Glacial Energy, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications, 61637-61638 [2014-24345]
Download as PDF
Federal Register / Vol. 79, No. 198 / Tuesday, October 14, 2014 / Notices
questions about the Environmental Site
Review (or needing directions) should
contact Charlie Kuffner of Rugraw, LLC
at (415) 652–8553 or email at
charlie.kuffner@gmail.com. Those
individuals planning to participate in
the Environmental Site Review should
notify Mr. Kuffner of their intent, no
later than Friday, October 31, 2014. For
more details about the Environmental
Site Review, including meeting
locations, transportation options, meal
options, and the itinerary, please see the
information in Appendix A of the SD1.
Objectives
At the scoping meetings, the staff will:
(1) Summarize the environmental issues
tentatively identified for analysis in the
EA and CEQA document; (2) solicit
from the meeting participants all
available information, especially
quantifiable data, on the resources at
issue; (3) encourage statements from
experts and the public on issues that
should be analyzed in the EA, and
CEQA document, including viewpoints
in opposition to, or in support of, the
staffs’ preliminary views; (4) determine
the resource issues to be addressed in
the EA and CEQA document; (5)
identify those issues that require a
detailed analysis, as well as those issues
that do not require a detailed analysis;
(6) solicit from the meeting participants,
input to the State Water Board on the
type of CEQA document that should be
prepared, and (7) solicit from any
responsible or trustee agency or other
interested parties that believes an EIR
should be prepared, environmental
information to identify the scope and
content of an EIR should the State Water
Board determine an EIR should be
prepared.
mstockstill on DSK4VPTVN1PROD with NOTICES
Procedures
The meetings will be recorded by a
stenographer and become part of the
formal record of the Commission and
State Water Board proceedings on the
project.
Individuals, organizations, and
agencies with environmental expertise
and concerns are encouraged to attend
the meeting(s) and to assist the staff in
defining and clarifying the issues to be
addressed in the EA and CEQA
document.
Dated: October 3, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–24299 Filed 10–10–14; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
16:59 Oct 10, 2014
Jkt 235001
61637
Dated: October 6, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[FR Doc. 2014–24316 Filed 10–10–14; 8:45 am]
[Docket No. EL15–2–000]
BILLING CODE 6717–01–P
UIF GP, LLC; Notice of Petition for
Declaratory Order
DEPARTMENT OF ENERGY
Take notice that on October 3, 2014,
pursuant to Rule 207(a)(2) of the Federal
Energy Regulatory Commission’s
(Commission) Rules of Practice and
Procedure, 18 CFR 385.207(a)(2), UIF
GP, LLC (UIF) filed a petition for
declaratory order requesting that the
Commission: (1) Disclaim jurisdiction
over UIF as a public utility under
section 201(e) of the Federal Power Act
(FPA) and (2) disclaim jurisdiction over
future transfers of the Class A–1
Interests or Class B Interests in Neptune
Regional Transmission System, LLC
under section 203(a)(1) of the FPA., as
more fully explained in the petition.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Petitioner.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on November 3, 2014.
PO 00000
Frm 00042
Fmt 4703
Sfmt 4703
Federal Energy Regulatory
Commission
[Project No. 14636–000]
Glacial Energy, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On September 19, 2014, Glacial
Energy, LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Talkeetna River Dam Hydroelectric
Project (Talkeetna River Project or
project) to be located on the Talkeetna
River, near Talkeetna in MatanuskaSusitna Borough, Alaska. The sole
purpose of a preliminary permit, if
issued, is to grant the permit holder
priority to file a license application
during the permit term. A preliminary
permit does not authorize the permit
holder to perform any land-disturbing
activities or otherwise enter upon lands
or waters owned by others without the
owners’ express permission.
The proposed project would consist of
the following: (1) A 2,300-foot-long,
370-foot-high dam located at an
elevation of 970 feet mean sea level on
the Talkeetna River; (2) a 2,700-footlong, 12-foot-diameter steel penstock;
(3) a 1,500-foot-long, 50-foot-wide, 20foot-tall concrete open channel spillway
exiting downstream from the dam; (4) a
75-foot long, 125-foot-wide powerhouse
with three Francis turbine units rated
for 25 megawatts (MW) each or 75 MW
total at 320 feet of net head; (5) a 100foot-wide, 30-foot-deep, 35-foot-long
concrete tailrace emptying into the
Talkeetna River; (6) an 11-mile, 69kilovolt transmission line; (7) a
substation; ; and (8) appurtenant
facilities.
