Combined Notice of Filings #1, 63614-63615 [2014-25342]
Download as PDF
asabaliauskas on DSK5VPTVN1PROD with NOTICES
63614
Federal Register / Vol. 79, No. 206 / Friday, October 24, 2014 / Notices
Line Company LLC’s Hillabee
Expansion Project (currently in the
NEPA Pre-Filing Process under Docket
No. PF14–6–000), the Commission
cannot begin preparation of the
Environmental Impact Statement (EIS)
to comply with the NEPA of 1969, until
after both remaining applications are
filed. Within 90 days after the
Commission issues a Notice of
Application for the final received
application, the Commission staff will
issue a Notice of Schedule for
Environmental Review that will indicate
the anticipated date for the
Commission’s staff issuance of the final
EIS analyzing all three proposals. The
issuance of a Notice of Schedule for
Environmental Review will also serve to
notify federal and state agencies of the
timing for the completion of all
necessary reviews, and the subsequent
need to complete all federal
authorizations within 90 days of the
date of issuance of the Commission
staff’s final EIS.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
7 copies of filings made with the
Commission and must mail a copy to
the applicant and to every other party in
the proceeding. Only parties to the
proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
VerDate Sep<11>2014
20:00 Oct 23, 2014
Jkt 235001
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 5 copies of the protest or
intervention to the Federal Energy
regulatory Commission, 888 First Street
NE., Washington, DC 20426.
Comment Date: October 31, 2014.
Dated: October 10, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–25325 Filed 10–23–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
Combined Notice of Filings #1
Take notice that the Commission
received the following electric rate
filings:
Docket Numbers: ER14–2576–001.
Applicants: Public Service Company
of Colorado.
Description: Compliance filing per 35:
2014–10–17_Att-P SGIP Order 792
Errata—Filing to be effective 8/4/2014.
Filed Date: 10/17/14.
Accession Number: 20141017–5062.
Comments Due: 5 p.m. ET 11/7/14.
Docket Numbers: ER15–121–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): 2014–10–16_SA 788
Termination ATC-Consumers Energy to
be effective 10/17/2014.
PO 00000
Frm 00018
Fmt 4703
Sfmt 4703
Filed Date: 10/16/14.
Accession Number: 20141016–5149.
Comments Due: 5 p.m. ET 11/6/14.
Docket Numbers: ER15–122–000.
Applicants: Southern Company
Services, Inc.
Description: Southern Company
Services, Inc. submits Notice of
Termination of Integrated Transmission
System Investment Responsibility
Reconciliation Agreement between
Georgia Transmission Corporation and
Georgia Power Company.
Filed Date: 10/16/14.
Accession Number: 20141016–5163.
Comments Due: 5 p.m. ET 11/6/14.
Docket Numbers: ER15–123–000.
Applicants: Midcontinent
Independent System Operator, Inc.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): 2014–10–17 2nd Quarter
Tariff Pricing Clean-Up—Filing to be
effective 10/18/2014.
Filed Date: 10/17/14.
Accession Number: 20141017–5074.
Comments Due: 5 p.m. ET 11/7/14.
Docket Numbers: ER15–125–000.
Applicants: Premcor Refining Group
Inc.
Description: Notice of Cancellation of
Market-Based Rate Tariff and Tariff ID
of The Premcor Refining Group Inc.
Filed Date: 10/17/14.
Accession Number: 20141017–5097.
Comments Due: 5 p.m. ET 11/7/14.
Docket Numbers: ER15–126–000.
Applicants: Valero Power Marketing
LLC.
Description: Notice of Cancellation of
Market-Based Rate Tariff and Tariff ID
of Valero Power Marketing LLC.
Filed Date: 10/17/14.
Accession Number: 20141017–5099.
Comments Due: 5 p.m. ET 11/7/14.
Docket Numbers: ER15–127–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): Service Agreement No.
3234; Queue No. W4–060 to be effective
9/17/2014.
Filed Date: 10/17/14.
Accession Number: 20141017–5129.
