Tennessee Gas Pipeline Company, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Compressor Station 245 Horsepower Replacement Project and Request for Comments on Environmental Issues, 64764-64765 [2014-25898]
Download as PDF
64764
Federal Register / Vol. 79, No. 211 / Friday, October 31, 2014 / Notices
In addition, the Commission offers a
free service called eSubscription which
allows you to keep track of all formal
issuances and submittals in specific
dockets. This can reduce the amount of
time you spend researching proceedings
by automatically providing you with
notification of these filings, document
summaries, and direct links to the
documents. Go to www.ferc.gov/docsfiling/esubscription.asp.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: October 23, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–25897 Filed 10–30–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP14–552–000]
asabaliauskas on DSK5VPTVN1PROD with NOTICES
Tennessee Gas Pipeline Company,
LLC; Notice of Intent To Prepare an
Environmental Assessment for the
Proposed Compressor Station 245
Horsepower Replacement Project and
Request for Comments on
Environmental Issues
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Compressor Station 245 Horsepower
Replacement Project involving
construction and operation of facilities
by Tennessee Gas Pipeline Company,
LLC (TGP) in Herkimer County, New
York. The Commission will use this EA
in its decision-making process to
determine whether the project is in the
public convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the project.
Your input will help the Commission
staff determine what issues they need to
evaluate in the EA. Please note that the
scoping period will close on November
24, 2014.
This notice is being sent to the
Commission’s current environmental
mailing list for this project. State and
local government representatives should
notify their constituents of this
proposed project and encourage them to
comment on their areas of concern.
TGP provided landowners with a fact
sheet prepared by the FERC entitled
VerDate Sep<11>2014
18:51 Oct 30, 2014
Jkt 235001
‘‘An Interstate Natural Gas Facility On
My Land? What Do I Need To Know?’’
This fact sheet addresses a number of
typically asked questions, including
how to participate in the Commission’s
proceedings. It is also available for
viewing on the FERC Web site
(www.ferc.gov).
Summary of the Proposed Project
At its existing Compressor Station 245
in Herkimer County, New York, TGP
proposes to:
(1) Abandon in place one existing
3,500 horsepower Worthington ML12
natural gas-fired compressor unit;
(2) retire from active service three
existing 1,400 horsepower Worthington
UTC natural gas-fired compressor units
and retain the units in place for standby
use;
(3) install one new 8,219 horsepower
Taurus 70 natural gas-fired turbine
compressor unit; and
(4) construct a new compressor
building and associated facilities to
house the new compressor unit.
TGP states that the project would
enable TGP to meet New York state
nitrogen oxide emission limits, and
would improve overall system
reliability and flexibility. TGP does not
anticipate that its proposal would result
in any increase in mainline capacity.
The general location of the project
facilities is shown in appendix 1.1
Land Requirements for Construction
The project would disturb
approximately 25 acres of previously
disturbed land entirely owned by TGP
within the existing Compressor Station
245 property boundary. Public roads as
well as private roads on the existing
Compressor Station 245 site would be
used for access to proposed construction
work areas. New road extensions from
existing roads within the compressor
station site would be constructed.
The EA Process
The National Environmental Policy
Act (NEPA) requires the Commission to
take into account the environmental
impacts that could result from an action
whenever it considers the issuance of a
Certificate of Public Convenience and
Necessity. NEPA also requires us 2 to
1 The appendices referenced in this notice will
not appear in the Federal Register. Copies of
appendices were sent to all those receiving this
notice in the mail and are available at www.ferc.gov
using the link called ‘‘eLibrary’’ or from the
Commission’s Public Reference Room, 888 First
Street NE., Washington, DC 20426, or call (202)
502–8371. For instructions on connecting to
eLibrary, refer to the last page of this notice.
2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
environmental staff of the Commission’s Office of
Energy Projects.
