Securement of Unattended Equipment, 53356-53383 [2014-21253]
Download as PDF
53356
Federal Register / Vol. 79, No. 174 / Tuesday, September 9, 2014 / Proposed Rules
FEDERAL COMMUNICATIONS
COMMISSION
DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
47 CFR Part 20
49 CFR Part 232
[WT Docket No. 12–269 and GN Docket No.
12–268; Report No. 3009]
Petitions for Reconsideration of Action
in Rulemaking Proceeding
Federal Communications
Commission.
ACTION: Petition for reconsideration.
AGENCY:
tkelley on DSK3SPTVN1PROD with PROPOSALS
Federal Communications Commission.
Marlene H. Dortch,
Secretary, Office of the Secretary, Office of
the Managing Director.
[FR Doc. 2014–21372 Filed 9–8–14; 8:45 am]
BILLING CODE 6712–01–P
VerDate Mar<15>2010
16:51 Sep 08, 2014
Jkt 232001
RIN 2130–AC47
Securement of Unattended Equipment
Federal Railroad
Administration (FRA), Department of
Transportation (DOT).
ACTION: Notice of proposed rulemaking.
AGENCY:
In this document, Petitions
for Reconsideration (Petitions) have
been filed in the Commission’s
Rulemaking proceeding, by Charles W.
Logan, Lawler, Metzger, Keeney &
Logan, LLC, on behalf of Sprint
Corporation, and by Trey Hanbury,
Hogan Lovells US, LLP, on behalf of TMobile USA, Inc.
DATES: Oppositions to the Petitions
must be filed on or before September 24,
2014. Replies to an opposition must be
filed on or before October 6, 2014.
ADDRESSES: Federal Communications
Commission, 445 12th Street SW.,
Washington, DC 20554.
FOR FURTHER INFORMATION CONTACT:
Amy Brett, Wireless
Telecommunications Bureau, (202) 418–
2703, email: Amy.Brett@fcc.gov.
SUPPLEMENTARY INFORMATION: This is a
summary of Commission’s document,
Report No. 3009, released August 21,
2014. The full text of Report No. 3009
is available for viewing and copying in
Room CY–B402, 445 12th Street SW.,
Washington, DC or may be purchased
from the Commission’s copy contractor,
Best Copy and Printing, Inc. (BCPI) (1–
800–378–3160). The Commission will
not send a copy of this Notice pursuant
to the Congressional Review Act, 5
U.S.C. 801(a)(1)(A) because this notice
does not have an impact on any rules of
particular applicability.
Subject: Policies Regarding Mobile
Spectrum Holdings; Expanding the
Economic and Innovation Opportunities
of Spectrum Through Incentive
Auctions, published at 79 FR 39977,
July 11, 2014, in WT Docket No. 12–269
and GN Docket No. 12–268 and
published pursuant to 47 CFR 1.429(e).
See also § 1.4(b)(1) of the Commission’s
rules.
Number of Petitions Filed: 2.
SUMMARY:
[Docket No. FRA–2014–0032, Notice No. 1]
FRA proposes amendments to
the brake system safety standards for
freight and other non-passenger trains
and equipment to strengthen the
requirements relating to the securement
of unattended equipment. Specifically,
FRA would codify many of the
requirements already included in its
Emergency Order 28, Establishing
Additional Requirements for
Attendance and Securement of Certain
Freight Trains and Vehicles on Mainline
Track or Mainline Siding Outside of a
Yard or Terminal. FRA proposes to
amend existing regulations to include
additional securement requirements for
unattended equipment, primarily for
trains transporting poisonous by
inhalation hazardous materials or large
volumes of Division 2.1 (flammable
gases), Class 3 (flammable or
combustible liquids, including crude oil
and ethanol), and Class 1.1 or 1.2
(explosives) hazardous materials. For
these trains, FRA also proposes
additional communication requirements
relating to job briefings and securement
verification. Finally, FRA proposes to
require all locomotives left unattended
outside of a yard to be equipped with
an operative exterior locking
mechanism. Attendance on trains would
be required on equipment not capable of
being secured in accordance with the
proposed and existing requirements.
DATES: (1) Written comments must be
received by November 10, 2014.
Comments received after that date will
be considered to the extent possible
without incurring additional expenses
or delays. (2) FRA anticipates being able
to resolve this rulemaking without a
public hearing. However, if prior to
October 9, 2014, FRA receives a specific
request for a public hearing, a hearing
will be scheduled and FRA will publish
a supplemental document in the
Federal Register to inform interested
parties of the date, time, and location of
such hearing.
ADDRESSES: Comments: Comments
related to this proceeding may be
SUMMARY:
PO 00000
Frm 00011
Fmt 4702
Sfmt 4702
submitted by any of the following
methods:
• Web site: Comments should be filed
at the Federal eRulemaking Portal,
https://www.regulations.gov. Follow the
online instructions for submitting
comments.
• Fax: 202–493–2251.
• Mail: Docket Management Facility,
U.S. Department of Transportation, 1200
New Jersey Avenue SE., Room W12–
140, Washington, DC 20590.
• Hand Delivery: Room W12–140 on
the Ground level of the West Building,
1200 New Jersey Avenue SE.,
Washington, DC, between 9 a.m. and 5
p.m. ET, Monday through Friday, except
Federal holidays.
Instructions: All submissions must
include the agency name and docket
number or Regulatory Identification
Number (RIN) for this rulemaking. Note
that all comments received will be
posted without change to https://
www.regulations.gov including any
personal information. Please see the
Privacy Act heading in the
‘‘Supplementary Information’’ section of
this document for Privacy Act
information related to any submitted
comments or materials.
Docket: For access to the docket to
read background documents or
comments received, go to https://
www.regulations.gov at any time or to
Room W12–140 on the Ground level of
the West Building, 1200 New Jersey
Avenue SE., Washington, DC between 9
a.m. and 5 p.m. Monday through Friday,
except Federal Holidays.
FOR FURTHER INFORMATION CONTACT:
Steven Zuiderveen, Railroad Safety
Specialist, Motive & Power Equipment
Division, Office of Safety Assurance and
Compliance, Federal Railroad
Administration, RRS–14, West Building
3rd Floor, 1200 New Jersey Avenue SE.,
Washington, DC 20590 (telephone: 202–
493–6337); Jason Schlosberg, Trial
Attorney, Office of Chief Counsel, RCC–
10, Mail Stop 10, West Building 3rd
Floor, Room W31–207, 1200 New Jersey
Avenue SE., Washington, DC 20590
(telephone: 202–493–6032).
SUPPLEMENTARY INFORMATION:
Table of Contents for Supplementary
Information
I. Executive Summary
II. Background
´
A. Lac-Megantic Derailment
1. Facts
2. Response
B. Safety Concerns Arising Out of the Lac´
Megantic Derailment and Other Train
Incidents Involving Flammable Liquids
and Gases and Poison Inhalation Hazard
Materials.
C. Current Securement Regulations and
Related Guidance
E:\FR\FM\09SEP1.SGM
09SEP1
53357
Federal Register / Vol. 79, No. 174 / Tuesday, September 9, 2014 / Proposed Rules
D. Emergency Order 28 and Related
Guidance
E. RSAC Overview
III. Section-by-Section Analysis
IV. Regulatory Impact and Notices
A. Executive Orders 12866 and 13563 and
DOT Regulatory Policies and Procedures
B. Regulatory Flexibility Act and Executive
Order 13272
C. Paperwork Reduction Act
D. Federalism
E. International Trade Impact Assessment
F. Environmental Assessment
G. Unfunded Mandates Reform Act of 1995
H. Energy Impact
I. Privacy Act
I. Executive Summary
Purpose of the Proposed Regulatory
Action
While FRA’s existing securement
regulations have been successful in
mitigating risks associated with the
rolling of unattended equipment, FRA
recognizes that—particularly in light of
certain accidents like the one last year
´
in Lac-Megantic, Quebec, Canada—
additional requirements may be
warranted when such equipment
includes certain hazardous materials
that can contribute to high-consequence
events. To address these concerns, FRA
issued Emergency Order 28, 78 FR
48218 (Aug. 7, 2013), engaged in
proceedings with the Railroad Safety
Advisory Committee to draft
recommended regulations, and is
issuing this responsive notice of
proposed rulemaking (NPRM). FRA is
proposing this rulemaking pursuant to
the authority granted to the Secretary of
Transportation in 49 U.S.C. 20102–
20103, 20107, 20133, 20141, 20301–
20303, 20306, 21301–20302, 21304; 28
U.S.C. 2461, note; which the Secretary
has delegated to the Administrator of
FRA pursuant to 49 CFR 1.89.
Summary of the Major Provisions of the
Proposed Regulatory Action
In this proceeding, FRA proposes
requirements to ensure that each
locomotive left unattended outside of a
yard be equipped with an operative
exterior locking mechanism and that
such locks be applied on the controlling
locomotive cab door when a train is
transporting tank cars loaded with
certain hazardous materials. This
proposed rule would provide that such
hazardous materials trains may only be
left unattended on a main track or
siding if justified in a plan adopted by
the railroad, accompanied by an
appropriate job briefing, and proper
securement is made and verified. This
proposed rule would also require
additional verification of securement in
the event that a non-railroad emergency
responder may have been in a position
to have affected the equipment.
Costs and Benefits of the Proposed
Regulatory Action
In this rule, the benefits ($1,163,669 at
a 7% discount, $1,579,240 at a 3%
discount) outweigh the costs ($86,685 at
a 7% discount, $99,909 at a 3%
discount), with total net benefits over 20
years of $1,076,984 at a 7% discount (or
$95,009 annualized) and $1,478,331 at a
3% discount (or $96,538 annualized).
Discounted value
Discounted values
Discount factor
7%
Costs:
Attending Trains ...............................................................................................................................................
Installing Locks .................................................................................................................................................
Total Costs .......................................................................................................................................................
Benefits:
Reduced Vandalism .........................................................................................................................................
Reduced Recordkeeping ..................................................................................................................................
Total Benefits ............................................................................................................................................
3%
$36,685
50,000
86,685
$49,909
50,000
99,909
180,873
982,786
250,666
1,328,573
$1,163,669
$1,579,240
Discounted value
Discounted values net benefits
Discount factor
7%
Total .........................................................................................................................................................................
Annualized ...............................................................................................................................................................
tkelley on DSK3SPTVN1PROD with PROPOSALS
II. Background
In 2001, FRA issued regulations
governing the securement of unattended
equipment. 66 FR 4104 (Jan. 17, 2001).
These regulations have been effective in
protecting against the risk of rolling
equipment. Over the last few years,
there has been a significant increase in
the volume of rail traffic for certain
types of commodities, such as
petroleum crude oil (crude oil) and
ethanol, both of which are highly
flammable and often transported in
large unit or ‘‘key’’ trains, as defined in
the industry by the Association of
American Railroads (AAR). See AAR
VerDate Mar<15>2010
16:51 Sep 08, 2014
Jkt 232001
Circular No. OT–55–N (Aug. 5, 2013),
available at https://www.boe.aar.com/
CPC-1258%20OT-55-N%208-5-13.pdf.
Since 2009, there have been a number
of serious rail accidents involving the
transportation of large quantities of
flammable liquids. A number of these
accidents involved trains transporting
large quantities of ethanol. However,
since 2011, there has been significant
growth in the rail transport of
flammable crude oil, and FRA has seen
a number of accident-related releases of
crude oil in that time. One significant
accident involving tank cars loaded
with crude oil was July 6, 2013,
PO 00000
Frm 00012
Fmt 4702
Sfmt 4702
$1,076,984
95,009
3%
$1,479,331
96,538
´
derailment in the town of Lac-Megantic,
Quebec, Canada. After reviewing the
facts related to this derailment, FRA
concluded that additional action was
necessary to eliminate an immediate
hazard of death, personal injury, or
significant harm to the environment,
particularly in instances where certain
hazardous materials are involved. Thus
about a year ago FRA issued Emergency
Order 28 requiring railroads to
implement additional procedures to
ensure the proper securement of
equipment containing certain types and
amounts of hazardous materials when
left unattended. Subsequent to the
E:\FR\FM\09SEP1.SGM
09SEP1
53358
Federal Register / Vol. 79, No. 174 / Tuesday, September 9, 2014 / Proposed Rules
issuance of Emergency Order 28, FRA
also enlisted the assistance of the
Railroad Safety Advisory Committee
(RSAC) to develop recommendations
regarding the attendance and
securement of railroad equipment
transporting certain hazardous materials
when left unattended in light of the
requirements contained in Emergency
Order 28.
traveled an additional 1⁄2 mile before
stopping.
The derailment caused a release of 6
million liters of petroleum crude oil,
resulting in a large fire with multiple
explosions. At this time, it is estimated
that there were 47 fatalities.2 There was
also extensive damage to the town, and
approximately 2,000 people were
evacuated from the surrounding area.
´
A. Lac-Megantic Derailment
2. Response
In response to this accident, Transport
Canada—the Canadian government
department responsible for regulating
transportation safety in Canada—issued
an emergency railroad directive on July
23, 2013.3 While Transport Canada
explained in the emergency directive
that the cause of the accident in Lac´
Megantic remained unknown, the
emergency directive stated that, ‘‘in
light of the catastrophic results of the
´
Lac-Megantic accident and in the
interest of ensuring the continued safety
and security of railway transportation,
there is an immediate need to clarify the
regime respecting unattended
locomotives on main track and sidings
and the transportation of dangerous
goods in tank cars using a one person
crew to address any threat to the safety
and security of railway operations.’’ As
such, Transport Canada exercised its
statutory emergency directive authority
to order railroad companies in Canada
to comply with certain requirements
related to unauthorized entry into
locomotive cabs, directional controls on
locomotives, the application of hand
brakes to cars left unattended for more
than one hour, setting of the automatic
brake and independent brake on any
locomotive attached to cars that is left
unattended for one hour or less,
attendance related to locomotives
attached to loaded tank cars
transporting dangerous goods on main
track, and the number of crew members
assigned to a locomotive attached to
loaded tank cars transporting dangerous
goods on a main track or siding.
Also on July 23, 2013, Transport
Canada issued an accompanying order
pursuant to paragraph 19(a)(1) of the
Canadian Railway Safety Act directing
tkelley on DSK3SPTVN1PROD with PROPOSALS
1. Facts
On July 6, 2013, in the town of Lac´
Megantic, Quebec, Canada, an accident
involving tank cars loaded with
petroleum crude oil occurred on track
owned by Montreal, Maine & Atlantic
Railway Corporation (MMA), a company
incorporated in the United States.
According to a report issued by the
Transportation Safety Board (TSB) of
Canada, the incident is summarized as
follows.1 On July 5, 2013, a locomotive
engineer was operating freight train
MMA–002 on the Sherbrooke
Subdivision from Farnham (milepost
125.60) and at around 10:50 p.m.
stopped near Nantes, Quebec (milepost
7.40) on its way to its destination,
Brownville Junction, Maine. The train
was approximately 4,700 feet long,
weighed over 10,000 tons, and included
a locomotive consist of 5 head-end
locomotives and one VB car, 1 box car
(buffer car), and 72 tank cars loaded
with approximately 7.7 million liters of
petroleum crude oil (UN 1267). The
locomotive engineer parked train
MMA–002 on the main line, on a
descending grade of 1.2%, attempted to
secure the train, and departed, leaving
the train unattended. At around 11:40
p.m., a local resident reported a fire on
the train. The local fire department was
called and responded with another
MMA employee. At approximately
midnight, the controlling locomotive
was shut down and the fire
extinguished. After the fire was
extinguished, the fire department and
the MMA employee left the site.
At approximately 1:00 a.m. the next
day (the early morning of July 6th), the
train began rolling and picking up speed
down the descending grade toward the
´
town of Lac-Megantic, Quebec, located
7.2 miles away and approximately 30
miles from the United States-Canada
border. At about 1:15 a.m., near the
center of town, the train derailed. The
locomotive consist, which separated
from the train, did not derail and
1 Railway
Investigative Report R13D0054, TSB,
July 6, 2013, available at https://www.tsb.gc.ca/eng/
rapports-reports/rail/2013/R13D0054/
R13D0054.pdf.
VerDate Mar<15>2010
16:51 Sep 08, 2014
Jkt 232001
2 See id.; see also Statistical Summary Railway
Occurrences 2013, TSB, pp. 2, 5, available at
https://www.tsb.gc.ca/eng/stats/rail/2013/ssro2013.pdf.
3 See Emergency Directive Pursuant to Section 33
of the Railway Safety Act, Safety and Security of
Locomotives in Canada, July 23, 2013, available at
https://news.gc.ca/web/article-en.do?nid=829609;
see also Rail Safety Advisor Letter—09/13,
Securement of Equipment and Trains Left
Unattended, Transport Canada (July 18, 2013),
available at https://www.tsb.gc.ca/eng/mediasmedia/sur-safe/letter/rail/2013/r13d0054/
r13d0054–617–09–13.asp.
PO 00000
Frm 00013
Fmt 4702
Sfmt 4702
railroad companies in Canada to
formulate or revise certain railroad
operating rules, respecting the safety
and security of unattended locomotives,
uncontrolled movements, and crew size
requirements.4 The order provides that
rules should be based on an assessment
of safety and security risks, and shall at
a minimum ensure that the cab(s) of
unattended controlling locomotives are
secure against unauthorized entry;
ensure that the reverse levers
(commonly referred to as a ‘‘reversers’’)
of unattended locomotives are removed
and secured; prevent uncontrolled
movements of railway equipment by
addressing the application of hand
brakes; ensure the security of stationary
railway equipment transporting
dangerous goods; and provide for
minimum operating crew requirements
considering technology, length of train,
speeds, classification of dangerous
goods being transported, and other risk
factors.
The Railway Association of Canada
submitted proposed operating rules to
Transport Canada on November 20,
2013. Transport Canada accepted the
proposed rules submitted on December
26, 2013, making the operating rules
applicable to all railway companies
operating in Canada. See TC O 0–167.
As a result, railroads operating in
Canada are now required to comply
with Canadian Rail Operating Rules
(CROR) CROR 112, as amended.
CROR 62 pertains to ‘‘Unattended
engines.’’ The term ‘‘unattended’’ is
now defined in the CROR as ‘‘when an
employee is not in close enough
proximity to take effective action.’’ The
new Canadian requirements, applicable
to each engine left unattended outside
of an attended yard or terminal, requires
cab securement to prevent unauthorized
entry and removal of the reverser from
the engine when it does not have a high
idle feature and not in sub-zero
temperatures. See CROR 62 (TC O 0–
167). Transport Canada also approved
expansive revisions to CROR 112, which
now provides minimum requirements,
acceptable methods, and factors to
consider for securing equipment while
switching en route or left unattended.
See CROR 112 (TC O 0–167).
´
In direct response to the Lac-Megantic
derailment, DOT began taking actions
consistent with Transport Canada to
ensure the safe transportation of
products by rail in the United States,
with a particular focus on certain
hazardous materials that present an
4 Railroads operating within Canada were at the
´
time of the Lac-Megantic derailment, and are
currently, required to comply with the Canadian
Rail Operating Rules (CROR) that have been
approved by Transport Canada.
E:\FR\FM\09SEP1.SGM
09SEP1
Federal Register / Vol. 79, No. 174 / Tuesday, September 9, 2014 / Proposed Rules
immediate danger for communities and
the environment in the event of a train
accident. In Emergency Order 28, FRA
sought to address the immediate
dangers that arise from unattended
equipment that is left unsecured on
mainline tracks. Emergency Order 28
remains in effect today, as amended by
FRA’s August 27, 2013, letter approving
with conditions a joint petition for relief
from the AAR and the American Short
Line and Regional Railroad Association
(ASLRRA). Railroads currently are
required to comply with Emergency
Order 28, as amended, in addition to 49
CFR 232.103(n). Emergency Order 28, as
amended, contains six securementrelated requirements governing when,
where, and how certain hazardous
materials tank cars may be left
unattended, including certain
communication requirements:
tkelley on DSK3SPTVN1PROD with PROPOSALS
(1) A railroad must not leave equipment
unattended on a mainline outside of a yard
or terminal when the equipment includes a
minimum number of loaded tank cars
containing certain types of hazardous
materials, referred to as ‘‘Appendix A
Materials’’ —5 or more tank cars containing
materials poisonous by inhalation (PIH),
including anhydrous ammonia and ammonia
solutions and/or 20 rail car loads of
flammable gases or liquids (e.g., crude oil
and ethanol)—until the railroad develops,
adopts, and complies with a plan that
identifies specific locations and
circumstances when such equipment may be
left unattended.5
(2) A railroad must develop a process for
securing unattended equipment containing
Appendix A Materials that includes: (a)
locking the controlling locomotive cab or
removing and securing the reverser and (b)
communication of pertinent securement
information to the dispatcher for recordation.
(3) Each railroad must review and verify,
and adjust, as necessary, existing procedures
and processes related to the number of hand
brakes to be set on all unattended trains and
equipment.
(4) Each railroad must require a job briefing
addressing securement for any job that will
impact or require the securement of any
equipment in the course in the course of the
work being performed.
(5) Each railroad must ensure that a
qualified railroad employee inspects all
equipment that any emergency responder has
been on, under, or between for proper
securement before the train or vehicle is left
unattended.
(6) Each railroad must provide notice to all
employees affected by Emergency Order 28.
See 78 FR 48224 (Aug. 7, 2013).
Following a request from AAR and
ASLRRA, FRA granted partial relief
from Emergency Order 28’s dispatcher
communication requirement in certain
limited situations. FRA’s relief letter
5 AAR
has voluntarily applied EO 28 to trains that
have a single PIH tank car.
VerDate Mar<15>2010
16:51 Sep 08, 2014
Jkt 232001
provides that a railroad employee may
leave equipment unattended on a
mainline or siding without contacting
the train dispatcher when the employee
is actively engaged in switching duties
as long as the employee ensures that
there is an emergency application of the
air brakes, hand brakes are set in
accordance with 49 CFR 232.103(n), and
the employee has demonstrated
knowledge of FRA and railroad
securement requirements. See Letter
from Robert C. Lauby, Acting Associate
Administrator for Railroad Safety/Chief
Safety Officer, Federal Railroad
Administration, to Michael J. Rush,
Associate General Counsel, AAR, and
Keith T. Borman, Vice President and
General Counsel, ASLRRA, (Aug. 27,
2013), available at https://
rsac.fra.dot.gov/meetings/
20130829.php.
Additionally, FRA and the Pipeline
and Hazardous Materials Safety
Administration (PHMSA) jointly issued
a Safety Advisory to railroads and
commodity shippers detailing eight
recommended actions the industry
should take to better ensure the safe
transport of hazardous materials. See
Federal Railroad Administration Safety
´
Advisory 2013–06, Lac-Megantic
Railroad Accident and DOT Safety
Recommendations, 78 FR 48224 (Aug. 7,
2013), available at https://
www.fra.dot.gov/eLib/details/L04720.
These recommendations include:
Reviewing the details and lessons
´
learned from the Lac Megantic accident;
reviewing crew staffing levels; removing
and securing the train’s ‘‘reverser’’ when
unattended; review of all railroad
operating procedures, testing and
operating rules related to securing a
train; reviewing Transport Canada’s
directives to secure and safely operate a
train; and conducting a system-wide
assessment of security risks when a
train is unattended and identify
mitigation efforts for those risks.
Additionally, the Safety Advisory
recommends testing and sampling of
crude oil for proper classification for
shipment, as well as a review of all
shippers’ safety and security plans. FRA
also convened an emergency meeting of
FRA’s RSAC to begin the deliberative
process with FRA’s stakeholders,
including railroad management, railroad
labor, shippers, car owners, and others,
as the agency considers requirements in
Emergency Order 28 and
recommendations in the Safety
Advisory that should be made a part of
its regulations.6
6 The RSAC was given three tasks. In addition to
developing securement recommendations, it was
also tasked with developing recommendations
PO 00000
Frm 00014
Fmt 4702
Sfmt 4702
53359
On August 19, 2014, the TSB released
its Railway Investigation Report
R13D0054, citing 18 causal and
contributing factors, plus an additional
16 findings as to risk, concerning the
´
accident at Lac-Megantic. FRA believes
that DOT has taken, or is already taking,
action concerning each of those factors.
The TSB notably included in its list of
factors the MMA’s weak safety culture
and ineffective oversight on train
securement. The report also identified
factors relating directly to train
securement such as insufficient hand
brakes and improper hand brake test
applications. This instant rulemaking
proposes requirements that would
enhance safety culture and oversight
and that would address train
securement. For instance, as further
discussed below, FRA proposes to
mandate by regulation the
implementation of operating rules and
practices requiring that securement be
part of all relevant job briefings. FRA
also proposes rules requiring
verification with a qualified person that
equipment is adequately and effectively
secured in accordance with the
regulations before being left unattended.
These requirements aim to increase the
safety dialog between railroad
employees and to provide enhanced
oversight within the organization. In
doing so, these communications should
better ensure that crew members apply
the proper number of hand brakes, and
more correctly apply hand brake tests,
on unattended equipment. Also notable
was the report’s findings as to risk that
states: ‘‘If trains are left unattended in
easily accessible locations, with
locomotive cab doors unlocked and the
reverser handle available in the cab, the
risk of unauthorized access, vandalism,
and tampering with locomotive controls
is increased.’’ This proposed rule
directly addresses this concern with
requirements relating to the installation
and use of locomotive door locks and
reverser removal.
addressing issues relating to train crew size and
hazardous materials such as identification and
classification of hazardous materials, operational
controls, and handling of certain hazardous
materials shipments. The RSAC hazardous
materials working group was able to reach
consensus on amending the definitions of ‘‘residue’’
and ‘‘key train’’ and clarifying the jurisdiction
concerning loading, unloading, and storage of
hazardous materials before and during
transportation. These recommendations have been
provided to PHMSA, which has regulatory
authority over hazardous materials shipments.
E:\FR\FM\09SEP1.SGM
09SEP1
53360
Federal Register / Vol. 79, No. 174 / Tuesday, September 9, 2014 / Proposed Rules
tkelley on DSK3SPTVN1PROD with PROPOSALS
B. Safety Concerns Arising Out of the
´
Lac-Megantic Derailment and Other
Train Incidents Involving Flammable
Liquids and Gases and Poison
Inhalation Hazard Materials
The vast majority of hazardous
materials shipped by rail each year
arrive at their destinations safely and
without incident. Indeed, in calendar
year 2013, there were only 18 accidents
in which a hazardous material was
released (involving a total of 78 cars) out
of approximately 1.6 million shipments
of hazardous material transported in rail
tank cars in the United States. However,
´
the Lac-Megantic incident demonstrates
the substantial potential for danger that
exists when an unattended train rolls
away and derails resulting in the
sudden release of hazardous materials
into the environment. Although the Lac´
Megantic incident occurred in Canada,
the freight railroad operating
environment in Canada is similar to that
in the United States, and a number of
railroads operate in both countries.7
Freight railroads in the United States
also transport a substantial amount and
variety of hazardous materials,
including materials poisonous by
inhalation (PIH materials), also known
as materials toxic by inhalation (TIH),
and explosive materials. Moreover, an
increasing proportion of the hazardous
materials transported by rail is classified
as flammable.8
´
The MMA train in the Lac-Megantic
incident was transporting 72 carloads of
crude oil with five locomotives and a
loaded box car. A similar type of train
consist is commonly found on rail lines
in the United States, because crude oil
is often transported in solid blocks or by
a unit train consisting entirely of tank
cars containing crude oil. Crude oil is
often classified by an offeror as a
7 As an example, MMA formerly operated in both
the United States and Canada, with approximately
510 miles of track in Maine, Vermont, and Quebec,
and the tank cars transporting the crude oil that
´
derailed in Lac-Megantic originated in the Williston
Basin of North Dakota. A discussion concerning the
applicable Canadian securement requirements can
be found above in the section titled ‘‘2. Response,’’
which addresses the actions taken by the United
States and Canada in direct response to the Lac´
Megantic incident.
8 PHMSA prescribes a comprehensive regulatory
safety system that categorizes hazardous materials
into nine hazard classes based on the type of
hazards presented by the materials. See 49 CFR
parts 172 and 173. Under PHMSA’s regulations,
crude oil, in most forms, meets the definition of a
‘‘Class 3’’ hazardous material, which signifies that
it is a flammable liquid. Ethanol, discussed below,
also is a Class 3 hazardous material. PIH materials,
referenced above, include ‘‘Class 2 and Division
2.3’’ gases and ‘‘Class 6, and Division 6.1’’ poisons
other than gases. Chlorine gas and anhydrous
ammonia are two examples of PIH materials
(Division 2.3) that are commonly transported by
rail.
VerDate Mar<15>2010
16:51 Sep 08, 2014
Jkt 232001
flammable liquid; per PHMSA’s
Hazardous Materials Regulations
(HMRs), however, its packing group can
be I, II, or III depending on the blend of
constituent crude oils. According to the
AAR, crude oil traffic increased 68-fold
in the United States between 2005 and
2013. Much of this growth has occurred
because of developments in North
Dakota, as the Bakken formation in the
Williston Basin has become a major
source for oil production in the United
States. Texas also has contributed to the
growth of crude oil shipments by rail.
As a result, carloads of crude oil
increased from approximately 81,452 in
2011 to approximately 485,384 in 2013.
The Bakken crude oil from North Dakota
is primarily shipped via rail to refineries
located near the U.S. Gulf Coast—
particularly in Texas and Louisiana—or
also to pipeline connections, most
notably to connections located in
Oklahoma. Crude oil is also shipped via
rail to refineries on the East Coast and
West Coast, and to a lesser extent,
refineries in other regions of the U.S.9
All indications from the U.S.
Department of Energy’s U.S. Energy
Information Administration (EIA) are
that rail capacity for Bakken crude oil
from the Williston Basin will continue
to expand to meet production.10 Rail
shipments from the North Dakota region
are forecast to increase over the next
two years (as are pipeline shipments).
Much of the near-term growth in rail
originations is a function of how quickly
rail car manufacturers can meet the
demand by producing new tank cars,
primarily for transporting Bakken crude
oil. The rise in rail originations in crude
oil is subject to changes in the number
of tank cars available, price of crude oil,
overall production of crude oil in that
region; and if, or how quickly,
additional pipeline capacity from that
region comes online. However, for the
foreseeable future, all indications are for
continued growth of rail originations of
crude in that region as new tank car
fleets come online to meet demand.
