Mr. Ray F. Ward; Application Tendered for Filing With the Commission and Soliciting Additional Study Requests and Establishing Procedural Schedule for Relicensing and a Deadline for Submission of Final Amendments, 55786-55787 [2014-22096]
Download as PDF
mstockstill on DSK4VPTVN1PROD with NOTICES
55786
Federal Register / Vol. 79, No. 180 / Wednesday, September 17, 2014 / Notices
Accession Number: 20140908–5201.
Comments Due: 5 p.m. ET 9/29/14.
Docket Numbers: ER14–2807–000.
Applicants: Southern California
Edison Company.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): Distribution Service
Agreement with US Topco Energy, Inc.
to be effective 11/9/2014.
Filed Date: 9/9/14.
Accession Number: 20140909–5001.
Comments Due: 5 p.m. ET 9/30/14.
Docket Numbers: ER14–2809–000.
Applicants: CPV Maryland, LLC.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): Revised Market-Based
Rate Tariff Filing to be effective
11/9/2014.
Filed Date: 9/9/14.
Accession Number: 20140909–5116.
Comments Due: 5 p.m. ET 9/30/14.
Docket Numbers: ER14–2810–000.
Applicants: CPV Sentinel, LLC.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): Revised Market-Based
Rate Tariff Filing to be effective
11/9/2014.
Filed Date: 9/9/14.
Accession Number: 20140909–5117.
Comments Due: 5 p.m. ET 9/30/14.
Docket Numbers: ER14–2811–000.
Applicants: CPV Keenan II Renewable
Energy Company.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): Revised Market-Based
Rate Tariff Filing to be effective
11/9/2014.
Filed Date: 9/9/14.
Accession Number: 20140909–5118.
Comments Due: 5 p.m. ET 9/30/14.
Docket Numbers: ER14–2812–000.
Applicants: CPV Shore, LLC.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): Revised Market-Based
Rate Tariff Filing to be effective
11/9/2014.
Filed Date: 9/9/14.
Accession Number: 20140909–5119.
Comments Due: 5 p.m. ET 9/30/14.
Docket Numbers: ER14–2813–000.
Applicants: PacifiCorp.
Description: Tariff Withdrawal per
35.15: Termination of Klamath Energy
Construction Agreement to be effective
11/12/2014.
Filed Date: 9/9/14.
Accession Number: 20140909–5125.
Comments Due: 5 p.m. ET 9/30/14.
Docket Numbers: ER14–2814–000.
Applicants: PJM Interconnection,
L.L.C.
Description: § 205(d) rate filing per
35.13(a)(2)(iii): Original Service
Agreement No. 3940; Queue No. Y3–054
to be effective 8/11/2014.
Filed Date: 9/9/14.
Accession Number: 20140909–5178.
VerDate Sep<11>2014
18:24 Sep 16, 2014
Jkt 232001
Comments Due: 5 p.m. ET 9/30/14.
The filings are accessible in the
Commission’s eLibrary system by
clicking on the links or querying the
docket number.
Any person desiring to intervene or
protest in any of the above proceedings
must file in accordance with Rules 211
and 214 of the Commission’s
Regulations (18 CFR 385.211 and
385.214) on or before 5:00 p.m. Eastern
time on the specified comment date.
Protests may be considered, but
intervention is necessary to become a
party to the proceeding.
eFiling is encouraged. More detailed
information relating to filing
requirements, interventions, protests,
service, and qualifying facilities filings
can be found at: https://www.ferc.gov/
docs-filing/efiling/filing-req.pdf. For
other information, call (866) 208–3676
(toll free). For TTY, call (202) 502–8659.
Dated: September 9, 2014.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2014–22178 Filed 9–16–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 9842–006]
Mr. Ray F. Ward; Application Tendered
for Filing With the Commission and
Soliciting Additional Study Requests
and Establishing Procedural Schedule
for Relicensing and a Deadline for
Submission of Final Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: Minor New
License.
b. Project No.: 9842–006.
c. Date filed: August 28, 2014.
d. Applicant: Mr. Ray F. Ward.
e. Name of Project: Ward Mill
Hydroelectric Project.
f. Location: On the Watauga River, in
the Township of Laurel Creek, Watauga
County, North Carolina. The project
does not occupy lands of the United
States.
g. Filed Pursuant to: Federal Power
Act 16 U.S.C. 791 (a)–825(r).
h. Applicant Contact: Andrew C.
