m. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
Register online at https://
www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Anyone may submit comments, a
protest, or a motion to intervene in
accordance with the requirements of
Rules of Practice and Procedure, 18 CFR
385.210, .211, and .214. In determining
the appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
All filings must (1) bear in all capital
letters the title ‘‘COMMENTS’’, ‘‘REPLY
COMMENTS’’,
‘‘RECOMMENDATIONS,’’ ‘‘TERMS
AND CONDITIONS,’’ or
‘‘PRESCRIPTIONS;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person submitting the
filing; and (4) otherwise comply with
the requirements of 18 CFR 385.2001
through 385.2005. All comments,
recommendations, terms and conditions
or prescriptions must set forth their
evidentiary basis and otherwise comply
with the requirements of 18 CFR 4.34(b).
Agencies may obtain copies of the
application directly from the applicant.
Each filing must be accompanied by
proof of service on all persons listed on
the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b), and
385.2010.
n. Public notice of the filing of the
initial development application, which
has already been given, established the
due date for filing competing
applications or notices of intent. Under
the Commission’s regulations, any
competing development application
must be filed in response to and in
compliance with public notice of the
VerDate Sep<11>2014
20:00 Oct 23, 2014
Jkt 235001
initial development application. No
competing applications or notices of
intent may be filed in response to this
notice.
o. Procedural Schedule:
The application will be processed
according to the following revised
Hydro Licensing Schedule. Revisions to
the schedule may be made as
appropriate.
Milestone
Target date
Filing of recommendations,
preliminary terms and
conditions, and preliminary fishway prescriptions.
Commission issues Draft
EIS.
Comments on Draft EIS ....
Modified Terms and Conditions.
Commission Issues Final
EIS.
December 2014.
June 2015.
August 2015.
October 2015.
January 2016.
p. A license applicant must file no
later than 60 days following the date of
issuance of the notice of acceptance and
ready for environmental analysis
provided for in 5.22: (1) A copy of the
water quality certification; (2) a copy of
the request for certification, including
proof of the date on which the certifying
agency received the request; or (3)
evidence of waiver of water quality
certification.
Include the following paragraphs for
original licenses only:
r. Any qualified applicant desiring to
file a competing application must
submit to the Commission, on or before
the specified intervention deadline date,
a competing development application,
or a notice of intent to file such an
application. Submission of a timely
notice of intent allows an interested
person to file the competing
development application no later than
120 days after the specified intervention
deadline date. Applications for
preliminary permits will not be
accepted in response to this notice.
A notice of intent must specify the
exact name, business address, and
telephone number of the prospective
applicant, and must include an
unequivocal statement of intent to
submit a development application. A
notice of intent must be served on the
applicant(s) named in this public notice.
Dated: October 17, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–25329 Filed 10–23–14; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00016
Fmt 4703
Sfmt 4703
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2101–096]
Sacramento Municipal Utility District;
Notice of Application Accepted for
Filing, Ready for Environmental
Analysis, Soliciting Comments,
Motions To Intervene, Protests,
Recommendations, Terms and
Conditions, and Fishway Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Amendment
of License.
b. Project No.: 2101–096.
c. Date Filed: August 27, 2014.
d. Applicant: Sacramento Municipal
Utility District.
e. Name of Project: Upper American
River Hydroelectric Project.
f. Location: The project is located on
Silver Creek and the Rubicon and South
Fork American rivers in El Dorado and
Sacramento counties, California. The
project occupies federal lands
administered by the Bureau of Land
Management and by the U.S. Forest
Service within the Eldorado National
Forest.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Mr. David
Hanson, Project Manager, Hydro
Licensing & Permitting, Sacramento
Municipal Utility District, P.O. Box
15830, Mail Stop K203, Sacramento, CA
95852–0830, (888) 742–7683.
i. FERC Contact: Mr. Steven Sachs
(202) 502–8666 or Steven.Sachs@
ferc.gov.