PO 00000
Frm 00024
Fmt 4703
Sfmt 4703
discover and address concerns the
public may have about proposals. This
process is referred to as ‘‘scoping.’’ The
main goal of the scoping process is to
focus the analysis in the EA on the
important environmental issues. By this
notice, the Commission requests public
comments on the scope of the issues to
address in the EA. We will consider all
filed comments during the preparation
of the EA.
In the EA we will discuss impacts that
could occur as a result of the
construction and operation of the
proposed project under these general
headings:
• Geology and soils;
• land use;
• water resources;
• cultural resources;
• vegetation, wildlife, and sensitive
species;
• air quality and noise; and
• public safety.
We will also evaluate reasonable
alternatives to the proposed project or
portions of the project, and make
recommendations on how to lessen or
avoid impacts on the various resource
areas.
The EA will present our independent
analysis of the issues. The EA will be
available in the public record through
eLibrary. Depending on the comments
received during the scoping process, we
may also publish and distribute the EA
to the public for an allotted comment
period. We will consider all comments
on the EA before making our
recommendations to the Commission.
To ensure we have the opportunity to
consider and address your comments,
please carefully follow the instructions
in the Public Participation section
below.
With this notice, we are asking
agencies with jurisdiction by law and/
or special expertise with respect to the
environmental issues of this project to
formally cooperate with us in the
preparation of the EA.3 Agencies that
would like to request cooperating
agency status should follow the
instructions for filing comments
provided under the Public Participation
section of this notice.
Public Participation
You can make a difference by
providing us with your specific
comments or concerns about the project.
Your comments should focus on the
potential environmental effects,
reasonable alternatives, and measures to
3 The Council on Environmental Quality
regulations addressing cooperating agency
responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
E:\FR\FM\31OCN1.SGM
31OCN1
Federal Register / Vol. 79, No. 211 / Friday, October 31, 2014 / Notices
asabaliauskas on DSK5VPTVN1PROD with NOTICES
avoid or lessen environmental impacts.
The more specific your comments, the
more useful they will be. To ensure that
your comments are timely and properly
recorded, please send your comments so
that the Commission receives them in
Washington, DC on or before November
24, 2014.
For your convenience, there are three
methods which you can use to submit
your comments to the Commission. In
all instances please reference the project
docket number (CP14–552–000) with
your submission. The Commission
encourages electronic filing of
comments and has expert staff available
to assist you at (202) 502–8258 or
efiling@ferc.gov.
(1) You can file your comments
electronically using the eComment
feature on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. This is an easy
method for interested persons to submit
brief, text-only comments on a project;
(2) You can file your comments
electronically using the eFiling feature
on the Commission’s Web site
(www.ferc.gov) under the link to
Documents and Filings. With eFiling,
you can provide comments in a variety
of formats by attaching them as a file
with your submission. New eFiling
users must first create an account by
clicking on ‘‘eRegister.’’ You must select
the type of filing you are making. If you
are filing a comment on a particular
project, please select ‘‘Comment on a
Filing’’; or
(3) You can file a paper copy of your
comments by mailing them to the
following address: Kimberly D. Bose,
Secretary, Federal Energy Regulatory
Commission, 888 First Street NE., Room
1A, Washington, DC 20426.
Environmental Mailing List
The environmental mailing list
includes federal, state, and local
government representatives and
agencies; elected officials;
environmental and public interest
groups; other interested parties; and
local libraries and newspapers. This list
also includes all affected landowners (as
defined in the Commission’s
regulations) who own homes within
certain distances of aboveground
facilities, and anyone who submits
comments on the project. We will
update the environmental mailing list as
the analysis proceeds to ensure that we
send the information related to this
environmental review to all individuals,
organizations, and government entities
interested in and/or potentially affected
by the proposed project.
If we publish and distribute the EA,
copies will be sent to the environmental
VerDate Sep<11>2014
18:51 Oct 30, 2014
Jkt 235001
mailing list for public review and
comment. If you would prefer to receive
a paper copy of the document instead of
the CD version or would like to remove
your name from the mailing list, please
return the attached Information Request
(appendix 2).