´
As demonstrated by the Lac-Megantic
derailment, in a high-consequence
incident, crude oil is problematic when
released because it is flammable. This
risk is compounded because it is
commonly shipped in large unit trains.
9 See AAR’s May 2013 paper ‘‘Moving Crude Oil
by Rail’’, available online at: https://www.aar.org/
safety/Documents/Assets/Transportation_of_
Crude_Oil_by_Rail.pdf.
10 See EIA reports ‘‘Bakken crude oil price
differential to WTI narrows over last 14 months,’’
available online at: https://www.eia.gov/
todayinenergy/detail.cfm?id=10431; and ‘‘Rail
delivery of U.S. oil and petroleum products
continues to increase, but pace slows,’’ available
online at: https://www.eia.gov/todayinenergy/
detail.cfm?id=12031.
PO 00000
Frm 00015
Fmt 4702
Sfmt 4702
´
Subsequent to the Lac-Megantic
derailment, the United States has seen
at least three major rail-related incidents
involving crude oil unit trains that
evidence the dangerous results that can
occur when crude oil is not transported
safely. FRA recognizes that none of
these three derailments resulted from a
roll-away situation that would have
been addressed by this rule.
On April 30, 2014, there was
derailment near downtown Lynchburg,
Virginia, of an eastbound CSX
Transportation, Inc. (CSX) unit train
consisting of 105 tank cars loaded with
crude oil. Seventeen of the train’s cars
derailed. One of the tank cars was
breached, leading to a crude oil fire.
Emergency responders were forced to
evacuate approximately 350 individuals
from the immediate area. Additionally,
three of the derailed tank cars came to
rest in the adjacent James River, causing
up to 30,000 gallons of crude oil to be
spilled into the river. The National
Transportation Safety Board (NTSB) and
DOT are both investigating this accident
to determine the cause.
On December 30, 2013, a westbound
grain train derailed 13 cars near
Casselton, North Dakota, fouling main
track 2.11 Simultaneously, an eastbound
crude oil unit train was operating on
main track 2. The crude oil unit train
reduced its speed and collided with a
derailed car that was fouling, resulting
in the derailment of the head-end
locomotives and the first 21 cars of the
crude oil unit train. Eighteen of the 21
derailed tank cars ruptured, releasing an
estimated 400,000 gallons of crude. The
ruptured tank cars ignited causing an
explosion. There were no reported
injuries by either train crew, nor were
there any injuries to the public;
however, about 1,400 people were
evacuated. Damages from the derailment
are estimated at $6.1 million.12
Also, on November 8, 2013, a 90-car
crude oil train derailed in a rural area
near Aliceville, Alabama. The crude oil
shipment had originated in North
Dakota and was bound for Walnut Hill,
Florida, to be transported by a regional
pipeline to a refinery in Saraland,
Alabama. More than 20 cars derailed,
and at least 11 cars ignited, resulting in
an explosion and fire. Although there
were no reported injuries, an
undetermined amount of crude oil
escaped from derailed cars and fouled a
wetlands area near the derailment site.
11 This derailment currently is being investigated
by the National Transportation Safety Board
(NTSB), and information regarding this incident can
be found at the NTSB Web site. See https://
www.ntsb.gov/doclib/reports/2014/Casselton_ND_
Preliminary.pdf.
12 See id.
E:\FR\FM\09SEP1.SGM
09SEP1
tkelley on DSK3SPTVN1PROD with PROPOSALS
Federal Register / Vol. 79, No. 174 / Tuesday, September 9, 2014 / Proposed Rules
The dangers related to crude oil trains
are not necessarily unique. They also
exist with other hazardous materials
such as ethanol, which is another
flammable liquid that is commonly
transported in large quantities by rail. In
2012, more carloads of ethanol were
transported via rail than any other
hazardous material. The railroads
experienced an increase in ethanol
traffic of 442 percent between 2005 and
2010. Although in 2013 the number of
carloads dropped by 10 percent from
2010 levels, there were still
approximately 297,000 carloads
transported by rail. Since 2009, there
have been at least four major mainline
derailments resulting in the breach of
tank cars containing ethanol. While FRA
recognizes that none of these four
derailments resulted from a roll-away
situation, they are instructive on the
destructive potential of a derailment
involving tank cars containing
flammable products:
• On August 5, 2012, in Plevna,
Montana, a BNSF Railway Co. train
derailed 18 cars while en route from
Baker, Montana. Seventeen of the 18
cars were tank cars loaded with
denatured alcohol, a form of ethanol.
Five of the cars caught on fire resulting
in explosions, the burning of
surrounding property not within the
railroad’s right-of-way, and the
evacuation of the immediate area.
• On July 11, 2012, in Columbus, OH,
a Norfolk Southern Railway Co. train
derailed while operating on main track.
Thirteen tank cars containing ethanol
derailed resulting in a fire and the
evacuation of 100 people within a onemile radius of the derailment.
• On February 6, 2011, in Arcadia,
Ohio, a Norfolk Southern Railway Co.
train operating on single main track
derailed 33 tank cars loaded with
ethanol. The derailment caused a major
fire and forced the evacuation of a onemile radius around the derailment.
• On June 19, 2009, in Cherry Valley,
Illinois, a Canadian National Railway
train derailed 19 tank cars loaded with
ethanol. Thirteen of the 19 derailed cars
caught fire, and there were reports of
explosions. One person died, and there
were 9 reported injuries related to the
fire. Additionally, approximately 600
residences were evacuated within a
1⁄2-mile radius of the derailment.
While these accidents were serious,
their results had potential for more
higher-consequence outcomes. The
higher-consequence releases created the
potential for additional deaths, injuries,
property damage, and environmental
damage.
There are other hazardous materials
that have similar potential for higher-
VerDate Mar<15>2010
16:51 Sep 08, 2014
Jkt 232001
consequence danger. For example,
accidents involving trains transporting
other hazardous materials, including
PIH materials such as chlorine and
anhydrous ammonia, can also result in
serious consequences as evidenced by
the following accidents:
• On January 6, 2005, in Graniteville,
South Carolina, a Norfolk Southern
Railway Co. train collided with another
Norfolk Southern Railway Co. train that
was parked on a customer side track,
derailing both locomotives and 16 cars
of the moving train. The accident was
caused by a misaligned switch. Three
tank cars containing chlorine derailed,
one of which was punctured. The
resulting chlorine exposure caused 9
deaths, approximately 554 people were
taken to local hospitals, and an
additional 5,400 people within a onemile radius of the site were evacuated
by law enforcement personnel. FRA’s
analysis of the total cost of the accident
was $126 million, including fatalities,
injuries, evacuation costs, property
damage, environmental cleanup, and
track out of service.
• On June 28, 2004, near Macdona,
TX, a Union Pacific Railroad Co. train
passed a stop signal and collided with
a BNSF Railway Co. train. A chlorine
car was punctured, and the chlorine gas
that was released killed three and
injured 32.
• On January 18, 2002, a Canadian
Pacific Railway train containing 15 tank
cars of anhydrous ammonia derailed
half a mile from the city limits of Minot,
North Dakota due to a breaking of the
rail at a joint. Five of these tank cars
ruptured, which resulted in an ammonia
vapor that spread 5 miles downwind
over an area where 11,600 people lived.
The accident caused one death, 11
serious injuries, and 322 minor injuries.
Environmental cleanup costs reported to
the NTSB were $8 million.
• On July 18, 2001, 11 of 60 cars in
a CSX Transportation, Inc. freight train
derailed while passing through the
Howard Street Tunnel in downtown
Baltimore, Maryland. The train included
8 tank cars loaded with hazardous
material; 4 of these were among the cars
that derailed. A leak in a tank car
containing tripropylene resulted in a
chemical fire. A break in a water main
above the tunnel flooded both the
tunnel and the streets above it with
millions of gallons of water.
While train accidents involving
hazardous materials are caused by
variety of factors, nearly one-half of all
accidents are related to railroad human
factors or equipment defects. FRA’s data
shows that since 2009, human factors
have been the most common cause of
reportable train accidents. Based on
PO 00000
Frm 00016
Fmt 4702
Sfmt 4702
53361
FRA’s accident reporting data for the
period from 2010 through May 2014,
approximately 34 percent of reported
train accidents/incidents, as defined by
49 CFR 225.5, were human factorcaused.13 With regard to the securement
of unattended equipment, specifically,
FRA accident/incident data indicates
that approximately 8.7 percent of
reported human factor-caused train
accidents/incidents from calendar year
2010 until May 2014 were the result of
improper securement, which means that
improper securement is the cause of
approximately 2.9 percent of all
reported accidents/incidents.14 The
types of securement errors that typically
lead to accidents/incidents include
failing to apply any hand brakes at all,
failing to apply a sufficient number of
hand brakes, and failing to correctly
apply hand brakes. Emergency Order 28
and this proposed rulemaking intend to
address some of the human factors
failures that may cause unattended
equipment to be improperly secured to
protect against a derailment situation
similar to that which occurred in Lac´
Megantic.
C. Current Securement Regulations and
Related Guidance
As previously noted, FRA has existing
regulations designed to ensure that
trains and vehicles are properly secured
before being left unattended. See 49 CFR
232.103(n). In FRA’s view, if existing
regulations are followed, the risk of
movement of unattended equipment is
substantially reduced. The current
regulations define ‘‘unattended
equipment’’ as ‘‘equipment left standing
and unmanned in such a manner that
the brake system of the equipment
cannot be readily controlled by a
qualified person.’’ Id. Section
232.103(n) generally addresses the
securement of unattended equipment by
stating that a train’s air brakes must not
be depended on to hold equipment
standing unattended on a grade. More
specifically, § 232.103(n) also requires
that the railroad apply a sufficient
number of hand brakes to hold the
equipment with the air brakes released
and that the brake pipe pressure be
reduced to zero with the angle cock
opened on one end of a cut of cars when
13 FRA estimates that there were a total of
approximately 8,976 accidents/incidents reported
during that time period. Approximately 3,030 of
those accidents/incidents were caused by human
factors, and 906 involved equipment that was
placarded as containing hazardous materials.
14 There were a total of approximately 264
reported accidents/incidents that were caused by
securement errors. Of those 264 accidents/
incidents, approximately 98 involved equipment
that was placarded as containing hazardous
materials.
E:\FR\FM\09SEP1.SGM
09SEP1
tkelley on DSK3SPTVN1PROD with PROPOSALS
53362
Federal Register / Vol. 79, No. 174 / Tuesday, September 9, 2014 / Proposed Rules
not connected to a locomotive or other
compressed air source. The regulations
also require railroads to develop a
process or procedure for verifying that
the hand brakes applied are sufficient to
hold the equipment with the air brakes
released. When dealing with
locomotives and locomotive consists,
§ 232.103(n)(3) establishes specific
additional requirements:
• All hand brakes must be fully
applied on all locomotives in the lead
consist of an unattended train.
• All hand brakes must be fully
applied on all locomotives in an
unattended locomotive consist outside
of yard limits.
• The minimum requirement for an
unattended locomotive consist within
yard limits is that the hand brake must
be fully applied on the controlling
locomotive.
• Railroads must develop, adopt, and
comply with procedures for securing
any unattended locomotive that is not
equipped with an operative hand brake.
Additionally, FRA requires each
railroad to adopt and comply with
instructions addressing each unattended
locomotive’s position of the throttle,
generator field switch, isolation switch,
and automatic brake valve and the
status of its reverser and independent
brakes. See 49 CFR 232.103(n)(4).
FRA has also issued guidance
documents interpreting these
regulations. For instance, on March 24,
2010, FRA issued Technical Bulletin
MP&E 2010–01, Enforcement Guidance
Regarding Securement of Equipment
with Title 49 Code of Federal
Regulations Section 232.103(n) (TB 10–
01), available at https://www.fra.dot.gov/
eLib/details/L02394. While FRA
continues to believe that the securement
requirements of § 232.103 are not met
where there is a complete failure to
apply even a single hand brake on
unattended equipment, FRA also
recognizes that there are times when it
is necessary to have unsecured
equipment, such as during switching
activities when assembling and
disassembling trains within
classification yards. Therefore, TB
10–01 provides guidance regarding
alternative forms of securement in such
instances. As an example, TB 10–01
notes that FRA will allow a train crew
cutting away from a cut of cars, to
initiate an emergency brake application
on the cut of cars, and then close the
angle cock if the crew is taking a
locomotive consist directly to the
opposite end of the cut of cars to in
order to couple the locomotive consist
to the cars or to open the angle cock at
the other end and leave the angle cock
VerDate Mar<15>2010
16:51 Sep 08, 2014
Jkt 232001
open and vented to the atmosphere, as
required under 49 CFR 232.103(n)(2).
Additionally, TB 10–01 makes clear that
FRA will allow the use of skates and
retarders in hump classification yards,
classification yards with bowl tracks, or
flat switching yards if the retarders and
skates are used within their design
criteria and as intended. While this
proposal does not contain any specific
proposed regulatory text referencing the
content of TB 10–01, FRA is considering
codifying TB 10–01 by amending the
rule at the final rule stage of this
proceeding. This would constitute a
clarifying amendment to ensure that
FRA’s long-standing interpretation and
application of the existing regulation is
contained directly in the regulation.
FRA seeks comments on clarifying the
rule to address the provisions of TB 10–
01 in the final rule.
Despite the demonstrated
effectiveness of FRA’s current
securement regulations, FRA recognizes
that due to increased shipments of
hazardous materials such as crude oil
and ethanol, combined with the
potential for higher-consequences
related to any accident that might occur
due to improper securement,
particularly on mainline track and
mainline sidings outside of a yard or
terminal, proper securement has become
a serious and immediate safety concern.
Therefore, FRA established additional
securement measures in Emergency
Order 28 in an effort to ensure the
continued protection of the health and
safety of railroad employees, the general
public, and the environment. In this
NPRM, FRA proposes establishing
permanent rules that will strengthen the
current regulations and ensure public
safety by adopting the necessary and
effective securement measures that FRA
included in Emergency Order 28 as part
of its immediate response to the Lac´
Megantic derailment.
Also notable is that over the past year,
FRA and PHMSA have undertaken
nearly two dozen actions to enhance the
safe transport of crude oil. This
comprehensive approach includes nearand long-term steps such as the
following: Launching ‘‘Operation
Classification’’ in the Bakken region to
verify that crude oil is properly
classified; issuing safety advisories,
alerts, emergency orders and regulatory
updates; conducting special inspections;
aggressively moving forward with a
rulemaking to enhance tank car
standards; and reaching agreement with
railroad companies on a series of
immediate voluntary actions including
reducing speeds, increasing inspections,
using new brake technology and
investing in first responder training.
PO 00000
Frm 00017
Fmt 4702
Sfmt 4702
Most of those actions have been well
outside the scope of securement.
However, FRA references these actions
here to help place this rulemaking in the
broader context of DOT’s wide-ranging
response to the safety issues created by
these trains. For a summary of these
actions, see Federal Railroad
Administration’s Action Plan for
Hazardous Materials Safety, Federal
Railroad Administration (May 20, 2014)
available at https://www.fra.dot.gov/
eLib/details/L04721.
D. Emergency Order 28 and Related
Guidance
On August 2, 2013, FRA issued
Emergency Order 28 establishing
additional requirements on the
treatment of securement of unattended
equipment. On the same date, FRA
issued a related Safety Advisory and
announced an emergency RSAC
meeting. See Federal Railroad
Administration Safety Advisory 2013–
´
06, Lac-Megantic Railroad Accident and
DOT Safety Recommendations, 78 FR
48224 (Aug. 7, 2013), available at
https://www.fra.dot.gov/eLib/details/
L04720. FRA also subsequently issued
guidance related to Emergency Order 28
and granted partial relief from
Emergency Order 28 to the AAR and
ASLRRA. See Guidance on Emergency
Order 28 (Aug. 21, 2013), available at
https://rsac.fra.dot.gov/meetings/
20130829.php; Letter from Robert C.
Lauby, Acting Associate Administrator
for Railroad Safety/Chief Safety Officer,
FRA, to Michael J. Rush, Associate
General Counsel, AAR, and Keith T.
Borman, Vice President and General
Counsel, American Short Line and
Regional Railroad Association, (Aug. 27,
2013), available at https://
rsac.fra.dot.gov/meetings/
20130829.php.
E. RSAC Overview
In March 1996, FRA established the
RSAC, which provides a forum for
collaborative rulemaking and program
development. RSAC includes
representatives from all of the agency’s
major stakeholder groups, including
railroads, labor organizations, suppliers
and manufacturers, and other interested
parties. A list of RSAC members
follows:
• American Association of Private
Railroad Car Owners (AARPCO);
• American Association of State
Highway & Transportation Officials
(AASHTO);
• American Chemistry Council
(ACC);
• American Petroleum Institute (API);
• American Public Transportation
Association (APTA);
E:\FR\FM\09SEP1.SGM
09SEP1
Federal Register / Vol. 79, No. 174 / Tuesday, September 9, 2014 / Proposed Rules
tkelley on DSK3SPTVN1PROD with PROPOSALS
• American Short Line and Regional
Railroad Association (ASLRRA);
• American Train Dispatchers
Association (ATDA);
• AAR;
• Association of State Rail Safety
Managers (ASRSM);
• Association of Tourist Railroads
and Railway Museums (ATRRM);
• Brotherhood of Locomotive
Engineers and Trainmen (BLET);
• Brotherhood of Maintenance of Way
Employes Division (BMWED);
• Brotherhood of Railroad Signalmen
(BRS);
• Chlorine Institute;
• Federal Transit Administration
(FTA);*
• Fertilizer Institute;
• Institute of Makers of Explosives;
• International Association of
Machinists and Aerospace Workers
(IAM);
• International Brotherhood of
Electrical Workers (IBEW);
• Labor Council for Latin American
Advancement (LCLAA);*
• League of Railway Industry
Women;*
• National Association of Railroad
Passengers (NARP);
• National Association of Railway
Business Women;*
• National Conference of Firemen &
Oilers;
• National Railroad Construction and
Maintenance Association (NRC);
• National Railroad Passenger
Corporation (Amtrak);
• National Transportation Safety
Board (NTSB);*
• Railway Passenger Car Alliance
(RPCA)
• Railway Supply Institute (RSI);
• Safe Travel America (STA);
• Secretaria de Comunicaciones y
Transporte;*
• SMART Transportation Division
(SMART TD);
• Transport Canada;*
• Transport Workers Union of
America (TWU);
• Transportation Communications
International Union/Brotherhood of
Railway Carmen (TCIU/BRC);
• Transportation Security
Administration (TSA).
* Indicates associate, non-voting
membership.
When appropriate, FRA assigns a task
to RSAC, and after consideration and
debate, RSAC may accept or reject the
task. If accepted, RSAC establishes a
working group that possesses the
appropriate expertise and representation
of interests to develop recommendations
to FRA for action on the task. These
recommendations are developed by
VerDate Mar<15>2010
16:51 Sep 08, 2014
Jkt 232001
consensus. The working group may
establish one or more task forces or
other subgroups to develop facts and
options on a particular aspect of a given
task. The task force, or other subgroup,
reports to the working group. If a
working group comes to consensus on
recommendations for action, the
package is presented to RSAC for a vote.
If the proposal is accepted by a simple
majority of RSAC, the proposal is
formally recommended to FRA. FRA
then determines what action to take on
the recommendation. Because FRA staff
play an active role at the working group
level in discussing the issues and
options and in drafting the language of
the consensus proposal, and because the
RSAC recommendation constitutes the
consensus of some of the industry’s
leading experts on a given subject, FRA
is often favorably inclined toward the
RSAC recommendation. However, FRA
is in no way bound to follow the
recommendation and the agency
exercises its independent judgment on
whether the recommended rule achieves
the agency’s regulatory goals, is soundly
supported, and is in accordance with
applicable policy and legal
requirements. Often, FRA varies in some
respects from the RSAC
recommendation in developing the
actual regulatory proposal or final rule.
Any such variations would be noted and
explained in the rulemaking document
issued by FRA. If the working group or
RSAC is unable to reach consensus on
recommendations for action, FRA
resolves the issue(s) through traditional
rulemaking proceedings or other action.
The RSAC convened an emergency
session on August 29, 2013, in response
´
to the accident at Lac-Megantic, to brief
members on the preliminary findings of
the accident, to discuss the safety issues
related to the accident, and to discuss
Emergency Order 28. At that meeting,
the RSAC accepted Task No. 13–03 to
refer to the Securement Working Group
(SWG) the responsibility of ensuring
that ‘‘appropriate processes and
procedures are in place to ensure that
any unattended trains and vehicles on
mainline track or mainline sidings
outside of a yard or terminal are
properly secured against unintended
movement, and as appropriate, such
securement is properly confirmed and
verified.’’ In doing so, the SWG was
tasked with reviewing: the standards for
the securement of unattended
equipment under 49 CFR 232.103(n)
and its concomitant regulatory guidance
published in TB 10–01; the
requirements of Emergency Order 28;
and the recommendations contained in
Federal Railroad Administration Safety
PO 00000
Frm 00018
Fmt 4702
Sfmt 4702
53363
´
Advisory 2013–06—Lac-Megantic
Railroad Accident Discussion and DOT
Safety Recommendations. The SWG was
also tasked with identifying any other
issues relevant to FRA’s regulatory
treatment of securement of equipment to
prevent unintended movement. While
the RSAC also tasked the SWG with
reviewing operational testing, the SWG
concluded that no changes were
necessary to the regulations relating to
operational testing.
In addition to FRA, the following
organizations contributed members to
the SWG:
• AAR, including members from
BNSF Railway Company (BNSF),
Canadian National Railway (CN),
Canadian Pacific Railway (CP), CSX
Transportation, Inc. (CSX), Genesee &
Wyoming Inc. (GNWR), Kansas City
Southern Railway (KCS), Long Island
Rail Road (LIRR), Metro-North Railroad
(MNCW), Northeast Illinois Regional
Commuter Railroad Corporation
(METRA), Norfolk Southern Railway
Company (NS), Railway Association of
Canada, and Union Pacific Railroad
Company (UP);
• Amtrak;
• API;
• APTA, including members Keolis
North America, Massachusetts Bay
Commuter Railroad Company, LLC
(MBCR); and North County Transit
District (NCTD);
• ASLRRA, including members from
Anacostia Rail Holdings, Central
California Traction Company (CCT),
OmniTRAX, Rio Grande Pacific
Corporation, and WATCO Companies,
Inc. (WATCO);
• ASRSM, including members from
California Public Utilities Commission
(CPUC);
• ATDA;
• BLET;
• BMWED;
• BRS;
• IAM;
• NRC, including members from
Herzog Transit Services (Herzog);
• NTSB;
• PHMSA;
• RSI;
• SMART TD;
• TCIU/BRC;
• Transport Canada; and
• TWU.
The SWG convened subsequently on
October 30, 2013, December 17, 2013,
January 28, 2014, and March 4, 2014, in
Washington, DC to respond to these
tasks and voted to approve the
recommendation on March 4, 2014. The
SWG presented its recommendation to
the full RSAC, which voted by
electronic ballot between March 25 and
March 31, 2015, to accept the
E:\FR\FM\09SEP1.SGM
09SEP1
53364
Federal Register / Vol. 79, No. 174 / Tuesday, September 9, 2014 / Proposed Rules
recommendations. On April 2, 2014, the
RSAC announced that by majority vote
the recommendations had been
approved and would become its
recommendation to the Administrator.
The recommendation of the RSAC
include amendments to 49 CFR
232.103(n) that would do the following:
(1) provide additional requirements for
the securement of unattended
equipment carrying certain hazardous
materials; (2) mandate the
implementation of operating rules and
practices requiring that securement be
part of all relevant job briefings; and (3)
require adoption and compliance with
procedures to secure equipment
subsequent to an emergency response.
The RSAC recommendation also
includes amendments to 49 CFR
232.105 that would require equipping
locomotives with exterior locking
mechanisms.
tkelley on DSK3SPTVN1PROD with PROPOSALS
III. Section-by-Section Analysis
Unless otherwise noted, all ‘‘part’’
and ‘‘section’’ references below refer to
provisions either in title 49 of the CFR
or proposed to be in title 49 of the CFR.
FRA seeks comments on all proposals
made in this NPRM.
Before entering into specific analysis
of each proposed section, it is important
to make clear that this proposal, which
provides more restrictive securement
requirements for specific types of
equipment, does not affect FRA’s policy
concerning the Federal hours of service
requirements. FRA continues to believe
that a railroad may not require or allow
a train employee with an accumulated
time on duty of 12 hours or more to
remain on a train for the sole purpose
of meeting the securement
requirements, including those proposed
here. A train employee may, however,
remain on an unsecured train, if that
employee is legitimately waiting for
deadhead transportation from duty to a
point of final release, performs no
covered or commingled service,15 and is
15 A person is considered by the hours of service
laws to be neither on duty nor off duty during
periods they are either waiting for or in deadhead
transportation to their point of final release (i.e.,
have completed their time on duty and are waiting
for or in transportation to end their duty tour). In
order to be considered ‘‘waiting for’’ deadhead
transportation, the person must not be required to
perform other duties. Merely being on a train and
remaining sufficiently alert to respond to any
unintended movement of the equipment is not
inherently performing a duty; being on or with the
train is a necessary element of waiting for
transportation from the train. This is true even
when the railroad receives the benefit of having the
train attended while employees aboard wait for
transportation. Such time is considered ‘‘limbo
time’’ and is not contingent upon the train’s
securement status. See BLET v. Atchison Topeka
and Santa Fe Railway, 516 U.S. 152 (1996) (holding
that the time waiting for deadhead transportation
VerDate Mar<15>2010
16:51 Sep 08, 2014
Jkt 232001
free to leave the equipment when
deadhead transportation arrives. In this
case, time spent waiting for and in
deadhead transportation is treated as
neither time on duty nor time off duty.
FRA also notes that this proposed rule
does not include the portion of
Emergency Order 28 that requires
railroads to review, verify, and adjust, as
necessary, existing requirements and
instructions related to the number of
hand brakes to be set on unattended
trains and vehicles, and to review and
adjust, as necessary, the procedures for
verifying that the number of hand
brakes is sufficient to hold the train or
vehicle with the air brakes released. It
was FRA’s concern that existing railroad
processes and procedures related to
setting and verifying hand brakes on
unattended trains and equipment were
not sufficient to hold all trains and
vehicles in all circumstances. FRA
believes that the railroads have fulfilled
this requirement and thus there is no
need to include it in this proposed rule.
FRA seeks comments on the exclusion
of this Emergency Order 28 requirement
here.
Proposed Amendments to 49 CFR Part
232
Section 232.5 Definitions
In the 2001 rule, the definition of
‘‘unattended equipment’’ was included
in § 232.103(n). As further discussed
below, FRA is proposing a new
paragraph (h) for § 232.105, which
would also make use of the definition
for ‘‘unattended equipment.’’ Since the
term would be used in multiple
sections, FRA believes it would be
prudent to move the definition to the
more broadly applicable definitions in
§ 232.5. Doing so would also allow FRA
to rephrase paragraph (n) for clarity
purposes, as discussed further below.
Proposed placement of the definition in
§ 232.5 would not change its meaning
and would be solely for applicability
and clarity purposes.
FRA proposes changing the term
‘‘yard limits’’ to ‘‘yard’’ without any
change to its definition, with concurrent
changes from ‘‘yard limits’’ to ‘‘yard’’ in
§ 232.103(n). FRA also proposes to
include the term ‘‘yard’’ in its new
under the hours of service laws must be counted as
‘‘limbo time.’’). However, should the employee be
required to perform some activity to prevent the
movement of the equipment or to secure the train
prior to departing with deadhead transportation,
then the time spent performing the activity and any
intervening time spent waiting would be considered
covered and commingled service respectively. See
49 CFR part 228, app. A. Thus, whether a train is
secured or unsecured when an employee is waiting
for deadhead transportation, that waiting time will
count as limbo time, so long as no covered activities
are performed.
PO 00000
Frm 00019
Fmt 4702
Sfmt 4702
§ 232.105(h). As currently defined in
part 232, a yard limit is ‘‘a system of
tracks, not including main tracks and
sidings, used for classifying cars,
making-up and inspecting trains, or
storing cars and equipment.’’ But in part
218, yard limits are described as a
railroad-designated operating territory
that is established by yard limit signs;
and timetable, train orders, or special
instructions. See 49 CFR 218.35(a).
Making this change clarifies that
specific securement practices are
connected to the physical presence of a
yard, and not to an operating practices
description of yard limits, which could
potentially encompass an entire railway
system.
Section 232.103 General Requirements
for all Train Brake Systems
As previously noted, FRA is
proposing to move the definition of
‘‘unattended equipment’’ to § 232.5,
creating an opportunity to rephrase and
clarify the introductory language of
paragraph (n). Part of this proposal is to
move the opening sentence in paragraph
(n)—‘‘A train’s air brake shall not be
depended upon to hold equipment
standing unattended on a grade
(including a locomotive, a car, or a train
whether or not locomotive is
attached)’’—to paragraph (n)(2). The
introductory language of paragraph (n)
would remain more succinct and clear.
While it is not an RSAC
recommendation, FRA also proposes to
amend paragraph (n)(1) to make more
clear its existing expectation that in
most circumstances at least one hand
brake must be applied to hold
unattended equipment. While this has
been stated in earlier rulemakings and
guidance documents, see e.g., TB 10–01,
there has been some confusion about
whether the use of wheel chocks, skates,
or other securement devices is sufficient
to hold unattended equipment. FRA’s
longstanding interpretation is that at
least one hand brake is required to hold
unattended equipment except in certain
limited situations. For instance, in a
hump classification yard an alternative
form securement, such as skates and
retarders may be allowed provided they
are used within their design criteria and
as intended. FRA believes adding
explicit language to the regulatory text
is warranted in order to formally
address the requirement to set at least
one hand brake in most instances.
As previously mentioned, proposed
paragraph (n)(2) would be amended to
include language from the introduction
of paragraph (n), which prohibits a
train’s air brake from being depended
upon to hold equipment standing
unattended on a grade (including a
E:\FR\FM\09SEP1.SGM
09SEP1
tkelley on DSK3SPTVN1PROD with PROPOSALS
Federal Register / Vol. 79, No. 174 / Tuesday, September 9, 2014 / Proposed Rules
locomotive, a car, or a train whether or
not locomotive is attached). FRA further
proposes to remove the phrase ‘‘on a
grade,’’ as such a requirement is
arguably superfluous and confusing.
