Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB) Review; Comment Request, 57984-57985 [2014-22968]
Download as PDF
57984
Federal Register / Vol. 79, No. 187 / Friday, September 26, 2014 / Notices
4:30 p.m.–6:30 p.m. Executive Session
for Site Visit Team—(Closed).
6:30 p.m.–9 p.m. Dinner for Panel and
Faculty—(Open).
November 7
8 a.m.–3 p.m. Executive Session and
Director’s Response to Feedback,
Debriefing with PREM Director and
co-PIs—(Closed).
Reason for Closing: The work being
reviewed may include information of a
proprietary or confidential nature,
including technical information;
financial data, such as salaries and
personal information concerning
individuals associated with the
proposals. These matters are exempt
under 5 U.S.C. 552 b(c), (4) and (6) of
the Government in the Sunshine Act.
Dated: September 23, 2014.
Suzanne Plimpton,
Acting Committee Management Officer.
[FR Doc. 2014–22958 Filed 9–25–14; 8:45 am]
BILLING CODE 7555–01–P
mstockstill on DSK4VPTVN1PROD with NOTICES
Proposal Review Panel for Materials
Research; Notice of Meeting
Agenda
November 12
6 p.m.–9 p.m. Executive Session and
Dinner for Site Visit Team—
(Closed).
Jkt 232001
November 14
8:00 a.m.–3:00 p.m. Executive Session
and Director’s Response to
Feedback, Debriefing with PREM
Director and co-PIs—(Closed).
Reason for Closing: The work being
reviewed may include information of a
proprietary or confidential nature,
including technical information;
financial data, such as salaries and
personal information concerning
individuals associated with the
proposals. These matters are exempt
under 5 U.S.C. 552 b(c), (4) and (6) of
the Government in the Sunshine Act.
[FR Doc. 2014–22959 Filed 9–25–14; 8:45 a.m.]
In accordance with the Federal
Advisory Committee Act (Pub. L. 92–
463 as amended), the National Science
Foundation announces the following
meeting:
Name: Proposal Review Panel for
Materials Research (DMR) #1203.
Dates and Times: November 12, 2014;
6:00 p.m.–9:00 p.m.
November 13, 2014; 8:00 a.m.–9:30
p.m.
November 14, 2014; 8:00 a.m.–3:30
p.m.
Place: California State University,
Northridge, CA.
Type of Meeting: Part-Open.
Contact Person: Dr. Charles Bouldin,
Program Director, Partnership for
Research and Education in Materials
Program, Division of Materials Research,
Room 1065, National Science
Foundation, 4201 Wilson Boulevard,
Arlington, VA 22230, Telephone (703)
292–4920.
Purpose of Meeting: To provide
advice and recommendations
concerning further support of the
Partnerships for Research and Education
in Materials (PREM).
19:14 Sep 25, 2014
8:00 a.m.–8:30 a.m. Executive
session—(Closed).
8:30 a.m.–4:30 p.m. Presentations by
PREM Director, co-PIs, Institutional
Representatives and program.
participants—(Open).
4:30 p.m.–6:30 p.m. Executive Session
for Site Visit Team—(Closed).
6:30 p.m.–9:00 p.m. Dinner for Panel
and Faculty—(Open).
Dated: September 23, 2014.
Suzanne Plimpton,
Acting Committee Management Officer.
NATIONAL SCIENCE FOUNDATION
VerDate Sep<11>2014
November 13
BILLING CODE 7555–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. NRC–2014–0157]
Agency Information Collection
Activities: Submission for the Office of
Management and Budget (OMB)
Review; Comment Request
Nuclear Regulatory
Commission.
ACTION: Notice of the OMB review of
information collection and solicitation
of public comment.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) has recently
submitted to OMB for review the
following proposal for the collection of
information under the provisions of the
Paperwork Reduction Act of 1995 (44
U.S.C. Chapter 35). The NRC hereby
informs potential respondents that an
agency may not conduct or sponsor, and
that a person is not required to respond
to, a collection of information unless it
displays a currently valid OMB control
number. The NRC published a Federal
Register notice with a 60-day comment
period on this information collection on
July 2, 2014.
