Gulf Coast Synthetic Energy Center, LLC; Notice of Application, 57072-57073 [2014-22649]
Download as PDF
57072
Federal Register / Vol. 79, No. 185 / Wednesday, September 24, 2014 / Notices
asabaliauskas on DSK5VPTVN1PROD with NOTICES
eligibility of such institutions, and (2)
State licensing responsibilities with
respect to such institutions.
• Any other advisory function
relating to accreditation and
institutional eligibility that the
Secretary may prescribe.
Access to Records of the Meeting: The
Department will post the official report
of the meeting on the NACIQI Web site
90 days after the meeting. Pursuant to
the FACA, the public may also inspect
the materials at 1990 K Street NW.,
Washington, DC, by emailing
aslrecordsmanager@ed.gov or by calling
(202) 219–7067 to schedule an
appointment.
Reasonable Accommodations: The
meeting site is accessible to individuals
with disabilities. If you will need an
auxiliary aid or service to participate in
the meeting (e.g., interpreting service,
assistive listening device, or materials in
an alternate format), notify the contact
person listed in this notice at least two
weeks before the scheduled meeting
date. Although we will attempt to meet
a request received after that date, we
may not be able to make available the
requested auxiliary aid or service
because of insufficient time to arrange
it.
Electronic Access to this Document:
The official version of this document is
the document published in the Federal
Register. Free Internet access to the
official edition of the Federal Register
and the Code of Federal Regulations is
available via the Federal Digital System
at: www.gpo.gov/fdsys. At this site you
can view this document, as well as all
other documents of this Department
published in the Federal Register, in
text or Adobe Portable Document
Format (PDF). To use PDF, you must
have Adobe Acrobat Reader, which is
available free at the site.
You may also access documents of the
Department published in the Federal
Register by using the article search
feature at: www.federalregister.gov.
Specifically, through the advanced
search feature at this site, you can limit
your search to documents published by
the Department.
Authority: 20 U.S.C. 1011c.
Lynn B. Mahaffie,
Acting Assistant Secretary for Postsecondary
Education.
[FR Doc. 2014–22725 Filed 9–23–14; 8:45 am]
BILLING CODE 4000–01–P
VerDate Sep<11>2014
18:41 Sep 23, 2014
Jkt 232001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP14–546–000]
Gulf Coast Synthetic Energy Center,
LLC; Notice of Application
Take notice that on September 2,
2014, Gulf Coast Synthetic Energy
Center (Gulf Coast), LLC, 10877
Wilshire Boulevard, Suite 1000, Los
Angeles, California 90024, filed in
Docket No. CP14–546–000 an
application pursuant to section 7(b) of
the Natural Gas Act (NGA) requesting
authorization to abandon its pipeline
facilities located in Tensas and
Concordia Parishes, Louisiana; and
Adams County, Mississippi and its Part
157, Subpart F blanket certificate issued
under Docket No. CP08–415–000, all as
more fully set forth in the application
which is on file with the Commission
and open to public inspection. The
filing may also be viewed on the web at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, please contact
FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at (866) 208–3676, or TTY, contact
(202) 502–8659.
Any questions concerning this
application may be directed to M.
Benjamin Machlis, Attorney, Holland &
Hart LLP, 222 South Main St., Suite
2200, Salt Lake City, UT 84101 at (801)
799–5800.
Specifically, Gulf Coast proposes to
abandon approximately 17.83 miles of
65⁄8 inch diameter pipeline, a 1,000 feet
of 6 inch diameter pipeline lateral, a 200
horsepower compressor station, and
appurtenant facilities, including a
crossing of the Mississippi River.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
There are two ways to become
involved in the Commission’s review of
this project. First, any person wishing to
obtain legal status by becoming a party
to the proceedings for this project
should, on or before the comment date
stated below, file with the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426,
a motion to intervene in accordance
with the requirements of the
Commission’s Rules of Practice and
Procedure (18 CFR 385.214 or 385.211)
and the Regulations under the NGA (18
CFR 157.10). A person obtaining party
status will be placed on the service list
maintained by the Secretary of the
Commission and will receive copies of
all documents filed by the applicant and
by all other parties. A party must submit
original and 7 copies of filings made
with the Commission and must mail a
copy to the applicant and to every other
party in the proceeding. Only parties to
the proceeding can ask for court review
of Commission orders in the proceeding.