Comments Due: 5 p.m. ET 11/7/14.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
E:\FR\FM\24OCN1.SGM
24OCN1
Federal Register / Vol. 79, No. 206 / Friday, October 24, 2014 / Notices
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: October 17, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014–25342 Filed 10–23–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP14–529–000]
Tennessee Gas Pipeline Company,
L.L.C.; Notice of Intent To Prepare an
Environmental Assessment for the
Proposed Connecticut Expansion
Project, Request for Comments on
Environmental Issues, Notice of Public
Scoping Meetings, and Notice of
Environmental Site Reviews
The staff of the Federal Energy
Regulatory Commission (FERC or
Commission) will prepare an
environmental assessment (EA) that will
discuss the environmental impacts of
the Connecticut Expansion Project
(Project) involving construction and
operation of facilities by Tennessee Gas
Pipeline Company, L.L.C. (Tennessee)
in Albany County, New York; Berkshire
63615
and Hampden Counties, Massachusetts;
and Hartford County, Connecticut. The
Commission will use the EA in its
decision-making process to determine
whether the project is in the public
convenience and necessity.
This notice announces the opening of
the scoping process the Commission
will use to gather input from the public
and interested agencies on the Project.
Your input will help the Commission
staff determine what issues they need to
evaluate in the EA. Please note that the
scoping period will close on November
10, 2014.
You may submit comments in written
form or verbally. Further details on how
to submit written comments are in the
Public Participation section of this
notice. In lieu of or in addition to
sending written comments, the
Commission invites you to attend one of
the FERC public scoping meetings
scheduled for the Project as follows:
FERC PUBLIC SCOPING MEETINGS
Tuesday, October 28, 2014
Wednesday, October 29, 2014
Thursday, October 30, 2014
7:00 p.m.–9:00 p.m.
7:00 p.m.–9:00 p.m.
7:00 p.m.–9:00 p.m.
East Granby Community Center, 20 Center
Street, East Granby, CT 06026.
Sandisfield Art Center, 5 Hammertown Road,
Sandisfield, MA 01255.
Town Hall Auditorium, 445 Delaware Avenue,
Delmar, NY 12054.
The public scoping meetings are
designed to provide you with more
detailed information and another
opportunity to offer your comments on
the proposed Project. Tennessee
representatives will be present one hour
before each meeting with Project maps
and will be available to answer
questions. Interested groups and
individuals are encouraged to attend the
meetings and to present comments on
the issues they believe should be
addressed in the EA. A transcript of
each meeting will be made so that your
comments will be accurately recorded.
On October 28, 29, and 30, 2014, the
Commission staff will also conduct an
onsite environmental review of the
proposed locations for Tennessee’s
Project. The onsite review will
commence at the meeting locations
identified below and will proceed by
vehicle and on foot to view the
proposed pipeline routes from public
access points and Tennessee’s existing
pipeline right-of-way. Each site review
will require about three hours to
complete. Any interested parties
planning to attend must provide their
own transportation and should meet at
8:30am at the following locations:
FERC ONSITE ENVIRONMENTAL REVIEWS
Tuesday, October 28, 2014
Wednesday, October 29, 2014
Thursday, October 30, 2014
8:30 a.m.–11:30 a.m.
8:30 a.m.–11:30 a.m.
8:30 a.m.–11:30 a.m.
asabaliauskas on DSK5VPTVN1PROD with NOTICES
East Granby Community Center, 20 Center
Street, East Granby, CT 06026.
For additional information regarding
the onsite environmental reviews,
please contact FERC’s Office of External
Affairs at (866) 208–FERC.
This notice is being sent to the
Commission’s current environmental
mailing list for this Project. State and
local government representatives should
notify their constituents of this
proposed Project and encourage them to
comment on their areas of concern.
VerDate Sep<11>2014
20:00 Oct 23, 2014
Jkt 235001
Old Town Hall, 3 Silverbrook
Sandisfield, MA 01255.
Road,
If you are a landowner receiving this
notice, a pipeline company
representative may contact you about
the acquisition of an easement to
construct, operate, and maintain the
proposed facilities. The company would
seek to negotiate a mutually acceptable
agreement. However, if the Commission
approves the Project, that approval
conveys with it the right of eminent
domain. Therefore, if easement
negotiations fail to produce an
PO 00000
Frm 00019
Fmt 4703
Sfmt 4703
Town Hall Annex, 445 Delaware Avenue,
Delmar, NY 12054.
agreement, the pipeline company could
initiate condemnation proceedings
where compensation would be
determined in accordance with state
law.