Becoming an Intervenor
In addition to involvement in the EA
scoping process, you may want to
become an ‘‘intervenor’’ which is an
official party to the Commission’s
proceeding. Intervenors play a more
formal role in the process and are able
to file briefs, appear at hearings, and be
heard by the courts if they choose to
appeal the Commission’s final ruling.
An intervenor formally participates in
the proceeding by filing a request to
intervene. Instructions for becoming an
intervenor are in the User’s Guide under
the ‘‘e-filing’’ link on the Commission’s
Web site.
Additional Information
Additional information about the
project is available from the
Commission’s Office of External Affairs,
at (866) 208–FERC, or on the FERC Web
site at www.ferc.gov using the
‘‘eLibrary’’ link. Click on the eLibrary
link, click on ‘‘General Search’’ and
enter the docket number, excluding the
last three digits in the Docket Number
field (i.e., CP14–552). Be sure you have
selected an appropriate date range. For
assistance, please contact FERC Online
Support at FercOnlineSupport@ferc.gov
or toll free at (866) 208–3676, or for
TTY, contact (202) 502–8659. The
eLibrary link also provides access to the
texts of formal documents issued by the
Commission, such as orders, notices,
and rulemakings.
In addition, the Commission now
offers a free service called eSubscription
which allows you to keep track of all
formal issuances and submittals in
specific dockets. This can reduce the
amount of time you spend researching
proceedings by automatically providing
you with notification of these filings,
document summaries, and direct links
to the documents. Go to www.ferc.gov/
docs-filing/esubscription.asp.
Finally, public meetings or site visits
will be posted on the Commission’s
calendar located at www.ferc.gov/
EventCalendar/EventsList.aspx along
with other related information.
Dated: October 24, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–25898 Filed 10–30–14; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00025
Fmt 4703
Sfmt 4703
64765
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket Nos. CP13–499–000; CP13–502–
000]
Constitution Pipeline Company, LLC;
Iroquois Gas Transmission System,
LP; Notice of Availability of the Final
Environmental Impact Statement for
the Proposed Constitution Pipeline
and Wright Interconnect Projects
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) has prepared a final
environmental impact statement (EIS)
for the Constitution Pipeline and Wright
Interconnect Projects, proposed by
Constitution Pipeline Company, LLC
(Constitution) and Iroquois Gas
Transmission System, L.P. (Iroquois) in
the above-referenced dockets.
Constitution and Iroquois request
authorization to construct and operate
certain interstate natural gas pipeline
facilities in Pennsylvania and New York
to deliver up to 650,000 dekatherms per
day of natural gas supply to markets in
New York and New England.
The final EIS assesses the potential
environmental effects of the
construction and operation of the
Constitution Pipeline and Wright
Interconnect Projects in accordance
with the requirements of the National
Environmental Policy Act (NEPA). The
FERC staff concludes that approval of
the proposed projects, would have some
adverse environmental impacts;
however, these impacts would be
reduced to less-than-significant levels
with the implementation of
Constitution’s and Iroquois’ proposed
mitigation and the additional measures
recommended by staff in the final EIS.
The U.S. Environmental Protection
Agency, the U.S. Army Corps of
Engineers, the Federal Highway
Administration, and the New York State
Department of Agriculture and Markets
participated as cooperating agencies in
the preparation of the EIS. Cooperating
agencies have jurisdiction by law or
special expertise with respect to
resources potentially affected by the
proposal and participate in the NEPA
analysis. The U.S. Army Corps of
Engineers would adopt the final EIS if,
after an independent review of the
document, it concludes that its
comments and suggestions have been
satisfied.
The final EIS addresses the potential
environmental effects of the
construction and operation of the
facilities in Susquehanna County,
Pennsylvania and Broome, Chenango,
E:\FR\FM\31OCN1.SGM
31OCN1
Agencies
[Federal Register Volume 79, Number 211 (Friday, October 31, 2014)]
[Notices]
[Pages 64764-64765]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-25898]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP14-552-000]
Tennessee Gas Pipeline Company, LLC; Notice of Intent To Prepare
an Environmental Assessment for the Proposed Compressor Station 245
Horsepower Replacement Project and Request for Comments on
Environmental Issues
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the Compressor Station 245
Horsepower Replacement Project involving construction and operation of
facilities by Tennessee Gas Pipeline Company, LLC (TGP) in Herkimer
County, New York. The Commission will use this EA in its decision-
making process to determine whether the project is in the public
convenience and necessity.