Perfectly level track is rare, and there is
still a risk of unattended movement
caused by numerous factors, such as a
mistake in the location or length of the
level track, the effect of extreme
weather, or an impact from other
equipment. Moreover, the phrase ‘‘on a
grade’’ has led some to the erroneous
conclusion that hand brakes must only
be applied if the equipment is left on a
grade. While grade is likely a factor in
determining the number of hand brakes
that would sufficiently hold unattended
equipment, it is not a factor in
determining whether hand brakes
should be applied at all. Accordingly,
FRA proposes that the language be
modified to make clearer that the hand
brake application requirement is
universal, regardless of grade.
Proposed paragraphs (n)(6) through
(n)(8) attempt to address the
aforementioned heightened concerns
relating to the securement of unattended
equipment carrying certain hazardous
materials. Proposed paragraph (n)(6)
defines the type of cars covered by these
requirements and is intended to ensure
that proposed paragraphs (n)(7) and
(n)(8) apply only to equipment that
includes loads. Specifically, paragraph
(n)(6) provides that the substantive
requirements of paragraphs (n)(7) and
(n)(8) will apply to:
(1) any loaded freight car containing
PIH material, including anhydrous
ammonia and ammonia solutions; or
(2) twenty (20) or more loaded cars or
loaded intermodal portable tanks of any
one or any combination of PIH materials
(including anhydrous ammonia and
ammonia solutions), or any flammable
gas, flammable or combustible liquid,
explosives, or a hazardous substance
listed at § 173.31(f)(2) of this title.
FRA notes that this language is
broader than the language used in
PHMSA’s NPRM on Enhanced Tank Car
Standards and Operational Controls for
High-Hazard Flammable Trains
(HHFTs). See 79 FR 45016 (Aug. 1,
2014). In that rule, PHMSA proposed
certain new requirements for HHFTs,
which it defines as ‘‘a train comprised
of 20 or more carloads of a Class 3
flammable liquid and ensures that the
rail requirements are more closely
aligned with the risks posed by the
operation of these trains.’’ 79 FR at
45017. Paragraph (n)(6) proposes new
securement requirements that would
cover a single PIH tank car. Moreover,
where the proposed PHMSA rule would
only cover trains with 20 or more
VerDate Mar<15>2010
16:51 Sep 08, 2014
Jkt 232001
carloads of flammable liquids,
paragraph (n)(6) proposes to cover
situations where there are 20 or more
carloads or loaded intermodal portable
tanks of PIH materials, flammable gases,
flammable or combustible liquids,
explosives, other hazard substances
listed at § 173.31(f)(2), or any
combination thereof. FRA seeks
comment on this proposal and also
seeks comment on whether a defined
term should be used for equipment
covered under paragraph (n)(6).
The proposed regulatory text exempts
residue cars from consideration.
Residue cars are defined by PHMSA
under the HMRs. FRA will continue to
rely on the HMRs for this definition,
even if amended. Together, FRA and
PHMSA are concurrently considering
new regulations relating to the
placement in trains of cars containing
hazardous materials. In that effort,
loaded and residue cars may be treated
the same. FRA does not believe that any
resulting train placement regulation
would affect the securement regulations
we are considering in the instant
proceeding. Nevertheless, the parties
have expressed concerns that such
inconsistent use may foster confusion or
be ‘‘pitted against one another.’’ FRA
seeks further comment explaining how
such confusion or conflict may manifest
itself.
Proposed paragraph (n)(7) provides
certain conditions under which such
equipment may be left unattended,
including the development of a plan
identifying locations where such
equipment may be left unattended.
Proposed paragraph (n)(8) includes
specific requirements regarding the
securement of such equipment.
Emergency Order 28 prohibits each
railroad from leaving trains or vehicles
that are transporting certain hazardous
materials on mainline track or mainline
siding outside of a yard or terminal
unless the railroad adopts and complies
with a plan that identifies the specific
locations and circumstances for which it
is safe and suitable for leaving such
trains or vehicles unattended.
According to Emergency Order 28, the
plan must contain sufficient analysis of
the safety risks and any mitigating
circumstances the railroad has
considered in making its determination.
FRA expressed its intent not to formally
grant approval to any plan, and it
continues to monitor such plans. In the
event that FRA determines that
adequate justification is not provided,
the railroad is required to ensure that
trains and equipment are attended until
appropriate modifications are made to
the railroad’s plan.
PO 00000
Frm 00020
Fmt 4702
Sfmt 4702
53365
In proposed paragraph (n)(7)(i), FRA
intends to continue these requirements
by regulation. While FRA continues to
believe that it is not necessary to
provide approval for each plan, which
could take considerable resources, FRA
must ensure proper enforcement and
oversight. Accordingly, proposed
paragraph (n)(7)(i) includes a
requirement that the railroad notify FRA
when it modifies its existing plan and
provide FRA with a copy of the plan
upon request. For similar reasons, FRA
will also retain the right to require
modifications to any insufficient plan.
Proposed paragraph (n)(7)(i),
however, differs from Emergency Order
28 in one manner. It allows a railroad
to leave a train or equipment
unattended on mainline track that is
running through a yard or on mainline
track that is adjacent to the yard without
covering the location in the railroad’s
plan. This change is based on feedback
received during the SWG meetings,
which voted unanimously to adopt the
proposed language in paragraph
(n)(7)(i), with the recommendation of
the full RSAC to move forward with the
regulatory provision.
In Emergency Order 28, FRA made a
decision that it was not necessary to
include mainline tracks and mainline
sidings that run through a yard in a
railroad’s plan for leaving equipment
unattended. FRA’s rationale for this
decision was that a yard was defined
space where the railroad performed a
particular set of tasks (classifying cars,
making-up and inspecting trains, or
storing cars and equipment). As a result
of the tasks performed there, yards tend
to have appropriate geographic
characteristics, sufficient railroad
activity, and a population of railroad
personnel in close proximity that make
them safer places for leaving equipment
unattended. In FRA’s view, mainline
tracks that run through yards share
those characteristics with the yard
tracks surrounding it and is often used
as a de facto ‘‘yard’’ track to assist with
classifying cars and with making-up and
inspecting trains. As such, FRA did not
see a need when drafting Emergency
Order 28 for railroads to identify
mainline tracks within a yard in the
railroad’s securement plan before a
railroad would be allowed to leave
equipment unattended on the mainline
track that is surrounded by a yard.
The feedback received through the
RSAC process was that tracks adjacent
to the yard share many of the same
characteristics as mainline tracks that
run through a yard. Therefore, FRA has
proposed in this rulemaking to treat
mainline track that is adjacent to the
yard in the same manner that it is
E:\FR\FM\09SEP1.SGM
09SEP1
tkelley on DSK3SPTVN1PROD with PROPOSALS
53366
Federal Register / Vol. 79, No. 174 / Tuesday, September 9, 2014 / Proposed Rules
currently treating mainline track that
runs through a yard under Emergency
Order 28. In proposing this change, FRA
intends only to cover those tracks that
are immediately adjacent to the yard
and that are in close enough proximity
to the yard that the adjacent tracks share
the characteristics of the yard. FRA
seeks comments on its treatment of
tracks adjacent to the yard.
Proposed paragraph (n)(7)(ii) would
establish new requirements for those
trains that are left unattended on
mainline track that is running through
a yard or on mainline track that is
adjacent to the yard. It would apply
aspects of Emergency Order 28 to these
tracks by requiring verification that
securement has been completed in
accordance with the railroad’s process
and procedures (see discussion below
concerning paragraph (n)(8)(i)), and that
the locomotive cab is locked or the
reverser is removed from the control
stand and placed in a secured location
(see discussion below concerning
paragraph (n)(8)(ii)).
Emergency Order 28 requires
railroads to develop specific processes
for employees responsible for securing
any unattended train or vehicles
transporting certain hazardous materials
that must be left on mainline track or a
mainline siding outside of a yard. FRA
believes that this requirement should
continue in regulation. The proposed
rule allows a railroad to leave a
paragraph (n)(6) train unattended on
mainline track or a siding outside of a
yard where the railroad has a plan in
place and on mainline tracks that are in
or adjacent to yards. In doing so,
proposed paragraph (n)(8)(i) requires the
employee responsible for the
securement of the equipment to verify
securement and proposed paragraph
(n)(8)(ii) requires the train crew to lock
the controlling locomotive cab or
remove and secure the reverser from the
control stand.16
Proposed paragraph (n)(8)(i) requires
that an employee responsible for
securing equipment defined by
paragraph (n)(6) verify securement with
another qualified person. This is similar
to Emergency Order 28 which currently
requires employees to verify proper
securement with a qualified railroad
employee. This may be done by relaying
pertinent securement information (i.e.,
the number of hand brakes applied, the
tonnage and length of the train or
vehicle, the grade and terrain features of
the track, any relevant weather
16 The reverser is the directional control for the
locomotive. Removing the reverser would
essentially put the locomotive in neutral,
preventing it from moving forward or backward
under the power of the engine.
VerDate Mar<15>2010
16:51 Sep 08, 2014
Jkt 232001
conditions, and the type of equipment
being secured) to the qualified railroad
employee. The qualified railroad
employee must then verify and confirm
with the train crew that the securement
meets the railroad’s requirements.
However, proposed paragraph (n)(8)(i)
does not contain a requirement that the
railroad maintain a record of the
verification of proper securement.
FRA believes that the type of
verification requirement in proposed
paragraph (n)(8)(i) will serve to ensure
that any employee who is responsible
for securing equipment containing
hazardous materials will follow
appropriate procedures because the
employee will need to fully consider the
securement procedures to relay what
was done to the qualified employee.
Further, the qualified railroad employee
(e.g. a trainmaster, road foreman of
engines, or another train crew
employee) will be in a position to
ensure that a sufficient number of hand
brakes have been applied. Under this
proposed rule, the qualified railroad
employee must have adequate
knowledge of the railroad’s securement
requirements for the specific location or
for the specific circumstance for which
the equipment will be left unattended.
Without limiting the type of employee
who may be qualified, FRA envisions
that a dispatcher, roadmaster,
yardmaster, road foreman of engines, or
another crew member would be able to
serve in the verification capacity.
FRA has decided not to continue the
recordation requirement based on
experience in enforcing Emergency
Order 28. FRA has found that requiring
recordation of securement information
is superfluous because the verification
requirement ensures that two
individuals consulting with each other
make certain that the appropriate
securement method is used. The intent
of the recordation requirement was to
ensure the communications are taking
place. FRA has found over the last year
that communications occur in the
course of the verification process.
Therefore, it does not believe requiring
railroads to make a record of each
securement event is necessary to ensure
proper securement. Nevertheless, FRA
seeks comment concerning enforcement
of the verification requirement, absent
recordation.
Also under Emergency Order 28, the
employees responsible for securing the
train or vehicles must lock the
controlling locomotive cab door or
remove and secure the reverser before
leaving it unattended. Accordingly,
proposed paragraph (n)(8)(ii) requires
further protection of the locomotive to
prevent movement of unattended
PO 00000
Frm 00021
Fmt 4702
Sfmt 4702
equipment that could be caused by
unauthorized access to the locomotive
cab.
Representatives from the railroad
labor strongly suggested at the SWG
meetings that a locking mechanism be
applied to each locomotive covered
under this rule, seeking that lock
installation be complete within 18
months. BLET stated that locomotive
cab security is a major concern to the
labor caucus.
The language approved by the SWG
provided that the controlling locomotive
cab shall be locked on locomotives
capable of being locked or the reverser
on the controlling locomotive shall be
removed from the control stand and
placed in a secured location. The use of
the conjunctive appears to indicate a
choice; each railroad may opt to either
lock the locomotive or remove its
reverser. However, based on the
discussions during the SWG meetings,
FRA believes that the SWG intended for
proposed paragraph (n)(8)(ii) to mean
that all covered locomotives should be
locked when so equipped. FRA has
made slight alterations to the language
in paragraph (n)(8)(ii) from the language
that was approved by the SWG in order
to more accurately address the lock
requirement. FRA understands that the
reverser provision is intended for the
interim period until locks are installed
or when a locomotive has been
equipped with a lock but the lock has
become inoperative. FRA also notes that
under this proposal a railroad would be
free to require both the locking of the
locomotive and the removal of the
reverser. FRA does not intend to limit
a railroad to just one or the other. FRA
seeks comment on this understanding,
particularly as to whether the
alternative of removing the reverser
should only be available during the
timeframe when the locking mechanism
becomes broken or otherwise ineffective
or whether, in the interest of safety
redundancy, the regulations should
require railroads to both lock cab doors
and to remove reverser handles.
When a railroad relies on removing
the reverser as a means for securement,
FRA expects that the reverser will be
taken by the appropriate railroad
employee from the controlling
locomotive cab so that it is not
accessible to an unauthorized person
such as a trespasser. Alternatively, FRA
anticipates allowing the reverser to be
secured in the cab of an unlocked
controlling locomotive as long as the
reverser is kept in a box or other
compartment that can be locked within
the locomotive cab. However, FRA
would not consider a reverser ‘‘secured’’
within the meaning of this proposal if
E:\FR\FM\09SEP1.SGM
09SEP1
tkelley on DSK3SPTVN1PROD with PROPOSALS
Federal Register / Vol. 79, No. 174 / Tuesday, September 9, 2014 / Proposed Rules
the railroad allows the reverser to be
stored merely out of plain sight.
In most instances, FRA would
consider a locomotive with an
ineffective locking mechanism to be
noncompliant with paragraph (n)(8)(ii)
if the locomotive is left unattended with
the reverser remaining in the control
stand. FRA recognizes that there may be
times when a locomotive’s lock becomes
inoperative and its reverser cannot be
removed, thus making compliance with
proposed paragraph (n)(8)(ii) nearly
impossible. Accordingly, for such
instances, FRA proposes an exception
under paragraph (n)(8)(iii). FRA believes
that application of this exception would
only be utilized on the rare occasion
where older locomotives with integrated
reversers may be utilized or where
weather conditions make the reverser
necessary for operations (i.e., to prevent
the locomotive from freezing). FRA
seeks comments on the intent,
application, and language of this
proposed exception.
FRA believes that the job briefing
requirement in Emergency Order 28
should be codified in regulation.
Accordingly, proposed paragraph (n)(9)
would require each railroad to
implement operating rules and practices
requiring the discussion of securement
among crew members and other
involved railroad employees before
engaging in any job that will impact or
require the securement of any
equipment in the course of the work
being performed. This proposed
requirement is analogous to other
Federal regulations that require crew
members to have a job briefing before
performing various tasks, such as
confirming the position of a main track
switch before leaving an area. The
purpose of this proposed job briefing
requirement is to make certain that all
crew members and other involved
railroad employees are aware of what is
necessary to properly secure the
equipment in compliance with
§ 232.103(n).
Under this proposal, FRA expects that
the crew will discuss the equipment
that is impacted, the responsibilities of
each employee involved in the
securement of a train or vehicle, the
number of hand brakes that will be
required to secure the affected
equipment, the process for ensuring that
securement is sufficient, how the
verification will be determined, and any
other relevant factors affecting
securement. FRA seeks comments on
whether these expectations are
reasonable, accurate, and either
sufficiently comprehensive or somehow
lacking.
VerDate Mar<15>2010
16:51 Sep 08, 2014
Jkt 232001
FRA recognizes that in some
instances, there may be only one crew
member performing a switch or
operation and that would have to secure
equipment alone at the end of the
activity. FRA believes that the issue of
self-satisfying a job briefing is best left
to the railroad when complying with
part 218. Nevertheless, FRA seeks
comments on how to apply this
requirement in a situation involving a
single person crew and how it
interrelates with part 218.
Under paragraph (n)(10), FRA is
proposing to require railroads to
develop procedures to ensure that a
qualified railroad employee inspects all
equipment that any emergency
responder has been on, under, or
between for proper securement before
the rail equipment or train is left
unattended. As it may be necessary for
emergency responders to modify the
state of the equipment for the
performance of their jobs by going on,
under, or between equipment, it is
critical for the railroad to have a
qualified employee subsequently
inspect the equipment to ensure that the
equipment continues to be properly
secured before it is again left
unattended.
The proposed rule requires railroads
to establish a process to ensure that a
qualified railroad employee inspects all
equipment that any emergency
responder (e.g., fireman or paramedic)
has been on, under, or between for
proper securement before the train or
vehicle is left unattended. FRA
understands that on rare occasions there
may be situations where an emergency
responder accesses railroad equipment
without the knowledge of the railroad.
The railroad’s process can take that type
of situation into account; however, FRA
will expect that a qualified railroad
employee will inspect equipment after it
has been accessed by an emergency
responder in any circumstance where
the railroad acting in a reasonable
manner knew or should have known of
an emergency responder’s presence on,
under, or between the subject
equipment.
The proposed rule requires that these
procedures are followed as soon as
safely practicable after learning that an
emergency responder has interfaced
with the equipment. FRA seeks
comments on what should be
considered ‘‘as soon as safely
practicable.’’
Section 232.105 General Requirements
for Locomotives
FRA proposes a new paragraph (h) to
§ 232.105 to provide further
requirements concerning locking
PO 00000
Frm 00022
Fmt 4702
Sfmt 4702
53367
mechanisms on locomotive doors.
While proposed § 232.103(n)(8)(ii)
provides securement controls for the
controlling locomotive cab that is left
unattended on a mainline track or
siding as part of a train that meets the
minimum quantities of hazardous
materials established in proposed
§ 232.103(n)(6)(i), FRA believes that
additional requirement should apply to
all locomotives left outside a yard.
Accordingly, FRA proposes including
those requirements under § 232.105.
During the meetings of the RSAC
SWG, representatives of the labor
unions proposed requiring the
installation of locking mechanisms on
all locomotives covered by these
proposed rules. AAR subsequently
committed that all locomotives will be
equipped with cab door locks by March
of 2017. AAR clarified its statement by
ensuring that there will be no
distinction between interchange and
non-interchange locomotives. In the
interest of codifying this deadline as
applicable to the scope of this proposed
rule, paragraph (h)(1) proposes that after
March 1, 2017, each locomotive left
unattended outside of a yard be
equipped with an operative exterior
locking mechanism. By no means does
this requirement limit AAR’s ambition
that its members equip additional
locomotives (e.g., switching locomotives
inside a yard) in their respective fleets.
FRA also proposes to include this
requirement in § 232.105 so that it
applies to all locomotives left
unattended outside of a yard or on a
track immediately adjacent to a yard,
not just those locomotives defined
under § 232.103(n)(6). FRA seeks
comment on this requirement.
Proposed paragraphs (h)(2) and (h)(3)
are meant to ensure that locking
mechanisms, if broken or otherwise
inoperative, are repaired in a reasonable
timeframe. FRA expects that each
locomotive equipped with a locking
mechanism will be inspected and
maintained at the time of the
locomotive’s periodic inspection. See 49
CFR 229.23. If a locking mechanism is
found inoperative at any time other than
the periodic inspection, proposed
paragraph (h)(3) would require the
railroad to repair it within 30 days.
However, if the periodic inspection falls
within the 30-day limit for repair, FRA
would expect that the lock will be
repaired at the time of the periodic
inspection in accordance with the
requirement in paragraph (h)(2). For
instance, if a locomotive engineer were
to find the lock inoperative during a
daily inspection and the periodic
inspection was scheduled 15 days later,
then FRA would expect that the railroad
E:\FR\FM\09SEP1.SGM
09SEP1
53368
Federal Register / Vol. 79, No. 174 / Tuesday, September 9, 2014 / Proposed Rules
will repair the locking mechanism at the
time of the periodic inspection.
Alternatively, if the same situation were
to arise but the periodic inspection was
scheduled to occur 45 days later, the
railroad would be expected to repair the
locking mechanism prior to the time of
the periodic inspection to comply with
the 30-day time limit in paragraph
(h)(3).
For the purposes of this regulation,
‘‘operative’’ means that, when applied,
the locking mechanism will reasonably
be expected to keep unauthorized
people from gaining access into a
locomotive while the locomotive is
unoccupied. However, in doing so, the
railroad must assure that ingress and
egress is provided for in normal
circumstances and emergencies. FRA
seeks comments on this understanding.
FRA also seeks information and
comments on the possibility of a
qualified person finding difficulty
accessing the locomotive cab in the
event of an unintentional movement of
the equipment.
Under proposed paragraph (h)(4), if a
locking mechanism becomes inoperative
in the interval between a locomotive’s
periodic inspection dates, this provision
does not require that a locomotive be
removed from service upon the
discovery of an inoperative locking
mechanism. Railroads may continue to
use the locomotive without an operative
lock. However, if such equipment
covered by proposed § 232.103(n)(6) is
left unattended and without an
operative lock, then the railroad must
default to the alternative securement
option governing the reverser under
proposed § 232.103(n)(8)(ii) or fall
under the exception provided per
proposed § 232.103(n)(8)(iii).
IV. Regulatory Impact and Notices
A. Executive Orders 12866 and 13563
and DOT Regulatory Policies and
Procedures
This proposed rule has been
evaluated in accordance with existing
policies and procedures, and
determined to be significant under
Executive Order 12866, Executive Order
13563, and DOT policies and
procedures. 44 FR 11034 (Feb. 26,
1979). For purposes of analyzing this
rule, FRA uses as a baseline the rules in
effect at the time of publication,
including Emergency Order 28. The
analysis separately quantifies ongoing
costs of Emergency Order 28 that might
exceed business practices that would
remain in effect in absence of
Emergency Order 28. It is reasonable to
assume that most of the requirements of
Emergency Order 28 would continue as
business practices; for example the
railroads have already improved their
practices in determining the proper
application of hand brakes to secure a
train and the verification that the hand
brake application is adequate. Further,
the exterior locking mechanism
provision in the rule reflects an existing
commitment among AAR member
railroads, which had been working on
developing a lock standard applicable to
its members for over a year, so the costs
associated with this provision are
limited to non-AAR member railroads,
primarily short line railroads. This
analysis also does not include sunk
costs.
FRA was able to quantify the costs of
the proposed rule, but not able to
quantify all the benefits, as many of the
benefits are the result of reducing risk
from high consequence, low probability
events that are not easily quantified.
Thus, FRA will discuss the benefits that
can be quantified, that by themselves
justify the cost of the proposal and will
provide a brief discussion of the nonquantified benefits. The monetized
discounted and annualized net benefits
would be:
Discounted value
Discounted values
Discount factor
7%
Total .........................................................................................................................................................................
Annualized ...............................................................................................................................................................
tkelley on DSK3SPTVN1PROD with PROPOSALS
Statement of Need
The United States has experienced a
dramatic growth in the quantity of
flammable materials being shipped by
rail in recent years. According to the rail
industry, in the U.S. in 2009, there were
10,800 carloads of crude oil shipped by
rail. In 2013, there were 400,000
carloads. In the Bakken region, over one
million barrels a day of crude oil was
produced in March 2014,17 most of
which is transported by rail.
Transporting flammable material carries
safety and environmental risks. The risk
of flammability is compounded in the
context of rail transportation because
petroleum crude oil and ethanol are
commonly shipped in large unit trains.
In recent years, train accidents
involving a flammable material release
and resulting fire with severe
17 Information regarding oil and gas production is
available at the following URL: https://www.eia.gov/
petroleum/drilling/#tabs-summary-2.
VerDate Mar<15>2010
16:51 Sep 08, 2014
Jkt 232001
consequences have occurred with
increasing frequency (i.e. Arcadia, OH,
Plevna, MT, Casselton, ND, Aliceville,
´
AL, Lac-Megantic, Quebec).
Shippers and rail companies are not
insured against the full liability of the
potential consequences of incidents
involving hazardous materials. As a
result, these events impose externalities.
Among Class I railroads, a self-insured
retention of $25 million is common,
though it can be as much as $50 million,
especially when PIH/TIH material is
involved. Smaller regional and short
line carriers, i.e., Class II and Class III
railroads, on the other hand, typically
maintain retention levels well below
$25 million as they usually have a more
conservative view of risk and usually do
not have the cash-flow to support
substantial self-insurance levels. At this
time, the maximum coverage available
in the commercial rail insurance market
appears to be $1 billion per carrier, per
PO 00000
Frm 00023
Fmt 4702
Sfmt 4702
$1,076,984
95,009
3%
$1,479,331
96,538
incident.18 While this level of insurance
is sufficient for the vast majority of
accidents, it appears that no amount of
coverage is adequate to cover a higher
consequence event. One example of this
issue is the incident that occurred at Lac
´
Megantic, Quebec, in July of 2013. The
rail carrier responsible for the incident
was covered for a maximum of $25
million in insurance liability, and it had
to declare bankruptcy because that
coverage and the companies remaining
capital combined were insufficient to
pay for more than a fraction of the harm
that was caused. This is one example
where rail carriers and shippers may not
bear the entire cost of ‘‘making whole’’
those affected when an incident
18 See ‘‘The Transportation of Hazardous
Materials: Insurance, Security, and Safety Costs,’’
DOT Report to Congress, December 2009, at
https://www.dot.gov/office-policy/transportationhazardous-materials-insurance-security-and-safetycosts.
E:\FR\FM\09SEP1.SGM
09SEP1
Federal Register / Vol. 79, No. 174 / Tuesday, September 9, 2014 / Proposed Rules
tkelley on DSK3SPTVN1PROD with PROPOSALS
involving crude and ethanol shipment
by rail occurs.
FRA believes that the failure to secure
equipment decreases the safe
transportation of goods by rail, and
increases the possibility of a higherconsequence event, particularly when
dealing with a key train transporting a
material such as crude oil. It is difficult
to assess how much of the decrease in
safety is from railroads not requiring
their employees to secure equipment or
from employees failing to comply with
railroad securement requirements. The
´
Lac-Megantic accident shows that the
railroads were not successful using
operating rules in effect at the time of
the accident, perhaps because an
employee did not follow those rules or
might not have had adequate guidance
on what constituted adequate
securement. FRA believes that use of its
authority will enhance compliance with
railroad issued orders. There may also
have been an issue of incomplete
information—which can cause a market
failure—that was corrected in the wake
´
of the Lac-Megantic accident and
Emergency Order 28, in that railroads
had not yet developed the procedures
required in response to Emergency
Order 28. This problem of incomplete
information related to securement
procedures has been addressed, so it is
not part of the baseline. Finally,
incomplete information also may be
causing a market failure among some
railroads that have not put locks on
their locomotives left outside yards.
Cost-Benefit Analysis of Individual
Sections
Following is a discussion of the
regulatory costs and benefits associated
with each proposed requirement.
Proposed changes to the definition in
§ 232.5 have no substantive impact and
do not result in any new costs or
benefits.
Proposed changes to § 232.103(n)(2)
will have negligible impact or real
burdens, but may increase compliance
with existing rules. As noted above, the
changes being proposed to this
paragraph merely clarify FRA’s
longstanding interpretation, application,
and enforcement of the existing
regulation.
Proposed § 232.103(n)(6) lists types of
trains and equipment covered by
proposed § 232.103(n)(7) and (n)(8), but
does not directly impose any specific
requirements.
Proposed § 232.103(n)(7)(i) prohibits
leaving affected equipment unattended
on a main track or siding (except when
that main track or siding runs through,
or is directly adjacent to a yard) until
the railroad has adopted and is
VerDate Mar<15>2010
16:51 Sep 08, 2014
Jkt 232001
complying with a plan identifying
specific locations or circumstances
when the equipment may be left
unattended. Railroads already have
developed and implemented such plans
under Emergency Order 28, so there is
no cost to create such plans. The initial
revision and notification burden would
have been in identifying safety rationale
related to such locations and
circumstances, but that has already been
accomplished through compliance with
Emergency Order 28. To the extent that
railroads further revise their plans in the
future, there will be some additional
costs. This will not occur frequently,
resulting in nominal burden in the
future.
Proposed § 232.103(n)(7)(ii), an
expansion of Emergency Order 28 that
applies to trains left unattended on
main tracks that are in or adjacent to
yards, requires trains left in yards to
have the locomotive cab locked, or the
reverser removed, if possible, but would
not impose additional requirements in a
yard if the locking mechanism is
inoperative. This portion of the
proposed requirement is part of longstanding railroad business practices,
and will add no costs or benefits.
In proposed paragraph (n)(8)(i), there
is a new proposed requirement, which
in almost all cases was already in place
as a business practice. It requires that
the qualified individual who secures the
train verify with a second qualified
individual that the train has been
secured in accordance with the
railroad’s operating rules, including
whatever the employee has done to
ensure that an adequate number of hand
brakes have been employed. On a train
with two or more crew members, the
train crew will verify among
themselves. This would happen as a
matter of business practice. In the event
that the train is secured by a single
person crew, the verification would
involve a second person, typically a
yardmaster, who is also qualified. All
safety-critical activities by train crews
are communicated to at least one
additional person as a standard
operating practice. This is part of the
railroads’ conscious effort to avoid a
single point human factor failure that
can cause an accident. FRA believes that
less than one-tenth of one-percent
(0.1%) of the affected trains will be
operated by a single crew member when
securing in a yard, because there are
very few single person crews operating
affected trains, and because many
affected trains will be operated
continuously to their destination. Some
trains will be secured outside of yards,
but that burden is discussed below in
this analysis. In this analysis, FRA
PO 00000
Frm 00024
Fmt 4702
Sfmt 4702
53369
assumes that there will be 1,000 affected
trains per day, of which 0.1% (1 daily
or 365 annually) would have a single
person crew. Further, FRA assumes that
in the absence of the proposed rule, 95
percent of railroads would require the
verification as a business practice. This
means that over 20 years, only 365
trains would be affected. FRA believes
the communication will take 15 seconds
of two qualified individuals’ time, or 30
labor seconds. There is no cost to
initiate communication, because in any
event a person leaving a train would
have to communicate with the
yardmaster to let the yardmaster know
where the crew member left the train
and to let the yardmaster know the train
would no longer be moving in the yard.
Over the 20-year life, the undiscounted
value would be 182.5 labor minutes or
roughly 3 labor hours. At $50 per hour
the cost over 20 years, undiscounted
cost would be $150, and the annual cost
would only be $7.50. FRA requests
comments on the current and future
levels of train operations impacted and
the labor estimates associated with
compliance.
