Draft Environmental Assessment of the Proposed Olmsted Hydroelectric Power Plant Replacement Project, 56599 [2014-21768]
Download as PDF
Federal Register / Vol. 79, No. 183 / Monday, September 22, 2014 / Notices
B. Solicitation of Public Comment
This notice is soliciting comments
from members of the public and affected
parties concerning the collection of
information described in Section A on
the following:
(1) Whether the proposed collection
of information is necessary for the
proper performance of the functions of
the agency, including whether the
information will have practical utility;
(2) The accuracy of the agency’s
estimate of the burden of the proposed
collection of information;
(3) Ways to enhance the quality,
utility, and clarity of the information to
be collected; and
(4) Ways to minimize the burden of
the collection of information on those
who are to respond; including through
the use of appropriate automated
collection techniques or other forms of
information technology, e.g., permitting
electronic submission of responses.
HUD encourages interested parties to
submit comment in response to these
questions.
Authority: Section 3507 of the Paperwork
Reduction Act of 1995, 44 U.S.C. Chapter 35.
Dated: September 17, 2014.
Colette Pollard,
Department Reports Management Officer,
Office of the Chief Information Officer.
[FR Doc. 2014–22484 Filed 9–19–14; 8:45 am]
BILLING CODE 4210–67–P
DEPARTMENT OF THE INTERIOR
[RR04000000, 144R0680R1,
RR.17549897.2014001.02]
Draft Environmental Assessment of
the Proposed Olmsted Hydroelectric
Power Plant Replacement Project
Office of the Assistant
Secretary—Water and Science Central
Utah Project Completion Act Office,
Interior.
ACTION: Notice of availability.
AGENCY:
The Department of the
Interior and the Central Utah Water
Conservancy District, as joint leads, are
evaluating the impacts of a proposed
replacement of the Olmsted
Hydroelectric Power Plant, and have
prepared an associated Draft
Environmental Assessment for public
review.
asabaliauskas on DSK5VPTVN1PROD with NOTICES
SUMMARY:
Submit written comments on the
Draft Environmental Assessment by
October 22, 2014.
ADDRESSES: Send written comments on
the Draft Environmental Assessment to
Mr. Chris Elison, 355 W. University
Parkway, Orem, UT 84058–7303; by
DATES:
VerDate Sep<11>2014
17:07 Sep 19, 2014
Jkt 232001
email to chrise@cuwcd.com; or by
facsimile to 801–226–7150.
Copies of the Draft Environmental
Assessment are available for inspection
at:
• Central Utah Water Conservancy
District, 355 West University
Parkway, Orem, Utah 84058–7303
• Department of the Interior, Central
Utah Project Completion Act Office,
302 East 1860 South, Provo, Utah
84606
In addition, the document is available
at www.cuwcd.com, www.cupcao.gov, or
www.cuwcd.com/olmsted/.
Mr.
W. Russ Findlay, Central Utah Project
Completion Act Office, 302 East 1860
South, Provo, Utah 84606; by calling
801–379–1084; or email at wfindlay@
usbr.gov.
FOR FURTHER INFORMATION CONTACT:
The
Department of the Interior, and Central
Utah Water Conservancy District are
publishing this notice pursuant to
Section 102(2)(c) of the National
Environmental Policy Act of 1969, as
amended. The Draft Environmental
Assessment presents analysis of the
anticipated environmental effects of a
proposed replacement of the Olmsted
Hydroelectric Power Plant. The
Proposed Action in the Draft
Environmental Assessment includes:
Constructing a new powerhouse,
replacing the penstocks, modifying
existing operations to utilize the 10
million gallon Olmsted Flow
Equalization Reservoir, marketing the
power generated, constructing operation
and maintenance facilities, and
improving access to the site.
We are requesting public comment on
the Draft Environmental Assessment.
Before including your address, phone
number, email address, or other
personal identifying information in your
comment, you should be aware that
your entire comment—including your
personal identifying information—may
be made publicly available at any time.
While you can ask us in your
comment to withhold your personal
identifying information from public
review, we cannot guarantee that we
will be able to do so.
SUPPLEMENTARY INFORMATION:
Dated: August 26, 2014.
Reed R. Murray,
Program Director, Central Utah Project
Completion Act, Department of the Interior.
[FR Doc. 2014–21768 Filed 9–19–14; 8:45 am]
BILLING CODE 4310–MN–P
PO 00000
Frm 00045
Fmt 4703
Sfmt 4703
56599
DEPARTMENT OF THE INTERIOR
Bureau of Safety and Environmental
Enforcement
[Docket ID BSEE–2014–0005; OMB Control
Number 1014–0015; 14XE1700DX
EEEE500000 EX1SF0000.DAQ000]
Information Collection Activities:
Unitization; Submitted for Office of
Management and Budget (OMB)
Review; Comment Request
ACTION:
30-day Notice.