1. Type of submission, new, revision,
or extension: Extension.
SUMMARY:
PO 00000
Frm 00116
Fmt 4703
Sfmt 4703
2. The title of the information
collection: Voluntary Reporting of
Performance Indicators.
3. Current OMB approval number:
3150–0195.
4. The form number if applicable: N/
A.
5. How often the collection is
required: Quarterly.
6. Who will be required or asked to
report: Power reactor licensees.
7. An estimate of the number of
annual responses: 400.
8. The estimated number of annual
respondents: 100.
9. An estimate of the total number of
hours needed annually to complete the
requirement or request: 81,250 hours
(80,000 hours of reporting and 1,250
hours of recordkeeping).
10. Abstract: As part of a joint
industry-NRC initiative, the NRC
receives information submitted
voluntarily by power reactor licensees
regarding selected performance
attributes known as performance
indicators (PIs). Performance indicators
are objective measures of the
performance of licensee systems or
programs. The NRC uses PI information
and inspection results in its Reactor
Oversight Process to make decisions
about plant performance and regulatory
response. Licensees transmit PIs
electronically to reduce burden on
themselves and the NRC.
The public may examine and have
copied for a fee publicly-available
documents, including the final
supporting statement, at the NRC’s
Public Document Room, Room O–1F21,
One White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852. The
OMB clearance requests are available at
the NRC’s Web site: https://www.nrc.gov/
public-involve/doc-comment/omb/. The
document will be available on the
NRC’s home page site for 60 days after
the signature date of this notice.
Comments and questions should be
directed to the OMB reviewer listed
below by October 27, 2014. Comments
received after this date will be
considered if it is practical to do so, but
assurance of consideration cannot be
given to comments received after this
date.
Danielle Y. Jones, Desk Officer, Office
of Information and Regulatory Affairs
(3150–0195), NEOB–10202, Office of
Management and Budget, Washington,
DC 20503.
Comments can also be emailed to
Danielle_Y_Jones@omb.eop.gov or
submitted by telephone at 202–395–
1741.
The NRC Clearance Officer is Kristen
Benney, telephone: 301–415–6355.
E:\FR\FM\26SEN1.SGM
26SEN1
Federal Register / Vol. 79, No. 187 / Friday, September 26, 2014 / Notices
Dated at Rockville, Maryland, this 23rd day
of September, 2014.
For the Nuclear Regulatory Commission.
Kristen Benney,
NRC Clearance Officer, Office of Information
Services.
[FR Doc. 2014–22968 Filed 9–25–14; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket No. NRC–2014–0104]
Agency Information Collection
Activities: Submission for the Office of
Management and Budget Review;
Comment Request
Nuclear Regulatory
Commission.
ACTION: Notice of the OMB review of
information collection and solicitation
of public comment.
AGENCY:
The NRC has recently
submitted to OMB for review the
following proposal for the collection of
information under the provisions of the
Paperwork Reduction Act of 1995 (44
U.S.C. Chapter 35). The NRC hereby
informs potential respondents that an
agency may not conduct or sponsor, and
that a person is not required to respond
to, a collection of information unless it
displays a currently valid OMB control
number. The NRC published a Federal
Register notice with a 60-day comment
period on this information collection on
June 30, 2014.
1. Type of submission, new, revision,
or extension: Revision.
2. The title of the information
collection: 10 CFR Part 72, ‘‘Licensing
Requirements for the Independent
Storage of Spent Nuclear Fuel, HighLevel Radioactive Waste and ReactorRelated Greater than Class C Waste.’’
3. Current OMB approval number:
3150–0132.
