Combined Notice of Filings, 59766-59767 [2014-23528]

Download as PDF mstockstill on DSK4VPTVN1PROD with NOTICES 59766 Federal Register / Vol. 79, No. 192 / Friday, October 3, 2014 / Notices Comments Due: 5 p.m. ET 10/17/14. Docket Numbers: ER14–2943–000. Applicants: Avista Corporation. Description: Initial rate filing per 35.12 Avista Corp Service Agreement No. 544 to be effective 10/1/2014. Filed Date: 9/26/14. Accession Number: 20140926–5005. Comments Due: 5 p.m. ET 10/17/14. Docket Numbers: ER14–2944–000. Applicants: NorthWestern Corporation. Description: Initial rate filing per 35.12 SA 724 Utilities Agreement with Montana DOT re Kershaw Turn Lanes Project to be effective 11/25/2014. Filed Date: 9/26/14. Accession Number: 20140926–5117. Comments Due: 5 p.m. ET 10/17/14. Docket Numbers: ER14–2945–000. Applicants: Roundtop Energy LLC. Description: Initial rate filing per 35.12 Roundtop Energy LLC MBR Tariff Application to be effective 11/25/2014. Filed Date: 9/26/14. Accession Number: 20140926–5118. Comments Due: 5 p.m. ET 10/17/14. Docket Numbers: ER14–2946–000. Applicants: PJM Interconnection, L.L.C. Description: § 205(d) rate filing per 35.13(a)(2)(iii): Original Service Agreement No. 3939; Queue Z2–019 to be effective 8/28/2014. Filed Date: 9/26/14. Accession Number: 20140926–5122. Comments Due: 5 p.m. ET 10/17/14. Docket Numbers: ER14–2947–000. Applicants: NorthWestern Corporation. Description: § 205(d) rate filing per 35.13(a)(2)(iii): SA 605 Second Revised—NITSA with Bonnevilla Power Administration to be effective 10/1/2014. Filed Date: 9/26/14. Accession Number: 20140926–5144. Comments Due: 5 p.m. ET 10/17/14. Docket Numbers: ER14–2948–000. Applicants: Tucson Electric Power Company. Description: § 205(d) rate filing per 35.13(a)(2)(iii): Gila River Power Station Ownership Agreement to be effective 11/25/2014. Filed Date: 9/26/14. Accession Number: 20140926–5145. Comments Due: 5 p.m. ET 10/17/14. Docket Numbers: ER14–2949–000. Applicants: Puget Sound Energy, Inc. Description: Initial rate filing per 35.12 Air Products TX Interconnection, NITSA & NOA Agreements to be effective 9/1/2014. Filed Date: 9/26/14. Accession Number: 20140926–5147. Comments Due: 5 p.m. ET 10/17/14. VerDate Sep<11>2014 18:08 Oct 02, 2014 Jkt 235001 Docket Numbers: ER14–2950–000. Applicants: Midcontinent Independent System Operator, ALLETE, Inc. Description: § 205(d) rate filing per 35.13(a)(2)(iii): 2014–09–26_SA 2700 Great Northern Transmission Line MPFCA to be effective 11/25/2014. Filed Date: 9/26/14. Accession Number: 20140926–5148. Comments Due: 5 p.m. ET 10/17/14. Docket Numbers: ER14–2951–000. Applicants: Wisconsin Electric Power Company. Description: § 205(d) rate filing per 35.13(a)(2)(iii): FERC Electric Tariff Rate Schedule No. 122 to be effective 12/1/2014. Filed Date: 9/26/14. Accession Number: 20140926–5150. Comments Due: 5 p.m. ET 10/17/14. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 26, 2014. Nathaniel J. Davis, Sr., Deputy Secretary. Filed Date: 9/23/14. Accession Number: 20140923–5183. Comments Due: 5 p.m. ET 10/14/14. 284.123(g) Protests Due: Docket Numbers: RP14–1277–000. Applicants: Transcontinental Gas Pipe Line Company. Description: § 4(d) rate filing per 154.403(d)(2): LNG Fuel Tracker Filing 2014 to be effective 11/1/2014. Filed Date: 9/25/14. Accession Number: 20140925–5109. Comments Due: 5 p.m. ET 10/7/14. Docket Numbers: RP14–1278–000. Applicants: Midcontinent Express Pipeline LLC. Description: § 4(d) rate filing per 154.204: Continental Resources’ Negotiated Rate to be effective 10/1/ 2014. Filed Date: 9/25/14. Accession Number: 20140925–5121. Comments Due: 5 p.m. ET 10/7/14. Docket Numbers: RP14–1279–000. Applicants: Tennessee Gas Pipeline Company, L.L.C. Description: § 4(d) rate filing per 154.204: Volume No. 2—Statoil Natural Gas LLC SP102661 to be effective 11/1/ 2014. Filed Date: 9/25/14. Accession Number: 20140925–5151. Comments Due: 5 p.m. ET 10/7/14. Any person desiring to intervene or protest in any of the above proceedings