Devon Gas Services, L.P.; Notice of Petition for Declaratory Order, 54705 [2014-21743]
Download as PDF
Federal Register / Vol. 79, No. 177 / Friday, September 12, 2014 / Notices
DEPARTMENT OF ENERGY
appropriate. Such notices, motions, or
protests must be filed on or before the
comment date. On or before the
comment date, it is not necessary to
serve motions to intervene or protests
on persons other than the Applicant.
The Commission encourages
electronic submission of protests and
interventions in lieu of paper using the
‘‘eFiling’’ link at https://www.ferc.gov.
Persons unable to file electronically
should submit an original and 5 copies
of the protest or intervention to the
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at
https://www.ferc.gov, using the
‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Reference Room in Washington, DC.
There is an ‘‘eSubscription’’ link on the
Web site that enables subscribers to
receive email notification when a
document is added to a subscribed
docket(s). For assistance with any FERC
Online service, please email
FERCOnlineSupport@ferc.gov, or call
(866) 208–3676 (toll free). For TTY, call
(202) 502–8659.
Comment Date: 5:00 p.m. Eastern
Time on October 2, 2014.
Federal Energy Regulatory
Commission
Dated: September 4, 2014.
Kimberly D. Bose,
Secretary.
[Docket No. CP14–547–000]
[FR Doc. 2014–21743 Filed 9–11–14; 8:45 am]
Docket Nos. ER13–1923, ER13–1938,
ER13–1943, ER13–1945, Midcontinent
Independent System Operator, Inc.
Docket Nos. ER13–1924, ER13–1926,
ER13–1927, ER13–1936, ER13–1944,
ER13–1947, PJM Interconnection,
L.L.C.
Docket Nos. ER13–1937, ER13–1939,
Southwest Power Pool, Inc.
Docket No. ER14–1174, Southwest
Power Pool, Inc.
Docket No. ER14–1713, Midcontinent
Independent System Operator, Inc.
Docket No. ER14–1736, Midcontinent
Independent System Operator, Inc.
Docket No. ER14–2367, PJM
Interconnection, L.L.C.
Docket No. ER14–2368, Midcontinent
Independent System Operator, Inc.
For more information, contact Mary
Cain, Office of Energy Policy and
Innovation, Federal Energy Regulatory
Commission at (202) 502–6337 or
mary.cain@ferc.gov.
Dated: September 5, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–21738 Filed 9–11–14; 8:45 am]
BILLING CODE 6717–01–P
BILLING CODE 6717–01–P
tkelley on DSK3SPTVN1PROD with NOTICES
Devon Gas Services, L.P.; Notice of
Petition for Declaratory Order
Take notice that on September 2,
2014, Devon Gas Services, L.P.(DGS),
pursuant to Rule 207(a)(2) of the Federal
Energy Regulatory Commission’s Rules
of Practice and Procedure, 18 CFR
385.207(a)(2) (2014), filed a petition for
declaratory order seeking a Commission
order declaring that certain natural gas
pipeline and appurtenant facilities to be
acquired by DGS from Natural Gas
Pipeline Company of America, LLC, will
perform a gathering function upon their
abandonment, transfer, and sale, and
therefore, will be exempt from the
Commission’s jurisdiction pursuant to
Section 1(b) of the Natural Gas Act.
Any person desiring to intervene or to
protest this filing must file in
accordance with Rules 211 and 214 of
the Commission’s Rules of Practice and
Procedure (18 CFR 385.211, 385.214).
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
VerDate Mar<15>2010
17:58 Sep 11, 2014
Jkt 232001
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 14626–000]
GreenVolt Hydro, LLC; Notice of
Preliminary Permit Application
Accepted for Filing and Soliciting
Comments, Motions To Intervene, and
Competing Applications
On June 20, 2014, GreenVolt Hydro,
LLC filed an application for a
preliminary permit, pursuant to section
4(f) of the Federal Power Act (FPA),
proposing to study the feasibility of the
Two Girls Creek Hydroelectric Project
(project) to be located on Two Girls
Creek near Sweet Home in Linn County,
Oregon. The sole purpose of a
preliminary permit, if issued, is to grant
the permit holder priority to file a
license application during the permit
term. A preliminary permit does not
authorize the permit holder to perform
any land-disturbing activities or
otherwise enter upon lands or waters
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
54705
owned by others without the owners’
express permission.