Givens, Cardinal Energy Service, Inc.,
620 N. West St., Suite 103, Raleigh,
North Carolina 27603, (919) 834–0909.
i. FERC Contact: Adam Peer at (202)
502–8449, adam.peer@ferc.gov.
j. Cooperating agencies: Federal, state,
local, and tribal agencies with
PO 00000
Frm 00043
Fmt 4703
Sfmt 4703
jurisdiction and/or special expertise
with respect to environmental issues
that wish to cooperate in the
preparation of the environmental
document should follow the
instructions for filing such requests
described in item l below. Cooperating
agencies should note the Commission’s
policy that agencies that cooperate in
the preparation of the environmental
document cannot also intervene. See, 94
FERC ¶ 61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18
CFR of the Commission’s regulations, if
any resource agency, Indian Tribe, or
person believes that an additional
scientific study should be conducted in
order to form an adequate factual basis
for a complete analysis of the
application on its merit, the resource
agency, Indian Tribe, or person must file
a request for a study with the
Commission not later than 60 days from
the date of filing of the application, and
serve a copy of the request on the
applicant.
l. Deadline for filing additional study
requests and requests for cooperating
agency status: October 27, 2014
The Commission strongly encourages
electronic filing. Please file additional
study requests and requests for
cooperating agency status using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY). In lieu of
electronic filing, please send a paper
copy to: Secretary, Federal Energy
Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first
page of any filing should include docket
number P–9842–006.
m. The application is not ready for
environmental analysis at this time.
n. The Ward Mill Project consists of:
(1) An existing 130-foot-long by 20-foothigh dam; (2) An existing 4.6 acre
reservoir with an estimated gross storage
capacity of 16.3 acre-feet; (3) a 14-footlong, 5-foot-wide, and 7.5-foot-tall
penstock made of rock, concrete and
reinforced steel; (4) a powerhouse
containing two generating units for a
total installed capacity of 168 kilowatts;
(5) existing transmission facilities; and
(6) appurtenant facilities. The project is
estimated to generate from below
290,000 to over 599,000 kilowatt-hours
annually. The dam and existing
facilities are owned by the applicant. No
new project facilities are proposed.
o. A copy of the application is
available for review at the Commission
in the Public Reference Room or may be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
E:\FR\FM\17SEN1.SGM
17SEN1
Federal Register / Vol. 79, No. 180 / Wednesday, September 17, 2014 / Notices
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field to access the
document. For assistance, contact FERC
Online Support. A copy is also available
for inspection and reproduction at the
address in item h above.
You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
p. Procedural schedule and final
amendments: The application will be
processed according to the following
preliminary Hydro Licensing Schedule.
Revisions to the schedule will be made
as appropriate.
Issue Acceptance or Deficiency Letter
October 2014
Request Additional Information
October 2014
Issue Notice of Acceptance January
2015
Issue Scoping Document 1 for
comments February 2015
Comments on Scoping Document 1
April 2015
Issue Scoping Document 2 May 2015
Issue notice of ready for
environmental analysis May 2015
Commission issues EA January 2016
Comments on EA February 2016
Final amendments to the application
must be filed with the Commission no
later than 30 days from the issuance
date of the notice of ready for
environmental analysis.
Dated: September 10, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–22096 Filed 9–16–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[ Project No. 2503–154]
mstockstill on DSK4VPTVN1PROD with NOTICES
Duke Energy Carolinas, LLC; Notice of
Application Tendered for Filing With
the Commission and Establishing
Procedural Schedule for Licensing and
Deadline for Submission of Final
Amendments
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection.
a. Type of Application: New Major
License.
b. Project No.: 2503–154.
c. Date Filed: August 27, 2014.
d. Applicant: Duke Energy Carolinas,
LLC.
e. Name of Project: Keowee-Toxaway
Hydroelectric Project.
f. Location: The existing KeoweeToxaway Project is located on the
Toxaway, Keowee, and Little Rivers in
Oconee County and Pickens County,
South Carolina and Transylvania
County, North Carolina. The KeoweeToxaway Project occupies no federal
lands.
g. Filed Pursuant to: Federal Power
Act, 16 U.S. C. 791 (a)–825(r).
h. Applicant Contact: Jennifer Huff,
Duke Energy Carolinas, LLC, 526 S.