To comply with the
Paperwork Reduction Act of 1995
(PRA), BSEE is notifying the public that
we have submitted to OMB an
information collection request (ICR) for
review approval of the paperwork
requirements in the regulations under
Subpart M, Unitization. This notice also
provides the public a second
opportunity to comment on the revised
paperwork burden of these regulatory
requirements.
SUMMARY:
You must submit comments by
October 22, 2014.
ADDRESSES: Submit comments by either
fax (202) 395–5806 or email
(OIRA_Submission@omb.eop.gov)
directly to the Office of Information and
Regulatory Affairs, OMB, Attention:
Desk Officer for the Department of the
Interior (1014–0015). Please provide a
copy of your comments to BSEE by any
of the means below.
• Electronically go to https://
www.regulations.gov. In the Search box,
enter BSEE–2014–0005 then click
search. Follow the instructions to
submit public comments and view all
related materials. We will post all
comments.
• Email nicole.mason@bsee.gov, fax
(703) 787–1546, or mail or hand-carry
comments to the Department of the
Interior; Bureau of Safety and
Environmental Enforcement;
Regulations and Standards Branch;
ATTN: Nicole Mason; 381 Elden Street,
HE3313; Herndon, Virginia 20170–4817.
Please reference ICR 1014–0015 in your
comment and include your name and
return address.
FOR FURTHER INFORMATION CONTACT:
Nicole Mason, Regulations and
Standards Branch, (703) 787–1605, to
request additional information about
this ICR. To see a copy of the entire ICR
submitted to OMB, go to https://
www.reginfo.gov (select Information
Collection Review, Currently Under
Review).
DATES:
SUPPLEMENTARY INFORMATION:
Title: 30 CFR 250, Subpart M,
Unitization.
E:\FR\FM\22SEN1.SGM
22SEN1
Agencies
[Federal Register Volume 79, Number 183 (Monday, September 22, 2014)]
[Notices]
[Page 56599]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-21768]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
[RR04000000, 144R0680R1, RR.17549897.2014001.02]
Draft Environmental Assessment of the Proposed Olmsted
Hydroelectric Power Plant Replacement Project
AGENCY: Office of the Assistant Secretary--Water and Science Central
Utah Project Completion Act Office, Interior.
ACTION: Notice of availability.
-----------------------------------------------------------------------
SUMMARY: The Department of the Interior and the Central Utah Water
Conservancy District, as joint leads, are evaluating the impacts of a
proposed replacement of the Olmsted Hydroelectric Power Plant, and have
prepared an associated Draft Environmental Assessment for public
review.
DATES: Submit written comments on the Draft Environmental Assessment by
October 22, 2014.
ADDRESSES: Send written comments on the Draft Environmental Assessment
to Mr. Chris Elison, 355 W. University Parkway, Orem, UT 84058-7303; by
email to chrise@cuwcd.com; or by facsimile to 801-226-7150.
Copies of the Draft Environmental Assessment are available for
inspection at:
Central Utah Water Conservancy District, 355 West University
Parkway, Orem, Utah 84058-7303
Department of the Interior, Central Utah Project Completion
Act Office, 302 East 1860 South, Provo, Utah 84606
In addition, the document is available at www.cuwcd.com,
www.cupcao.gov, or www.cuwcd.com/olmsted/.
FOR FURTHER INFORMATION CONTACT: Mr. W. Russ Findlay, Central Utah
Project Completion Act Office, 302 East 1860 South, Provo, Utah 84606;
by calling 801-379-1084; or email at wfindlay@usbr.gov.
SUPPLEMENTARY INFORMATION: The Department of the Interior, and Central
Utah Water Conservancy District are publishing this notice pursuant to
Section 102(2)(c) of the National Environmental Policy Act of 1969, as
amended. The Draft Environmental Assessment presents analysis of the
anticipated environmental effects of a proposed replacement of the
Olmsted Hydroelectric Power Plant. The Proposed Action in the Draft
Environmental Assessment includes: Constructing a new powerhouse,
replacing the penstocks, modifying existing operations to utilize the
10 million gallon Olmsted Flow Equalization Reservoir, marketing the
power generated, constructing operation and maintenance facilities, and
improving access to the site.
We are requesting public comment on the Draft Environmental
Assessment. Before including your address, phone number, email address,
or other personal identifying information in your comment, you should
be aware that your entire comment--including your personal identifying
information--may be made publicly available at any time.
While you can ask us in your comment to withhold your personal
identifying information from public review, we cannot guarantee that we
will be able to do so.
Dated: August 26, 2014.
Reed R. Murray,
Program Director, Central Utah Project Completion Act, Department of
the Interior.
[FR Doc. 2014-21768 Filed 9-19-14; 8:45 am]
BILLING CODE 4310-MN-P