The proposed project would consist of
the following new facilities: (1) A weir
with screened intake; (2) a 19,365-footlong, 30 to 36-inch-diameter high
density polyethylene (HDPE) penstock;
(3) a 50 feet by 40 feet concrete block
powerhouse with a single Pelton
turbine/generator unit rated for 5
megawatt at 1,606 feet of net head; (4)
a 1,000-foot-long, 60-inch-diameter
HDPE tailrace conduit; (5) an
underground 7.2-mile-long, 12-kilovolt
(kV) transmission line connection to an
existing transmission line (the point of
interconnection); (6) a 40-feet-wide right
of way access road; and (7) appurtenant
facilities. The estimated annual
generation of the project would be 36.87
gigawatt-hours.
Applicant Contact: Mr. Scott
Shankland, Manager, GreenVolt Hydro,
LLC, 52 Galen Street, Lake Oswego,
Oregon 97035; phone: (503) 504–2660.
FERC Contact: Kim Nguyen; email:
kim.nguyen@ferc.gov; phone: (202) 502–
6105.
Deadline for filing comments, motions
to intervene, competing applications
(without notices of intent), or notices of
intent to file competing applications: 60
days from the issuance of this notice.
Competing applications and notices of
intent must meet the requirements of 18
CFR 4.36.
The Commission strongly encourages
electronic filing. Please file comments,
motions to intervene, notices of intent,
and competing applications using the
Commission’s eFiling system at https://
www.ferc.gov/docs-filing/efiling.asp.
Commenters can submit brief comments
up to 6,000 characters, without prior
registration, using the eComment system
at https://www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–14626–000.
More information about this project,
including a copy of the application, can
be viewed or printed on the ‘‘eLibrary’’
link of Commission’s Web site at
https://www.ferc.gov/docs-filing/
elibrary.asp. Enter the docket number
(P–14626) in the docket number field to
access the document. For assistance,
contact FERC Online Support.
E:\FR\FM\12SEN1.SGM
12SEN1
Agencies
[Federal Register Volume 79, Number 177 (Friday, September 12, 2014)]
[Notices]
[Page 54705]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-21743]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP14-547-000]
Devon Gas Services, L.P.; Notice of Petition for Declaratory
Order
Take notice that on September 2, 2014, Devon Gas Services,
L.P.(DGS), pursuant to Rule 207(a)(2) of the Federal Energy Regulatory
Commission's Rules of Practice and Procedure, 18 CFR 385.207(a)(2)
(2014), filed a petition for declaratory order seeking a Commission
order declaring that certain natural gas pipeline and appurtenant
facilities to be acquired by DGS from Natural Gas Pipeline Company of
America, LLC, will perform a gathering function upon their abandonment,
transfer, and sale, and therefore, will be exempt from the Commission's
jurisdiction pursuant to Section 1(b) of the Natural Gas Act.
Any person desiring to intervene or to protest this filing must
file in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211, 385.214). Protests will be
considered by the Commission in determining the appropriate action to
be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a notice of
intervention or motion to intervene, as appropriate. Such notices,
motions, or protests must be filed on or before the comment date. On or
before the comment date, it is not necessary to serve motions to
intervene or protests on persons other than the Applicant.
The Commission encourages electronic submission of protests and
interventions in lieu of paper using the ``eFiling'' link at https://www.ferc.gov. Persons unable to file electronically should submit an
original and 5 copies of the protest or intervention to the Federal
Energy Regulatory Commission, 888 First Street NE., Washington, DC
20426.
This filing is accessible on-line at https://www.ferc.gov, using the
``eLibrary'' link and is available for review in the Commission's
Public Reference Room in Washington, DC. There is an ``eSubscription''
link on the Web site that enables subscribers to receive email
notification when a document is added to a subscribed docket(s). For
assistance with any FERC Online service, please email
FERCOnlineSupport@ferc.gov, or call (866) 208-3676 (toll free). For
TTY, call (202) 502-8659.
Comment Date: 5:00 p.m. Eastern Time on October 2, 2014.
Dated: September 4, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-21743 Filed 9-11-14; 8:45 am]