Proposed § 232.103(n)(8)(i) requires
that where a freight train or standing
freight car or cars as described in
proposed paragraph (n)(6) is left
unattended on a main track or siding
outside of a yard, an employee
responsible for securing the equipment
shall verify with another person
qualified to make the determination that
the equipment is secured in accordance
with the railroad’s processes and
procedures. This will impose no new
burden nor create any new benefit since
it is identical to what is currently
required by Emergency Order 28. Where
train crews with more than one crew
member are involved, then the crew
members would need to discuss the
securement and ensure that they had
secured the correct number of hand
brakes and taken other steps to properly
secure the train. Where single member
crews are involved, then the crew
member would have to call the
dispatcher or some other qualified
railroad employee to verify with the
qualified employee that the train had
been properly secured. As noted above,
Emergency Order 28 requires this
communication to occur presently, thus
railroads already have these procedures
established and continuing such
practice will not impose an additional
cost. Thus, the proposed changes to
§ 232.103(n) would create no new
benefits or costs, compared to the base
case.
Proposed § 232.103(n)(8)(ii) requires
that the controlling locomotive cab of a
freight train described in paragraph
E:\FR\FM\09SEP1.SGM
09SEP1
tkelley on DSK3SPTVN1PROD with PROPOSALS
53370
Federal Register / Vol. 79, No. 174 / Tuesday, September 9, 2014 / Proposed Rules
(n)(6) shall be locked on locomotives
capable of being locked or the reverser
on the controlling locomotive shall be
removed from the control stand and
placed in a secured location. In the case
of a locomotive with an operative lock,
the compliance will simply be locking
the lock. Railroads all require their
employees to lock unattended
locomotives equipped with operative
locks, for both safety and security
reasons. This provision of the proposed
rule codifies current business practices,
and creates no new benefits or costs.
Under proposed § 232.105(h) each
locomotive will have been equipped
with a lock, and if there should be a
lock malfunction, removing the reverser
will be sufficient to comply. Removing
the reverser of such a locomotive is
likely to be a business practice required
by operating rules except for two
conditions. The first condition is where
the locomotive does not have a
removable reverser. Such locomotives
are relatively old and are rarely used
outside of yard operations. The second
condition is where there is a reason to
keep the locomotive running while
standing. Almost all locomotives can
idle with the reverser removed, but
there are no locomotives that can run at
speeds above normal idle, sometimes
needed for cold weather conditions,
with the reverser removed. If a lock
should malfunction under either of
those two conditions, a railroad could
comply by several means:
• A railroad could remove the
reverser; almost all locomotives can idle
with the reverser removed, except in
very cold weather;
• A railroad could attend the
locomotive, which could involve either
placing a qualified individual aboard
the locomotive while it stands, or
boarding a new crew and having the
new crew continue moving the train
toward its destination. The most
economical way to accomplish this
would be to board a new crew and take
the train further along its route. The
railroad was going to have to call a crew
to move the train on its route anyway,
so if the railroad has sufficient time to
call a new crew, generally two hours,
the railroad would call a crew earlier
than originally planned. Dispatchers
continually adjust the flow of trains,
and adding a single train earlier than
originally planned would have little
effect on operations in almost all cases.
If the train is already close to its
destination this would not be practical
if the consignee unloading or transfer
operation were not available, or if the
train could not proceed for some other
reason, such as track congestion or
blockage, the railroad would not simply
VerDate Mar<15>2010
16:51 Sep 08, 2014
Jkt 232001
board the next crew and the railroad
would have to comply by some other
means;
• A railroad could arrange for the
train to stop in a yard, or on a main
track in or adjacent to a yard. This might
involve having the dispatcher expedite
the train so it can make a yard further
along its route, which might have little
cost;
• A railroad could have the train crew
switch locomotives, putting a lockequipped locomotive in the lead, which
would be costly and impractical; or
• A railroad could arrange to have the
lock repaired before leaving the train
unattended, which would also carry a
cost.
The burdens of proposed
§ 232.103(n)(8)(ii) on main track or
sidings outside of yards are imposed by
Emergency Order 28, so they are not
new burdens, and they still are
relatively small. For purposes of this
analysis, FRA conservatively estimates
that 1,000 trains per day 19 will be
subject to the proposed requirements of
§ 232.103(n)(8)(ii), but that 90 percent of
them will be excepted under proposed
§ 232.103(n)(8)(iii), because they will
have routing that calls for unattended
stops only in or adjacent to yards.20
That leaves 100 trains per day, or 36,500
trains per year. FRA estimates that one
in 500 locomotives or 73 per year will
have a defective lock. FRA also
estimates that 50 percent, or 36.5 per
year, would have been left running
while unattended, or would have been
equipped with a non-removable
reverser. A locomotive would be left
running either to avoid cold weather
starting or to avoid a brake test when the
next crew takes charge of the train. If the
locomotive would have been left
running to maintain brake pressure, the
train crew can leave one of the trailing
locomotives running to maintain brake
pressure, and lock its door. FRA
estimates that in all but ten cases per
year, the railroad will have been
notified of the lock malfunction, and
will have the next crew or current crew
take the train to a yard or its destination,
avoiding any costs.21
19 In an analysis of the safety of HHFTs, PHMSA
estimates that there are 150 trains per day. FRA’s
estimate of 1,000 trains per day is conservative.
20 FRA assumes that railroads will fix locks in or
adjacent to the first yard available, as a business
practice, and will leave any unattended trains in
yards locked.
21 Taking the train further along its route is the
least costly method of attending a train. The
railroad is obligated to provide a crew to move the
train further along its route anyway, and train crews
are on call. Once the train gets to the first yard on
its path, the lock will be repaired. Unloading
facilities are not part of the railroad, and FRA does
not regulate securement at unloading facilities,
which are subject instead to PHMSA regulations.
PO 00000
Frm 00025
Fmt 4702
Sfmt 4702
Trains per year:
Affected by the proposed rule: 365,000
No planned stop outside yards (90
percent of 365,000): 328,500
Planned stop outside yards (365,000–
328,500): 36,500
Defective lock and planned stop outside
yard (36,500/500): 73
Removing reverser provides compliance
(50 percent of 73): 36.5
Further action needed (73–36.5): 36.5
Sent on to next yard or destination: 26.5
Remedial action must be taken: 10 22
FRA believes that in half the cases
remaining (five cases), the railroad will
repair or replace the lock, and in the
other half (also five cases), the railroad
will have personnel attend a standing
train. The railroad may repair or replace
the lock, in which case the cost is the
additional cost of repairing the lock
outside of a yard. A railroad using AAR
standard locks may attach an additional
locking mechanism, not compliant with
AAR standards until the AAR standard
lock can be replaced. This appears to be
the lowest cost means of complying
with the rule. If a hasp is present, the
railroad may have provided the crew
with a spare lock, in which case the cost
is negligible, two of the five cases per
year. If a hasp is not present, the
railroad may have repair personnel
locate to the train, estimated at an
average cost of $0.56 per mile for 20
miles, or $11.20 per incident. In
addition, the installation is expected to
require two hours service time,
including travel, for two repair
personnel, at an estimated cost of $50
per person hour,23 for a labor cost of
$200. The installation is expected to
cost $100 if the railroad does not install
a standard lock, one case per year. The
total cost for this repair would be $11.20
for transportation, $100 for materials,
plus $200 for labor, a total of $311.20.
If the railroad replaces the existing lock,
then no materials cost is added, because
the railroad could have been expected to
replace the lock at the next yard. The
total cost to replace an existing lock
would be $11.20 for transportation, plus
$200 for labor for a total of $211.20. The
total cost to replace existing locks is 2
times $211.20, or $422.40. The total cost
for lock replacement includes the
negligible costs if the crew has a lock
that fits an existing hasp, plus $311.20
22 FRA requests comment on the number of cases
per year where remedial action would be required,
and on the assumptions relied upon to estimate that
number.
23 Surface Transportation Board (STB) wage data
show that the average compensation for personnel
engaged in Maintenance of Equipment & Stores was
$28.46 in 2013. FRA adds a 75 percent burden
which would yield $49.81 per hour, which is
rounded here to $50 per hour.
E:\FR\FM\09SEP1.SGM
09SEP1
53371
Federal Register / Vol. 79, No. 174 / Tuesday, September 9, 2014 / Proposed Rules
to install a new hasp and lock, plus
$422.20 to replace existing locks, a total
of $733.60. In any estimate of net
present value, the labor costs for lock
installation should not be incremented
by a factor to account for growth in real
wages, because the growth in real wages
is assumed to be directly related to
productivity. The more productive the
worker, the fewer hours needed to
install a lock, including reductions in
time needed to travel. FRA believes that
small railroads will not be affected by
these costs because small railroads will
use a lock and hasp system and will be
as to be negligible. FRA does not believe
this is a likely response, and this value
is not used any further.
FRA estimates the cost to attend a
standing train at $470 per incident,24 or
a total of $2,350 per year for 5 incidents,
which assumes a burdened rate for labor
of $51.04 per hour.
In summary of the foregoing costs
associated with locomotive locks, FRA
believes the likely responses to
inoperative locking mechanisms, where
the railroad cannot simply remove a
reverser or move the train, will break
down as follows:
able to replace the lock before the train
is left stopped, should the lock
malfunction.
FRA estimates the cost to switch
locomotives at $150 for the cost of
switching and at least $500 for a brake
test after switching, for a total of $650
per train. A railroad is unlikely to do
this unless the purpose of keeping
engines running was to keep the engines
warm on a cold day, no stop was likely
at a location where the lock could be
repaired, and at least one more stop was
likely on the train’s route. The
likelihood of such a situation is so small
Approach taken
Unit cost
Annual total
cost
Frequency
Place Lock in Existing Hasp ........................................................................................................
Install New Hasp and Lock ..........................................................................................................
Replace Existing Lock .................................................................................................................
Attend Train .................................................................................................................................
$0.00
311.20
211.20
470.00
2
1
2
5
$0.00
311.20
422.40
2,350.00
Total ......................................................................................................................................
........................
........................
25 3,083.60
The total cost imposed by proposed
section 232.103(n)(8)(ii) would be
$2,350 plus $311.20 plus $411.40 per
year, a total of $3,083.60, or roughly
$3,100, per year.
To more accurately annualize these
costs, however, FRA must also consider
the direct wage portion of the costs
attending trains and provide for annual
real wage increases. Of the
aforementioned burdened wage rate,
$29.16 is the direct wage portion.
Multiplying the direct wage portion
hourly rate against 9 hours pay per
event with 5 events per year, the direct
wage portion annual cost total is
$1,312.33, which we will round to
$1,300. These direct wage costs for train
personnel will need to be incremented
by a factor of 1.18 percent per year to
account for increases in real wage,
induced by increased productivity in
accordance with estimates from the
Congressional Budget Office.26
FRA compiled the following summary
table, using initial annual costs of
$3,100 (i.e., the first year’s annual
locomotive locks costs total rounded
up), broken into direct wage costs for
simply attending trains, $1,300—which
are increased every year by 1.18 percent
to account for growth in real wages,
whereas the first year’s increase would
result in a direct wage cost of
$1,315.34—and other costs of $1,800,
including initial burden on wages to
attend trains, labor costs to repair or
replace locks, where productivity
growth is assumed to match growth in
real wages, and costs for other items.
The costs are all the result of actions
taken to comply with attendance of a
train in the event a locking mechanism
becomes inoperative:
Discounted value
Wage inflator
(percent)
Year
Direct wage
cost
All other costs
Discount factor
Total costs
tkelley on DSK3SPTVN1PROD with PROPOSALS
7%
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
.........................................................
.........................................................
.........................................................
.........................................................
.........................................................
.........................................................
.........................................................
.........................................................
.........................................................
.........................................................
.........................................................
.........................................................
.........................................................
.........................................................
.........................................................
.........................................................
101.18
102.37
103.58
104.80
106.04
107.29
108.56
109.84
111.14
112.45
113.77
115.12
116.47
117.85
119.24
120.65
24 STB wage data show that the average
compensation for personnel engaged in Train, Yard
and Engine was $29.16 in 2013. FRA adds a 75
percent burden which would yield $51.04 per hour.
The minimum payment for qualified personnel
called out is a fixed sum or hourly pay, whichever
is greater. The fixed amount is roughly equal to 8
VerDate Mar<15>2010
16:51 Sep 08, 2014
Jkt 232001
$1,315.34
1,330.86
1,346.57
1,362.45
1,378.53
1,394.80
1,411.26
1,427.91
1,444.76
1,461.81
1,479.06
1,496.51
1,514.17
1,532.04
1,550.11
1,568.40
$1,800
1,800
1,800
1,800
1,800
1,800
1,800
1,800
1,800
1,800
1,800
1,800
1,800
1,800
1,800
1,800
hours’ pay. There may be instances where the
duration of the assignment exceeds 8 hours. FRA
assumed a 9 hour average pay, or 9 times $51.04,
for a burdened wage of $459.32 per incident. FRA
further assumed $11.20 in travel costs, or a total
cost of $470.52 per incident, which FRA rounded
to $470 per incident.
PO 00000
Frm 00026
Fmt 4702
Sfmt 4702
$3,115.34
3,130.86
3,146.57
3,162.45
3,178.53
3,194.80
3,211.26
3,227.91
3,244.76
3,261.81
3,279.06
3,296.51
3,314.17
3,332.04
3,350.11
3,368.40
25 Rounds
$3,115
2,926
2,748
2,582
2,425
2,278
2,140
2,010
1,888
1,774
1,667
1,566
1,472
1,383
1,299
1,221
3%
$3,115
3,040
2,966
2,894
2,824
2,756
2,689
2,625
2,561
2,500
2,440
2,381
2,324
2,269
2,215
2,162
to $3,100.
on real wage growth forecasts from the
Congressional Budget Office, DOT’s guidance
estimates that there will be an expected 1.18
percent annual growth rate in median real wages
over the next 30 years (2013–2043).
26 Based
E:\FR\FM\09SEP1.SGM
09SEP1
53372
Federal Register / Vol. 79, No. 174 / Tuesday, September 9, 2014 / Proposed Rules
Discounted value
Wage inflator
(percent)
Year
Direct wage
cost
All other costs
Discount factor
Total costs
7%
.........................................................
.........................................................
.........................................................
.........................................................
122.07
123.51
124.97
126.44
1,586.91
1,605.64
1,624.58
1,643.75
1,800
1,800
1,800
1,800
3,386.91
3,405.64
3,424.58
3,443.75
1,147
1,078
1,013
952
2,111
2,060
2,012
1,964
Total ..................................................
........................
........................
........................
........................
36,685
49,909
Annualized ........................................
tkelley on DSK3SPTVN1PROD with PROPOSALS
2031
2032
2033
2034
3%
........................
........................
........................
........................
3,236
3,257
Proposed § 232.103(n)(8)(ii) also
provides a direct safety benefit of this
rulemaking. Only about 36.5 trains per
year are likely to be affected, as
described above. FRA believes that in
the absence of this rulemaking all
locomotives would be equipped with
locks as a business practice, as
described below. FRA believes that as a
business practice, the locomotives that
can be locked will be locked, and the
remaining locomotives that have
reversers that can be removed that are
not left running would have their
reversers removed and secured. FRA
believes that trains left running with
reversers in place are the most
vulnerable to serious harm as a result of
casual mischief. It is possible that a
vandal moving a reverser in an
unattended running locomotive could
cause a higher-consequence event, given
the kinds of materials regulated here.
Further, individuals who believe they
are doing some good—for example first
responders who believe the train is in a
dangerous location—may also be
tempted to try to move the train. If they
lack proper skills, this movement
creates a risk. FRA does not have a good
way to estimate the likelihood of a
serious event from such a small number
of affected trains; however, given the
kinds of trains involved, FRA finds that
the costs are justified by the benefits of
risk reduction.
Proposed § 232.103(n)(8)(iii) provides
an exception for trains left unattended
on main tracks in or adjacent to yards,
and does not change burdens from
Emergency Order 28. The
communication requirement in
proposed § 232.103(n)(9), is unchanged
from Emergency Order 28, and will
impose no new burden nor create any
new benefit for train crews with more
than one crew member. Proposed
§ 232.103(n)(10) requires railroads to
adopt and comply with procedures to
ensure that, as soon as safely
practicable, a qualified employee
verifies the proper securement of any
unattended equipment when the
railroad has knowledge that a non-
VerDate Mar<15>2010
16:51 Sep 08, 2014
Jkt 232001
railroad emergency responder has been
on, under, or between the equipment.
This was required by Emergency Order
28 and remains unchanged from
Emergency Order 28, and will impose
no new burden nor create any new
benefit. FRA also believes that after the
´
Lac Megantic accident that railroads
would have adopted this practice even
in the absence of Emergency Order 28,
as a standard business practice, so FRA
is confident that this section creates no
new benefits or costs.
One requirement of Emergency Order
28 that is not included in the proposed
rule is a requirement that employees
who are responsible for securing trains
and vehicles transporting Appendix A
Materials must communicate to the train
dispatcher the number of hand brakes
applied, the tonnage and length of the
train or vehicle, the grade and terrain
features of the track, any relevant
weather conditions, and the type of
equipment being secured; train
dispatchers must record the information
provided; and train dispatchers or other
qualified railroad employees must verify
and confirm with the train crew that the
securement meets the railroad’s
requirements. The proposed rule
includes verification procedures but
does not include the recordkeeping
required by Emergency Order 28. FRA’s
Paperwork Reduction Act analysis of
the recordkeeping requirements shows
the annual burden at 867 hours to notify
the dispatcher to make the record, and
an additional 867 hours to make the
record. FRA estimates that there will be
an average of 26,000 communications
(100 instances on 260 days per year) to
dispatchers triggering the recording
requirement, which takes an average of
four minutes to complete, for a total of
1,734 hours. If the value of the
employees’ time is $50 per hour, the
annual cost of the Emergency Order 28
recordkeeping requirement is $86,700,
and that cost would be eliminated by
the proposed rule. FRA believes the
recordkeeping requirements have been
relatively more onerous for smaller
railroads, but does not have a
PO 00000
Frm 00027
Fmt 4702
Sfmt 4702
breakdown of the proportion of the cost
reduction benefit that will accrue to
small railroads.
Proposed § 232.105(h) requires, after
March 1, 2017, that each locomotive left
unattended outside of a yard shall be
equipped with an operative exterior
locking mechanism. AAR standard
S–5520 requires that each locomotive
left unattended outside of a yard shall
be equipped with an operative exterior
locking mechanism, and requires that
locomotives be equipped in order to be
used in interchange service. These
mechanisms will meet the requirements
of proposed § 232.105(h). FRA believes
that for Class I and Class II railroads, all
costs and benefits of proposed
§ 232.105(h) will be a result of business
practices because their locomotives
operate in interchange service. These
railroads are already in the process of
installing exterior locking mechanisms
on all of their locomotives that do not
operate exclusively in yard service. FRA
further believes that small railroads
have already equipped virtually all of
their locomotives with exterior locking
mechanisms. This was discussed at
RSAC meetings.
FRA believes that the reason Class I
and Class II railroads have just recently
started installing locking mechanisms
on their locomotives is that until
recently there was no standard for
keying the locking mechanisms.
Locomotives of these railroads operate
in interchange service and can move
from railroad to railroad. If each railroad
had to maintain a set of keys for all
other railroads’ locomotives, that would
have been cumbersome. The recent,
common keyed, industry standard
provides a solution, and allows the
business practice of installing locking
mechanisms to proceed.
FRA believes that, for smaller
railroads, locking locomotive cabs is a
good business practice that already
takes place because it avoids vandalism
and locomotive cab intruders. Several
reports indicate that a locomotive
belonging to the Adirondack Scenic
Railroad was vandalized on or around
E:\FR\FM\09SEP1.SGM
09SEP1
Federal Register / Vol. 79, No. 174 / Tuesday, September 9, 2014 / Proposed Rules
October 15, 2013.27 Damage to the
locomotive was approximately $50,000,
and does not include lost revenue.
Anecdotal reports are that the vandals
removed the copper wiring, which has
value as scrap. This event was not
reported to FRA. This is an example of
unreported vandalism, and FRA staff
believes that a great deal of vandalism
is unreported, largely because the events
do not meet all the requirements that
would result in filing an accident/
incident report with FRA. Over the
years, FRA staff has received several
first-hand accounts of vandalism or cabs
occupied by intruders. FRA believes
that the likelihood of vandalism or cabs
being occupied by trespassers increases
as the likelihood of railroad observation
of the train decreases. Most small
railroads operate in environments with
a lower than average likelihood of
observation. FRA believes that
vandalism is also more likely to have a
severe impact on a small railroad’s
operations since these railroads do not
have many spare locomotives or
personnel. If a railroad has ten
locomotives and five get vandalized, its
operations will be severely impacted.
Likewise if a small railroad’s operating
crew is injured by an intruder in a cab,
the operations for that day will likely be
halted. As indicated by small railroad
representatives at RSAC, small railroads
do generally equip their locomotives
with exterior cab locks. FRA believes
that if all small railroads considered the
impacts of vandalism and intruders, the
small railroads would and have
installed exterior cab locks.
The unit cost for a locking mechanism
meeting AAR standard S–5520 is $215.
FRA believes that smaller railroads
could comply with proposed
§ 232.105(h) with a simpler lock and
hasp system, for a unit cost of $100.
53373
slowing trains depends upon multiple
factors including other types of trains,
other train speeds, dispatching
requirements, work zones, and
topography. Looking at numerous
variables, for purposes of another
analysis, DOT estimated the average
cost of a train delay to be $500 per
hour.28 This cost estimate was
determined by reviewing costs
associated with crew members, supply
chain logistic time delays based on
various freight commodities, and
passenger operating costs for business
and other travel. It is reasonable to
assume that delays to smaller railroad
operations are lower in cost. Thus, for
purposes of this analysis, for the
impacted railroads, FRA is using an
hourly train delay cost of $300 per hour.
FRA requests comment regarding this
assumption. Thus the cost per year for
500 locomotives would be 500 times 5
percent times $100, or $2,500, or $5 per
locomotive year. Added to the
vandalism cost the total cost of exposure
would be $35 per locomotive year. If an
installation of a locking mechanism
costs $100, it would take less than 3
years for the locks to pay for themselves
(before applying discount factors). FRA
believes that in the absence of this rule
most small railroads would apply
locking mechanisms to locomotives left
unattended outside of yards, especially
in light of the vandalism incident on the
Adirondack Scenic Railroad. FRA
believes the net cost of installing and
using the locks for small railroads is
zero because the installation cost is
offset by the business benefits.
FRA assumes the locks will be
purchased in the first year, because the
business benefit is apparent. Thus, the
costs are $100 times 500 locomotives, or
$50,000, the same at both discount rates
because 2015 is not discounted.
FRA requests comment regarding this
estimate. Given the smaller number of
locomotives, personnel, territory, and
facilities, use of this type of system
would not be problematic.
FRA believes that no more than 500
locomotives belonging to Class III
railroads lack locking mechanisms that
comply with proposed § 232.105(h).
Thus, the cost to install the locking
mechanisms would be no more than 500
times $100, or $50,000.
Based on anecdotal information from
FRA staff, between 1 percent and 3
percent of locomotives are vandalized
each year. Some vandalism is relatively
minor, such as graffiti sprayed on the
walls of the cab, but some is much more
serious, for example damage or removal
of electrical equipment, or of
instruments. More modern cabs have
very expensive control systems, with
one or more monitor screens. It would
not be difficult for vandals to cause
more than $50,000 in damage to a
modern cab. The repairs not only would
involve removal and replacement of
damaged components, but would also
involve calibration. For purposes of this
analysis, FRA is assuming 1 percent of
locomotives would be vandalized each
year if not equipped with locks, and the
mean cost of a vandalism incident is
$3,000. The expected cost of vandalism
is therefore $30 per locomotive year for
unequipped locomotives.
Locomotive cabs are also occupied by
unauthorized occupants, usually
homeless, from time to time. Based on
staff anecdotal data, FRA assumes that
five percent of locomotive cabs are
occupied at least once per year. FRA
believes that the cost per incident is
$100, including costs to clean debris
and inspect to determine that nothing in
the cab has been damaged. This cost
represents 20 minutes delay with a train
delay cost. The economic impact of
Discounted value
Year
Total costs
Discount factor
7%
3%
$50,000.00
$50,000
$50,000
Total ......................................................................................................................................
50,000.00
50,000
50,000
Annualized ............................................................................................................................
tkelley on DSK3SPTVN1PROD with PROPOSALS
2015 .............................................................................................................................................
........................
4,411
3,263
A more serious crime with far more
potential to cause harm off the railroads’
rights-of-way is theft and operation of a
train. In 1975, two teenagers stole a
switching locomotive and operated it
until it crashed.29 FRA staff has received
27 Adirondack Scenic Railroad Locomotive
Vandalized, North County Public Radio Web site,
October 15, 2013.
28 PHMSA’s proposed rule ‘‘Hazardous Materials:
Enhanced Rail Tank Car Standards and Operational
Controls for High-Hazard Flammable Trains’’
applies a $500 per hour estimate of the cost of delay
for the rail network overall. 79 FR 45015 (Aug. 1,
2014).
29 Pierce Haviland, The Putnam Division, last
updated November 10, 2010, available at https://
piercehaviland.com/rail/putnam.html This incident
was probably not reportable because it occurred on
an abandoned railroad, no longer part of the
general system of rail transportation.
VerDate Mar<15>2010
16:51 Sep 08, 2014
Jkt 232001
PO 00000
Frm 00028
Fmt 4702
Sfmt 4702
E:\FR\FM\09SEP1.SGM
09SEP1
53374
Federal Register / Vol. 79, No. 174 / Tuesday, September 9, 2014 / Proposed Rules
anecdotal information regarding other
locomotives being stolen and operated,
but permanent records of the incidents
could not be found. If a train described
in proposed § 232.103(n)(6) was stolen
and operated, it could easily cause the
kinds of harm seen at in the
Graniteville, South Carolina accident
´
and the Lac Megantic incident, with
societal costs of $260 million to $1.2
´
billion. The Lac Megantic incident is
illustrative of, but not necessarily the
outer limit of, a high-consequence event
scenario for derailment of a paragraph
(n)(6) train. The derailment occurred in
a small town with a low population
density by U.S. standards, but resulted
in the deaths of 47 people and the
destruction of much of the downtown
area. A year after the event,
decontamination of the soil and water/
sewer systems is still ongoing. Cleanup
of the lake and river that flows from it
has not been completed, and
downstream communities are still using
alternative sources for drinking water.
Initial estimates of the cost of this event
were roughly $1 billion, but the cleanup
costs have doubled from initial
estimates of $200 million to at least
$400 million, and the total cost to clean
up, remediate, and rebuild the town
could rise as high as $2.7 billion. The
frequency and magnitude of these
events is highly uncertain. It is,
therefore, difficult to predict with any
precision how many of these higher
consequence events may occur over the
coming years, or how costly these
events may be. In the worst case
scenario for a fatal event, the results
could be several times the damages seen
´
at Lac Megantic both in loss of life and
other associated costs.
In estimating the damages of a higherconsequence event, we begin with the
current estimated damages of Lac
´
Megantic. We used this accident to
illustrate the potential benefits of
preventing or mitigating events of this
magnitude. It is challenging to use this
one data point to model potential
damages of higher consequence events
that differ in nature from the Lac
´
Megantic accident. However, as the
volume of crude oil shipped by rail
continues to grow, it is reasonable to
assume that events of this magnitude
may occur.
By installing locks to avoid such
dangers, the benefits indicated in the
following table are $17,500 per year
($35 times 500 locomotives), starting in
2016, the year after the locks are
installed.
Discounted value
Year
Total benefits
Discount factor
7%
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
3%
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
$0.00
17,500.00
17,500.00
17,500.00
17,500.00
17,500.00
17,500.00
17,500.00
17,500.00
17,500.00
17,500.00
17,500.00
17,500.00
17,500.00
17,500.00
17,500.00
17,500.00
17,500.00
17,500.00
17,500.00
$0
16,355
15,285
14,285
13,351
12,477
11,661
10,898
10,185
9,519
8,896
8,314
7,770
7,262
6,787
6,343
5,928
5,540
5,178
4,839
$0
16,990
16,495
16,015
15,549
15,096
14,656
14,229
13,815
13,412
13,022
12,642
12,274
11,917
11,570
11,233
10,905
10,588
10,279
9,980
Total ......................................................................................................................................
........................
180,873
250,666
Annualized ............................................................................................................................
........................
15,956
16,358
In addition to the above noted
benefits, the proposed rule itself reduces
costs—by removing the requirement to
record securement activities provided
under Emergency Order 28—by $86,700
per year, with no decrease in safety. In
FRA’s view, these savings more than
offset the minor costs associated with
the proposed rule.
Discounted value
Year
Total benefits
Discount factor
tkelley on DSK3SPTVN1PROD with PROPOSALS
7%
2015
2016
2017
2018
2019
2020
2021
2022
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
VerDate Mar<15>2010
16:51 Sep 08, 2014
Jkt 232001
PO 00000
Frm 00029
Fmt 4702
Sfmt 4702
$86,700.00
86,700.00
86,700.00
86,700.00
86,700.00
86,700.00
86,700.00
86,700.00
E:\FR\FM\09SEP1.SGM
09SEP1
$86,700
81,028
75,727
70,773
66,143
61,816
57,772
53,992
3%
$86,700
84,175
81,723
79,343
77,032
74,788
72,610
70,495
53375
Federal Register / Vol. 79, No. 174 / Tuesday, September 9, 2014 / Proposed Rules
Discounted value
Year
Total benefits
Discount factor
7%
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
3%
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
86,700.00
86,700.00
86,700.00
86,700.00
86,700.00
86,700.00
86,700.00
86,700.00
86,700.00
86,700.00
86,700.00
86,700.00
50,460
47,159
44,074
41,191
38,496
35,977
33,624
31,424
29,368
27,447
25,651
23,973
68,442
66,448
64,513
62,634
60,810
59,038
57,319
55,649
54,029
52,455
50,927
49,444
Total ......................................................................................................................................
........................
982,796
1,328,573
Annualized ............................................................................................................................
........................
86,700
86,700
FRA calculated the total monetized
costs of the rule, with the costs for
locomotive lock installation accounted
for only for the first year:
Discounted value
Wage inflator
(percent)
Year
Direct wage
cost
All other costs
Total costs
Discount factor
7%
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
3%
.........................................................
.........................................................
.........................................................
.........................................................
.........................................................
.........................................................
.........................................................
.........................................................
.........................................................
.........................................................
.........................................................
.........................................................
.........................................................
.........................................................
.........................................................
.........................................................
.........................................................
.........................................................
.........................................................
.........................................................