j. Deadline for filing motions to
intervene and protests, comments,
recommendations, terms and
conditions, and fishway prescriptions is
60 days from the issuance date of this
notice by the Commission; reply
comments are due 105 days from the
issuance date of this notice by the
Commission. The Commission strongly
encourages electronic filing. Please file
any motion to intervene, protest,
comments, and/or recommendations
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
E:\FR\FM\24OCN1.SGM
24OCN1
asabaliauskas on DSK5VPTVN1PROD with NOTICES
Federal Register / Vol. 79, No. 206 / Friday, October 24, 2014 / Notices
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–2101–096.
k. Description of Request: The
applicant proposes to construct a new
powerhouse located approximately
1,320 feet downstream of the existing
Slab Creek dam on the South Fork
American River. The powerhouse would
be used to supplement required
minimum flows and contain a single
turbine/generator unit with an installed
capacity of 2.7 megawatts and a
hydraulic capacity of 156 cubic feet per
second. The applicant also proposes to
construct a new 400-foot-long, 8-footdiameter steel penstock through the
existing White Rock Tunnel Adit No. 3
to feed the new powerhouse with flows
from the existing White Rock power
tunnel. The applicant also proposes to
install a new boating flow release valve
immediately downstream of the new
powerhouse and connected to the new
penstock.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
efiling.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions To
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
VerDate Sep<11>2014
20:00 Oct 23, 2014
Jkt 235001
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’,
‘‘MOTION TO INTERVENE’’, ‘‘TERMS
AND CONDITIONS’’ or ‘‘FISHWAY
PRESCRIPTIONS’’ as applicable; (2) set
forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the amendment.
Agencies may obtain copies of the
application directly from the applicant.
A copy of any protest or motion to
intervene must be served upon each
representative of the applicant specified
in the particular application. If an
intervener files comments or documents
with the Commission relating to the
merits of an issue that may affect the
responsibilities of a particular resource
agency, they must also serve a copy of
the document on that resource agency.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: October 17, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–25328 Filed 10–23–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP14–554–000; PF14–2–000]
Florida Southeast Connection, LLC:
Notice of Application
Take notice that on September 26,
2014, Florida Southeast Connection,
LLC (FSC), 700 Universe Boulevard,
Juno Beach, FL 33408, filed an
application under section 7(c) of the
Natural Gas Act and Parts 157 and 284
PO 00000
Frm 00017
Fmt 4703
Sfmt 4703
63613
of the Commission’s regulations
requesting authorization to construct,
own and operate a new natural gas
pipeline system (FSC Project) consisting
of approximately 126 miles of pipe,
associated valves, piping, and
appurtenant facilities, commencing at
an interconnection with the proposed
Sabal Trail Transmission, LLC (Sabal
Trail) pipeline near Intercession City,
Florida, and terminating at a delivery
point at the Florida Power & Light
Company (FPL) Martin Clean Energy
Center (Martin), near Indiantown,
Florida. FSC will have an initial
transportation capacity of 640,000
dekatherms per day.
In addition, FSC requests that the
Commission issue to FSC a blanket
certificate authorizing FSC to construct,
operate, and abandon certain facilities
under Part 157, Subpart F of the
Commission’s regulations, a blanket
certificate authorizing FSC to transport
natural gas, on an open access and selfimplementing basis, under Part 284,
Subpart G of the Commission’s
regulations, and authorizations
necessary to charge initial recourse rates
for certain services to be rendered by
FSC, all as more fully set forth in the
application which is on file with the
Commission and open for public
inspection. The filing may also be
viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or TTY, (202)
502–8659.
Any questions regarding the proposed
project should be directed to Robert E.
Sharra, Director Business Development,
Florida Southeast Connection, LLC, 700
Universe Boulevard, Juno Beach,
Florida 33408, or by calling (561) 691–
7274 (telephone) or (561) 304–5233 (fax)
or email at robert.sharra@nee.com.
On October 16, 2013, the Commission
staff granted FSC’s request to utilize the
National Environmental Policy Act
(NEPA) Pre-Filing Process and assigned
Docket No. PF14–2–000 to staff
activities involving the project. Now, as
of the filing of this application on
September 26, 2014, the NEPA PreFiling Process for this project has ended.