However, a person does not have to
intervene in order to have comments
considered. The second way to
participate is by filing with the
Secretary of the Commission, as soon as
possible, an original and two copies of
comments in support of or in opposition
to this project. The Commission will
consider these comments in
determining the appropriate action to be
taken, but the filing of a comment alone
will not serve to make the filer a party
to the proceeding. The Commission’s
rules require that persons filing
comments in opposition to the project
provide copies of their protests only to
the party or parties directly involved in
the protest.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commentors will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commentors will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commentors
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
E:\FR\FM\24SEN1.SGM
24SEN1
Federal Register / Vol. 79, No. 185 / Wednesday, September 24, 2014 / Notices
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests
and interventions in lieu of paper using
the ‘‘eFiling’’ link at https://
www.ferc.gov. Persons unable to file
electronically should submit an original
and 14 copies of the protest or
intervention to the Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: October 7, 2014.
Dated: September 16, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–22649 Filed 9–23–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP13–113–000]
asabaliauskas on DSK5VPTVN1PROD with NOTICES
Dominion Cove Point LNG, LP; Notice
of Designation of Commission Staff as
Non-Decisional
With respect to the proceeding in the
above-captioned docket, the staff listed
below from the Office of External Affairs
are designated as non-decisional in
deliberations by the Commission in this
docket. Accordingly, pursuant to 18
CFR 385.2202 (2013), they will not serve
as advisors to the Commission.
Likewise, as non-decisional staff,
pursuant to 18 CFR 385.2201 (2013),
they are prohibited from communicating
with advisory staff concerning any
deliberations in this docket.
Non-decisional employees:
Sarah McKinley, Angela Washington,
Janeen Said.
Dated: September 16, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–22646 Filed 9–23–14; 8:45 am]
BILLING CODE 6717–01–P
VerDate Sep<11>2014
18:41 Sep 23, 2014
Jkt 232001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 5669–000]
San Diego County Water Authority;
Notice of Application Accepted for
Filing, Soliciting Comments, Motions
To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Proceeding: Surrender of
Exemption.
b. Project No.: 5669–000.
c. Date Filed: June 16, 2014, and
supplemented on September 9, 2014.
d. Licensee: San Diego County Water
Authority.
e. Name of Project: Miramar Power
Plant Small Conduit Hydroelectric
Project.
f. Location: The project is located on
San Diego County Water Authority
Second Aqueduct Pipelines to the
Miramar Filtration Plant, San Diego, San
Diego County, California.
g. Filed Pursuant to: 18 CFR 4.102 and
4.95.
h. Licensee Contact: Mr. Carson
Struthers, Contracts Manager, San Diego
County Water Authority, 610 West 5th
Avenue, Escondido, CA 92025,
Telephone: 760–233–3224, Email:
cstruthers@sdcwa.org.
i. FERC Contact: Jennifer Polardino,
(202) 502–6437, Jennifer.Polardino@
ferc.gov.
j. Deadline for filing comments and
protests is 30 days from the issuance of
this notice by the Commission. Please
file your submittal electronically via the
Internet (eFiling) in lieu of paper. Please
refer to the instructions on the
Commission’s Web site under https://
www.ferc.gov/docs-filing/efiling.asp and
filing instructions in the Commission’s
Regulations at 18 CFR section
385.2001(a)(1)(iii). To assist you with
eFilings you should refer to the
submission guidelines document at
https://www.ferc.gov/help/submissionguide/user-guide.pdf. In addition,
certain filing requirements have
statutory or regulatory formatting and
other instructions. You should refer to
a list of these ‘‘qualified documents’’ at
https://www.ferc.gov/docs-filing/efiling/
filing.pdf. You must include your name
and contact information at the end of
your comments. Please include the
project number (P–5669–000) on any
documents or motions filed. The
Commission strongly encourages
electronic filings; otherwise, you should
submit an original and seven copies of
PO 00000
Frm 00030
Fmt 4703
Sfmt 4703
57073
any submittal to the following address:
The Secretary, Federal Energy
Regulatory Commission, Mail Code:
DHAC, PJ–12, 888 First Street NE.,
Washington, DC 20426.
k. Description of Project Facilities:
The project consists of: (1) An existing
48-inch diameter raw water conduit; (2)
a new 48-inch diameter inlet pipeline;
(3) a powerplant with three generating
units and a total installed capacity of
1,200 kW.
l. Description of Proceeding: On June
16, 2014, and supplemented on
September 9, 2014, San Diego County
Water Authority filed an application
stating that due to reconfigurations in
the exemptee’s water supply system that
decreased the pressure gradient, the
project has been offline since May 2002.