Tennessee provided landowners with
a fact sheet prepared by the FERC
entitled ‘‘An Interstate Natural Gas
Facility On My Land? What Do I Need
To Know?’’ This fact sheet addresses a
number of typically-asked questions,
including the use of eminent domain
E:\FR\FM\24OCN1.SGM
24OCN1
Agencies
[Federal Register Volume 79, Number 206 (Friday, October 24, 2014)]
[Notices]
[Pages 63614-63615]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-25342]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Combined Notice of Filings #1
Take notice that the Commission received the following electric
rate filings:
Docket Numbers: ER14-2576-001.
Applicants: Public Service Company of Colorado.
Description: Compliance filing per 35: 2014-10-17_Att-P SGIP Order
792 Errata--Filing to be effective 8/4/2014.
Filed Date: 10/17/14.
Accession Number: 20141017-5062.
Comments Due: 5 p.m. ET 11/7/14.
Docket Numbers: ER15-121-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) rate filing per 35.13(a)(2)(iii): 2014-
10-16_SA 788 Termination ATC-Consumers Energy to be effective 10/17/
2014.
Filed Date: 10/16/14.
Accession Number: 20141016-5149.
Comments Due: 5 p.m. ET 11/6/14.
Docket Numbers: ER15-122-000.
Applicants: Southern Company Services, Inc.
Description: Southern Company Services, Inc. submits Notice of
Termination of Integrated Transmission System Investment Responsibility
Reconciliation Agreement between Georgia Transmission Corporation and
Georgia Power Company.
Filed Date: 10/16/14.
Accession Number: 20141016-5163.
Comments Due: 5 p.m. ET 11/6/14.
Docket Numbers: ER15-123-000.
Applicants: Midcontinent Independent System Operator, Inc.
Description: Sec. 205(d) rate filing per 35.13(a)(2)(iii): 2014-
10-17 2nd Quarter Tariff Pricing Clean-Up--Filing to be effective 10/
18/2014.
Filed Date: 10/17/14.
Accession Number: 20141017-5074.
Comments Due: 5 p.m. ET 11/7/14.
Docket Numbers: ER15-125-000.
Applicants: Premcor Refining Group Inc.
Description: Notice of Cancellation of Market-Based Rate Tariff and
Tariff ID of The Premcor Refining Group Inc.
Filed Date: 10/17/14.
Accession Number: 20141017-5097.
Comments Due: 5 p.m. ET 11/7/14.
Docket Numbers: ER15-126-000.
Applicants: Valero Power Marketing LLC.
Description: Notice of Cancellation of Market-Based Rate Tariff and
Tariff ID of Valero Power Marketing LLC.
Filed Date: 10/17/14.
Accession Number: 20141017-5099.
Comments Due: 5 p.m. ET 11/7/14.
Docket Numbers: ER15-127-000.
Applicants: PJM Interconnection, L.L.C.
Description: Sec. 205(d) rate filing per 35.13(a)(2)(iii): Service
Agreement No. 3234; Queue No. W4-060 to be effective 9/17/2014.
Filed Date: 10/17/14.
Accession Number: 20141017-5129.
Comments Due: 5 p.m. ET 11/7/14.
The filings are accessible in the Commission's eLibrary system by
clicking on the links or querying the docket number.
Any person desiring to intervene or protest in any of the above
proceedings must file in accordance with Rules 211 and 214 of the
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00
p.m. Eastern time on the specified comment date. Protests may be
considered, but intervention is necessary to become a party to the
proceeding.
[[Page 63615]]
eFiling is encouraged. More detailed information relating to filing
requirements, interventions, protests, service, and qualifying
facilities filings can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676
(toll free). For TTY, call (202) 502-8659.
Dated: October 17, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014-25342 Filed 10-23-14; 8:45 am]
BILLING CODE 6717-01-P