From this time forward, this proceeding
will be conducted in Docket No. CP14–
554–000, as noted in the caption of this
Notice.
Because the environmental review of
the FSC Project must also include both
Sabal Trail (currently in the NEPA PreFiling Process under Docket No. PF14–
1–000) and Transcontinental Gas Pipe
E:\FR\FM\24OCN1.SGM
24OCN1
Agencies
[Federal Register Volume 79, Number 206 (Friday, October 24, 2014)]
[Notices]
[Pages 63612-63613]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-25328]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2101-096]
Sacramento Municipal Utility District; Notice of Application
Accepted for Filing, Ready for Environmental Analysis, Soliciting
Comments, Motions To Intervene, Protests, Recommendations, Terms and
Conditions, and Fishway Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Amendment of License.
b. Project No.: 2101-096.
c. Date Filed: August 27, 2014.
d. Applicant: Sacramento Municipal Utility District.
e. Name of Project: Upper American River Hydroelectric Project.
f. Location: The project is located on Silver Creek and the Rubicon
and South Fork American rivers in El Dorado and Sacramento counties,
California. The project occupies federal lands administered by the
Bureau of Land Management and by the U.S. Forest Service within the
Eldorado National Forest.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. David Hanson, Project Manager, Hydro
Licensing & Permitting, Sacramento Municipal Utility District, P.O. Box
15830, Mail Stop K203, Sacramento, CA 95852-0830, (888) 742-7683.
i. FERC Contact: Mr. Steven Sachs (202) 502-8666 or
Steven.Sachs@ferc.gov.
j. Deadline for filing motions to intervene and protests, comments,
recommendations, terms and conditions, and fishway prescriptions is 60
days from the issuance date of this notice by the Commission; reply
comments are due 105 days from the issuance date of this notice by the
Commission. The Commission strongly encourages electronic filing.
Please file any motion to intervene, protest, comments, and/or
recommendations using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
[[Page 63613]]
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-2101-096.
k. Description of Request: The applicant proposes to construct a
new powerhouse located approximately 1,320 feet downstream of the
existing Slab Creek dam on the South Fork American River. The
powerhouse would be used to supplement required minimum flows and
contain a single turbine/generator unit with an installed capacity of
2.7 megawatts and a hydraulic capacity of 156 cubic feet per second.
The applicant also proposes to construct a new 400-foot-long, 8-foot-
diameter steel penstock through the existing White Rock Tunnel Adit No.
3 to feed the new powerhouse with flows from the existing White Rock
power tunnel. The applicant also proposes to install a new boating flow
release valve immediately downstream of the new powerhouse and
connected to the new penstock.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov/docs-filing/efiling.asp. Enter the docket number excluding the last three digits in
the docket number field to access the document. You may also register
online at https://www.ferc.gov/docs-filing/esubscription.asp to be
notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions To Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the title ``COMMENTS'', ``PROTEST'',
``MOTION TO INTERVENE'', ``TERMS AND CONDITIONS'' or ``FISHWAY
PRESCRIPTIONS'' as applicable; (2) set forth in the heading the name of
the applicant and the project number of the application to which the
filing responds; (3) furnish the name, address, and telephone number of
the person protesting or intervening; and (4) otherwise comply with the
requirements of 18 CFR 385.2001 through 385.2005. All comments, motions
to intervene, or protests must set forth their evidentiary basis and
otherwise comply with the requirements of 18 CFR 4.34(b). All comments,
motions to intervene, or protests should relate to project works which
are the subject of the amendment. Agencies may obtain copies of the
application directly from the applicant. A copy of any protest or
motion to intervene must be served upon each representative of the
applicant specified in the particular application. If an intervener
files comments or documents with the Commission relating to the merits
of an issue that may affect the responsibilities of a particular
resource agency, they must also serve a copy of the document on that
resource agency. A copy of all other filings in reference to this
application must be accompanied by proof of service on all persons
listed in the service list prepared by the Commission in this
proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Dated: October 17, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-25328 Filed 10-23-14; 8:45 am]
BILLING CODE 6717-01-P