The following actions have been taken
to inactivate and secure the project: (1)
The units were disabled and outlet
values closed; and (2) lockout/tagouts
were also installed. Therefore, exemptee
requests to surrender the exemption for
the Miramar Project.
m. This notice is available for review
and reproduction at the Commission in
the Public Reference Room, Room 2A,
888 First Street NE., Washington, DC
20426. The filing may also be viewed on
the Commission’s Web site at https://
www.ferc.gov/docs-filing/elibrary.asp.
Enter the Docket number (P–5669–000)
excluding the last three digits in the
docket number field to access the
notice. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call toll-free 1–866–208–
3676 or email FERCOnlineSupport@
ferc.gov. For TTY, call (202) 502–8659.
n. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
o. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
p. Filing and Service of Responsive
Documents: Any filing must (1) bear in
all capital letters the title
E:\FR\FM\24SEN1.SGM
24SEN1
Agencies
[Federal Register Volume 79, Number 185 (Wednesday, September 24, 2014)]
[Notices]
[Pages 57072-57073]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-22649]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP14-546-000]
Gulf Coast Synthetic Energy Center, LLC; Notice of Application
Take notice that on September 2, 2014, Gulf Coast Synthetic Energy
Center (Gulf Coast), LLC, 10877 Wilshire Boulevard, Suite 1000, Los
Angeles, California 90024, filed in Docket No. CP14-546-000 an
application pursuant to section 7(b) of the Natural Gas Act (NGA)
requesting authorization to abandon its pipeline facilities located in
Tensas and Concordia Parishes, Louisiana; and Adams County, Mississippi
and its Part 157, Subpart F blanket certificate issued under Docket No.
CP08-415-000, all as more fully set forth in the application which is
on file with the Commission and open to public inspection. The filing
may also be viewed on the web at https://www.ferc.gov using the
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or TTY,
contact (202) 502-8659.
Any questions concerning this application may be directed to M.
Benjamin Machlis, Attorney, Holland & Hart LLP, 222 South Main St.,
Suite 2200, Salt Lake City, UT 84101 at (801) 799-5800.
Specifically, Gulf Coast proposes to abandon approximately 17.83
miles of 6\5/8\ inch diameter pipeline, a 1,000 feet of 6 inch diameter
pipeline lateral, a 200 horsepower compressor station, and appurtenant
facilities, including a crossing of the Mississippi River.
Pursuant to section 157.9 of the Commission's rules, 18 CFR 157.9,
within 90 days of this Notice the Commission staff will either complete
its environmental assessment (EA) and place it into the Commission's
public record (eLibrary) for this proceeding; or issue a Notice of
Schedule for Environmental Review. If a Notice of Schedule for
Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
There are two ways to become involved in the Commission's review of
this project. First, any person wishing to obtain legal status by
becoming a party to the proceedings for this project should, on or
before the comment date stated below, file with the Federal Energy
Regulatory Commission, 888 First Street NE., Washington, DC 20426, a
motion to intervene in accordance with the requirements of the
Commission's Rules of Practice and Procedure (18 CFR 385.214 or
385.211) and the Regulations under the NGA (18 CFR 157.10). A person
obtaining party status will be placed on the service list maintained by
the Secretary of the Commission and will receive copies of all
documents filed by the applicant and by all other parties. A party must
submit original and 7 copies of filings made with the Commission and
must mail a copy to the applicant and to every other party in the
proceeding. Only parties to the proceeding can ask for court review of
Commission orders in the proceeding.
However, a person does not have to intervene in order to have
comments considered. The second way to participate is by filing with
the Secretary of the Commission, as soon as possible, an original and
two copies of comments in support of or in opposition to this project.
The Commission will consider these comments in determining the
appropriate action to be taken, but the filing of a comment alone will
not serve to make the filer a party to the proceeding. The Commission's
rules require that persons filing comments in opposition to the project
provide copies of their protests only to the party or parties directly
involved in the protest.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commentors will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commentors will not be required to serve copies of filed
documents on all other parties. However, the non-party commentors will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the
[[Page 57073]]
Commission) and will not have the right to seek court review of the
Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests and interventions in lieu of paper using the ``eFiling'' link
at https://www.ferc.gov. Persons unable to file electronically should
submit an original and 14 copies of the protest or intervention to the
Federal Energy Regulatory Commission, 888 First Street NE., Washington,
DC 20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: October 7, 2014.
Dated: September 16, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-22649 Filed 9-23-14; 8:45 am]
BILLING CODE 6717-01-P