This notice announces the opening of the scoping process the
Commission will use to gather input from the public and interested
agencies on the project. Your input will help the Commission staff
determine what issues they need to evaluate in the EA. Please note that
the scoping period will close on November 24, 2014.
This notice is being sent to the Commission's current environmental
mailing list for this project. State and local government
representatives should notify their constituents of this proposed
project and encourage them to comment on their areas of concern.
TGP provided landowners with a fact sheet prepared by the FERC
entitled ``An Interstate Natural Gas Facility On My Land? What Do I
Need To Know?'' This fact sheet addresses a number of typically asked
questions, including how to participate in the Commission's
proceedings. It is also available for viewing on the FERC Web site
(www.ferc.gov).
Summary of the Proposed Project
At its existing Compressor Station 245 in Herkimer County, New
York, TGP proposes to:
(1) Abandon in place one existing 3,500 horsepower Worthington ML12
natural gas-fired compressor unit;
(2) retire from active service three existing 1,400 horsepower
Worthington UTC natural gas-fired compressor units and retain the units
in place for standby use;
(3) install one new 8,219 horsepower Taurus 70 natural gas-fired
turbine compressor unit; and
(4) construct a new compressor building and associated facilities
to house the new compressor unit.
TGP states that the project would enable TGP to meet New York state
nitrogen oxide emission limits, and would improve overall system
reliability and flexibility. TGP does not anticipate that its proposal
would result in any increase in mainline capacity.
The general location of the project facilities is shown in appendix
1.\1\
---------------------------------------------------------------------------
\1\ The appendices referenced in this notice will not appear in
the Federal Register. Copies of appendices were sent to all those
receiving this notice in the mail and are available at www.ferc.gov
using the link called ``eLibrary'' or from the Commission's Public
Reference Room, 888 First Street NE., Washington, DC 20426, or call
(202) 502-8371. For instructions on connecting to eLibrary, refer to
the last page of this notice.
---------------------------------------------------------------------------
Land Requirements for Construction
The project would disturb approximately 25 acres of previously
disturbed land entirely owned by TGP within the existing Compressor
Station 245 property boundary. Public roads as well as private roads on
the existing Compressor Station 245 site would be used for access to
proposed construction work areas. New road extensions from existing
roads within the compressor station site would be constructed.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
\2\ to discover and address concerns the public may have about
proposals. This process is referred to as ``scoping.'' The main goal of
the scoping process is to focus the analysis in the EA on the important
environmental issues. By this notice, the Commission requests public
comments on the scope of the issues to address in the EA. We will
consider all filed comments during the preparation of the EA.
---------------------------------------------------------------------------
\2\ ``We,'' ``us,'' and ``our'' refer to the environmental staff
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------
In the EA we will discuss impacts that could occur as a result of
the construction and operation of the proposed project under these
general headings:
Geology and soils;
land use;
water resources;
cultural resources;
vegetation, wildlife, and sensitive species;
air quality and noise; and
public safety.
We will also evaluate reasonable alternatives to the proposed
project or portions of the project, and make recommendations on how to
lessen or avoid impacts on the various resource areas.
The EA will present our independent analysis of the issues. The EA
will be available in the public record through eLibrary. Depending on
the comments received during the scoping process, we may also publish
and distribute the EA to the public for an allotted comment period. We
will consider all comments on the EA before making our recommendations
to the Commission. To ensure we have the opportunity to consider and
address your comments, please carefully follow the instructions in the
Public Participation section below.