The estimated annual generation of
the Talkeetna River Project would be
311 gigawatt-hours.
Applicant Contact: Mr. Brent L.
Smith, Manager, Northwest Power
Services, Inc., P.O. Box 872316, Wasilla,
AK 99687; phone: (907) 414–8223.
FERC Contact: Julia Kolberg; phone:
(202) 502–8261.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
E:\FR\FM\14OCN1.SGM
14OCN1
61638
Federal Register / Vol. 79, No. 198 / Tuesday, October 14, 2014 / Notices
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14630–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14636) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
date of publication of this notice in the
Federal Register.
Dated: October 3, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–24298 Filed 10–10–14; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[FRL–9917–54–OEI]
Agency Information Collection
Activities OMB Responses
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
Dated: October 7, 2014.
Kimberly D. Bose,
Secretary.
This document announces the
Office of Management and Budget
(OMB) responses to Agency Clearance
requests, in compliance with the
Paperwork Reduction Act (44 U.S.C.
3501 et seq.). An agency may not
conduct or sponsor, and a person is not
required to respond to, a collection of
information unless it displays a
currently valid OMB control number.
The OMB control numbers for EPA
regulations are listed in 40 CFR part 9
and 48 CFR chapter 15.
FOR FURTHER INFORMATION CONTACT:
Courtney Kerwin (202) 566–1669, or
email at kerwin.courtney@epa.gov and
please refer to the appropriate EPA
Information Collection Request (ICR)
Number.
[FR Doc. 2014–24345 Filed 10–10–14; 8:45 am]
SUPPLEMENTARY INFORMATION:
BILLING CODE 6717–01–P
SUMMARY:
OMB Responses to Agency Clearance
Requests
DEPARTMENT OF ENERGY
OMB Approvals
Federal Energy Regulatory
Commission
EPA ICR Number 1086.10; NSPS for
Onshore Natural Gas Processing Plants
(40 CFR part 60, subparts KKK and LLL)
(Renewal); 40 CFR part 60, subparts A,
KKK, and LLL; was approved on 08/05/
2014; OMB Number 2060–0120; expires
on 08/31/2017; Approved with change.
EPA ICR Number 1367.11; Regulation
of Fuels and Fuel Additives: Gasoline
Volatility (40 CFR 80.27); 40 CFR 80.27;
was approved on 08/06/2014; OMB
Number 2060–0178; expires on 08/31/
2017; Approved without change.
EPA ICR Number 2193.03; Energy Star
Program in the Residential Sector
(Renewal); was approved on 08/06/
2014; OMB Number 2060–0586; expires
on 08/31/2017; Approved with change.
EPA ICR Number 2472.01; Pesticide
Spray Drift Reduction Technologies; 40
CFR part 152; was approved on 08/12/
2014; OMB Number 2070–0191; expires
on 08/31/2017; Approved with change.
[Docket No. EL14–98–000]
mstockstill on DSK4VPTVN1PROD with NOTICES
Arizona Public Service Company;
Notice of Institution of Section 206
Proceeding and Refund Effective Date
On October 3, 2014, the Commission
issued an order in Docket No. EL14–98–
000, pursuant to section 206 of the
Federal Power Act (FPA), 16 U.S.C.
824e (2012), instituting an investigation
to determine whether market-based rate
authority for Arizona Public Service
Company (APS) in the APS balancing
authority area and the Phoenix Valley
Load Pocket is just and reasonable.
Arizona Public Service Company, 149
FERC ¶ 61,013 (2014).
The refund effective date in Docket
No. EL14–98–000, established pursuant
to section 206(b) of the FPA, will be the
VerDate Sep<11>2014
16:59 Oct 10, 2014
Jkt 235001
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
EPA ICR Number 2060.06; Cooling
Water Intake Structures Phase II
Existing Facility (Renewal); 40 CFR
parts 122 and 125; was approved on 08/
13/2014; OMB Number 2040–0257;
expires on 08/31/2017; Approved
without change.