must file in accordance with Rules 211 and 214 of the Commission’s Regulations (18 CFR 385.211 and 385.214) on or before 5:00 p.m. Eastern time on the specified comment date. Protests may be considered, but intervention is necessary to become a party to the proceeding. Filings in Existing Proceedings [FR Doc. 2014–23619 Filed 10–2–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings: Filings Instituting Proceedings Docket Numbers: PR14–55–000. Applicants: Arkansas Oklahoma Gas Corporation. Description: Request for Limited Waiver of Requirement to Submit Informational Rate Filing and Continued Limited Waiver of Form 549–D. PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 Docket Numbers: RP14–1196–001. Applicants: Gas Transmission Northwest LLC. Description: Compliance filing per 154.203: Compliance to RP14–1196–000 to be effective 9/22/2014. Filed Date: 9/26/14. Accession Number: 20140926–5018. Comments Due: 5 p.m. ET 10/8/14. Any person desiring to protest in any of the above proceedings must file in accordance with Rule 211 of the Commission’s Regulations (18 CFR § 385.211) on or before 5:00 p.m. Eastern time on the specified comment date. The filings are accessible in the Commission’s eLibrary system by clicking on the links or querying the docket number. eFiling is encouraged. More detailed information relating to filing requirements, interventions, protests, service, and qualifying facilities filings E:\FR\FM\03OCN1.SGM 03OCN1 Federal Register / Vol. 79, No. 192 / Friday, October 3, 2014 / Notices can be found at: https://www.ferc.gov/ docs-filing/efiling/filing-req.pdf. For other information, call (866) 208–3676 (toll free). For TTY, call (202) 502–8659. Dated: September 26, 2014. Nathaniel J. Davis, Sr., Deputy Secretary. [FR Doc. 2014–23528 Filed 10–2–14; 8:45 am] BILLING CODE 6717–01–P ENVIRONMENTAL PROTECTION AGENCY [EPA–R08–OAR–2014–0236; FRL–9917–35– Region–8] Adequacy Determination for Lamar and Steamboat Springs PM10 Maintenance Plans’ Motor Vehicle Emissions Budgets for Transportation Conformity Purposes; State of Colorado Environmental Protection Agency. ACTION: Notice of adequacy. AGENCY: In this notice, the Environmental Protection Agency (EPA) is notifying the public that the Agency has found the following adequate for transportation conformity purposes: The ‘‘Revised PM10 Maintenance Plan for the Lamar Attainment/Maintenance Area’’ and its motor vehicle emissions budget, and the ‘‘Revised PM10 Maintenance Plan for the Steamboat Springs Attainment/Maintenance Area’’ and its motor vehicle emissions budget. As more fully explained in the Supplementary Information section of this notice, this finding will affect future transportation conformity determinations. SUMMARY: This finding is effective on October 20, 2014. DATES: Tim Russ, Air Program, Mailcode 8P–AR, Environmental Protection Agency, Region 8, 1595 Wynkoop Street, Denver, Colorado 80202–1129, telephone number (303) 312–6479, fax number (303) 312–6064, or email russ.tim@ epa.gov. FOR FURTHER INFORMATION CONTACT: mstockstill on DSK4VPTVN1PROD with NOTICES SUPPLEMENTARY INFORMATION: Throughout this document, whenever ‘‘we,’’ ‘‘us,’’ or ‘‘our,’’ are used, we mean EPA. Whenever ‘‘State’’ is used, we mean the State of Colorado. Transportation conformity is required by section 176(c) of the Clean Air Act (CAA). The conformity rule provisions at 40 CFR 93 require that transportation plans, programs, and projects conform to a State Implementation Plan (SIP) and establish the criteria and procedures for determining whether or not they do. VerDate Sep<11>2014 18:08 Oct 02, 2014 Jkt 235001 Conformity to a SIP means that transportation activities will not produce new air quality violations, worsen existing violations, or delay timely attainment of the National Ambient Air Quality Standard (NAAQS). The criteria by which we determine whether a SIP revision’s motor vehicle emissions budget (MVEB) is adequate for conformity purposes are outlined in 40 CFR 93.118(e)(4), which was