With this notice, we are asking agencies with jurisdiction by law
and/or special expertise with respect to the environmental issues of
this project to formally cooperate with us in the preparation of the
EA.\3\ Agencies that would like to request cooperating agency status
should follow the instructions for filing comments provided under the
Public Participation section of this notice.
---------------------------------------------------------------------------
\3\ The Council on Environmental Quality regulations addressing
cooperating agency responsibilities are at Title 40, Code of Federal
Regulations, Part 1501.6.
---------------------------------------------------------------------------
Public Participation
You can make a difference by providing us with your specific
comments or concerns about the project. Your comments should focus on
the potential environmental effects, reasonable alternatives, and
measures to
[[Page 64765]]
avoid or lessen environmental impacts. The more specific your comments,
the more useful they will be. To ensure that your comments are timely
and properly recorded, please send your comments so that the Commission
receives them in Washington, DC on or before November 24, 2014.
For your convenience, there are three methods which you can use to
submit your comments to the Commission. In all instances please
reference the project docket number (CP14-552-000) with your
submission. The Commission encourages electronic filing of comments and
has expert staff available to assist you at (202) 502-8258 or
efiling@ferc.gov.
(1) You can file your comments electronically using the eComment
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. This is an easy method for interested persons to
submit brief, text-only comments on a project;
(2) You can file your comments electronically using the eFiling
feature on the Commission's Web site (www.ferc.gov) under the link to
Documents and Filings. With eFiling, you can provide comments in a
variety of formats by attaching them as a file with your submission.
New eFiling users must first create an account by clicking on
``eRegister.'' You must select the type of filing you are making. If
you are filing a comment on a particular project, please select
``Comment on a Filing''; or
(3) You can file a paper copy of your comments by mailing them to
the following address: Kimberly D. Bose, Secretary, Federal Energy
Regulatory Commission, 888 First Street NE., Room 1A, Washington, DC
20426.
Environmental Mailing List
The environmental mailing list includes federal, state, and local
government representatives and agencies; elected officials;
environmental and public interest groups; other interested parties; and
local libraries and newspapers. This list also includes all affected
landowners (as defined in the Commission's regulations) who own homes
within certain distances of aboveground facilities, and anyone who
submits comments on the project. We will update the environmental
mailing list as the analysis proceeds to ensure that we send the
information related to this environmental review to all individuals,
organizations, and government entities interested in and/or potentially
affected by the proposed project.
If we publish and distribute the EA, copies will be sent to the
environmental mailing list for public review and comment. If you would
prefer to receive a paper copy of the document instead of the CD
version or would like to remove your name from the mailing list, please
return the attached Information Request (appendix 2).
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an ``intervenor'' which is an official party to the
Commission's proceeding. Intervenors play a more formal role in the
process and are able to file briefs, appear at hearings, and be heard
by the courts if they choose to appeal the Commission's final ruling.
An intervenor formally participates in the proceeding by filing a
request to intervene. Instructions for becoming an intervenor are in
the User's Guide under the ``e-filing'' link on the Commission's Web
site.
Additional Information
Additional information about the project is available from the
Commission's Office of External Affairs, at (866) 208-FERC, or on the
FERC Web site at www.ferc.gov using the ``eLibrary'' link. Click on the
eLibrary link, click on ``General Search'' and enter the docket number,
excluding the last three digits in the Docket Number field (i.e., CP14-
552). Be sure you have selected an appropriate date range. For
assistance, please contact FERC Online Support at
FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY,
contact (202) 502-8659. The eLibrary link also provides access to the
texts of formal documents issued by the Commission, such as orders,
notices, and rulemakings.
In addition, the Commission now offers a free service called
eSubscription which allows you to keep track of all formal issuances
and submittals in specific dockets. This can reduce the amount of time
you spend researching proceedings by automatically providing you with
notification of these filings, document summaries, and direct links to
the documents. Go to www.ferc.gov/docs-filing/esubscription.asp.
Finally, public meetings or site visits will be posted on the
Commission's calendar located at www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.
Dated: October 24, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-25898 Filed 10-30-14; 8:45 am]
BILLING CODE 6717-01-P