101.18
102.37
103.58
104.80
106.04
107.29
108.56
109.84
111.14
112.45
113.77
115.12
116.47
117.85
119.24
120.65
122.07
123.51
124.97
126.44
$1,315.34
1,330.86
1,346.57
1,362.45
1,378.53
1,394.80
1,411.26
1,427.91
1,444.76
1,461.81
1,479.06
1,496.51
1,514.17
1,532.04
1,550.11
1,568.40
1,586.91
1,605.64
1,624.58
1,643.75
$51,800
1,800
1,800
1,800
1,800
1,800
1,800
1,800
1,800
1,800
1,800
1,800
1,800
1,800
1,800
1,800
1,800
1,800
1,800
1,800
$53,115.34
3,130.86
3,146.57
3,162.45
3,178.53
3,194.80
3,211.26
3,227.91
3,244.76
3,261.81
3,279.06
3,296.51
3,314.17
3,332.04
3,350.11
3,368.40
3,386.91
3,405.64
3,424.58
3,443.75
$53,115
2,926
2,748
2,582
2,425
2,278
2,140
2,010
1,888
1,774
1,667
1,566
1,472
1,383
1,299
1,221
1,147
1,078
1,013
952
$53,115
3,040
2,966
2,894
2,824
2,756
2,689
2,625
2,561
2,500
2,440
2,381
2,324
2,269
2,215
2,162
2,111
2,060
2,012
1,964
Total ..................................................
........................
........................
........................
........................
86,685
99,909
Annualized ........................................
........................
........................
........................
........................
7,647
6,520
FRA calculated the total monetized
benefits of the rule, which includes
savings from relief of Emergency Order
28’s recordation requirement for each
year plus savings provided each year
from the use of locomotive locks after
the first year of installation:
Discounted value
tkelley on DSK3SPTVN1PROD with PROPOSALS
Year
Total benefits
Discount factor
7%
2015
2016
2017
2018
2019
2020
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
VerDate Mar<15>2010
16:51 Sep 08, 2014
Jkt 232001
PO 00000
Frm 00030
Fmt 4702
Sfmt 4702
$86,700.00
104,200.00
104,200.00
104,200.00
104,200.00
104,200.00
E:\FR\FM\09SEP1.SGM
09SEP1
$86,700
97,383
91,012
85,058
79,494
74,293
3%
$86,700
101,165
98,218
95,358
92,580
89,884
53376
Federal Register / Vol. 79, No. 174 / Tuesday, September 9, 2014 / Proposed Rules
Discounted value
Year
Total benefits
Discount factor
7%
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
3%
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
.............................................................................................................................................
104,200.00
104,200.00
104,200.00
104,200.00
104,200.00
104,200.00
104,200.00
104,200.00
104,200.00
104,200.00
104,200.00
104,200.00
104,200.00
104,200.00
69,433
64,891
60,645
56,678
52,970
49,505
46,266
43,239
40,411
37,767
35,296
32,987
30,829
28,812
87,266
84,724
82,256
79,861
77,535
75,276
73,084
70,955
68,888
66,882
64,934
63,043
61,207
59,424
Total ......................................................................................................................................
........................
1,163,669
1,579,240
Annualized ............................................................................................................................
........................
102,656
103,058
Summary of the Costs and Benefits
contributions of each item to the total
discounted costs and benefits over 20
years.
To summarize the above identified
costs and benefits, FRA tabulated the
Discounted value
Discounted values
Discount factor
7%
Costs:
Attending Trains ...............................................................................................................................................
Installing Locks .................................................................................................................................................
Total Costs .......................................................................................................................................................
Benefits:
Reduced Vandalism .........................................................................................................................................
Reduced Recordkeeping ..................................................................................................................................
Total Benefits ............................................................................................................................................
3%
$36,685
50,000
86,685
$49,909
50,000
99,909
180,873
982,786
250,666
1,328,573
1,163,669
1,579,240
For further distillation, FRA
calculated the net benefits over 20 years:
Discounted value
Discounted values net benefits
Discount factor
7%
tkelley on DSK3SPTVN1PROD with PROPOSALS
Total .........................................................................................................................................................................
Annualized ...............................................................................................................................................................
FRA could eliminate Emergency
Order 28, but most of the requirements
of Emergency Order 28 conform to
business practices of the railroads.
The costs that are not directly offset
by a monetized benefit are the annual
costs of either attending locomotives or
expediting their repair. Above, FRA
estimates the annualized cost beyond
current business practices at $3,236–
$3,257 per year.30 These costs are
balanced against an incident with costs
of $260 million to $1.2 billion, but with
extremely low probability. The
incidents avoided by attendance
provisions would only occur where the
train was not equipped with functioning
locking mechanisms under conditions
where the railroad would have sent a
repair team out to the location of the
16:51 Sep 08, 2014
Jkt 232001
PO 00000
Frm 00031
Fmt 4702
Sfmt 4702
$1,479,331
96,538
train to repair the locking mechanism or
would have sent a qualified employee to
attend the train, roughly ten events per
year. As discussed above, these
situations would involve a locomotive
that is left running either to avoid cold
weather starting or to avoid a brake test
when the next crew takes charge of the
train. The number of events estimated is
based on professional judgment. If the
30 This cost is slightly increased by the increase
in value of real wages over time.
VerDate Mar<15>2010
$1,076,984
95,009
3%
E:\FR\FM\09SEP1.SGM
09SEP1
Federal Register / Vol. 79, No. 174 / Tuesday, September 9, 2014 / Proposed Rules
tkelley on DSK3SPTVN1PROD with PROPOSALS
event avoided is $330 million,31 and the
annual cost is less than $3,300 for ten
events, then the rule costs about $330
per event and would roughly break even
if one in a million events of leaving a
locomotive consist for one of the
regulated trains unattended with an
unlocked cab and a reverser unsecured
in the cab were to result in a higherconsequence incident. FRA believes the
small but relatively predictable annual
cost is justified by the hard to measure
very small probability, very high
consequence incident risk avoided. The
portion of the rule requiring attendance
of a train with inoperative locking
mechanisms will not affect the
likelihood of such an incident where the
locking mechanism is functioning or
where railroad does not comply with
the proposed rule.
The remainder of Emergency Order 28
and the proposed rule do not impose
costs beyond expected business
practices. FRA believes that the
business benefits of installing locking
mechanisms and locking locomotive
cabs return net benefits to the railroads.
FRA believes that locking the
locomotive cab or removing the reverser
will reduce the likelihood of a higherconsequence event. FRA believes the
continuing requirements from
Emergency Order 28 or the requirements
of the proposed rule will sever the
potential causal chain of a lowprobability high-consequence event.
Thus, FRA rejects the alternative of
simply removing Emergency Order 28.
reasonable approach. FRA requests
comments on all aspects of this analysis.
Alternatives Considered
FRA considered as an alternative
requiring all trains subject to proposed
§ 232.103(n)(6) to be attended if left
stopped outside yards, without regard to
the presence of a locking mechanism or
reverser. FRA believes that railroads
would work to enhance routing and
crew scheduling so that of the 1,000
affected trains per day, only 50 would
require unattended stops outside of
yards. The cost per event to attend a
train would be $470 per incident. The
daily cost would be 50 times $470, or
$23,500. The annual cost would be
$8,577,500.
FRA believes the proposed rule is as
effective as the alternative considered,
at much lower cost. Thus, FRA rejected
the more restrictive alternative. FRA
further believes that given the tradeoff
between the certainty of relatively low
costs and the benefit of very lowprobability yet very high-consequence
incidents, the proposed rule is a
1. Description of Regulated Entities and
Impacts
The ‘‘universe’’ of the entities under
consideration includes only those small
entities that can reasonably be expected
to be directly affected by the provisions
of this rule. In this case, the ‘‘universe’’
will be Class III freight railroads that
own locomotives or that have traffic
including trains that would be subject to
proposed § 232.103(n)(6).
The U.S. Small Business
Administration (SBA) stipulates in its
‘‘Size Standards’’ that the largest a
railroad business firm that is ‘‘forprofit’’ may be, and still be classified as
a ‘‘small entity,’’ is 1,500 employees for
‘‘Line Haul Operating Railroads’’ and
500 employees for ‘‘Switching and
Terminal Establishments.’’ ‘‘Small
entity’’ is defined in the Act as a small
business that is independently owned
and operated, and is not dominant in its
field of operation. Additionally, section
601(5) defines ‘‘small entities’’ as
governments of cities, counties, towns,
townships, villages, school districts, or
special districts with populations less
than 50,000.
31 This estimate falls between the damages of
Graniteville and Lac-Megantic. It is selected only
for illustrative purposes.
VerDate Mar<15>2010
16:51 Sep 08, 2014
Jkt 232001
B. Regulatory Flexibility Act and
Executive Order 13272
To ensure that the impact of this
rulemaking on small entities is properly
considered, FRA developed this
proposed rule in accordance with
Executive Order 13272 (‘‘Proper
Consideration of Small Entities in
Agency Rulemaking’’) and DOT’s
policies and procedures to promote
compliance with the Regulatory
Flexibility Act (5 U.S.C. 601 et seq.).
The Regulatory Flexibility Act
requires an agency to review regulations
to assess their impact on small entities.
An agency must conduct a regulatory
flexibility analysis unless it determines
and certifies that a rule is not expected
to have a significant economic impact
on a substantial number of small
entities.
As discussed in the preamble above,
FRA is proposing to amend regulations
affecting securement of certain trains
carrying particular hazardous materials
in particular quantities, and requiring
that cabs of all locomotives left
unattended, except for those left
unattended on main tracks that are in or
adjacent to yards, be equipped with
locking mechanisms. FRA is certifying
that this proposed rule will result in ‘‘no
significant economic impact on a
substantial number of small entities.’’
The following section explains the
reasons for this certification.
PO 00000
Frm 00032
Fmt 4702
Sfmt 4702
53377
Federal agencies may adopt their own
size standards for small entities in
consultation with SBA and in
conjunction with public comment.
Pursuant to that authority, FRA has
published a final policy that formally
establishes ‘‘small entities’’ as railroads
which meet the line haulage revenue
requirements of a Class III railroad.32
The revenue requirements are currently
$20 million or less in annual operating
revenue. The $20 million limit (which
is adjusted by applying the railroad
revenue deflator adjustment) 33 is based
on the Surface Transportation Board’s
(STB) threshold for a Class III railroad
carrier. FRA is using the STB’s
threshold in its definition of ‘‘small
entities’’ for this rule.
FRA believes that virtually all small
railroads on the general system of rail
transportation will be affected by this
rule, as there are almost no railroads
that do not own at least one locomotive.
There are 671 small railroads on the
general system of rail transportation.
As noted above, no small entities are
expected to incur any costs under
proposed § 232.103. Small entities
owning locomotives may incur a cost to
install a locking mechanism under
proposed § 232.105, but as also noted
above, the locking mechanisms will pay
for themselves in reduced vandalism
costs in less than three years. FRA
believes that at least 90 percent of
affected locomotives are already
equipped with locking mechanisms, and
the cost to install a locking mechanism
is $100 for a mechanism that does not
have to comply with AAR standards for
interchange. Any small railroad’s
locomotives operated in interchange
service would have to have AAR
compliant locks to remain in
interchange service, but that is not a
cost of the rule. Thus, the rule will
impose a cost of $100 on about ten
percent of locomotives, but the
investment will pay for itself in less
than three years. FRA believes this is
not a substantial impact on any small
entity.
Further, small railroads will benefit
from a reduction in recordkeeping
requirements, as described above.
Pursuant to the Regulatory Flexibility
Act, 5 U.S.C. 605(b), the FRA
Administrator certifies that this
proposed rule would not have a
significant economic impact on a
substantial number of small entities.
FRA requests comment on both this
32 See 68 FR 24891 (May 9, 2003); 49 CFR Part
209, app. C.
33 For further information on the calculation of
the specific dollar limit, please see 49 CFR Part
1201.
E:\FR\FM\09SEP1.SGM
09SEP1
53378
Federal Register / Vol. 79, No. 174 / Tuesday, September 9, 2014 / Proposed Rules
analysis and this certification, and its
estimates of the impacts on small
railroads.
C. Paperwork Reduction Act
The new information collection
requirements in this proposed rule are
being submitted for approval to the
Office of Management and Budget
(OMB) under the Paperwork Reduction
Act of 1995, 44 U.S.C. 3501 et seq. The
sections that contain the new and
current information collection
requirements and the estimated time to
fulfill each requirement are as follows:
CFR Section
Respondent universe
Total annual
responses
Average time per
response
229.27—Annual tests .....................................
232.3—Applicability—Export, industrial, &
other cars not owned by railroads-identification.
232.7—Waivers ..............................................
232.15—Movement of Defective Equipment—Tags/Records.
—Written Notification ..............................
232.17—Special Approval Procedure.
—Petitions for special approval of safety-critical revision.
—Petitions for special approval of prerevenue service acceptance plan.
—Service of petitions ..............................
—Statement of interest ...........................
—Comment .............................................
232.103—Gen’l requirements—all train brake
systems—Stickers.
30,000 locomotives ....
655 railroads ..............
120,000 tests .............
8 cards .......................
15 minutes .................
10 minutes .................
30,000 hours.
1 hour.
655 railroads ..............
1,620,000 cars ...........
10 petitions ................
128,400 tags/records
160 hours ...................
2.5 minutes ................
1,600 hours.
5,350 hours
1,620,000 cars ...........
25,000 notices ...........
3 minutes ...................
1,250 hours.
655 railroads ..............
1 petition ....................
100 hours ...................
100 hours.
655 railroads ..............
1 petition ....................
100 hours ...................
100 hours.
655 railroads ..............
Public/railroads ..........
Public/railroads ..........
114,000 cars ..............
1 petition ....................
4 statements ..............
13 comments .............
70,000 sticker ............
20 hours .....................
8 hours .......................
4 hours .......................
10 minutes .................
20 hours.
32 hours.
52 hours.
11,667 hours.
Already Fulfilled under Fulfilled under OMB
OMB No. 210–0601.
No. 210–0601.
655 railroads .............. 10 revised plans ........
Fulfilled under OMB
No. 210–0601.
10 hours .....................
Fulfilled under OMB
No. 210–0601.
100 hours.
655 railroads ..............
10 notices ..................
30 minutes .................
5 hours.
Included under Sec.
232.103(n)(9).
Included Under Sec.
232.103(n)(9).
Included under Sec.
232.103(n)(9).
Included under Sec.
232.103(n)(9).
655 railroads ..............
491 revised rules/
practices.
2 hours .......................
982 hours.
100,000 Employees ...
30 seconds ................
195,000 hours.
655 railroads ..............
23,400,000 job briefings.
100 inspections/
records.
4 hours .......................
400 hours.
30,000 Locomotives ...
30,000 forms ..............
5 minutes ...................
2,500 hours.
30,000 Locomotives ...
30,000 insp. records ..
30 seconds ................
250 hours.
30,000 Locomotives ...
73 repairs/records ......
60.25 minutes ............
73 hours.
10 new railroads ........
1 plan .........................
40 hours .....................
40 hours.
50 railroads/plans ......
50 railroads/plans ......
655 railroads ..............
10 revisions ................
1,150 records .............
1,656,000 rec .............
20 hours .....................
20 hours .....................
4 minutes ...................
200 hours.
23,000 hours.
110,400 hours.
30,000 locomotives ....
6,358 records .............
4 minutes ...................
424 hours.
30,000 locomotives ....
6,358 tags ..................
30 seconds ................
53 hours.
8,000 locomotives ......
10 markings ...............
5 minutes ...................
1 hour.
5 new railroads ..........
655 railroads ..............
5 .rules .......................
15 revisions ................
4 hours .......................
1 hour .........................
20 hours.
15 hours.
Proposed Rule New Requirements
232.103(n)(3)(iv)—RR Procedure for Securing Unattended Locomotive.
232.103(n)(7)—RR Plan Identifying Specific
Locations or Circumstances where Equipment May Be Left Unattended.
—Notification to FRA When RR Develops and Hast Plan in Place or Modifies Existing Plan.
232.103(n)(8)—Employee Verification with
Another Qualified Employee of Securement of Freight Train or Freight Car Left
Unattended.
232.103(n)(9)—RR Implementation of Op.
Rules/Practices Requiring Job Briefing for
Securement of Unattended Equipment.
—Securement Job Briefings ...................
tkelley on DSK3SPTVN1PROD with PROPOSALS
232.103(n)(10)—RR Adoption of Procedure
for Verification of Securement of Equipment by Qualified Employee—Inspection
of Equipment by Qualified Employee after
Responder Visit.
232.105—General requirements for locomotives—Inspection.
Proposed Rule New Requirements
232.105(h)—RR Inspection of Locomotive
Exterior Locking Mechanism/Records.
—RR Repair, where necessary, of Locomotive Exterior Locking Mechanism.
232.107—Air source requirements and cold
weather
operations—Monitoring
Plan
(Subsequent Years).
—Amendments/Revisions to Plan ..........
—Recordkeeping ....................................
232.109—Dynamic brake requirements—status/record.
—Inoperative dynamic brakes: Repair
record.
—Tag bearing words ‘‘inoperative dynamic brakes’’.
—Deactivated dynamic brakes (Sub.
Yrs.).
—Operating rules (Subsequent Years) ..
—Amendments/Revisions .......................
VerDate Mar<15>2010
16:51 Sep 08, 2014
Jkt 232001
PO 00000
Frm 00033
Fmt 4702
Sfmt 4702
E:\FR\FM\09SEP1.SGM
09SEP1
Total annual burden
hours
Federal Register / Vol. 79, No. 174 / Tuesday, September 9, 2014 / Proposed Rules
53379
Respondent universe
Total annual
responses
Average time per
response
—Requests to increase 5 mph Overspeed restriction.
—Knowledge criteria—locomotive engineers—Subsequent Years.
232.111—Train information handling .............
—Sub. Yrs.—Amendments/Revisions ....
—Report requirements to train crew ......
232.203—Training
requirements—Tr.
Prog.—Sub Yr.
—Amendments to written program .........
—Training records ..................................
—Training notifications ...........................
—Audit program ......................................
—Amendments to validation/assessment
program.
232.205—Class 1 brake test—Notifications/
Records.
232.207—Class 1A brake tests—Designation
Lists Where Performed.
Subsequent Years: Notice of Change to
232.209—Class II brake tests—intermediate
‘‘Roll-by inspection—Results to train driver.
232.213—Written Designation to FRA of Extended haul trains.
232.303—General requirements—single car
test: Tagging of Moved Equipment.
—Last repair track brake test/single car
test—Stenciled on Side of Equipment.
232.305—Single Car Tests—Performance
and Records.
232.307—Modification of single car air brake
test procedures: Requests.
—Affirmation Statement on Mod. Req.
To Employee Representatives.
—Comments on Modification Request ...
232.309—Repair track brake test ..................
232.403—Unique Code ..................................
232.407—EOT Operations requiring 2-way
Voice Radio Communications.
232.409—Inspection/Tests/Records EOTs ....
tkelley on DSK3SPTVN1PROD with PROPOSALS
CFR Section
655 railroads ..............
5 requests ..................
30 min. + 20 hours ....
103 hours.
5 new railroads ..........
5 amendments ...........
16 hours .....................
80 hours.
5 new railroads ..........
100 railroads ..............
655 railroads ..............
15 railroads ................
5 procedures ..............
100 revisions ..............
2,112,000 reports .......
5 programs .................
40 hours .....................
20 hours .....................
10 minutes .................
100 hours ...................
200 hours.
2,000 hours.
352,000 hours.
500 hours.
655
655
655
655
655
..............
..............
..............
..............
..............
559 revisions ..............
67,000 record .............
67,000 notices ...........
1 plan + 559 copies ...
50 revisions ................
8 hours .......................
8 minutes ...................
3 minutes ...................
40 hours/1 min. ..........
20 hours .....................
4,472 hours.
8,933 hours.
3,350 hours.
49 hours.
1,000 hours.
655 railroads ..............
45 seconds ................
20,575 hours.
655 railroads ..............
1,646,000 notices/
record.
5 lists ..........................
1 hour .........................
5 hours.
655 railroads ..............
655 railroads ..............
250 notices ................
1,597,400 comments
10 minutes .................
3 seconds ..................
42 hours.
1,331 hours.
83,000 long dist.
movements.
1,600,000 frgt. cars ....
250 letters ..................
15 minutes .................
63 hours.
5,600 tags ..................
5 minutes ...................
467 hours.
1,600,000 frgt. cars ....
320,000 markings ......
5 minutes ...................
26,667 hours.
1,600,000 frgt. cars ....
320,000 tests/records
60 minutes .................
320,000 hours.
AAR ............................
1 request + 3 copies ..
100 hours + 5 minutes
100 hours.
AAR ............................
30 minutes + 5 minutes.
8 hours .......................
30 minutes .................
5 minutes ...................
30 seconds ................
1 hour.
16 hours.
2,500 hours.
1 hour.
417 hours.
30 seconds ................
3,729 hours.
245 railroads ..............
1 statement + 4 copies.
2 comments ...............
5,000 tests .................
12 requests ................
50,000 verbal comments.
447,500 tests/notices/
record.
32,708 units marked ..
1 minute .....................
545 hours.
655 railroads ..............
1 letter ........................
1 hour .........................
1 hour.
655 railroads ..............
1 request ....................
3 hours .......................
3 hours.
655 railroads ..............
655 railroads ..............
1 procedure ................
1 revision ...................
160 hours ...................
40 hours .....................
160 hours.
40 hours.
655 railroads ..............
655 railroads ..............
1 petition ....................
1 report ......................
67 hours .....................
13 hours .....................
67 hours.
13 hours.
655 railroads ..............
4 railroads ..................
1 description ..............
1 plan .........................
40 hours .....................
160 hours ...................
40 hours.
160 hours.
4 railroads ..................
1 plan .........................
60 hours .....................
60 hours.
4 railroads ..................
1 request + 2 copies ..
8 hours + 5 minutes ..
8 hours.
4 railroads ..................
4 statements + 24
copies.
60 minutes + 5 minutes.
6 hours.
Public/Industry ...........
1 railroad ....................
4 comments ...............
1 program ..................
2 hours .......................
100 hours ...................
8 hours.
100 hours.
1 railroad ....................
1 program ..................
100 hour .....................
100 hours.
1 railroad ....................
1,602 trained employees.
1,602 trained employees.
8 hours/24 hrs. ...........
26,480 hours.
1 hour/8 hours ...........
7,580 hours.
—Telemetry Equipment—Testing and
Calibration.
232.503—Process to introduce new brake
technology.
—Special approval ..................................
232.505—Pre-revenue svc accept. test plan.
—Submission of maintenance procedure
—Amendments to maintenance procedure.
—Design description ...............................
—Report to FRA Assoc. Admin. for Railroad Safety.
—Brake system technology testing ........
232.603—Configuration Management—Configuration Management Plan (ECP).
—Subsequent
Years—Configuration
Management Plans.
—Request for Modification of Standards
and Extra Copies to FRA.
—Affirmative Statements that RRs have
served copies of Modification Request
to Employee Representatives.
—Comments on requested modification
232.605—ECP Brakes: Training—Adopt/Developing an ECP Training Program—First
Year.
—Subsequent Years—ECP Training
Prog.
—ECP Brakes Training of Employees—
First Year.
—ECP Brakes Training of Employees—
Subsequent Years.
VerDate Mar<15>2010
16:51 Sep 08, 2014
Jkt 232001
railroads
railroads
railroads
railroads
railroads
Railroad/Public ...........
640 shops ..................
245 railroads ..............
245 railroads ..............
245 railroads ..............
2 railroads ..................
PO 00000
Frm 00034
Fmt 4702
Sfmt 4702
E:\FR\FM\09SEP1.SGM
09SEP1
Total annual burden
hours
53380
Federal Register / Vol. 79, No. 174 / Tuesday, September 9, 2014 / Proposed Rules
CFR Section
Respondent universe
Total annual
responses
Average time per
response
—ECP Training Records—Yr. One ........
—ECP Training Records—Subsequent
Yrs.
—Assessment of ECP Training Plan ......
—Adopt Operating Rules for ECP
Brakes.
—Amended Locomotive Engineer Certification Program (ECP Brakes).
232.607—ECP Inspection and Testing—Initial Terminal—Inspections and Notification/
Record of Class I Brake Tests.
—Cars added or removed en route—
Class I Brake Test and Notification.
—Non-ECP cars added to ECP Trains—
Inspections and Tags for Defective
Cars.
232.609—Handling of Defective Equipment
with ECP Brake Systems—Freight Car w/
defective conventional brakes moved in
train operating in ECP brake mode.
—Inspections/Tagging for ECP Train
moving w/less than 85 percent operative/effective brakes.
—Cars tagged in accordance with Section 232.15.
232.609—Conventional Train with standalone ECP brake equipped cars—Tagging.
—Procedures for handling ECP brake
system repairs and designation of repair locations.
—List of repair locations .........................
—Notification to FRA Safety Administrator regarding change to repair location list.
232.611—Periodic
Maintenance—Inspections before being released from repair
Shop.
—Procedures/Petition for ECP Single
Car Test.
—Single Car Air Brake Tests—Records
—Modification of Single Car Test Standards.
2 railroads ..................
2 railroads ..................
1,602 records .............
1,602 records .............
8 minutes ...................
4 minutes ...................
214 hours.
107 hours.
2 railroads ..................
2 railroads ..................
1 ECP plan ................
1 Oper. Rule ..............
40 hours .....................
24 hours .....................
40 hours.
24 hours.
2 railroads ..................
1 amended programs
40 hours .....................
40 hours.
1 railroad ....................
2,500 insp.+ 2,500 notices.
90 min. + 45 seconds
3,781 hours.
1 railroad ....................
60 minutes + 45 seconds.
5 minutes + 2.5 minutes.
253 hours.
200 Cars ....................
250 inspection + 125
notices.
50 insp.+ 100 tags/
records.
25 Cars ......................
50 tags/records ..........
2.5 minutes ................
2 hours.
20 Cars ......................
20 insp. + 40 tags/
records.
5 minutes + 2.5 minutes.
3 hours.
25 Cars ......................
50 tags/records ..........
2.5 minutes ................
2 hours.
50 Cars ......................
100 tags/records ........
2.5 minutes ................
4 hours.
2 railroads ..................
2 procedures ..............
24 hours .....................
48 hours.
2 railroads ..................
2 railroads ..................
2 lists ..........................
1 notification ...............
8 hours .......................
1 hour .........................
16 hours.
1 hour.
500 Freight Cars ........
500 insp./rcds ............
10 minutes .................
83 hours.
1 Railroad Rep. ..........
1 petition + 2 copies ..
24 hours + 5 minutes
24 hours.
50 Freight Cars ..........
1 Railroad Rep. ..........
50 tests/records .........
1 mod. Proc. ..............
45 minutes .................
40 hours .....................
38 hours.
40 hours.
The new requirements of the
proposed rule essentially duplicate
those already approved by OMB for
Emergency Order No. 28 (under OMB
No. 2130–0601). When this instant rule
becomes final (assuming no changes
from proposed to final rule) and the
information collection associated with it
is approved by OMB (under OMB No.
2130–0008), FRA will discontinue OMB
tkelley on DSK3SPTVN1PROD with PROPOSALS
232.103(n)(7)—RR Plan identifying
specific locations where equipment
may be left unattended.
—Notification to FRA when RR
develops & has plan in place
or modifies existing plan.
—(n)(9)—Railroad Implementation of operating rules requiring
job briefing for securing unattended trains.
16:51 Sep 08, 2014
8 hours.
hours, and increased the number of
responses by 23,430,684. The current
inventory shows a burden total of
991,451 hours, while the present
submission exhibits a burden total of
1,172,335 hours. Hence, there is a total
burden increase of 180,884 hours for
this information collection request.
Accordingly here is the table for
program changes:
Responses &
avg. time
(previous submission)
CFR Section
VerDate Mar<15>2010
No. 2130–0601 and eliminate the
205,404 hour burden associated with it
from the OMB inventory. Thus, the FRA
total burden in OMB’s inventory then
will actually show a net reduction of
24,520 hours from the present
inventory.
As reflected in the below table,
program changes will have increased
the number of burden hours by 196,810
Total annual burden
hours
Responses &
avg. time
(this submission)
Burden hours
(previous submission)
FRA burden hours
(this submission)
Difference
(plus/minus)
0 revised plans .....
0 hours .................
10 revised plans ...
10 hours ...............
0 hours .................
100 hours .............
+100 hours
+10 responses.
0 notices ..............
0 minutes .............
10 notices ............
30 minutes ...........
0 hours .................
5 hours .................
+5 hours
+10 responses.
0 revised rules/
practices.
0 hours .................
491 revised rules/
practices.
2 hours .................
0 hours .................
982 hours .............
+982 hours
+491 resp.
Jkt 232001
PO 00000
Frm 00035
Fmt 4702
Sfmt 4702
E:\FR\FM\09SEP1.SGM
09SEP1
Federal Register / Vol. 79, No. 174 / Tuesday, September 9, 2014 / Proposed Rules
53381
Responses &
avg. time
(previous submission)
Responses &
avg. time
(this submission)
Burden hours
(previous submission)
FRA burden hours
(this submission)
Difference
(plus/minus)
232.103(n)(9)—Securement Job Briefings.
0 job briefings ......
0 seconds ............
195,000 hours ......
0 inspections ........
0 hours .................
23,400,000 job
briefings.
30 seconds ..........
100 inspections ....
4 hours .................
0 hours .................
—(n)(10)—Inspection of equipment after emergency responder visit.
232.105(h)—RR inspection of exterior
locking mechanism on locomotive
left unattended outside a yard.
—RR repair, where necessary, of
locomotive exterior locking
mechanism.
tkelley on DSK3SPTVN1PROD with PROPOSALS
CFR Section
0 hours .................
400 hours .............
+195,000 hrs.
+23,400,000 responses.
+400 hours
+100 resp.
30,000 inspections/records.
30 seconds ..........
73 repairs/records
60.25 minutes ......
0 hours .................
250 hours .............
+250 hours
+30,000 resp.
0 hours .................
73 hours ...............
+73 hours
+73 responses.
0 inspections ........
0 seconds ............
0 repairs/record ....
0 minutes .............
All estimates include the time for
reviewing instructions; searching
existing data sources; gathering or
maintaining the needed data; and
reviewing the information. Pursuant to
44 U.S.C. 3506(c)(2)(B), FRA solicits
comments concerning: Whether these
information collection requirements are
necessary for the proper performance of
the functions of FRA, including whether
the information has practical utility; the
accuracy of FRA’s estimates of the
burden of the information collection
requirements; the quality, utility, and
clarity of the information to be
collected; and whether the burden of
collection of information on those who
are to respond, including through the
use of automated collection techniques
or other forms of information
technology, may be minimized. For
information or a copy of the paperwork
package submitted to OMB, contact Mr.