EPA ICR Number 0282.16; Engine
Emission Defect Information Reports
and Voluntary Emission Recall Reports
(Renewal); 40 CFR 85, 89, 90, 91, 92, 94,
1035, 1039, 1042, 1045, 1048, 1051,
1054, 1068; was approved on 08/21/
2014; OMB Number 2060–0048; expires
on 08/31/2017; Approved without
change.
EPA ICR Number 1246.12; Reporting
and Recordkeeping for Asbestos
Abatement Worker Protection; 40 CFR
part 763 subpart G; was approved on 08/
21/2014; OMB Number 2070–0072;
expires on 08/31/2017; Approved
without change.
Courtney Kerwin,
Acting Director, Collections Strategies
Division.
[FR Doc. 2014–24318 Filed 10–10–14; 8:45 am]
BILLING CODE 6560–50–P
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OPA–2014–0445; FRL–9917–75–
OEI]
Information Collection Request
Submitted to OMB for Review and
Approval; Comment Request; Oil
Pollution Act Facility Response Plans
(Renewal)
Environmental Protection
Agency (EPA).
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency has submitted an information
collection request (ICR), ‘‘Oil Pollution
Act Facility Response Plans (Renewal)’’
(EPA ICR No. 1630.12, OMB Control No.
2050–0135) to the Office of Management
and Budget (OMB) for review and
approval in accordance with the
Paperwork Reduction Act (44 U.S.C.
3501 et seq.). This is a proposed
extension of the ICR, which is currently
approved through October 31, 2014.
Public comments were previously
requested via the Federal Register (79
FR 44768) on August 1, 2014 during a
60-day comment period. This notice
allows for an additional 30 days for
public comments. A fuller description
of the ICR is given below, including its
estimated burden and cost to the public.
An Agency may not conduct or sponsor
and a person is not required to respond
to a collection of information unless it
SUMMARY:
E:\FR\FM\14OCN1.SGM
14OCN1
Agencies
[Federal Register Volume 79, Number 198 (Tuesday, October 14, 2014)]
[Notices]
[Pages 61637-61638]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-24345]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14636-000]
Glacial Energy, LLC; Notice of Preliminary Permit Application
Accepted for Filing and Soliciting Comments, Motions To Intervene, and
Competing Applications
On September 19, 2014, Glacial Energy, LLC filed an application for
a preliminary permit, pursuant to section 4(f) of the Federal Power Act
(FPA), proposing to study the feasibility of the Talkeetna River Dam
Hydroelectric Project (Talkeetna River Project or project) to be
located on the Talkeetna River, near Talkeetna in Matanuska-Susitna
Borough, Alaska. The sole purpose of a preliminary permit, if issued,
is to grant the permit holder priority to file a license application
during the permit term. A preliminary permit does not authorize the
permit holder to perform any land-disturbing activities or otherwise
enter upon lands or waters owned by others without the owners' express
permission.
The proposed project would consist of the following: (1) A 2,300-
foot-long, 370-foot-high dam located at an elevation of 970 feet mean
sea level on the Talkeetna River; (2) a 2,700-foot-long, 12-foot-
diameter steel penstock; (3) a 1,500-foot-long, 50-foot-wide, 20-foot-
tall concrete open channel spillway exiting downstream from the dam;
(4) a 75-foot long, 125-foot-wide powerhouse with three Francis turbine
units rated for 25 megawatts (MW) each or 75 MW total at 320 feet of
net head; (5) a 100-foot-wide, 30-foot-deep, 35-foot-long concrete
tailrace emptying into the Talkeetna River; (6) an 11-mile, 69-kilovolt
transmission line; (7) a substation; ; and (8) appurtenant facilities.
The estimated annual generation of the Talkeetna River Project
would be 311 gigawatt-hours.
Applicant Contact: Mr. Brent L. Smith, Manager, Northwest Power
Services, Inc., P.O. Box 872316, Wasilla, AK 99687; phone: (907) 414-
8223.
FERC Contact: Julia Kolberg; phone: (202) 502-8261.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of
[[Page 61638]]
intent to file competing applications: 60 days from the issuance of
this notice. Competing applications and notices of intent must meet the
requirements of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file
comments, motions to intervene, notices of intent, and competing
applications using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-14630-000.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at https://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-14636) in the docket number field to access
the document. For assistance, contact FERC Online Support.
Dated: October 7, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-24345 Filed 10-10-14; 8:45 am]
BILLING CODE 6717-01-P