Draft Environmental Assessment of the Proposed Olmsted Hydroelectric Power Plant Replacement Project, 56599 [2014-21768]

Download as PDF Federal Register / Vol. 79, No. 183 / Monday, September 22, 2014 / Notices B. Solicitation of Public Comment This notice is soliciting comments from members of the public and affected parties concerning the collection of information described in Section A on the following: (1) Whether the proposed collection of information is necessary for the proper performance of the functions of the agency, including whether the information will have practical utility; (2) The accuracy of the agency’s estimate of the burden of the proposed collection of information; (3) Ways to enhance the quality, utility, and clarity of the information to be collected; and (4) Ways to minimize the burden of the collection of information on those who are to respond; including through the use of appropriate automated collection techniques or other forms of information technology, e.g., permitting electronic submission of responses. HUD encourages interested parties to submit comment in response to these questions. Authority: Section 3507 of the Paperwork Reduction Act of 1995, 44 U.S.C. Chapter 35. Dated: September 17, 2014. Colette Pollard, Department Reports Management Officer, Office of the Chief Information Officer. [FR Doc. 2014–22484 Filed 9–19–14; 8:45 am] BILLING CODE 4210–67–P DEPARTMENT OF THE INTERIOR [RR04000000, 144R0680R1, RR.17549897.2014001.02] Draft Environmental Assessment of the Proposed Olmsted Hydroelectric Power Plant Replacement Project Office of the Assistant Secretary—Water and Science Central Utah Project Completion Act Office, Interior. ACTION: Notice of availability. AGENCY: The Department of the Interior and the Central Utah Water Conservancy District, as joint leads, are evaluating the impacts of a proposed replacement of the Olmsted Hydroelectric Power Plant, and have prepared an associated Draft Environmental Assessment for public review. asabaliauskas on DSK5VPTVN1PROD with NOTICES SUMMARY: Submit written comments on the Draft Environmental Assessment by October 22, 2014. ADDRESSES: Send written comments on the Draft Environmental Assessment to Mr. Chris Elison, 355 W. University Parkway, Orem, UT 84058–7303; by DATES: VerDate Sep<11>2014 17:07 Sep 19, 2014 Jkt 232001 email to chrise@cuwcd.com; or by facsimile to 801–226–7150. Copies of the Draft Environmental Assessment are available for inspection at: • Central Utah Water Conservancy District, 355 West University Parkway, Orem, Utah 84058–7303 • Department of the Interior, Central Utah Project Completion Act Office, 302 East 1860 South, Provo, Utah 84606 In addition, the document is available at www.cuwcd.com, www.cupcao.gov, or www.cuwcd.com/olmsted/. Mr. W. Russ Findlay, Central Utah Project Completion Act Office, 302 East 1860 South, Provo, Utah 84606; by calling 801–379–1084; or email at wfindlay@ usbr.gov. FOR FURTHER INFORMATION CONTACT: The Department of the Interior, and Central Utah Water Conservancy District are publishing this notice pursuant to Section 102(2)(c) of the National Environmental Policy Act of 1969, as amended. The Draft Environmental Assessment presents analysis of the anticipated environmental effects of a proposed replacement of the Olmsted Hydroelectric Power Plant. The Proposed Action in the Draft Environmental Assessment includes: Constructing a new powerhouse, replacing the penstocks, modifying existing operations to utilize the 10 million gallon Olmsted Flow Equalization Reservoir, marketing the power generated, constructing operation and maintenance facilities, and improving access to the site. We are requesting public comment on the Draft Environmental Assessment. Before including your address, phone number, email address, or other personal identifying information in your comment, you should be aware that your entire comment—including your personal identifying information—may be made publicly available at any time. While you can ask us in your comment to withhold your personal identifying information from public review, we cannot guarantee that we will be able to do so. SUPPLEMENTARY INFORMATION: Dated: August 26, 2014. Reed R. Murray, Program Director, Central Utah Project Completion Act, Department of the Interior. [FR Doc. 2014–21768 Filed 9–19–14; 8:45 am] BILLING CODE 4310–MN–P PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 56599 DEPARTMENT OF THE INTERIOR Bureau of Safety and Environmental Enforcement [Docket ID BSEE–2014–0005; OMB Control Number 1014–0015; 14XE1700DX EEEE500000 EX1SF0000.DAQ000] Information Collection Activities: Unitization; Submitted for Office of Management and Budget (OMB) Review; Comment Request ACTION: 30-day Notice. To comply with the Paperwork Reduction Act of 1995 (PRA), BSEE is notifying the public that we have submitted to OMB an information collection request (ICR) for review approval of the paperwork requirements in the regulations under Subpart M, Unitization. This notice also provides the public a second opportunity to comment on the revised paperwork burden of these regulatory requirements. SUMMARY: You must submit comments by October 22, 2014. ADDRESSES: Submit comments by either fax (202) 395–5806 or email (OIRA_Submission@omb.eop.gov) directly to the Office of Information and Regulatory Affairs, OMB, Attention: Desk Officer for the Department of the Interior (1014–0015). Please provide a copy of your comments to BSEE by any of the means below. • Electronically go to https:// www.regulations.gov. In the Search box, enter BSEE–2014–0005 then click search. Follow the instructions to submit public comments and view all related materials. We will post all comments. • Email nicole.mason@bsee.gov, fax (703) 787–1546, or mail or hand-carry comments to the Department of the Interior; Bureau of Safety and Environmental Enforcement; Regulations and Standards Branch; ATTN: Nicole Mason; 381 Elden Street, HE3313; Herndon, Virginia 20170–4817. Please reference ICR 1014–0015 in your comment and include your name and return address. FOR FURTHER INFORMATION CONTACT: Nicole Mason, Regulations and Standards Branch, (703) 787–1605, to request additional information about this ICR. To see a copy of the entire ICR submitted to OMB, go to https:// www.reginfo.gov (select Information Collection Review, Currently Under Review). DATES: SUPPLEMENTARY INFORMATION: Title: 30 CFR 250, Subpart M, Unitization. E:\FR\FM\22SEN1.SGM 22SEN1