Church Street, Charlotte, NC 28202;
Telephone (980) 373–4392.
i. FERC Contact: Stephen Bowler,
(202) 502–6861 or stephen.bowler@
ferc.gov
j. This application is not ready for
environmental analysis at this time.
k. The Project Description:
The Keowee-Toxaway Project consists
of two developments: The upstream,
710.1–MW Jocassee Development and
the downstream, 157.5-megawatt (MW)
Keowee Development owned by Duke
Energy Carolinas, LLC. The Jocassee
Development includes: A 385-foot-high,
1,800-foot-long main earthfill dam with
top elevation at 1,125 feet above mean
sea level (msl); two circular intake
structures passing water to two water
conveyance tunnels leading to four
turbines; two saddle dikes (825 feet and
500 feet in length); a partially-open
powerhouse just downstream of the dam
containing four reversible pump-turbine
units authorized for an installed
capacity of 177.5 MW each; a 50-footwide, concrete, ogee-type spillway with
two Taintor gates; a 230-kilovolt (kV)
transmission system; and appurtenant
facilities. The maximum hydraulic
capacity is 36,200 cfs.
The Jocassee Development is operated
as a pumped-storage project, with the
pump-turbines used for generating
power during peak demand periods
(typically during the day), and for
pumping water back through the
tunnels to Lake Jocassee (typically
during the night). The pumps have a
capacity of 32,720 cfs. The Jocassee
Development is also the lower lake for
the 1,065 MW Bad Creek Hydroelectric
Project No. 2740, which is also owned
by Duke, but is not part of this
relicensing.
The Keowee Development includes: a
165-foot-high, 3,500-foot-long earthfill
dam impounding the Keowee River, and
a 165-foot-high, 1,800-foot-long earthfill
dam impounding the Little River; four
saddle dikes (1,900 feet, 225 feet, 350
feet, and 650 feet in length); an intake
dike at the Oconee Nuclear Station; a
176-foot wide, concrete, ogee-type
spillway with four Taintor gates; a
concrete intake structure leading to two
penstocks; a concrete powerhouse at the
base of Keowee dam containing two
Francis-type, mixed flow turbinegenerator units authorized for an
installed capacity of 78.8 MW each; a
150-foot by 500-foot concrete tailrace; a
230-kV transmission system; and
appurtenant facilities. The maximum
hydraulic capacity is 24,920 cfs.
Duke and several stakeholders signed
a relicensing agreement (settlement),
which resolves all issues to relicensing
the project among the signatories.
l. Locations of the Application: A
copy of the application is available for
review at the Commission in the Public
Reference Room or may be viewed on
the Commission’s Web site at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov, (866) 208–3676 (toll free), or
(202) 502–8659 (TTY).
A copy is also available for inspection
and reproduction at the address in item
(h) above.
m. You may also register online at
https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, contact FERC Online
Support.
n. Procedural Schedule:
The application will be processed
according to the following preliminary
Hydro Licensing Schedule. Revisions to
the schedule may be made as
appropriate.
Milestone
Target date
Notice of Acceptance/Notice of Ready for ..............................................................................................................................
Environmental Analysis ...........................................................................................................................................................
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions .....................................................
Commission issues Draft EA ...................................................................................................................................................
Comments on Draft Environmental Assessment (EA) ............................................................................................................
VerDate Sep<11>2014
18:24 Sep 16, 2014
Jkt 232001
PO 00000
Frm 00044
Fmt 4703
55787
Sfmt 4703
E:\FR\FM\17SEN1.SGM
17SEN1
October 26, 2014.
December 25, 2014.
June 23, 2015.
July 23, 2015.