promulgated August 15, 1997 (62 FR 43780). We described our process for determining the adequacy of submitted SIP MVEBs in our July 1, 2004 Transportation Conformity Rule Amendments (69 FR 40004). We used these resources in making our adequacy determinations announced in this notice. This notice is simply an announcement of findings that we have already made and are as described below: Lamar (PM10): The State submitted the ‘‘Revised PM10 Maintenance Plan for the Lamar Attainment/Maintenance Area’’ 1 on May 13, 2013. The State prepared the submittal to meet the requirements of section 175A(b) of the CAA for a second 10-year maintenance plan. We posted the ‘‘Revised PM10 Maintenance Plan for the Lamar Attainment/Maintenance Area’’ for adequacy review on EPA’s transportation conformity Web site on November 15, 2013. The public comment period closed on December 16, 2013, and we did not receive any comments in response to the adequacy review posting (see https://www.epa.gov/ otaq/stateresources/transconf/ currsips.htm#lamar-co). EPA sent a letter to the Colorado Department of Public Health and Environment (CDPHE) on January 23, 2014, stating that the submitted Lamar PM10 second 10-year maintenance plan and the 2025 PM10 MVEB were adequate for transportation conformity purposes. Steamboat Springs (PM10): The State submitted the ‘‘Revised PM10 Maintenance Plan for the Steamboat Springs Attainment/Maintenance Area’’ on May 11, 2012. The State prepared the submittal to meet the requirements of section 175A(b) of the CAA for a second 10-year maintenance plan. We posted the ‘‘Revised PM10 Maintenance Plan for the Steamboat Springs Attainment/ Maintenance Area’’ for adequacy review on EPA’s transportation conformity Web site on November 15, 2013. The public comment period closed on December 16, 2013, and we did not receive any comments in response to the adequacy 1 PM 10 refers to particulate matter less than or equal to 10 microns in diameter. PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 59767 review posting (see https://www.epa.gov/ otaq/stateresources/transconf/ currsips.htm#steam-spr-co). EPA sent a letter to the CDPHE on January 23, 2014, stating that the submitted Steamboat Springs PM10 second 10-year maintenance plan and the 2024 PM10 MVEB were adequate for transportation conformity purposes. For the Lamar PM10 maintenance area, the MVEB we found adequate is 764 pounds of PM10 per day in 2025. Following the effective date listed in the DATES section of this notice, the Colorado Department of Transportation and the U.S. Department of Transportation are required to use this motor vehicle emissions budget for future transportation conformity determinations for projects in the Lamar PM10 maintenance area. For the Steamboat Springs PM10 maintenance area, the MVEB we found adequate is 1,103 pounds of PM10 per day in 2024. Following the effective date listed in the DATES section of this notice, the Colorado Department of Transportation and the U.S. Department of Transportation are required to use this motor vehicle emissions budget for future transportation conformity determinations for projects in the Steamboat Springs PM10 maintenance area. Please note that our adequacy review described above is separate from our rulemaking action on the two maintenance plans discussed above and should not be used to prejudge our ultimate approval or disapproval of each of the SIP revisions. Even if we find a maintenance plan and its MVEB adequate for transportation conformity purposes now, we may later find it necessary to disapprove the SIP revision. Should this situation arise, we would then revisit our adequacy finding. Authority: 42 U.S.C. 7401 et seq. Dated: September 4, 2014. Shaun L. McGrath, Regional Administrator, Region 8. [FR Doc. 2014–23636 Filed 10–2–14; 8:45 am] BILLING CODE 6560–50–P ENVIRONMENTAL PROTECTION AGENCY [ER–FRL–9017–3] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564–7146 or https://www.epa.gov/ compliance/nepa/. E:\FR\FM\03OCN1.SGM 03OCN1