Robert Brogan, Information Clearance
Officer, at 202–493–6292, or Ms.
Kimberly Toone at 202–493–6132.
Organizations and individuals
desiring to submit comments on the
collection of information requirements
should direct them to Mr. Robert Brogan
or Ms. Kimberly Toone, Federal
Railroad Administration, 1200 New
Jersey Avenue SE., 3rd Floor,
Washington, DC 20590. Comments may
also be submitted via email to Mr.
Brogan or Ms. Toone at the following
address: Robert.Brogan@dot.gov;
Kimberly.Toone@dot.gov.
OMB is required to make a decision
concerning the collection of information
requirements contained in this proposed
rule between 30 and 60 days after
publication of this document in the
Federal Register. Therefore, a comment
to OMB is best assured of having its full
effect if OMB receives it within 30 days
of publication. The final rule will
respond to any OMB or public
comments on the information collection
requirements contained in this proposal.
VerDate Mar<15>2010
16:51 Sep 08, 2014
Jkt 232001
FRA is not authorized to impose a
penalty on persons for violating
information collection requirements
which do not display a current OMB
control number, if required. FRA
intends to obtain current OMB control
numbers for any new information
collection requirements resulting from
this rulemaking action prior to the
effective date of the final rule. The OMB
control number, when assigned, will be
announced by separate notice in the
Federal Register.
D. Federalism
Executive Order 13132, ‘‘Federalism’’
(64 FR 43255, Aug. 10, 1999), requires
FRA to develop an accountable process
to ensure ‘‘meaningful and timely input
by State and local officials in the
development of regulatory policies that
have federalism implications.’’ ‘‘Policies
that have federalism implications’’ are
defined in the Executive Order to
include regulations that have
‘‘substantial direct effects on the States,
on the relationship between the national
government and the States, or on the
distribution of power and
responsibilities among the various
levels of government.’’ Under Executive
Order 13132, the agency may not issue
a regulation with federalism
implications that imposes substantial
direct compliance costs and that is not
required by statute, unless the Federal
government provides the funds
necessary to pay the direct compliance
costs incurred by State and local
governments or the agency consults
with State and local government
officials early in the process of
developing the regulation. Where a
regulation has federalism implications
and preempts State law, the agency
seeks to consult with State and local
officials in the process of developing the
regulation.
This proposed rule has been analyzed
in accordance with the principles and
criteria contained in Executive Order
PO 00000
Frm 00036
Fmt 4702
Sfmt 4702
13132. FRA has determined that the
proposed rule does not have substantial
direct effects on the States, on the
relationship between the national
government and the States, or on the
distribution of power and
responsibilities among the various
levels of government. In addition, FRA
has determined that this proposed rule
does not impose substantial direct
compliance costs on State and local
governments. Therefore, the
consultation and funding requirements
of Executive Order 13132 do not apply.
This rule adds requirements to part
232. FRA is not aware of any State
having regulations similar to these
proposals. However, FRA notes that this
part could have preemptive effect by the
operation of law under a provision of
the former Federal Railroad Safety Act
of 1970, repealed, revised, reenacted,
and codified at 49 U.S.C. 20106 (Sec.
20106). Sec. 20106 provides that States
may not adopt or continue in effect any
law, regulation, or order related to
railroad safety or security that covers
the subject matter of a regulation
prescribed or order issued by the
Secretary of Transportation (with
respect to railroad safety matters) or the
Secretary of Homeland Security (with
respect to railroad security matters),
except when the State law, regulation,
or order qualifies under the ‘‘essentially
local safety or security hazard’’
exception to Sec. 20106. In addition,
section 20119(b) authorizes FRA to
issue a rule governing the discovery and
use of risk analysis information in
litigation.
In sum, FRA has analyzed this
proposed rule in accordance with the
principles and criteria contained in
Executive Order 13132. As explained
above, FRA has determined that this
proposed rule has no federalism
implications, other than the possible
preemption of State laws under 49
U.S.C. 20106 and 20119. Accordingly,
FRA has determined that preparation of
E:\FR\FM\09SEP1.SGM
09SEP1
53382
Federal Register / Vol. 79, No. 174 / Tuesday, September 9, 2014 / Proposed Rules
a federalism summary impact statement
for this proposed rule is not required.
G. Unfunded Mandates Reform Act of
1995
energy action’’ within the meaning of
Executive Order 13211.
E. International Trade Impact
Assessment
Pursuant to section 201 of the
Unfunded Mandates Reform Act of 1995
(Pub. L. 104–4, 2 U.S.C. 1531), each
Federal agency ‘‘shall, unless otherwise
prohibited by law, assess the effects of
Federal regulatory actions on State,
local, and tribal governments, and the
private sector (other than to the extent
that such regulations incorporate
requirements specifically set forth in
law).’’ Section 202 of the Act (2 U.S.C.
1532) further requires that ‘‘before
promulgating any general notice of
proposed rulemaking that is likely to
result in the promulgation of any rule
that includes any Federal mandate that
may result in expenditure by State,
local, and tribal governments, in the
aggregate, or by the private sector, of
$100,000,000 or more (adjusted
annually for inflation) in any 1 year, and
before promulgating any final rule for
which a general notice of proposed
rulemaking was published, the agency
shall prepare a written statement’’
detailing the effect on State, local, and
tribal governments and the private
sector. For the year 2013, this monetary
amount of $100,000,000 has been
adjusted to $151,000,000 to account for
inflation. This proposed rule will not
result in the expenditure of more than
$151,000,000 by the public sector in any
one year, and thus preparation of such
a statement is not required.
I. Privacy Act
The Trade Agreement Act of 1979
prohibits Federal agencies from
engaging in any standards or related
activities that create unnecessary
obstacles to the foreign commerce of the
United States. Legitimate domestic
objectives, such as safety, are not
considered unnecessary obstacles. The
statute also requires consideration of
international standards and where
appropriate, that they be the basis for
U.S. standards. This rulemaking is
purely domestic in nature and is not
expected to affect trade opportunities
for U.S. firms doing business overseas or
for foreign firms doing business in the
United States.
F. Environmental Assessment
tkelley on DSK3SPTVN1PROD with PROPOSALS
FRA has evaluated this rule in
accordance with its ‘‘Procedures for
Considering Environmental Impacts’’
(FRA’s Procedures) (64 FR 28545, May
26, 1999) as required by the National
Environmental Policy Act (42 U.S.C.
4321 et seq.), other environmental
statutes, Executive Orders, and related
regulatory requirements. FRA has
determined that this rule is not a major
FRA action (requiring the preparation of
an environmental impact statement or
environmental assessment) because it is
categorically excluded from detailed
environmental review pursuant to
section 4(c)(20) of FRA’s Procedures.
See 64 FR 28547, May 26, 1999. Section
4(c)(20) reads as follows: ‘‘(c) Actions
categorically excluded. Certain classes
of FRA actions have been determined to
be categorically excluded from the
requirements of these Procedures as
they do not individually or
cumulatively have a significant effect on
the human environment. * * * The
following classes of FRA actions are
categorically excluded:
* * * (20) Promulgation of railroad
safety rules and policy statements that
do not result in significantly increased
emissions or air or water pollutants or
noise or increased traffic congestion in
any mode of transportation.’’
In accordance with section 4(c) and
(e) of FRA’s Procedures, the agency has
further concluded that no extraordinary
circumstances exist with respect to this
proposed regulation that might trigger
the need for a more detailed
environmental review. As a result, FRA
finds that this rule is not a major
Federal action significantly affecting the
quality of the human environment.
VerDate Mar<15>2010
16:51 Sep 08, 2014
Jkt 232001
H. Energy Impact
Executive Order 13211 requires
Federal agencies to prepare a Statement
of Energy Effects for any ‘‘significant
energy action.’’ 66 FR 28355, May 22,
2001. Under the Executive Order, a
‘‘significant energy action’’ is defined as
any action by an agency (normally
published in the Federal Register) that
promulgates, or is expected to lead to
the promulgation of, a final rule or
regulation (including a notice of
inquiry, advance NPRM, and NPRM)
that (1)(i) is a significant regulatory
action under Executive Order 12866 or
any successor order and (ii) is likely to
have a significant adverse effect on the
supply, distribution, or use of energy; or
(2) is designated by the Administrator of
the Office of Information and Regulatory
Affairs as a significant energy action.
FRA has evaluated this proposed rule in
accordance with Executive Order 13211.
FRA has determined that this proposed
rule will not have a significant adverse
effect on the supply, distribution, or use
of energy. Consequently, FRA has
determined that this proposed
regulatory action is not a ‘‘significant
PO 00000
Frm 00037
Fmt 4702
Sfmt 4702
Interested parties should be aware
that anyone is able to search the
electronic form of all comments
received into any agency docket by the
name of the individual submitting the
comment (or signing the comment, if
submitted on behalf of an association,
business, labor union, etc.). You may
review DOT’s complete Privacy Act
Statement in the Federal Register
published on April 11, 2000 (65 FR
19477–19478), or you may visit https://
www.dot.gov/privacy.html.
List of Subjects in 49 CFR Part 232
Hazardous material, Power brakes,
Railroad safety, Securement.
The Proposed Rule
In consideration of the foregoing, FRA
is proposing to amend part 232 of
chapter II, subtitle B of title 49, Code of
Federal Regulations as follows:
PART 232—[AMENDED]
1. The authority citation for part 232
is revised to read as follows:
■
Authority: 49 U.S.C. 20102–20103, 20107,
20133, 20141, 20301–20303, 20306, 21301–
20302, 21304; 28 U.S.C. 2461, note; and 49
CFR 1.89.
2. Section 232.5 is amended by adding
in alphabetical order the definition of
‘‘Unattended equipment’’, by removing
the word ‘‘limits’’ from the term ‘‘Yard
limits’’, and by moving the newly
designated definition of ‘‘Yard’’ before
the definition of ‘‘Yard air’’ to read as
follows:
■
§ 232.5
Definitions.
*
*
*
*
*
Unattended equipment means
equipment left standing and unmanned
in such a manner that the brake system
of the equipment cannot be readily
controlled by a qualified person.
*
*
*
*
*
Yard * * *
■ 3. Amend § 232.103 by:
■ a. Revising paragraphs (n)
introductory text and (n)(1) through (3).
■ b. Adding paragraphs (n)(6) through
(10).
The revisions and additions read as
follows:
§ 232.103 General requirements for all
train brake systems.
*
*
*
*
*
(n) Securement of unattended
equipment. Unattended equipment shall
be secured in accordance with the
following requirements:
E:\FR\FM\09SEP1.SGM
09SEP1
tkelley on DSK3SPTVN1PROD with PROPOSALS
Federal Register / Vol. 79, No. 174 / Tuesday, September 9, 2014 / Proposed Rules
(1) A sufficient number of hand
brakes, to be not fewer than one, shall
be applied to hold the equipment unless
an acceptable alternative method of
securement is provided. Railroads shall
develop and implement a process or
procedure to verify that the applied
hand brakes will sufficiently hold the
equipment with the air brakes released.
(2) Except for equipment connected to
a source of compressed air (e.g.,
locomotive or ground air source), prior
to leaving equipment unattended, the
brake pipe shall be reduced to zero at
a rate that is no less than a service rate
reduction, and the brake pipe vented to
atmosphere by leaving the angle cock in
the open position on the first unit of the
equipment left unattended. A train’s air
brake shall not be depended upon to
hold equipment standing unattended
(including a locomotive, a car, or a train
whether or not locomotive is attached).
(3) Except for distributed power units,
the following requirements apply to
unattended locomotives:
(i) All hand brakes shall be fully
applied on all locomotives in the lead
consist of an unattended train.
(ii) All hand brakes shall be fully
applied on all locomotives in an
unattended locomotive consist outside
of a yard.
(iii) At a minimum, the hand brake
shall be fully applied on the lead
locomotive in an unattended locomotive
consist within a yard.
(iv) A railroad shall develop, adopt,
and comply with procedures for
securing any unattended locomotive
required to have a hand brake applied
pursuant to paragraph (n)(3)(i) through
(n)(3)(iii) of this section when the
locomotive is not equipped with an
operative hand brake.
*
*
*
*
*
(6)(i) The requirements in paragraph
(n)(7) through (n)(8) of this section
apply to any freight train or standing
freight car or cars that contain:
(A) Any loaded freight car containing
a material poisonous by inhalation as
defined in § 171.8 of this title, including
anhydrous ammonia (UN 1005) and
ammonia solutions (UN 3318); or
(B) Twenty (20) or more loaded cars
or loaded intermodal portable tanks of
any one or any combination of a
hazardous material listed in paragraph
(n)(6)(i)(A), or any Division 2.1
(flammable gas), Class 3 (flammable or
combustible liquid), Class 1.1 or 1.2
(explosive), or a hazardous substance
listed at § 173.31(f)(2) of this title.
(ii) For the purposes of this paragraph,
a tank car containing a residue of a
hazardous material as defined in § 171.8
of this title is not considered a loaded
car.
VerDate Mar<15>2010
16:51 Sep 08, 2014
Jkt 232001
(7)(i) No equipment described in
paragraph (n)(6) of this section shall be
left unattended on a main track or
siding (except when that main track or
siding runs through, or is directly
adjacent to a yard) until the railroad has
adopted and is complying with a plan
identifying specific locations or
circumstances when the equipment may
be left unattended. The plan shall
contain sufficient safety justification for
determining when equipment may be
left unattended. The railroad must
notify FRA when the railroad develops
and has in place a plan, or modifies an
existing plan, under this provision prior
to operating pursuant to the plan. The
plan shall be made available to FRA
upon request. FRA reserves the right to
require modifications to any plan
should it determine the plan is not
sufficient.
(ii) Except as provided in paragraph
(n)(8)(iii) of this section, any freight
train described in paragraph (n)(6) of
this section that is left unattended on a
main track or siding that runs through,
or is directly adjacent to a yard shall
comply with the requirements
contained in paragraphs (n)(8)(i) and
(n)(8)(ii) of this section.
(8)(i) Where a freight train or standing
freight car or cars as described in
paragraph (n)(6) of this section is left
unattended on a main track or siding
outside of a yard, and not directly
adjacent to a yard, an employee
responsible for securing the equipment
shall verify with another person
qualified to make the determination that
the equipment is secured in accordance
with the railroad’s processes and
procedures.
(ii) The controlling locomotive cab of
a freight train described in paragraph
(n)(6) of this section shall be locked on
locomotives capable of being locked. If
the controlling cab is not capable of
being locked, the reverser on the
controlling locomotive shall be removed
from the control stand and placed in a
secured location.
(iii) A locomotive that is left
unattended on a main track or siding
that runs through, or is directly adjacent
to, a yard is excepted from the
requirements in (n)(8)(ii) of this section
where the locomotive is not equipped
with an operative lock and the
locomotive has a reverser that cannot be
removed from its control stand or has a
reverser that is necessary for cold
weather operations.
(9) Each railroad shall implement
operating rules and practices requiring
the job briefing of securement for any
activity that will impact or require the
securement of any unattended
PO 00000
Frm 00038
Fmt 4702
Sfmt 9990
53383
equipment in the course of the work
being performed.
(10) Each railroad shall adopt and
comply with procedures to ensure that,
as soon as safely practicable, a qualified
employee verifies the proper
securement of any unattended
equipment when the railroad has
knowledge that a non-railroad
emergency responder has been on,
under, or between the equipment.
*
*
*
*
*
■ 4. Add paragraph (h) to § 232.105 to
read as follows:
§ 232.105 General requirements for
locomotives.
*
*
*
*
*
(h)(1) After March 1, 2017, each
locomotive left unattended outside of a
yard or on a track directly adjacent to
the yard shall be equipped with an
operative exterior locking mechanism.
(2) The railroad shall inspect and,
where necessary, repair the locking
mechanism during a locomotive’s
periodic inspection required in § 229.23
of this chapter.
(3) In the event that a locking
mechanism becomes inoperative during
the time interval between periodic
inspections, the railroad must repair the
locking mechanism within 30 days of
finding the inoperative lock.
(4) A railroad may continue the use of
a locomotive without an operative
locking mechanism; however, if the
controlling locomotive of a train
meeting the requirements of
§ 232.103(n)(6)(i) does not have an
operative locking mechanism for the
locomotive, the train must not be left
unattended on main track or a siding
unless the reverser is removed from the
control stand as required in
§ 232.103(n)(8)(ii) or the locomotive
otherwise meets one of the exceptions
described in § 232.103(n)(8)(iii).
*
*
*
*
*
Joseph C. Szabo,
Administrator.
[FR Doc. 2014–21253 Filed 9–8–14; 8:45 am]
BILLING CODE 4910–06–P
E:\FR\FM\09SEP1.SGM
09SEP1
Agencies
[Federal Register Volume 79, Number 174 (Tuesday, September 9, 2014)]
[Proposed Rules]
[Pages 53356-53383]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-21253]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
49 CFR Part 232
[Docket No. FRA-2014-0032, Notice No. 1]
RIN 2130-AC47
Securement of Unattended Equipment
AGENCY: Federal Railroad Administration (FRA), Department of
Transportation (DOT).
ACTION: Notice of proposed rulemaking.
-----------------------------------------------------------------------
SUMMARY: FRA proposes amendments to the brake system safety standards
for freight and other non-passenger trains and equipment to strengthen
the requirements relating to the securement of unattended equipment.
Specifically, FRA would codify many of the requirements already
included in its Emergency Order 28, Establishing Additional
Requirements for Attendance and Securement of Certain Freight Trains
and Vehicles on Mainline Track or Mainline Siding Outside of a Yard or
Terminal. FRA proposes to amend existing regulations to include
additional securement requirements for unattended equipment, primarily
for trains transporting poisonous by inhalation hazardous materials or
large volumes of Division 2.1 (flammable gases), Class 3 (flammable or
combustible liquids, including crude oil and ethanol), and Class 1.1 or
1.2 (explosives) hazardous materials. For these trains, FRA also
proposes additional communication requirements relating to job
briefings and securement verification. Finally, FRA proposes to require
all locomotives left unattended outside of a yard to be equipped with
an operative exterior locking mechanism. Attendance on trains would be
required on equipment not capable of being secured in accordance with
the proposed and existing requirements.
DATES: (1) Written comments must be received by November 10, 2014.
Comments received after that date will be considered to the extent
possible without incurring additional expenses or delays. (2) FRA
anticipates being able to resolve this rulemaking without a public
hearing. However, if prior to October 9, 2014, FRA receives a specific
request for a public hearing, a hearing will be scheduled and FRA will
publish a supplemental document in the Federal Register to inform
interested parties of the date, time, and location of such hearing.
ADDRESSES: Comments: Comments related to this proceeding may be
submitted by any of the following methods:
Web site: Comments should be filed at the Federal
eRulemaking Portal, https://www.regulations.gov. Follow the online
instructions for submitting comments.
Fax: 202-493-2251.
Mail: Docket Management Facility, U.S. Department of
Transportation, 1200 New Jersey Avenue SE., Room W12-140, Washington,
DC 20590.
Hand Delivery: Room W12-140 on the Ground level of the
West Building, 1200 New Jersey Avenue SE., Washington, DC, between 9
a.m. and 5 p.m. ET, Monday through Friday, except Federal holidays.
Instructions: All submissions must include the agency name and
docket number or Regulatory Identification Number (RIN) for this
rulemaking. Note that all comments received will be posted without
change to https://www.regulations.gov including any personal
information. Please see the Privacy Act heading in the ``Supplementary
Information'' section of this document for Privacy Act information
related to any submitted comments or materials.
Docket: For access to the docket to read background documents or
comments received, go to https://www.regulations.gov at any time or to
Room W12-140 on the Ground level of the West Building, 1200 New Jersey
Avenue SE., Washington, DC between 9 a.m. and 5 p.m. Monday through
Friday, except Federal Holidays.
FOR FURTHER INFORMATION CONTACT: Steven Zuiderveen, Railroad Safety
Specialist, Motive & Power Equipment Division, Office of Safety
Assurance and Compliance, Federal Railroad Administration, RRS-14, West
Building 3rd Floor, 1200 New Jersey Avenue SE., Washington, DC 20590
(telephone: 202-493-6337); Jason Schlosberg, Trial Attorney, Office of
Chief Counsel, RCC-10, Mail Stop 10, West Building 3rd Floor, Room W31-
207, 1200 New Jersey Avenue SE., Washington, DC 20590 (telephone: 202-
493-6032).
SUPPLEMENTARY INFORMATION:
Table of Contents for Supplementary Information
I. Executive Summary
II. Background
A. Lac-M[eacute]gantic Derailment
1. Facts
2. Response
B. Safety Concerns Arising Out of the Lac-M[eacute]gantic
Derailment and Other Train Incidents Involving Flammable Liquids and
Gases and Poison Inhalation Hazard Materials.
C. Current Securement Regulations and Related Guidance
[[Page 53357]]
D. Emergency Order 28 and Related Guidance
E. RSAC Overview
III. Section-by-Section Analysis
IV. Regulatory Impact and Notices
A. Executive Orders 12866 and 13563 and DOT Regulatory Policies
and Procedures
B. Regulatory Flexibility Act and Executive Order 13272
C. Paperwork Reduction Act
D. Federalism
E. International Trade Impact Assessment
F. Environmental Assessment
G. Unfunded Mandates Reform Act of 1995
H. Energy Impact
I. Privacy Act
I. Executive Summary
Purpose of the Proposed Regulatory Action
While FRA's existing securement regulations have been successful in
mitigating risks associated with the rolling of unattended equipment,
FRA recognizes that--particularly in light of certain accidents like
the one last year in Lac-M[eacute]gantic, Quebec, Canada--additional
requirements may be warranted when such equipment includes certain
hazardous materials that can contribute to high-consequence events. To
address these concerns, FRA issued Emergency Order 28, 78 FR 48218
(Aug. 7, 2013), engaged in proceedings with the Railroad Safety
Advisory Committee to draft recommended regulations, and is issuing
this responsive notice of proposed rulemaking (NPRM). FRA is proposing
this rulemaking pursuant to the authority granted to the Secretary of
Transportation in 49 U.S.C. 20102-20103, 20107, 20133, 20141, 20301-
20303, 20306, 21301-20302, 21304; 28 U.S.C. 2461, note; which the
Secretary has delegated to the Administrator of FRA pursuant to 49 CFR
1.89.
Summary of the Major Provisions of the Proposed Regulatory Action
In this proceeding, FRA proposes requirements to ensure that each
locomotive left unattended outside of a yard be equipped with an
operative exterior locking mechanism and that such locks be applied on
the controlling locomotive cab door when a train is transporting tank
cars loaded with certain hazardous materials. This proposed rule would
provide that such hazardous materials trains may only be left
unattended on a main track or siding if justified in a plan adopted by
the railroad, accompanied by an appropriate job briefing, and proper
securement is made and verified. This proposed rule would also require
additional verification of securement in the event that a non-railroad
emergency responder may have been in a position to have affected the
equipment.
Costs and Benefits of the Proposed Regulatory Action
In this rule, the benefits ($1,163,669 at a 7% discount, $1,579,240
at a 3% discount) outweigh the costs ($86,685 at a 7% discount, $99,909
at a 3% discount), with total net benefits over 20 years of $1,076,984
at a 7% discount (or $95,009 annualized) and $1,478,331 at a 3%
discount (or $96,538 annualized).
------------------------------------------------------------------------
Discounted value
-------------------------------
Discounted values Discount factor
-------------------------------
7% 3%
------------------------------------------------------------------------
Costs:
Attending Trains.................... $36,685 $49,909
Installing Locks.................... 50,000 50,000
Total Costs......................... 86,685 99,909
Benefits:
Reduced Vandalism................... 180,873 250,666
Reduced Recordkeeping............... 982,786 1,328,573
rrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrrr
Total Benefits.................. $1,163,669 $1,579,240
------------------------------------------------------------------------
------------------------------------------------------------------------
Discounted value
-------------------------------
Discounted values net benefits Discount factor
-------------------------------
7% 3%
------------------------------------------------------------------------
Total................................... $1,076,984 $1,479,331
Annualized.............................. 95,009 96,538
------------------------------------------------------------------------
II. Background
In 2001, FRA issued regulations governing the securement of
unattended equipment. 66 FR 4104 (Jan. 17, 2001). These regulations
have been effective in protecting against the risk of rolling
equipment. Over the last few years, there has been a significant
increase in the volume of rail traffic for certain types of
commodities, such as petroleum crude oil (crude oil) and ethanol, both
of which are highly flammable and often transported in large unit or
``key'' trains, as defined in the industry by the Association of
American Railroads (AAR). See AAR Circular No. OT-55-N (Aug. 5, 2013),
available at https://www.boe.aar.com/CPC-1258%20OT-55-N%208-5-13.pdf.
Since 2009, there have been a number of serious rail accidents
involving the transportation of large quantities of flammable liquids.
A number of these accidents involved trains transporting large
quantities of ethanol. However, since 2011, there has been significant
growth in the rail transport of flammable crude oil, and FRA has seen a
number of accident-related releases of crude oil in that time. One
significant accident involving tank cars loaded with crude oil was July
6, 2013, derailment in the town of Lac-M[eacute]gantic, Quebec, Canada.
After reviewing the facts related to this derailment, FRA concluded
that additional action was necessary to eliminate an immediate hazard
of death, personal injury, or significant harm to the environment,
particularly in instances where certain hazardous materials are
involved. Thus about a year ago FRA issued Emergency Order 28 requiring
railroads to implement additional procedures to ensure the proper
securement of equipment containing certain types and amounts of
hazardous materials when left unattended. Subsequent to the
[[Page 53358]]
issuance of Emergency Order 28, FRA also enlisted the assistance of the
Railroad Safety Advisory Committee (RSAC) to develop recommendations
regarding the attendance and securement of railroad equipment
transporting certain hazardous materials when left unattended in light
of the requirements contained in Emergency Order 28.
A. Lac-M[eacute]gantic Derailment
1. Facts
On July 6, 2013, in the town of Lac-M[eacute]gantic, Quebec,
Canada, an accident involving tank cars loaded with petroleum crude oil
occurred on track owned by Montreal, Maine & Atlantic Railway
Corporation (MMA), a company incorporated in the United States.
According to a report issued by the Transportation Safety Board
(TSB) of Canada, the incident is summarized as follows.\1\ On July 5,
2013, a locomotive engineer was operating freight train MMA-002 on the
Sherbrooke Subdivision from Farnham (milepost 125.60) and at around
10:50 p.m. stopped near Nantes, Quebec (milepost 7.40) on its way to
its destination, Brownville Junction, Maine. The train was
approximately 4,700 feet long, weighed over 10,000 tons, and included a
locomotive consist of 5 head-end locomotives and one VB car, 1 box car
(buffer car), and 72 tank cars loaded with approximately 7.7 million
liters of petroleum crude oil (UN 1267). The locomotive engineer parked
train MMA-002 on the main line, on a descending grade of 1.2%,
attempted to secure the train, and departed, leaving the train
unattended. At around 11:40 p.m., a local resident reported a fire on
the train. The local fire department was called and responded with
another MMA employee. At approximately midnight, the controlling
locomotive was shut down and the fire extinguished. After the fire was
extinguished, the fire department and the MMA employee left the site.
---------------------------------------------------------------------------
\1\ Railway Investigative Report R13D0054, TSB, July 6, 2013,
available at https://www.tsb.gc.ca/eng/rapports-reports/rail/2013/R13D0054/R13D0054.pdf.
---------------------------------------------------------------------------
At approximately 1:00 a.m. the next day (the early morning of July
6th), the train began rolling and picking up speed down the descending
grade toward the town of Lac-M[eacute]gantic, Quebec, located 7.2 miles
away and approximately 30 miles from the United States-Canada border.
At about 1:15 a.m., near the center of town, the train derailed. The
locomotive consist, which separated from the train, did not derail and
traveled an additional \1/2\ mile before stopping.
The derailment caused a release of 6 million liters of petroleum
crude oil, resulting in a large fire with multiple explosions. At this
time, it is estimated that there were 47 fatalities.\2\ There was also
extensive damage to the town, and approximately 2,000 people were
evacuated from the surrounding area.
---------------------------------------------------------------------------
\2\ See id.; see also Statistical Summary Railway Occurrences
2013, TSB, pp. 2, 5, available at https://www.tsb.gc.ca/eng/stats/rail/2013/ssro-2013.pdf.
---------------------------------------------------------------------------
2. Response
In response to this accident, Transport Canada--the Canadian
government department responsible for regulating transportation safety
in Canada--issued an emergency railroad directive on July 23, 2013.\3\
While Transport Canada explained in the emergency directive that the
cause of the accident in Lac-M[eacute]gantic remained unknown, the
emergency directive stated that, ``in light of the catastrophic results
of the Lac-M[eacute]gantic accident and in the interest of ensuring the
continued safety and security of railway transportation, there is an
immediate need to clarify the regime respecting unattended locomotives
on main track and sidings and the transportation of dangerous goods in
tank cars using a one person crew to address any threat to the safety
and security of railway operations.'' As such, Transport Canada
exercised its statutory emergency directive authority to order railroad
companies in Canada to comply with certain requirements related to
unauthorized entry into locomotive cabs, directional controls on
locomotives, the application of hand brakes to cars left unattended for
more than one hour, setting of the automatic brake and independent
brake on any locomotive attached to cars that is left unattended for
one hour or less, attendance related to locomotives attached to loaded
tank cars transporting dangerous goods on main track, and the number of
crew members assigned to a locomotive attached to loaded tank cars
transporting dangerous goods on a main track or siding.
---------------------------------------------------------------------------
\3\ See Emergency Directive Pursuant to Section 33 of the
Railway Safety Act, Safety and Security of Locomotives in Canada,
July 23, 2013, available at https://news.gc.ca/web/article-en.do?nid=829609; see also Rail Safety Advisor Letter--09/13,
Securement of Equipment and Trains Left Unattended, Transport Canada
(July 18, 2013), available at https://www.tsb.gc.ca/eng/medias-media/sur-safe/letter/rail/2013/r13d0054/r13d0054-617-09-13.asp.
