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–26967 Filed 11–13–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EG14–80–000, EG14–81–000, EG14–82–000, et al.] Notice of Effectiveness of Exempt Wholesale Generator Status Docket Nos. Mountain Creek Power, LLC ..................................................................................................................................... LaPorte Power, LLC .................................................................................................................................................. Handley Power, LLC .................................................................................................................................................. Regulus Solar, LLC ................................................................................................................................................... Major Oak Power, LLC .............................................................................................................................................. Green Pastures Wind I, LLC ..................................................................................................................................... Avalon Solar Partners, LLC ....................................................................................................................................... Energia Sierra Juarez, S. de R.L. de C.V ................................................................................................................. Energia Sierra Juarez U.S. Transmission, LLC ........................................................................................................ Longhorn Wind Project, LLC ..................................................................................................................................... TX Hereford Wind, LLC ............................................................................................................................................. Catalina Solar 2, LLC ................................................................................................................................................ mstockstill on DSK4VPTVN1PROD with NOTICES Take notice that during the month of October 2014, the status of the abovecaptioned entities as Exempt Wholesale Generators became effective by operation of the Commission’s regulations. 18 CFR 366.7(a). Dated: November 6, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–26962 Filed 11–13–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF14–16–000] Columbia Gulf Transmission, LLC; Supplemental Notice of Intent To Prepare an Environmental Assessment for the Planned Cameron Access Project and Request for Comments on Environmental Issues On September 26, 2014, the Commission issued a ‘‘Notice of Intent to Prepare an Environmental VerDate Sep<11>2014 17:37 Nov 13, 2014 Jkt 235001 PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 EG14–80–000 EG14–81–000 EG14–82–000 EG14–83–000 EG14–84–000 EG14–85–000 EG14–86–000 EG14–87–000 EG14–88–000 EG14–89–000 EG14–90–000 EG14–91–000 Assessment for the Planned Cameron Access Project and Request for Comments on Environmental Issues’’ (NOI). It has come to our attention that portions of the environmental mailing list were not provided copies of the NOI; therefore, we are issuing this Supplemental NOI to extend the scoping period and provide additional time for interested parties to file comments on environmental issues. The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will E:\FR\FM\14NON1.SGM 14NON1

Agencies

[Federal Register Volume 79, Number 220 (Friday, November 14, 2014)]
[Notices]
[Page 68231]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-26962]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket Nos. EG14-80-000, EG14-81-000, EG14-82-000, et al.]


Notice of Effectiveness of Exempt Wholesale Generator Status

 
------------------------------------------------------------------------
                                                     Docket Nos.
------------------------------------------------------------------------
Mountain Creek Power, LLC.................                   EG14-80-000
LaPorte Power, LLC........................                   EG14-81-000
Handley Power, LLC........................                   EG14-82-000
Regulus Solar, LLC........................                   EG14-83-000
Major Oak Power, LLC......................                   EG14-84-000
Green Pastures Wind I, LLC................                   EG14-85-000
Avalon Solar Partners, LLC................                   EG14-86-000
Energia Sierra Juarez, S. de R.L. de C.V..                   EG14-87-000
Energia Sierra Juarez U.S. Transmission,                     EG14-88-000
 LLC......................................
Longhorn Wind Project, LLC................                   EG14-89-000
TX Hereford Wind, LLC.....................                   EG14-90-000
Catalina Solar 2, LLC.....................                   EG14-91-000
------------------------------------------------------------------------

    Take notice that during the month of October 2014, the status of 
the above-captioned entities as Exempt Wholesale Generators became 
effective by operation of the Commission's regulations. 18 CFR 
366.7(a).

    Dated: November 6, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-26962 Filed 11-13-14; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.