4. The form number if applicable: NA.
5. How often the collection is
required: Required reports are collected
and evaluated on a continuing basis as
events occur; submittal of reports varies
from less than one per year under some
rule sections to up to an average of
about 80 per year under other rule
sections. Applications for new licenses,
certificates of compliance (CoCs), and
amendments may be submitted at
anytime; applications for renewal of
licenses are required every 40 years for
an Independent Spent Fuel Storage
Installation (ISFSI) or CoC effective May
21, 2011, and every 40 years for a
Monitored Retrievable Storage (MRS)
facility.
mstockstill on DSK4VPTVN1PROD with NOTICES
SUMMARY:
VerDate Sep<11>2014
19:14 Sep 25, 2014
Jkt 232001
6. Who will be required or asked to
report: Certificate holders and
applicants for a CoC for spent fuel
storage casks; licensees and applicants
for a license to possess power reactor
spent fuel and other radioactive
materials associated with spent fuel
storage in an ISFSI; and the Department
of Energy for licenses to receive,
transfer, package and possess power
reactor spent fuel, high-level waste, and
other radioactive materials associated
with spent fuel and high-level waste
storage in an MRS.
7. An estimate of the number of
annual responses: 515.
8. The estimated number of annual
respondents: 76.
9. An estimate of the total number of
hours needed annually to complete the
requirement or request: 69,065.
10. Abstract: Part 72 of Title 10 of the
Code of Federal Regulations (10 CFR),
establishes mandatory requirements,
procedures, and criteria for the issuance
of licenses to receive, transfer, and
possess power reactor spent fuel and
other radioactive materials associated
with spent fuel storage in an ISFSI, as
well as requirements for the issuance of
licenses to the Department of Energy to
receive, transfer, package, and possess
power reactor spent fuel and high-level
radioactive waste, and other associated
radioactive materials in an MRS. The
information in the applications, reports,
and records is used by NRC to make
licensing and other regulatory
determinations.
The public may examine and have
copied for a fee publicly-available
documents, including the final
supporting statement, at the NRC’s
Public Document Room, Room O–1F21,
One White Flint North, 11555 Rockville
Pike, Rockville, Maryland 20852. The
OMB clearance requests are available at
the NRC’s Web site: https://www.nrc.gov/
public-involve/doc-comment/omb/. The
document will be available on the
NRC’s home page site for 60 days after
the signature date of this notice.
Comments and questions should be
directed to the OMB reviewer listed
below by October 27, 2014. Comments
received after this date will be
considered if it is practical to do so, but
assurance of consideration cannot be
given to comments received after this
date.
Danielle Y. Jones, Desk Officer, Office
of Information and Regulatory Affairs
(3150–0132), NEOB–10202, Office of
Management and Budget, Washington,
DC 20503
Comments can also be emailed to
Danielle_Y_Jones@omb.eop.gov or
submitted by telephone at 202–395–
1741.
PO 00000
Frm 00117
Fmt 4703
Sfmt 4703
57985
The Acting NRC Clearance Officer is
Brenda Miles, telephone: 301–415–
7884.
Dated at Rockville, Maryland, this 19th day
of September, 2014.
For the Nuclear Regulatory Commission.
Brenda Miles,
Acting NRC Clearance Officer, Office of
Information Services.
[FR Doc. 2014–22931 Filed 9–25–14; 8:45 am]
BILLING CODE 7590–01–P
NUCLEAR REGULATORY
COMMISSION
[Docket Nos. 52–025 and 52–026; NRC–
2014–0208]
Vogtle Electric Generating Plant, Units
3 and 4; Southern Nuclear Operating
Company; Reclassification of Portions
of Human Factors Verification and
Validation Planning Documents
Nuclear Regulatory
Commission.
ACTION: Exemption and combined
license amendment; issuance.
AGENCY:
The U.S. Nuclear Regulatory
Commission (NRC) is granting an
exemption to allow a departure from the
certification information of Tier 2* of
the generic design control document
(DCD) and issuing License Amendment
No. 22 to Combined Licenses (COL),
NPF–91 and NPF–92. The COLs were
issued to Southern Nuclear Operating
Company (SNC), Georgia Power
Company, Oglethorpe Power
Corporation, Municipal Electric
Authority of Georgia, and City of Dalton,
Georgia (the licensee), for construction
and operation of the Vogtle Electric
Generating Plant, Units 3 and 4, located
in Burke County, Georgia. The
amendment revises the updated final
safety analysis report (UFSAR) by
reclassifying portions of the five Tier 2*
Human Factors & Validation (V&V)
Technical Reports listed in UFSAR
Table 1.6–1 and Chapter 18, Subsection
18.11.2.