---------------------------------------------------------------------------
Also on July 23, 2013, Transport Canada issued an accompanying
order pursuant to paragraph 19(a)(1) of the Canadian Railway Safety Act
directing railroad companies in Canada to formulate or revise certain
railroad operating rules, respecting the safety and security of
unattended locomotives, uncontrolled movements, and crew size
requirements.\4\ The order provides that rules should be based on an
assessment of safety and security risks, and shall at a minimum ensure
that the cab(s) of unattended controlling locomotives are secure
against unauthorized entry; ensure that the reverse levers (commonly
referred to as a ``reversers'') of unattended locomotives are removed
and secured; prevent uncontrolled movements of railway equipment by
addressing the application of hand brakes; ensure the security of
stationary railway equipment transporting dangerous goods; and provide
for minimum operating crew requirements considering technology, length
of train, speeds, classification of dangerous goods being transported,
and other risk factors.
---------------------------------------------------------------------------
\4\ Railroads operating within Canada were at the time of the
Lac-M[eacute]gantic derailment, and are currently, required to
comply with the Canadian Rail Operating Rules (CROR) that have been
approved by Transport Canada.
---------------------------------------------------------------------------
The Railway Association of Canada submitted proposed operating
rules to Transport Canada on November 20, 2013. Transport Canada
accepted the proposed rules submitted on December 26, 2013, making the
operating rules applicable to all railway companies operating in
Canada. See TC O 0-167. As a result, railroads operating in Canada are
now required to comply with Canadian Rail Operating Rules (CROR) CROR
112, as amended.
CROR 62 pertains to ``Unattended engines.'' The term ``unattended''
is now defined in the CROR as ``when an employee is not in close enough
proximity to take effective action.'' The new Canadian requirements,
applicable to each engine left unattended outside of an attended yard
or terminal, requires cab securement to prevent unauthorized entry and
removal of the reverser from the engine when it does not have a high
idle feature and not in sub-zero temperatures. See CROR 62 (TC O 0-
167). Transport Canada also approved expansive revisions to CROR 112,
which now provides minimum requirements, acceptable methods, and
factors to consider for securing equipment while switching en route or
left unattended. See CROR 112 (TC O 0-167).
In direct response to the Lac-M[eacute]gantic derailment, DOT began
taking actions consistent with Transport Canada to ensure the safe
transportation of products by rail in the United States, with a
particular focus on certain hazardous materials that present an
[[Page 53359]]
immediate danger for communities and the environment in the event of a
train accident. In Emergency Order 28, FRA sought to address the
immediate dangers that arise from unattended equipment that is left
unsecured on mainline tracks. Emergency Order 28 remains in effect
today, as amended by FRA's August 27, 2013, letter approving with
conditions a joint petition for relief from the AAR and the American
Short Line and Regional Railroad Association (ASLRRA). Railroads
currently are required to comply with Emergency Order 28, as amended,
in addition to 49 CFR 232.103(n). Emergency Order 28, as amended,
contains six securement-related requirements governing when, where, and
how certain hazardous materials tank cars may be left unattended,
including certain communication requirements:
(1) A railroad must not leave equipment unattended on a mainline
outside of a yard or terminal when the equipment includes a minimum
number of loaded tank cars containing certain types of hazardous
materials, referred to as ``Appendix A Materials'' --5 or more tank
cars containing materials poisonous by inhalation (PIH), including
anhydrous ammonia and ammonia solutions and/or 20 rail car loads of
flammable gases or liquids (e.g., crude oil and ethanol)--until the
railroad develops, adopts, and complies with a plan that identifies
specific locations and circumstances when such equipment may be left
unattended.\5\
---------------------------------------------------------------------------
\5\ AAR has voluntarily applied EO 28 to trains that have a
single PIH tank car.
---------------------------------------------------------------------------
(2) A railroad must develop a process for securing unattended
equipment containing Appendix A Materials that includes: (a) locking
the controlling locomotive cab or removing and securing the reverser
and (b) communication of pertinent securement information to the
dispatcher for recordation.
(3) Each railroad must review and verify, and adjust, as
necessary, existing procedures and processes related to the number
of hand brakes to be set on all unattended trains and equipment.
(4) Each railroad must require a job briefing addressing
securement for any job that will impact or require the securement of
any equipment in the course in the course of the work being
performed.
(5) Each railroad must ensure that a qualified railroad employee
inspects all equipment that any emergency responder has been on,
under, or between for proper securement before the train or vehicle
is left unattended.
(6) Each railroad must provide notice to all employees affected
by Emergency Order 28.
See 78 FR 48224 (Aug. 7, 2013). Following a request from AAR and
ASLRRA, FRA granted partial relief from Emergency Order 28's dispatcher
communication requirement in certain limited situations. FRA's relief
letter provides that a railroad employee may leave equipment unattended
on a mainline or siding without contacting the train dispatcher when
the employee is actively engaged in switching duties as long as the
employee ensures that there is an emergency application of the air
brakes, hand brakes are set in accordance with 49 CFR 232.103(n), and
the employee has demonstrated knowledge of FRA and railroad securement
requirements. See Letter from Robert C. Lauby, Acting Associate
Administrator for Railroad Safety/Chief Safety Officer, Federal
Railroad Administration, to Michael J. Rush, Associate General Counsel,
AAR, and Keith T. Borman, Vice President and General Counsel, ASLRRA,
(Aug. 27, 2013), available at https://rsac.fra.dot.gov/meetings/20130829.php.
Additionally, FRA and the Pipeline and Hazardous Materials Safety
Administration (PHMSA) jointly issued a Safety Advisory to railroads
and commodity shippers detailing eight recommended actions the industry
should take to better ensure the safe transport of hazardous materials.
See Federal Railroad Administration Safety Advisory 2013-06, Lac-
M[eacute]gantic Railroad Accident and DOT Safety Recommendations, 78 FR
48224 (Aug. 7, 2013), available at https://www.fra.dot.gov/eLib/details/L04720. These recommendations include: Reviewing the details and
lessons learned from the Lac M[eacute]gantic accident; reviewing crew
staffing levels; removing and securing the train's ``reverser'' when
unattended; review of all railroad operating procedures, testing and
operating rules related to securing a train; reviewing Transport
Canada's directives to secure and safely operate a train; and
conducting a system-wide assessment of security risks when a train is
unattended and identify mitigation efforts for those risks.
Additionally, the Safety Advisory recommends testing and sampling of
crude oil for proper classification for shipment, as well as a review
of all shippers' safety and security plans. FRA also convened an
emergency meeting of FRA's RSAC to begin the deliberative process with
FRA's stakeholders, including railroad management, railroad labor,
shippers, car owners, and others, as the agency considers requirements
in Emergency Order 28 and recommendations in the Safety Advisory that
should be made a part of its regulations.\6\
---------------------------------------------------------------------------
\6\ The RSAC was given three tasks. In addition to developing
securement recommendations, it was also tasked with developing
recommendations addressing issues relating to train crew size and
hazardous materials such as identification and classification of
hazardous materials, operational controls, and handling of certain
hazardous materials shipments. The RSAC hazardous materials working
group was able to reach consensus on amending the definitions of
``residue'' and ``key train'' and clarifying the jurisdiction
concerning loading, unloading, and storage of hazardous materials
before and during transportation. These recommendations have been
provided to PHMSA, which has regulatory authority over hazardous
materials shipments.
---------------------------------------------------------------------------
On August 19, 2014, the TSB released its Railway Investigation
Report R13D0054, citing 18 causal and contributing factors, plus an
additional 16 findings as to risk, concerning the accident at Lac-
M[eacute]gantic. FRA believes that DOT has taken, or is already taking,
action concerning each of those factors. The TSB notably included in
its list of factors the MMA's weak safety culture and ineffective
oversight on train securement. The report also identified factors
relating directly to train securement such as insufficient hand brakes
and improper hand brake test applications. This instant rulemaking
proposes requirements that would enhance safety culture and oversight
and that would address train securement. For instance, as further
discussed below, FRA proposes to mandate by regulation the
implementation of operating rules and practices requiring that
securement be part of all relevant job briefings. FRA also proposes
rules requiring verification with a qualified person that equipment is
adequately and effectively secured in accordance with the regulations
before being left unattended. These requirements aim to increase the
safety dialog between railroad employees and to provide enhanced
oversight within the organization. In doing so, these communications
should better ensure that crew members apply the proper number of hand
brakes, and more correctly apply hand brake tests, on unattended
equipment. Also notable was the report's findings as to risk that
states: ``If trains are left unattended in easily accessible locations,
with locomotive cab doors unlocked and the reverser handle available in
the cab, the risk of unauthorized access, vandalism, and tampering with
locomotive controls is increased.'' This proposed rule directly
addresses this concern with requirements relating to the installation
and use of locomotive door locks and reverser removal.
[[Page 53360]]
B. Safety Concerns Arising Out of the Lac-M[eacute]gantic Derailment
and Other Train Incidents Involving Flammable Liquids and Gases and
Poison Inhalation Hazard Materials
The vast majority of hazardous materials shipped by rail each year
arrive at their destinations safely and without incident. Indeed, in
calendar year 2013, there were only 18 accidents in which a hazardous
material was released (involving a total of 78 cars) out of
approximately 1.6 million shipments of hazardous material transported
in rail tank cars in the United States. However, the Lac-
M[eacute]gantic incident demonstrates the substantial potential for
danger that exists when an unattended train rolls away and derails
resulting in the sudden release of hazardous materials into the
environment. Although the Lac-M[eacute]gantic incident occurred in
Canada, the freight railroad operating environment in Canada is similar
to that in the United States, and a number of railroads operate in both
countries.\7\ Freight railroads in the United States also transport a
substantial amount and variety of hazardous materials, including
materials poisonous by inhalation (PIH materials), also known as
materials toxic by inhalation (TIH), and explosive materials. Moreover,
an increasing proportion of the hazardous materials transported by rail
is classified as flammable.\8\
---------------------------------------------------------------------------
\7\ As an example, MMA formerly operated in both the United
States and Canada, with approximately 510 miles of track in Maine,
Vermont, and Quebec, and the tank cars transporting the crude oil
that derailed in Lac-M[eacute]gantic originated in the Williston
Basin of North Dakota. A discussion concerning the applicable
Canadian securement requirements can be found above in the section
titled ``2. Response,'' which addresses the actions taken by the
United States and Canada in direct response to the Lac-
M[eacute]gantic incident.
\8\ PHMSA prescribes a comprehensive regulatory safety system
that categorizes hazardous materials into nine hazard classes based
on the type of hazards presented by the materials. See 49 CFR parts
172 and 173. Under PHMSA's regulations, crude oil, in most forms,
meets the definition of a ``Class 3'' hazardous material, which
signifies that it is a flammable liquid. Ethanol, discussed below,
also is a Class 3 hazardous material. PIH materials, referenced
above, include ``Class 2 and Division 2.3'' gases and ``Class 6, and
Division 6.1'' poisons other than gases. Chlorine gas and anhydrous
ammonia are two examples of PIH materials (Division 2.3) that are
commonly transported by rail.
---------------------------------------------------------------------------
The MMA train in the Lac-M[eacute]gantic incident was transporting
72 carloads of crude oil with five locomotives and a loaded box car. A
similar type of train consist is commonly found on rail lines in the
United States, because crude oil is often transported in solid blocks
or by a unit train consisting entirely of tank cars containing crude
oil. Crude oil is often classified by an offeror as a flammable liquid;
per PHMSA's Hazardous Materials Regulations (HMRs), however, its
packing group can be I, II, or III depending on the blend of
constituent crude oils. According to the AAR, crude oil traffic
increased 68-fold in the United States between 2005 and 2013. Much of
this growth has occurred because of developments in North Dakota, as
the Bakken formation in the Williston Basin has become a major source
for oil production in the United States. Texas also has contributed to
the growth of crude oil shipments by rail. As a result, carloads of
crude oil increased from approximately 81,452 in 2011 to approximately
485,384 in 2013. The Bakken crude oil from North Dakota is primarily
shipped via rail to refineries located near the U.S. Gulf Coast--
particularly in Texas and Louisiana--or also to pipeline connections,
most notably to connections located in Oklahoma. Crude oil is also
shipped via rail to refineries on the East Coast and West Coast, and to
a lesser extent, refineries in other regions of the U.S.\9\
---------------------------------------------------------------------------
\9\ See AAR's May 2013 paper ``Moving Crude Oil by Rail'',
available online at: https://www.aar.org/safety/Documents/Assets/
TransportationofCrudeOilby
Rail.pdf.
---------------------------------------------------------------------------
All indications from the U.S. Department of Energy's U.S. Energy
Information Administration (EIA) are that rail capacity for Bakken
crude oil from the Williston Basin will continue to expand to meet
production.\10\ Rail shipments from the North Dakota region are
forecast to increase over the next two years (as are pipeline
shipments). Much of the near-term growth in rail originations is a
function of how quickly rail car manufacturers can meet the demand by
producing new tank cars, primarily for transporting Bakken crude oil.
The rise in rail originations in crude oil is subject to changes in the
number of tank cars available, price of crude oil, overall production
of crude oil in that region; and if, or how quickly, additional
pipeline capacity from that region comes online. However, for the
foreseeable future, all indications are for continued growth of rail
originations of crude in that region as new tank car fleets come online
to meet demand.
---------------------------------------------------------------------------
\10\ See EIA reports ``Bakken crude oil price differential to
WTI narrows over last 14 months,'' available online at: https://www.eia.gov/todayinenergy/detail.cfm?id=10431; and ``Rail delivery
of U.S. oil and petroleum products continues to increase, but pace
slows,'' available online at: https://www.eia.gov/todayinenergy/detail.cfm?id=12031.
---------------------------------------------------------------------------
As demonstrated by the Lac-M[eacute]gantic derailment, in a high-
consequence incident, crude oil is problematic when released because it
is flammable. This risk is compounded because it is commonly shipped in
large unit trains. Subsequent to the Lac-M[eacute]gantic derailment,
the United States has seen at least three major rail-related incidents
involving crude oil unit trains that evidence the dangerous results
that can occur when crude oil is not transported safely. FRA recognizes
that none of these three derailments resulted from a roll-away
situation that would have been addressed by this rule.
On April 30, 2014, there was derailment near downtown Lynchburg,
Virginia, of an eastbound CSX Transportation, Inc. (CSX) unit train
consisting of 105 tank cars loaded with crude oil. Seventeen of the
train's cars derailed. One of the tank cars was breached, leading to a
crude oil fire. Emergency responders were forced to evacuate
approximately 350 individuals from the immediate area. Additionally,
three of the derailed tank cars came to rest in the adjacent James
River, causing up to 30,000 gallons of crude oil to be spilled into the
river. The National Transportation Safety Board (NTSB) and DOT are both
investigating this accident to determine the cause.
On December 30, 2013, a westbound grain train derailed 13 cars near
Casselton, North Dakota, fouling main track 2.\11\ Simultaneously, an
eastbound crude oil unit train was operating on main track 2. The crude
oil unit train reduced its speed and collided with a derailed car that
was fouling, resulting in the derailment of the head-end locomotives
and the first 21 cars of the crude oil unit train. Eighteen of the 21
derailed tank cars ruptured, releasing an estimated 400,000 gallons of
crude. The ruptured tank cars ignited causing an explosion. There were
no reported injuries by either train crew, nor were there any injuries
to the public; however, about 1,400 people were evacuated. Damages from
the derailment are estimated at $6.1 million.\12\
---------------------------------------------------------------------------
\11\ This derailment currently is being investigated by the
National Transportation Safety Board (NTSB), and information
regarding this incident can be found at the NTSB Web site. See
https://www.ntsb.gov/doclib/reports/2014/
CasseltonNDPreliminary.pdf.
\12\ See id.
---------------------------------------------------------------------------
Also, on November 8, 2013, a 90-car crude oil train derailed in a
rural area near Aliceville, Alabama. The crude oil shipment had
originated in North Dakota and was bound for Walnut Hill, Florida, to
be transported by a regional pipeline to a refinery in Saraland,
Alabama. More than 20 cars derailed, and at least 11 cars ignited,
resulting in an explosion and fire. Although there were no reported
injuries, an undetermined amount of crude oil escaped from derailed
cars and fouled a wetlands area near the derailment site.
[[Page 53361]]
The dangers related to crude oil trains are not necessarily unique.
They also exist with other hazardous materials such as ethanol, which
is another flammable liquid that is commonly transported in large
quantities by rail. In 2012, more carloads of ethanol were transported
via rail than any other hazardous material. The railroads experienced
an increase in ethanol traffic of 442 percent between 2005 and 2010.
Although in 2013 the number of carloads dropped by 10 percent from 2010
levels, there were still approximately 297,000 carloads transported by
rail. Since 2009, there have been at least four major mainline
derailments resulting in the breach of tank cars containing ethanol.
While FRA recognizes that none of these four derailments resulted from
a roll-away situation, they are instructive on the destructive
potential of a derailment involving tank cars containing flammable
products:
On August 5, 2012, in Plevna, Montana, a BNSF Railway Co.
train derailed 18 cars while en route from Baker, Montana. Seventeen of
the 18 cars were tank cars loaded with denatured alcohol, a form of
ethanol. Five of the cars caught on fire resulting in explosions, the
burning of surrounding property not within the railroad's right-of-way,
and the evacuation of the immediate area.
On July 11, 2012, in Columbus, OH, a Norfolk Southern
Railway Co. train derailed while operating on main track. Thirteen tank
cars containing ethanol derailed resulting in a fire and the evacuation
of 100 people within a one-mile radius of the derailment.
On February 6, 2011, in Arcadia, Ohio, a Norfolk Southern
Railway Co. train operating on single main track derailed 33 tank cars
loaded with ethanol. The derailment caused a major fire and forced the
evacuation of a one-mile radius around the derailment.
On June 19, 2009, in Cherry Valley, Illinois, a Canadian
National Railway train derailed 19 tank cars loaded with ethanol.
Thirteen of the 19 derailed cars caught fire, and there were reports of
explosions. One person died, and there were 9 reported injuries related
to the fire. Additionally, approximately 600 residences were evacuated
within a \1/2\-mile radius of the derailment.
While these accidents were serious, their results had potential for
more higher-consequence outcomes. The higher-consequence releases
created the potential for additional deaths, injuries, property damage,
and environmental damage.
There are other hazardous materials that have similar potential for
higher-consequence danger. For example, accidents involving trains
transporting other hazardous materials, including PIH materials such as
chlorine and anhydrous ammonia, can also result in serious consequences
as evidenced by the following accidents:
On January 6, 2005, in Graniteville, South Carolina, a
Norfolk Southern Railway Co. train collided with another Norfolk
Southern Railway Co. train that was parked on a customer side track,
derailing both locomotives and 16 cars of the moving train. The
accident was caused by a misaligned switch. Three tank cars containing
chlorine derailed, one of which was punctured. The resulting chlorine
exposure caused 9 deaths, approximately 554 people were taken to local
hospitals, and an additional 5,400 people within a one-mile radius of
the site were evacuated by law enforcement personnel. FRA's analysis of
the total cost of the accident was $126 million, including fatalities,
injuries, evacuation costs, property damage, environmental cleanup, and
track out of service.
On June 28, 2004, near Macdona, TX, a Union Pacific
Railroad Co. train passed a stop signal and collided with a BNSF
Railway Co. train. A chlorine car was punctured, and the chlorine gas
that was released killed three and injured 32.
On January 18, 2002, a Canadian Pacific Railway train
containing 15 tank cars of anhydrous ammonia derailed half a mile from
the city limits of Minot, North Dakota due to a breaking of the rail at
a joint. Five of these tank cars ruptured, which resulted in an ammonia
vapor that spread 5 miles downwind over an area where 11,600 people
lived. The accident caused one death, 11 serious injuries, and 322
minor injuries. Environmental cleanup costs reported to the NTSB were
$8 million.
On July 18, 2001, 11 of 60 cars in a CSX Transportation,
Inc. freight train derailed while passing through the Howard Street
Tunnel in downtown Baltimore, Maryland. The train included 8 tank cars
loaded with hazardous material; 4 of these were among the cars that
derailed. A leak in a tank car containing tripropylene resulted in a
chemical fire. A break in a water main above the tunnel flooded both
the tunnel and the streets above it with millions of gallons of water.
While train accidents involving hazardous materials are caused by
variety of factors, nearly one-half of all accidents are related to
railroad human factors or equipment defects. FRA's data shows that
since 2009, human factors have been the most common cause of reportable
train accidents. Based on FRA's accident reporting data for the period
from 2010 through May 2014, approximately 34 percent of reported train
accidents/incidents, as defined by 49 CFR 225.5, were human factor-
caused.\13\ With regard to the securement of unattended equipment,
specifically, FRA accident/incident data indicates that approximately
8.7 percent of reported human factor-caused train accidents/incidents
from calendar year 2010 until May 2014 were the result of improper
securement, which means that improper securement is the cause of
approximately 2.9 percent of all reported accidents/incidents.\14\ The
types of securement errors that typically lead to accidents/incidents
include failing to apply any hand brakes at all, failing to apply a
sufficient number of hand brakes, and failing to correctly apply hand
brakes. Emergency Order 28 and this proposed rulemaking intend to
address some of the human factors failures that may cause unattended
equipment to be improperly secured to protect against a derailment
situation similar to that which occurred in Lac-M[eacute]gantic.
---------------------------------------------------------------------------
\13\ FRA estimates that there were a total of approximately
8,976 accidents/incidents reported during that time period.
Approximately 3,030 of those accidents/incidents were caused by
human factors, and 906 involved equipment that was placarded as
containing hazardous materials.
\14\ There were a total of approximately 264 reported accidents/
incidents that were caused by securement errors. Of those 264
accidents/incidents, approximately 98 involved equipment that was
placarded as containing hazardous materials.
---------------------------------------------------------------------------
C. Current Securement Regulations and Related Guidance
As previously noted, FRA has existing regulations designed to
ensure that trains and vehicles are properly secured before being left
unattended. See 49 CFR 232.103(n). In FRA's view, if existing
regulations are followed, the risk of movement of unattended equipment
is substantially reduced. The current regulations define ``unattended
equipment'' as ``equipment left standing and unmanned in such a manner
that the brake system of the equipment cannot be readily controlled by
a qualified person.'' Id. Section 232.103(n) generally addresses the
securement of unattended equipment by stating that a train's air brakes
must not be depended on to hold equipment standing unattended on a
grade. More specifically, Sec. 232.103(n) also requires that the
railroad apply a sufficient number of hand brakes to hold the equipment
with the air brakes released and that the brake pipe pressure be
reduced to zero with the angle cock opened on one end of a cut of cars
when
[[Page 53362]]
not connected to a locomotive or other compressed air source. The
regulations also require railroads to develop a process or procedure
for verifying that the hand brakes applied are sufficient to hold the
equipment with the air brakes released. When dealing with locomotives
and locomotive consists, Sec. 232.103(n)(3) establishes specific
additional requirements:
All hand brakes must be fully applied on all locomotives
in the lead consist of an unattended train.
All hand brakes must be fully applied on all locomotives
in an unattended locomotive consist outside of yard limits.
The minimum requirement for an unattended locomotive
consist within yard limits is that the hand brake must be fully applied
on the controlling locomotive.
Railroads must develop, adopt, and comply with procedures
for securing any unattended locomotive that is not equipped with an
operative hand brake.
Additionally, FRA requires each railroad to adopt and comply with
instructions addressing each unattended locomotive's position of the
throttle, generator field switch, isolation switch, and automatic brake
valve and the status of its reverser and independent brakes. See 49 CFR
232.103(n)(4).
FRA has also issued guidance documents interpreting these
regulations. For instance, on March 24, 2010, FRA issued Technical
Bulletin MP&E 2010-01, Enforcement Guidance Regarding Securement of
Equipment with Title 49 Code of Federal Regulations Section 232.103(n)
(TB 10-01), available at https://www.fra.dot.gov/eLib/details/L02394.
While FRA continues to believe that the securement requirements of
Sec. 232.103 are not met where there is a complete failure to apply
even a single hand brake on unattended equipment, FRA also recognizes
that there are times when it is necessary to have unsecured equipment,
such as during switching activities when assembling and disassembling
trains within classification yards. Therefore, TB 10-01 provides
guidance regarding alternative forms of securement in such instances.
As an example, TB 10-01 notes that FRA will allow a train crew cutting
away from a cut of cars, to initiate an emergency brake application on
the cut of cars, and then close the angle cock if the crew is taking a
locomotive consist directly to the opposite end of the cut of cars to
in order to couple the locomotive consist to the cars or to open the
angle cock at the other end and leave the angle cock open and vented to
the atmosphere, as required under 49 CFR 232.103(n)(2). Additionally,
TB 10-01 makes clear that FRA will allow the use of skates and
retarders in hump classification yards, classification yards with bowl
tracks, or flat switching yards if the retarders and skates are used
within their design criteria and as intended. While this proposal does
not contain any specific proposed regulatory text referencing the
content of TB 10-01, FRA is considering codifying TB 10-01 by amending
the rule at the final rule stage of this proceeding. This would
constitute a clarifying amendment to ensure that FRA's long-standing
interpretation and application of the existing regulation is contained
directly in the regulation. FRA seeks comments on clarifying the rule
to address the provisions of TB 10-01 in the final rule.
Despite the demonstrated effectiveness of FRA's current securement
regulations, FRA recognizes that due to increased shipments of
hazardous materials such as crude oil and ethanol, combined with the
potential for higher-consequences related to any accident that might
occur due to improper securement, particularly on mainline track and
mainline sidings outside of a yard or terminal, proper securement has
become a serious and immediate safety concern. Therefore, FRA
established additional securement measures in Emergency Order 28 in an
effort to ensure the continued protection of the health and safety of
railroad employees, the general public, and the environment. In this
NPRM, FRA proposes establishing permanent rules that will strengthen
the current regulations and ensure public safety by adopting the
necessary and effective securement measures that FRA included in
Emergency Order 28 as part of its immediate response to the Lac-
M[eacute]gantic derailment.
Also notable is that over the past year, FRA and PHMSA have
undertaken nearly two dozen actions to enhance the safe transport of
crude oil. This comprehensive approach includes near- and long-term
steps such as the following: Launching ``Operation Classification'' in
the Bakken region to verify that crude oil is properly classified;
issuing safety advisories, alerts, emergency orders and regulatory
updates; conducting special inspections; aggressively moving forward
with a rulemaking to enhance tank car standards; and reaching agreement
with railroad companies on a series of immediate voluntary actions
including reducing speeds, increasing inspections, using new brake
technology and investing in first responder training. Most of those
actions have been well outside the scope of securement. However, FRA
references these actions here to help place this rulemaking in the
broader context of DOT's wide-ranging response to the safety issues
created by these trains. For a summary of these actions, see Federal
Railroad Administration's Action Plan for Hazardous Materials Safety,
Federal Railroad Administration (May 20, 2014) available at https://www.fra.dot.gov/eLib/details/L04721.
D. Emergency Order 28 and Related Guidance
On August 2, 2013, FRA issued Emergency Order 28 establishing
additional requirements on the treatment of securement of unattended
equipment. On the same date, FRA issued a related Safety Advisory and
announced an emergency RSAC meeting. See Federal Railroad
Administration Safety Advisory 2013-06, Lac-M[eacute]gantic Railroad
Accident and DOT Safety Recommendations, 78 FR 48224 (Aug. 7, 2013),
available at https://www.fra.dot.gov/eLib/details/L04720. FRA also
subsequently issued guidance related to Emergency Order 28 and granted
partial relief from Emergency Order 28 to the AAR and ASLRRA. See
Guidance on Emergency Order 28 (Aug. 21, 2013), available at https://rsac.fra.dot.gov/meetings/20130829.php; Letter from Robert C. Lauby,
Acting Associate Administrator for Railroad Safety/Chief Safety
Officer, FRA, to Michael J. Rush, Associate General Counsel, AAR, and
Keith T. Borman, Vice President and General Counsel, American Short
Line and Regional Railroad Association, (Aug. 27, 2013), available at
https://rsac.fra.dot.gov/meetings/20130829.php.
E. RSAC Overview
In March 1996, FRA established the RSAC, which provides a forum for
collaborative rulemaking and program development. RSAC includes
representatives from all of the agency's major stakeholder groups,
including railroads, labor organizations, suppliers and manufacturers,
and other interested parties. A list of RSAC members follows:
American Association of Private Railroad Car Owners
(AARPCO);
American Association of State Highway & Transportation
Officials (AASHTO);
American Chemistry Council (ACC);
American Petroleum Institute (API);
American Public Transportation Association (APTA);
[[Page 53363]]
American Short Line and Regional Railroad Association
(ASLRRA);
American Train Dispatchers Association (ATDA);
AAR;
Association of State Rail Safety Managers (ASRSM);
Association of Tourist Railroads and Railway Museums
(ATRRM);
Brotherhood of Locomotive Engineers and Trainmen (BLET);
Brotherhood of Maintenance of Way Employes Division
(BMWED);
Brotherhood of Railroad Signalmen (BRS);
Chlorine Institute;
Federal Transit Administration (FTA);*
Fertilizer Institute;
Institute of Makers of Explosives;
International Association of Machinists and Aerospace
Workers (IAM);
International Brotherhood of Electrical Workers (IBEW);
Labor Council for Latin American Advancement (LCLAA);*
League of Railway Industry Women;*
National Association of Railroad Passengers (NARP);
National Association of Railway Business Women;*
National Conference of Firemen & Oilers;
National Railroad Construction and Maintenance Association
(NRC);
National Railroad Passenger Corporation (Amtrak);
National Transportation Safety Board (NTSB);*
Railway Passenger Car Alliance (RPCA)
Railway Supply Institute (RSI);
Safe Travel America (STA);
Secretaria de Comunicaciones y Transporte;*
SMART Transportation Division (SMART TD);
Transport Canada;*
Transport Workers Union of America (TWU);
Transportation Communications International Union/
Brotherhood of Railway Carmen (TCIU/BRC);
Transportation Security Administration (TSA).
* Indicates associate, non-voting membership.
When appropriate, FRA assigns a task to RSAC, and after
consideration and debate, RSAC may accept or reject the task. If
accepted, RSAC establishes a working group that possesses the
appropriate expertise and representation of interests to develop
recommendations to FRA for action on the task. These recommendations
are developed by consensus. The working group may establish one or more
task forces or other subgroups to develop facts and options on a
particular aspect of a given task. The task force, or other subgroup,
reports to the working group. If a working group comes to consensus on
recommendations for action, the package is presented to RSAC for a
vote. If the proposal is accepted by a simple majority of RSAC, the
proposal is formally recommended to FRA. FRA then determines what
action to take on the recommendation. Because FRA staff play an active
role at the working group level in discussing the issues and options
and in drafting the language of the consensus proposal, and because the
RSAC recommendation constitutes the consensus of some of the industry's
leading experts on a given subject, FRA is often favorably inclined
toward the RSAC recommendation. However, FRA is in no way bound to
follow the recommendation and the agency exercises its independent
judgment on whether the recommended rule achieves the agency's
regulatory goals, is soundly supported, and is in accordance with
applicable policy and legal requirements. Often, FRA varies in some
respects from the RSAC recommendation in developing the actual
regulatory proposal or final rule. Any such variations would be noted
and explained in the rulemaking document issued by FRA. If the working
group or RSAC is unable to reach consensus on recommendations for
action, FRA resolves the issue(s) through traditional rulemaking
proceedings or other action.