Agencies
[Federal Register Volume 79, Number 180 (Wednesday, September 17, 2014)]
[Notices]
[Pages 55786-55787]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-22096]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 9842-006]
Mr. Ray F. Ward; Application Tendered for Filing With the
Commission and Soliciting Additional Study Requests and Establishing
Procedural Schedule for Relicensing and a Deadline for Submission of
Final Amendments
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: Minor New License.
b. Project No.: 9842-006.
c. Date filed: August 28, 2014.
d. Applicant: Mr. Ray F. Ward.
e. Name of Project: Ward Mill Hydroelectric Project.
f. Location: On the Watauga River, in the Township of Laurel Creek,
Watauga County, North Carolina. The project does not occupy lands of
the United States.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
h. Applicant Contact: Andrew C. Givens, Cardinal Energy Service,
Inc., 620 N. West St., Suite 103, Raleigh, North Carolina 27603, (919)
834-0909.
i. FERC Contact: Adam Peer at (202) 502-8449, adam.peer@ferc.gov.
j. Cooperating agencies: Federal, state, local, and tribal agencies
with jurisdiction and/or special expertise with respect to
environmental issues that wish to cooperate in the preparation of the
environmental document should follow the instructions for filing such
requests described in item l below. Cooperating agencies should note
the Commission's policy that agencies that cooperate in the preparation
of the environmental document cannot also intervene. See, 94 FERC ]
61,076 (2001).
k. Pursuant to section 4.32(b)(7) of 18 CFR of the Commission's
regulations, if any resource agency, Indian Tribe, or person believes
that an additional scientific study should be conducted in order to
form an adequate factual basis for a complete analysis of the
application on its merit, the resource agency, Indian Tribe, or person
must file a request for a study with the Commission not later than 60
days from the date of filing of the application, and serve a copy of
the request on the applicant.
l. Deadline for filing additional study requests and requests for
cooperating agency status: October 27, 2014
The Commission strongly encourages electronic filing. Please file
additional study requests and requests for cooperating agency status
using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support
at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202)
502-8659 (TTY). In lieu of electronic filing, please send a paper copy
to: Secretary, Federal Energy Regulatory Commission, 888 First Street
NE., Washington, DC 20426. The first page of any filing should include
docket number P-9842-006.
m. The application is not ready for environmental analysis at this
time.
n. The Ward Mill Project consists of: (1) An existing 130-foot-long
by 20-foot-high dam; (2) An existing 4.6 acre reservoir with an
estimated gross storage capacity of 16.3 acre-feet; (3) a 14-foot-long,
5-foot-wide, and 7.5-foot-tall penstock made of rock, concrete and
reinforced steel; (4) a powerhouse containing two generating units for
a total installed capacity of 168 kilowatts; (5) existing transmission
facilities; and (6) appurtenant facilities. The project is estimated to
generate from below 290,000 to over 599,000 kilowatt-hours annually.
The dam and existing facilities are owned by the applicant. No new
project facilities are proposed.
o. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at https://www.ferc.gov using the
[[Page 55787]]
``eLibrary'' link. Enter the docket number excluding the last three
digits in the docket number field to access the document. For
assistance, contact FERC Online Support. A copy is also available for
inspection and reproduction at the address in item h above.
You may also register online at https://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances
related to this or other pending projects. For assistance, contact FERC
Online Support.
p. Procedural schedule and final amendments: The application will
be processed according to the following preliminary Hydro Licensing
Schedule. Revisions to the schedule will be made as appropriate.
Issue Acceptance or Deficiency Letter October 2014
Request Additional Information October 2014
Issue Notice of Acceptance January 2015
Issue Scoping Document 1 for comments February 2015
Comments on Scoping Document 1 April 2015
Issue Scoping Document 2 May 2015
Issue notice of ready for environmental analysis May 2015
Commission issues EA January 2016
Comments on EA February 2016
Final amendments to the application must be filed with the
Commission no later than 30 days from the issuance date of the notice
of ready for environmental analysis.
Dated: September 10, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-22096 Filed 9-16-14; 8:45 am]
BILLING CODE 6717-01-P