Agencies

[Federal Register Volume 79, Number 192 (Friday, October 3, 2014)]
[Notices]
[Pages 59766-59767]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-23528]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission


Combined Notice of Filings

    Take notice that the Commission has received the following Natural 
Gas Pipeline Rate and Refund Report filings:

Filings Instituting Proceedings

    Docket Numbers: PR14-55-000.
    Applicants: Arkansas Oklahoma Gas Corporation.
    Description: Request for Limited Waiver of Requirement to Submit 
Informational Rate Filing and Continued Limited Waiver of Form 549-D.
    Filed Date: 9/23/14.
    Accession Number: 20140923-5183.
    Comments Due: 5 p.m. ET 10/14/14.
    284.123(g) Protests Due:

    Docket Numbers: RP14-1277-000.
    Applicants: Transcontinental Gas Pipe Line Company.
    Description: Sec.  4(d) rate filing per 154.403(d)(2): LNG Fuel 
Tracker Filing 2014 to be effective 11/1/2014.
    Filed Date: 9/25/14.
    Accession Number: 20140925-5109.
    Comments Due: 5 p.m. ET 10/7/14.

    Docket Numbers: RP14-1278-000.
    Applicants: Midcontinent Express Pipeline LLC.
    Description: Sec.  4(d) rate filing per 154.204: Continental 
Resources' Negotiated Rate to be effective 10/1/2014.
    Filed Date: 9/25/14.
    Accession Number: 20140925-5121.
    Comments Due: 5 p.m. ET 10/7/14.

    Docket Numbers: RP14-1279-000.
    Applicants: Tennessee Gas Pipeline Company, L.L.C.
    Description: Sec.  4(d) rate filing per 154.204: Volume No. 2--
Statoil Natural Gas LLC SP102661 to be effective 11/1/2014.
    Filed Date: 9/25/14.
    Accession Number: 20140925-5151.
    Comments Due: 5 p.m. ET 10/7/14.

    Any person desiring to intervene or protest in any of the above 
proceedings must file in accordance with Rules 211 and 214 of the 
Commission's Regulations (18 CFR 385.211 and 385.214) on or before 5:00 
p.m. Eastern time on the specified comment date. Protests may be 
considered, but intervention is necessary to become a party to the 
proceeding.

Filings in Existing Proceedings

    Docket Numbers: RP14-1196-001.
    Applicants: Gas Transmission Northwest LLC.
    Description: Compliance filing per 154.203: Compliance to RP14-
1196-000 to be effective 9/22/2014.
    Filed Date: 9/26/14.
    Accession Number: 20140926-5018.
    Comments Due: 5 p.m. ET 10/8/14.

    Any person desiring to protest in any of the above proceedings must 
file in accordance with Rule 211 of the Commission's Regulations (18 
CFR Sec.  385.211) on or before 5:00 p.m. Eastern time on the specified 
comment date.
    The filings are accessible in the Commission's eLibrary system by 
clicking on the links or querying the docket number.
    eFiling is encouraged. More detailed information relating to filing 
requirements, interventions, protests, service, and qualifying 
facilities filings

[[Page 59767]]

can be found at: https://www.ferc.gov/docs-filing/efiling/filing-req.pdf. For other information, call (866) 208-3676 (toll free). For 
TTY, call (202) 502-8659.

    Dated: September 26, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014-23528 Filed 10-2-14; 8:45 am]
BILLING CODE 6717-01-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.