Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation Meetings, 65205 [2014-26066]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
Federal Register / Vol. 79, No. 212 / Monday, November 3, 2014 / Notices
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. This application is not ready for
environmental analysis at this time.
l. The proposed Sardis Lake Project
would utilize the following existing
Corps’ Sardis Lake dam facilities: (1) A
15,300-foot-long, 97-foot-high earth fill
embankment dam; (2) a reservoir; and
(3) outlet works consisting of a concrete
intake tower, four gated inlets that
combine to a 560-foot-long and 16.0-foot
by 18.25-foot ovoid concrete outlet
tunnel, and a stilling basin.
The proposed Sardis Lake Project
would consist of the following new
facilities: (1) A 510-foot-long, 15.5-footdiameter steel liner installed within the
existing concrete outlet tunnel; (2) a 50foot-long, 20-foot-high steel-lined,
reinforced concrete gated bifurcation at
the end of the existing concrete outlet
tunnel to divide the flows between the
existing stilling basin and new
powerhouse; (3) a 250-foot-long, 15.5foot-diameter steel penstock from the
bifurcation structure to the forebay; (4)
a 102.6-foot-long, 78-foot-wide, 50-foothigh forebay; (5) a 120-foot-long, 85foot-wide, 105-foot-high concrete
powerhouse containing two vertical
Kaplan generating units with a total
installed capacity of 14.6 megawatts; (6)
a 200-foot-long, 100-foot-wide tailrace
channel; (7) a substation; (8) a 7,097foot-long transmission line consisting of
a 887-foot-long, 4.160-kilovolt (kV)
buried cable from the powerhouse to the
substation, and a 6,210-foot-long
overhead, 161-kV line from the
substation to an existing utility-owned
distribution line; and (9) appurtenant
facilities. The average annual generation
would be 52,000 megawatt-hours.
m. A copy of the application is
available for electronic review at the
Commission in the Public Reference
Room, or may be viewed on the
Commission’s Web site at https://
www.ferc.gov, using the ‘‘eLibrary’’ link.
Enter the docket number, excluding the
last three digits in the docket number
field, to access the document. For
assistance, contact FERC Online
Support. A copy is available for
inspection and reproduction at the
address in item h above.
You may register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Scoping process.
VerDate Sep<11>2014
17:37 Oct 31, 2014
Jkt 235001
The Commission staff intends to
prepare an environmental assessment
(EA) for the project, in accordance with
the National Environmental Policy Act.
The EA will consider both site-specific
and cumulative environmental impacts
and reasonable alternatives to the
proposed action.
The Commission staff does not
propose to conduct any on-site scoping
meetings at this time. Instead, staff is
soliciting comments, recommendations,
and information on Scoping Document
(SD1) issued on October 27, 2014.
Copies of the SD1 outlining the
subject areas to be addressed in the EA
were distributed to the parties on the
Commission’s mailing list. Copies of the
SD1 may be viewed on the Web at
https://www.ferc.gov, using the
‘‘eLibrary’’ link. Enter the docket
number, excluding the last three digits
in the docket number field, to access the
document. For assistance, call 1–866–
208–3676, or for TTY, (202) 502–8659.
Dated: October 27, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–25989 Filed 10–31–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Notice of Commissioner and Staff
Attendance at North American Electric
Reliability Corporation Meetings
The Federal Energy Regulatory
Commission (Commission) hereby gives
notice that members of the Commission
and/or Commission staff may attend the
following meetings:
North American Electric Reliability
Corporation
Member Representatives Committee and
Board of Trustees Meetings
Board of Trustees Corporate Governance
and Human Resources Committee,
Finance and Audit Committee,
Compliance Committee, and
Standards Oversight and Technology
Committee Meetings
The Westin Buckhead Atlanta, 3391
Peachtree Road NE., Atlanta, GA
30326
November 12 (7:30 a.m.–5:00 p.m.) and
November 13 (8:30 a.m.–12:00 p.m.),
2014
Further information regarding these
meetings may be found at: https://
www.nerc.com/Pages/Calendar.aspx.
The discussions at the meetings,
which are open to the public, may
PO 00000
Frm 00031
Fmt 4703
Sfmt 4703
65205
address matters at issue in the following
Commission proceedings:
Docket No. RR14–5, North American
Electric Reliability Corporation
Docket No. RR14–6, North American
Electric Reliability Corporation
For further information, please
contact Jonathan First, 202–502–8529,
or jonathan.first@ferc.gov.
Dated: October 28, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–26066 Filed 10–31–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Western Area Power Administration
Pick-Sloan Missouri Basin Program—
Eastern Division-Rate Order No.
WAPA–170
Western Area Power
Administration, DOE.
ACTION: Notice of Proposed
Transmission and Ancillary Services
Formula Rates.
AGENCY:
The Western Area Power
Administration (Western), a power
marketing administration within the
Department of Energy (DOE), is
proposing new formula transmission
and ancillary services rates for the PickSloan Missouri Basin Program—Eastern
Division (P–SMBP—ED). The proposed
formula rates would become effective
October 1, 2015, and remain in effect
until September 30, 2020, or until
Western changes the formula rates
through another public rate process
pursuant to 10 CFR part 903, whichever
is sooner. Western’s Upper Great Plains
Region (Western-UGP) has joined the
Southwest Power Pool (SPP) Regional
Transmission Organization (RTO)
contingent upon Federal Energy
Regulatory Commission (FERC)
approval of Western-UGP’s negotiated
provisions in the SPP Membership
Agreement, Bylaws, and Tariff (SPP
Governing Documents). Transmission
and ancillary services will be provided
over Western-UGP facilities under the
SPP Open Access Transmission Tariff
(Tariff) by SPP as the transmission
service provider upon Western-UGP
transferring functional control to SPP.
Western-UGP needs to adopt new
formula rates for these transmission and
ancillary services so Western-UGP’s
costs can be recovered under the SPP
Tariff. These formula rates will provide
Western sufficient revenue to pay all
annual costs, including interest
expenses, and repay required
investments within the allowable
SUMMARY:
E:\FR\FM\03NON1.SGM
03NON1
Agencies
[Federal Register Volume 79, Number 212 (Monday, November 3, 2014)]
[Notices]
[Page 65205]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-26066]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Commissioner and Staff Attendance at North American
Electric Reliability Corporation Meetings
The Federal Energy Regulatory Commission (Commission) hereby gives
notice that members of the Commission and/or Commission staff may
attend the following meetings:
North American Electric Reliability Corporation
Member Representatives Committee and Board of Trustees Meetings
Board of Trustees Corporate Governance and Human Resources Committee,
Finance and Audit Committee, Compliance Committee, and Standards
Oversight and Technology Committee Meetings
The Westin Buckhead Atlanta, 3391 Peachtree Road NE., Atlanta, GA 30326
November 12 (7:30 a.m.-5:00 p.m.) and November 13 (8:30 a.m.-12:00
p.m.), 2014
Further information regarding these meetings may be found at:
https://www.nerc.com/Pages/Calendar.aspx.
The discussions at the meetings, which are open to the public, may
address matters at issue in the following Commission proceedings:
Docket No. RR14-5, North American Electric Reliability Corporation
Docket No. RR14-6, North American Electric Reliability Corporation
For further information, please contact Jonathan First, 202-502-
8529, or jonathan.first@ferc.gov.
Dated: October 28, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-26066 Filed 10-31-14; 8:45 am]
BILLING CODE 6717-01-P