Agencies

[Federal Register Volume 79, Number 183 (Monday, September 22, 2014)]
[Notices]
[Page 56599]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-21768]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF THE INTERIOR

[RR04000000, 144R0680R1, RR.17549897.2014001.02]


Draft Environmental Assessment of the Proposed Olmsted 
Hydroelectric Power Plant Replacement Project

AGENCY: Office of the Assistant Secretary--Water and Science Central 
Utah Project Completion Act Office, Interior.

ACTION: Notice of availability.

-----------------------------------------------------------------------

SUMMARY: The Department of the Interior and the Central Utah Water 
Conservancy District, as joint leads, are evaluating the impacts of a 
proposed replacement of the Olmsted Hydroelectric Power Plant, and have 
prepared an associated Draft Environmental Assessment for public 
review.

DATES: Submit written comments on the Draft Environmental Assessment by 
October 22, 2014.

ADDRESSES: Send written comments on the Draft Environmental Assessment 
to Mr. Chris Elison, 355 W. University Parkway, Orem, UT 84058-7303; by 
email to chrise@cuwcd.com; or by facsimile to 801-226-7150.
    Copies of the Draft Environmental Assessment are available for 
inspection at:

 Central Utah Water Conservancy District, 355 West University 
Parkway, Orem, Utah 84058-7303
 Department of the Interior, Central Utah Project Completion 
Act Office, 302 East 1860 South, Provo, Utah 84606

    In addition, the document is available at www.cuwcd.com, 
www.cupcao.gov, or www.cuwcd.com/olmsted/.

FOR FURTHER INFORMATION CONTACT: Mr. W. Russ Findlay, Central Utah 
Project Completion Act Office, 302 East 1860 South, Provo, Utah 84606; 
by calling 801-379-1084; or email at wfindlay@usbr.gov.

SUPPLEMENTARY INFORMATION: The Department of the Interior, and Central 
Utah Water Conservancy District are publishing this notice pursuant to 
Section 102(2)(c) of the National Environmental Policy Act of 1969, as 
amended. The Draft Environmental Assessment presents analysis of the 
anticipated environmental effects of a proposed replacement of the 
Olmsted Hydroelectric Power Plant. The Proposed Action in the Draft 
Environmental Assessment includes: Constructing a new powerhouse, 
replacing the penstocks, modifying existing operations to utilize the 
10 million gallon Olmsted Flow Equalization Reservoir, marketing the 
power generated, constructing operation and maintenance facilities, and 
improving access to the site.
    We are requesting public comment on the Draft Environmental 
Assessment. Before including your address, phone number, email address, 
or other personal identifying information in your comment, you should 
be aware that your entire comment--including your personal identifying 
information--may be made publicly available at any time.
    While you can ask us in your comment to withhold your personal 
identifying information from public review, we cannot guarantee that we 
will be able to do so.

    Dated: August 26, 2014.
Reed R. Murray,
Program Director, Central Utah Project Completion Act, Department of 
the Interior.
[FR Doc. 2014-21768 Filed 9-19-14; 8:45 am]
BILLING CODE 4310-MN-P
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.