The granting of the exemption allows
the changes to Tier 2* information
asked for in the amendment. Because
the acceptability of the exemption was
determined in part by the acceptability
of the amendment, the exemption and
amendment are being issued
concurrently.
SUMMARY:
Please refer to Docket ID
NRC–2014–0208 when contacting the
NRC about the availability of
information regarding this document.
You may obtain publicly-available
information related to this document
using any of the following methods:
ADDRESSES:
E:\FR\FM\26SEN1.SGM
26SEN1
Agencies
[Federal Register Volume 79, Number 187 (Friday, September 26, 2014)]
[Notices]
[Pages 57984-57985]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-22968]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket No. NRC-2014-0157]
Agency Information Collection Activities: Submission for the
Office of Management and Budget (OMB) Review; Comment Request
AGENCY: Nuclear Regulatory Commission.
ACTION: Notice of the OMB review of information collection and
solicitation of public comment.
-----------------------------------------------------------------------
SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has recently
submitted to OMB for review the following proposal for the collection
of information under the provisions of the Paperwork Reduction Act of
1995 (44 U.S.C. Chapter 35). The NRC hereby informs potential
respondents that an agency may not conduct or sponsor, and that a
person is not required to respond to, a collection of information
unless it displays a currently valid OMB control number. The NRC
published a Federal Register notice with a 60-day comment period on
this information collection on July 2, 2014.
1. Type of submission, new, revision, or extension: Extension.
2. The title of the information collection: Voluntary Reporting of
Performance Indicators.
3. Current OMB approval number: 3150-0195.
4. The form number if applicable: N/A.
5. How often the collection is required: Quarterly.
6. Who will be required or asked to report: Power reactor
licensees.
7. An estimate of the number of annual responses: 400.
8. The estimated number of annual respondents: 100.
9. An estimate of the total number of hours needed annually to
complete the requirement or request: 81,250 hours (80,000 hours of
reporting and 1,250 hours of recordkeeping).
10. Abstract: As part of a joint industry-NRC initiative, the NRC
receives information submitted voluntarily by power reactor licensees
regarding selected performance attributes known as performance
indicators (PIs). Performance indicators are objective measures of the
performance of licensee systems or programs. The NRC uses PI
information and inspection results in its Reactor Oversight Process to
make decisions about plant performance and regulatory response.
Licensees transmit PIs electronically to reduce burden on themselves
and the NRC.
The public may examine and have copied for a fee publicly-available
documents, including the final supporting statement, at the NRC's
Public Document Room, Room O-1F21, One White Flint North, 11555
Rockville Pike, Rockville, Maryland 20852. The OMB clearance requests
are available at the NRC's Web site: https://www.nrc.gov/public-involve/doc-comment/omb/. The document will be available on the NRC's home page
site for 60 days after the signature date of this notice.
Comments and questions should be directed to the OMB reviewer
listed below by October 27, 2014. Comments received after this date
will be considered if it is practical to do so, but assurance of
consideration cannot be given to comments received after this date.
Danielle Y. Jones, Desk Officer, Office of Information and
Regulatory Affairs (3150-0195), NEOB-10202, Office of Management and
Budget, Washington, DC 20503.
Comments can also be emailed to
DanielleYJones@omb.eop.gov or submitted by telephone
at 202-395-1741.
The NRC Clearance Officer is Kristen Benney, telephone: 301-415-
6355.
[[Page 57985]]
Dated at Rockville, Maryland, this 23rd day of September, 2014.
For the Nuclear Regulatory Commission.
Kristen Benney,
NRC Clearance Officer, Office of Information Services.
[FR Doc. 2014-22968 Filed 9-25-14; 8:45 am]
BILLING CODE 7590-01-P