The RSAC convened an emergency session on August 29, 2013, in
response to the accident at Lac-M[eacute]gantic, to brief members on
the preliminary findings of the accident, to discuss the safety issues
related to the accident, and to discuss Emergency Order 28. At that
meeting, the RSAC accepted Task No. 13-03 to refer to the Securement
Working Group (SWG) the responsibility of ensuring that ``appropriate
processes and procedures are in place to ensure that any unattended
trains and vehicles on mainline track or mainline sidings outside of a
yard or terminal are properly secured against unintended movement, and
as appropriate, such securement is properly confirmed and verified.''
In doing so, the SWG was tasked with reviewing: the standards for the
securement of unattended equipment under 49 CFR 232.103(n) and its
concomitant regulatory guidance published in TB 10-01; the requirements
of Emergency Order 28; and the recommendations contained in Federal
Railroad Administration Safety Advisory 2013-06--Lac-M[eacute]gantic
Railroad Accident Discussion and DOT Safety Recommendations. The SWG
was also tasked with identifying any other issues relevant to FRA's
regulatory treatment of securement of equipment to prevent unintended
movement. While the RSAC also tasked the SWG with reviewing operational
testing, the SWG concluded that no changes were necessary to the
regulations relating to operational testing.
In addition to FRA, the following organizations contributed members
to the SWG:
AAR, including members from BNSF Railway Company (BNSF),
Canadian National Railway (CN), Canadian Pacific Railway (CP), CSX
Transportation, Inc. (CSX), Genesee & Wyoming Inc. (GNWR), Kansas City
Southern Railway (KCS), Long Island Rail Road (LIRR), Metro-North
Railroad (MNCW), Northeast Illinois Regional Commuter Railroad
Corporation (METRA), Norfolk Southern Railway Company (NS), Railway
Association of Canada, and Union Pacific Railroad Company (UP);
Amtrak;
API;
APTA, including members Keolis North America,
Massachusetts Bay Commuter Railroad Company, LLC (MBCR); and North
County Transit District (NCTD);
ASLRRA, including members from Anacostia Rail Holdings,
Central California Traction Company (CCT), OmniTRAX, Rio Grande Pacific
Corporation, and WATCO Companies, Inc. (WATCO);
ASRSM, including members from California Public Utilities
Commission (CPUC);
ATDA;
BLET;
BMWED;
BRS;
IAM;
NRC, including members from Herzog Transit Services
(Herzog);
NTSB;
PHMSA;
RSI;
SMART TD;
TCIU/BRC;
Transport Canada; and
TWU.
The SWG convened subsequently on October 30, 2013, December 17,
2013, January 28, 2014, and March 4, 2014, in Washington, DC to respond
to these tasks and voted to approve the recommendation on March 4,
2014. The SWG presented its recommendation to the full RSAC, which
voted by electronic ballot between March 25 and March 31, 2015, to
accept the
[[Page 53364]]
recommendations. On April 2, 2014, the RSAC announced that by majority
vote the recommendations had been approved and would become its
recommendation to the Administrator.
The recommendation of the RSAC include amendments to 49 CFR
232.103(n) that would do the following: (1) provide additional
requirements for the securement of unattended equipment carrying
certain hazardous materials; (2) mandate the implementation of
operating rules and practices requiring that securement be part of all
relevant job briefings; and (3) require adoption and compliance with
procedures to secure equipment subsequent to an emergency response. The
RSAC recommendation also includes amendments to 49 CFR 232.105 that
would require equipping locomotives with exterior locking mechanisms.
III. Section-by-Section Analysis
Unless otherwise noted, all ``part'' and ``section'' references
below refer to provisions either in title 49 of the CFR or proposed to
be in title 49 of the CFR. FRA seeks comments on all proposals made in
this NPRM.
Before entering into specific analysis of each proposed section, it
is important to make clear that this proposal, which provides more
restrictive securement requirements for specific types of equipment,
does not affect FRA's policy concerning the Federal hours of service
requirements. FRA continues to believe that a railroad may not require
or allow a train employee with an accumulated time on duty of 12 hours
or more to remain on a train for the sole purpose of meeting the
securement requirements, including those proposed here. A train
employee may, however, remain on an unsecured train, if that employee
is legitimately waiting for deadhead transportation from duty to a
point of final release, performs no covered or commingled service,\15\
and is free to leave the equipment when deadhead transportation
arrives. In this case, time spent waiting for and in deadhead
transportation is treated as neither time on duty nor time off duty.
---------------------------------------------------------------------------
\15\ A person is considered by the hours of service laws to be
neither on duty nor off duty during periods they are either waiting
for or in deadhead transportation to their point of final release
(i.e., have completed their time on duty and are waiting for or in
transportation to end their duty tour). In order to be considered
``waiting for'' deadhead transportation, the person must not be
required to perform other duties. Merely being on a train and
remaining sufficiently alert to respond to any unintended movement
of the equipment is not inherently performing a duty; being on or
with the train is a necessary element of waiting for transportation
from the train. This is true even when the railroad receives the
benefit of having the train attended while employees aboard wait for
transportation. Such time is considered ``limbo time'' and is not
contingent upon the train's securement status. See BLET v. Atchison
Topeka and Santa Fe Railway, 516 U.S. 152 (1996) (holding that the
time waiting for deadhead transportation under the hours of service
laws must be counted as ``limbo time.''). However, should the
employee be required to perform some activity to prevent the
movement of the equipment or to secure the train prior to departing
with deadhead transportation, then the time spent performing the
activity and any intervening time spent waiting would be considered
covered and commingled service respectively. See 49 CFR part 228,
app. A. Thus, whether a train is secured or unsecured when an
employee is waiting for deadhead transportation, that waiting time
will count as limbo time, so long as no covered activities are
performed.
---------------------------------------------------------------------------
FRA also notes that this proposed rule does not include the portion
of Emergency Order 28 that requires railroads to review, verify, and
adjust, as necessary, existing requirements and instructions related to
the number of hand brakes to be set on unattended trains and vehicles,
and to review and adjust, as necessary, the procedures for verifying
that the number of hand brakes is sufficient to hold the train or
vehicle with the air brakes released. It was FRA's concern that
existing railroad processes and procedures related to setting and
verifying hand brakes on unattended trains and equipment were not
sufficient to hold all trains and vehicles in all circumstances. FRA
believes that the railroads have fulfilled this requirement and thus
there is no need to include it in this proposed rule. FRA seeks
comments on the exclusion of this Emergency Order 28 requirement here.
Proposed Amendments to 49 CFR Part 232
Section 232.5 Definitions
In the 2001 rule, the definition of ``unattended equipment'' was
included in Sec. 232.103(n). As further discussed below, FRA is
proposing a new paragraph (h) for Sec. 232.105, which would also make
use of the definition for ``unattended equipment.'' Since the term
would be used in multiple sections, FRA believes it would be prudent to
move the definition to the more broadly applicable definitions in Sec.
232.5. Doing so would also allow FRA to rephrase paragraph (n) for
clarity purposes, as discussed further below. Proposed placement of the
definition in Sec. 232.5 would not change its meaning and would be
solely for applicability and clarity purposes.
FRA proposes changing the term ``yard limits'' to ``yard'' without
any change to its definition, with concurrent changes from ``yard
limits'' to ``yard'' in Sec. 232.103(n). FRA also proposes to include
the term ``yard'' in its new Sec. 232.105(h). As currently defined in
part 232, a yard limit is ``a system of tracks, not including main
tracks and sidings, used for classifying cars, making-up and inspecting
trains, or storing cars and equipment.'' But in part 218, yard limits
are described as a railroad-designated operating territory that is
established by yard limit signs; and timetable, train orders, or
special instructions. See 49 CFR 218.35(a). Making this change
clarifies that specific securement practices are connected to the
physical presence of a yard, and not to an operating practices
description of yard limits, which could potentially encompass an entire
railway system.
Section 232.103 General Requirements for all Train Brake Systems
As previously noted, FRA is proposing to move the definition of
``unattended equipment'' to Sec. 232.5, creating an opportunity to
rephrase and clarify the introductory language of paragraph (n). Part
of this proposal is to move the opening sentence in paragraph (n)--``A
train's air brake shall not be depended upon to hold equipment standing
unattended on a grade (including a locomotive, a car, or a train
whether or not locomotive is attached)''--to paragraph (n)(2). The
introductory language of paragraph (n) would remain more succinct and
clear.
While it is not an RSAC recommendation, FRA also proposes to amend
paragraph (n)(1) to make more clear its existing expectation that in
most circumstances at least one hand brake must be applied to hold
unattended equipment. While this has been stated in earlier rulemakings
and guidance documents, see e.g., TB 10-01, there has been some
confusion about whether the use of wheel chocks, skates, or other
securement devices is sufficient to hold unattended equipment. FRA's
longstanding interpretation is that at least one hand brake is required
to hold unattended equipment except in certain limited situations. For
instance, in a hump classification yard an alternative form securement,
such as skates and retarders may be allowed provided they are used
within their design criteria and as intended. FRA believes adding
explicit language to the regulatory text is warranted in order to
formally address the requirement to set at least one hand brake in most
instances.
As previously mentioned, proposed paragraph (n)(2) would be amended
to include language from the introduction of paragraph (n), which
prohibits a train's air brake from being depended upon to hold
equipment standing unattended on a grade (including a
[[Page 53365]]
locomotive, a car, or a train whether or not locomotive is attached).
FRA further proposes to remove the phrase ``on a grade,'' as such a
requirement is arguably superfluous and confusing. Perfectly level
track is rare, and there is still a risk of unattended movement caused
by numerous factors, such as a mistake in the location or length of the
level track, the effect of extreme weather, or an impact from other
equipment. Moreover, the phrase ``on a grade'' has led some to the
erroneous conclusion that hand brakes must only be applied if the
equipment is left on a grade. While grade is likely a factor in
determining the number of hand brakes that would sufficiently hold
unattended equipment, it is not a factor in determining whether hand
brakes should be applied at all. Accordingly, FRA proposes that the
language be modified to make clearer that the hand brake application
requirement is universal, regardless of grade.
Proposed paragraphs (n)(6) through (n)(8) attempt to address the
aforementioned heightened concerns relating to the securement of
unattended equipment carrying certain hazardous materials. Proposed
paragraph (n)(6) defines the type of cars covered by these requirements
and is intended to ensure that proposed paragraphs (n)(7) and (n)(8)
apply only to equipment that includes loads. Specifically, paragraph
(n)(6) provides that the substantive requirements of paragraphs (n)(7)
and (n)(8) will apply to:
(1) any loaded freight car containing PIH material, including
anhydrous ammonia and ammonia solutions; or
(2) twenty (20) or more loaded cars or loaded intermodal portable
tanks of any one or any combination of PIH materials (including
anhydrous ammonia and ammonia solutions), or any flammable gas,
flammable or combustible liquid, explosives, or a hazardous substance
listed at Sec. 173.31(f)(2) of this title.
FRA notes that this language is broader than the language used in
PHMSA's NPRM on Enhanced Tank Car Standards and Operational Controls
for High-Hazard Flammable Trains (HHFTs). See 79 FR 45016 (Aug. 1,
2014). In that rule, PHMSA proposed certain new requirements for HHFTs,
which it defines as ``a train comprised of 20 or more carloads of a
Class 3 flammable liquid and ensures that the rail requirements are
more closely aligned with the risks posed by the operation of these
trains.'' 79 FR at 45017. Paragraph (n)(6) proposes new securement
requirements that would cover a single PIH tank car. Moreover, where
the proposed PHMSA rule would only cover trains with 20 or more
carloads of flammable liquids, paragraph (n)(6) proposes to cover
situations where there are 20 or more carloads or loaded intermodal
portable tanks of PIH materials, flammable gases, flammable or
combustible liquids, explosives, other hazard substances listed at
Sec. 173.31(f)(2), or any combination thereof. FRA seeks comment on
this proposal and also seeks comment on whether a defined term should
be used for equipment covered under paragraph (n)(6).
The proposed regulatory text exempts residue cars from
consideration. Residue cars are defined by PHMSA under the HMRs. FRA
will continue to rely on the HMRs for this definition, even if amended.
Together, FRA and PHMSA are concurrently considering new regulations
relating to the placement in trains of cars containing hazardous
materials. In that effort, loaded and residue cars may be treated the
same. FRA does not believe that any resulting train placement
regulation would affect the securement regulations we are considering
in the instant proceeding. Nevertheless, the parties have expressed
concerns that such inconsistent use may foster confusion or be ``pitted
against one another.'' FRA seeks further comment explaining how such
confusion or conflict may manifest itself.
Proposed paragraph (n)(7) provides certain conditions under which
such equipment may be left unattended, including the development of a
plan identifying locations where such equipment may be left unattended.
Proposed paragraph (n)(8) includes specific requirements regarding the
securement of such equipment.
Emergency Order 28 prohibits each railroad from leaving trains or
vehicles that are transporting certain hazardous materials on mainline
track or mainline siding outside of a yard or terminal unless the
railroad adopts and complies with a plan that identifies the specific
locations and circumstances for which it is safe and suitable for
leaving such trains or vehicles unattended. According to Emergency
Order 28, the plan must contain sufficient analysis of the safety risks
and any mitigating circumstances the railroad has considered in making
its determination. FRA expressed its intent not to formally grant
approval to any plan, and it continues to monitor such plans. In the
event that FRA determines that adequate justification is not provided,
the railroad is required to ensure that trains and equipment are
attended until appropriate modifications are made to the railroad's
plan.
In proposed paragraph (n)(7)(i), FRA intends to continue these
requirements by regulation. While FRA continues to believe that it is
not necessary to provide approval for each plan, which could take
considerable resources, FRA must ensure proper enforcement and
oversight. Accordingly, proposed paragraph (n)(7)(i) includes a
requirement that the railroad notify FRA when it modifies its existing
plan and provide FRA with a copy of the plan upon request. For similar
reasons, FRA will also retain the right to require modifications to any
insufficient plan.
Proposed paragraph (n)(7)(i), however, differs from Emergency Order
28 in one manner. It allows a railroad to leave a train or equipment
unattended on mainline track that is running through a yard or on
mainline track that is adjacent to the yard without covering the
location in the railroad's plan. This change is based on feedback
received during the SWG meetings, which voted unanimously to adopt the
proposed language in paragraph (n)(7)(i), with the recommendation of
the full RSAC to move forward with the regulatory provision.
In Emergency Order 28, FRA made a decision that it was not
necessary to include mainline tracks and mainline sidings that run
through a yard in a railroad's plan for leaving equipment unattended.
FRA's rationale for this decision was that a yard was defined space
where the railroad performed a particular set of tasks (classifying
cars, making-up and inspecting trains, or storing cars and equipment).
As a result of the tasks performed there, yards tend to have
appropriate geographic characteristics, sufficient railroad activity,
and a population of railroad personnel in close proximity that make
them safer places for leaving equipment unattended. In FRA's view,
mainline tracks that run through yards share those characteristics with
the yard tracks surrounding it and is often used as a de facto ``yard''
track to assist with classifying cars and with making-up and inspecting
trains. As such, FRA did not see a need when drafting Emergency Order
28 for railroads to identify mainline tracks within a yard in the
railroad's securement plan before a railroad would be allowed to leave
equipment unattended on the mainline track that is surrounded by a
yard.
The feedback received through the RSAC process was that tracks
adjacent to the yard share many of the same characteristics as mainline
tracks that run through a yard. Therefore, FRA has proposed in this
rulemaking to treat mainline track that is adjacent to the yard in the
same manner that it is
[[Page 53366]]
currently treating mainline track that runs through a yard under
Emergency Order 28. In proposing this change, FRA intends only to cover
those tracks that are immediately adjacent to the yard and that are in
close enough proximity to the yard that the adjacent tracks share the
characteristics of the yard. FRA seeks comments on its treatment of
tracks adjacent to the yard.
Proposed paragraph (n)(7)(ii) would establish new requirements for
those trains that are left unattended on mainline track that is running
through a yard or on mainline track that is adjacent to the yard. It
would apply aspects of Emergency Order 28 to these tracks by requiring
verification that securement has been completed in accordance with the
railroad's process and procedures (see discussion below concerning
paragraph (n)(8)(i)), and that the locomotive cab is locked or the
reverser is removed from the control stand and placed in a secured
location (see discussion below concerning paragraph (n)(8)(ii)).
Emergency Order 28 requires railroads to develop specific processes
for employees responsible for securing any unattended train or vehicles
transporting certain hazardous materials that must be left on mainline
track or a mainline siding outside of a yard. FRA believes that this
requirement should continue in regulation. The proposed rule allows a
railroad to leave a paragraph (n)(6) train unattended on mainline track
or a siding outside of a yard where the railroad has a plan in place
and on mainline tracks that are in or adjacent to yards. In doing so,
proposed paragraph (n)(8)(i) requires the employee responsible for the
securement of the equipment to verify securement and proposed paragraph
(n)(8)(ii) requires the train crew to lock the controlling locomotive
cab or remove and secure the reverser from the control stand.\16\
---------------------------------------------------------------------------
\16\ The reverser is the directional control for the locomotive.
Removing the reverser would essentially put the locomotive in
neutral, preventing it from moving forward or backward under the
power of the engine.
---------------------------------------------------------------------------
Proposed paragraph (n)(8)(i) requires that an employee responsible
for securing equipment defined by paragraph (n)(6) verify securement
with another qualified person. This is similar to Emergency Order 28
which currently requires employees to verify proper securement with a
qualified railroad employee. This may be done by relaying pertinent
securement information (i.e., the number of hand brakes applied, the
tonnage and length of the train or vehicle, the grade and terrain
features of the track, any relevant weather conditions, and the type of
equipment being secured) to the qualified railroad employee. The
qualified railroad employee must then verify and confirm with the train
crew that the securement meets the railroad's requirements. However,
proposed paragraph (n)(8)(i) does not contain a requirement that the
railroad maintain a record of the verification of proper securement.
FRA believes that the type of verification requirement in proposed
paragraph (n)(8)(i) will serve to ensure that any employee who is
responsible for securing equipment containing hazardous materials will
follow appropriate procedures because the employee will need to fully
consider the securement procedures to relay what was done to the
qualified employee. Further, the qualified railroad employee (e.g. a
trainmaster, road foreman of engines, or another train crew employee)
will be in a position to ensure that a sufficient number of hand brakes
have been applied. Under this proposed rule, the qualified railroad
employee must have adequate knowledge of the railroad's securement
requirements for the specific location or for the specific circumstance
for which the equipment will be left unattended. Without limiting the
type of employee who may be qualified, FRA envisions that a dispatcher,
roadmaster, yardmaster, road foreman of engines, or another crew member
would be able to serve in the verification capacity.
FRA has decided not to continue the recordation requirement based
on experience in enforcing Emergency Order 28. FRA has found that
requiring recordation of securement information is superfluous because
the verification requirement ensures that two individuals consulting
with each other make certain that the appropriate securement method is
used. The intent of the recordation requirement was to ensure the
communications are taking place. FRA has found over the last year that
communications occur in the course of the verification process.
Therefore, it does not believe requiring railroads to make a record of
each securement event is necessary to ensure proper securement.
Nevertheless, FRA seeks comment concerning enforcement of the
verification requirement, absent recordation.
Also under Emergency Order 28, the employees responsible for
securing the train or vehicles must lock the controlling locomotive cab
door or remove and secure the reverser before leaving it unattended.
Accordingly, proposed paragraph (n)(8)(ii) requires further protection
of the locomotive to prevent movement of unattended equipment that
could be caused by unauthorized access to the locomotive cab.
Representatives from the railroad labor strongly suggested at the
SWG meetings that a locking mechanism be applied to each locomotive
covered under this rule, seeking that lock installation be complete
within 18 months. BLET stated that locomotive cab security is a major
concern to the labor caucus.
The language approved by the SWG provided that the controlling
locomotive cab shall be locked on locomotives capable of being locked
or the reverser on the controlling locomotive shall be removed from the
control stand and placed in a secured location. The use of the
conjunctive appears to indicate a choice; each railroad may opt to
either lock the locomotive or remove its reverser. However, based on
the discussions during the SWG meetings, FRA believes that the SWG
intended for proposed paragraph (n)(8)(ii) to mean that all covered
locomotives should be locked when so equipped. FRA has made slight
alterations to the language in paragraph (n)(8)(ii) from the language
that was approved by the SWG in order to more accurately address the
lock requirement. FRA understands that the reverser provision is
intended for the interim period until locks are installed or when a
locomotive has been equipped with a lock but the lock has become
inoperative. FRA also notes that under this proposal a railroad would
be free to require both the locking of the locomotive and the removal
of the reverser. FRA does not intend to limit a railroad to just one or
the other. FRA seeks comment on this understanding, particularly as to
whether the alternative of removing the reverser should only be
available during the timeframe when the locking mechanism becomes
broken or otherwise ineffective or whether, in the interest of safety
redundancy, the regulations should require railroads to both lock cab
doors and to remove reverser handles.
When a railroad relies on removing the reverser as a means for
securement, FRA expects that the reverser will be taken by the
appropriate railroad employee from the controlling locomotive cab so
that it is not accessible to an unauthorized person such as a
trespasser. Alternatively, FRA anticipates allowing the reverser to be
secured in the cab of an unlocked controlling locomotive as long as the
reverser is kept in a box or other compartment that can be locked
within the locomotive cab. However, FRA would not consider a reverser
``secured'' within the meaning of this proposal if
[[Page 53367]]
the railroad allows the reverser to be stored merely out of plain
sight.
In most instances, FRA would consider a locomotive with an
ineffective locking mechanism to be noncompliant with paragraph
(n)(8)(ii) if the locomotive is left unattended with the reverser
remaining in the control stand. FRA recognizes that there may be times
when a locomotive's lock becomes inoperative and its reverser cannot be
removed, thus making compliance with proposed paragraph (n)(8)(ii)
nearly impossible. Accordingly, for such instances, FRA proposes an
exception under paragraph (n)(8)(iii). FRA believes that application of
this exception would only be utilized on the rare occasion where older
locomotives with integrated reversers may be utilized or where weather
conditions make the reverser necessary for operations (i.e., to prevent
the locomotive from freezing). FRA seeks comments on the intent,
application, and language of this proposed exception.
FRA believes that the job briefing requirement in Emergency Order
28 should be codified in regulation. Accordingly, proposed paragraph
(n)(9) would require each railroad to implement operating rules and
practices requiring the discussion of securement among crew members and
other involved railroad employees before engaging in any job that will
impact or require the securement of any equipment in the course of the
work being performed. This proposed requirement is analogous to other
Federal regulations that require crew members to have a job briefing
before performing various tasks, such as confirming the position of a
main track switch before leaving an area. The purpose of this proposed
job briefing requirement is to make certain that all crew members and
other involved railroad employees are aware of what is necessary to
properly secure the equipment in compliance with Sec. 232.103(n).
Under this proposal, FRA expects that the crew will discuss the
equipment that is impacted, the responsibilities of each employee
involved in the securement of a train or vehicle, the number of hand
brakes that will be required to secure the affected equipment, the
process for ensuring that securement is sufficient, how the
verification will be determined, and any other relevant factors
affecting securement. FRA seeks comments on whether these expectations
are reasonable, accurate, and either sufficiently comprehensive or
somehow lacking.
FRA recognizes that in some instances, there may be only one crew
member performing a switch or operation and that would have to secure
equipment alone at the end of the activity. FRA believes that the issue
of self-satisfying a job briefing is best left to the railroad when
complying with part 218. Nevertheless, FRA seeks comments on how to
apply this requirement in a situation involving a single person crew
and how it interrelates with part 218.
Under paragraph (n)(10), FRA is proposing to require railroads to
develop procedures to ensure that a qualified railroad employee
inspects all equipment that any emergency responder has been on, under,
or between for proper securement before the rail equipment or train is
left unattended. As it may be necessary for emergency responders to
modify the state of the equipment for the performance of their jobs by
going on, under, or between equipment, it is critical for the railroad
to have a qualified employee subsequently inspect the equipment to
ensure that the equipment continues to be properly secured before it is
again left unattended.
The proposed rule requires railroads to establish a process to
ensure that a qualified railroad employee inspects all equipment that
any emergency responder (e.g., fireman or paramedic) has been on,
under, or between for proper securement before the train or vehicle is
left unattended. FRA understands that on rare occasions there may be
situations where an emergency responder accesses railroad equipment
without the knowledge of the railroad. The railroad's process can take
that type of situation into account; however, FRA will expect that a
qualified railroad employee will inspect equipment after it has been
accessed by an emergency responder in any circumstance where the
railroad acting in a reasonable manner knew or should have known of an
emergency responder's presence on, under, or between the subject
equipment.
The proposed rule requires that these procedures are followed as
soon as safely practicable after learning that an emergency responder
has interfaced with the equipment. FRA seeks comments on what should be
considered ``as soon as safely practicable.''
Section 232.105 General Requirements for Locomotives
FRA proposes a new paragraph (h) to Sec. 232.105 to provide
further requirements concerning locking mechanisms on locomotive doors.
While proposed Sec. 232.103(n)(8)(ii) provides securement controls for
the controlling locomotive cab that is left unattended on a mainline
track or siding as part of a train that meets the minimum quantities of
hazardous materials established in proposed Sec. 232.103(n)(6)(i), FRA
believes that additional requirement should apply to all locomotives
left outside a yard. Accordingly, FRA proposes including those
requirements under Sec. 232.105.
During the meetings of the RSAC SWG, representatives of the labor
unions proposed requiring the installation of locking mechanisms on all
locomotives covered by these proposed rules. AAR subsequently committed
that all locomotives will be equipped with cab door locks by March of
2017. AAR clarified its statement by ensuring that there will be no
distinction between interchange and non-interchange locomotives. In the
interest of codifying this deadline as applicable to the scope of this
proposed rule, paragraph (h)(1) proposes that after March 1, 2017, each
locomotive left unattended outside of a yard be equipped with an
operative exterior locking mechanism. By no means does this requirement
limit AAR's ambition that its members equip additional locomotives
(e.g., switching locomotives inside a yard) in their respective fleets.
FRA also proposes to include this requirement in Sec. 232.105 so that
it applies to all locomotives left unattended outside of a yard or on a
track immediately adjacent to a yard, not just those locomotives
defined under Sec. 232.103(n)(6). FRA seeks comment on this
requirement.
Proposed paragraphs (h)(2) and (h)(3) are meant to ensure that
locking mechanisms, if broken or otherwise inoperative, are repaired in
a reasonable timeframe. FRA expects that each locomotive equipped with
a locking mechanism will be inspected and maintained at the time of the
locomotive's periodic inspection. See 49 CFR 229.23. If a locking
mechanism is found inoperative at any time other than the periodic
inspection, proposed paragraph (h)(3) would require the railroad to
repair it within 30 days. However, if the periodic inspection falls
within the 30-day limit for repair, FRA would expect that the lock will
be repaired at the time of the periodic inspection in accordance with
the requirement in paragraph (h)(2). For instance, if a locomotive
engineer were to find the lock inoperative during a daily inspection
and the periodic inspection was scheduled 15 days later, then FRA would
expect that the railroad
[[Page 53368]]
will repair the locking mechanism at the time of the periodic
inspection. Alternatively, if the same situation were to arise but the
periodic inspection was scheduled to occur 45 days later, the railroad
would be expected to repair the locking mechanism prior to the time of
the periodic inspection to comply with the 30-day time limit in
paragraph (h)(3).
For the purposes of this regulation, ``operative'' means that, when
applied, the locking mechanism will reasonably be expected to keep
unauthorized people from gaining access into a locomotive while the
locomotive is unoccupied. However, in doing so, the railroad must
assure that ingress and egress is provided for in normal circumstances
and emergencies. FRA seeks comments on this understanding. FRA also
seeks information and comments on the possibility of a qualified person
finding difficulty accessing the locomotive cab in the event of an
unintentional movement of the equipment.
Under proposed paragraph (h)(4), if a locking mechanism becomes
inoperative in the interval between a locomotive's periodic inspection
dates, this provision does not require that a locomotive be removed
from service upon the discovery of an inoperative locking mechanism.
Railroads may continue to use the locomotive without an operative lock.
However, if such equipment covered by proposed Sec. 232.103(n)(6) is
left unattended and without an operative lock, then the railroad must
default to the alternative securement option governing the reverser
under proposed Sec. 232.103(n)(8)(ii) or fall under the exception
provided per proposed Sec. 232.103(n)(8)(iii).
IV. Regulatory Impact and Notices
A. Executive Orders 12866 and 13563 and DOT Regulatory Policies and
Procedures
This proposed rule has been evaluated in accordance with existing
policies and procedures, and determined to be significant under
Executive Order 12866, Executive Order 13563, and DOT policies and
procedures. 44 FR 11034 (Feb. 26, 1979). For purposes of analyzing this
rule, FRA uses as a baseline the rules in effect at the time of
publication, including Emergency Order 28. The analysis separately
quantifies ongoing costs of Emergency Order 28 that might exceed
business practices that would remain in effect in absence of Emergency
Order 28. It is reasonable to assume that most of the requirements of
Emergency Order 28 would continue as business practices; for example
the railroads have already improved their practices in determining the
proper application of hand brakes to secure a train and the
verification that the hand brake application is adequate. Further, the
exterior locking mechanism provision in the rule reflects an existing
commitment among AAR member railroads, which had been working on
developing a lock standard applicable to its members for over a year,
so the costs associated with this provision are limited to non-AAR
member railroads, primarily short line railroads. This analysis also
does not include sunk costs.
FRA was able to quantify the costs of the proposed rule, but not
able to quantify all the benefits, as many of the benefits are the
result of reducing risk from high consequence, low probability events
that are not easily quantified. Thus, FRA will discuss the benefits
that can be quantified, that by themselves justify the cost of the
proposal and will provide a brief discussion of the non-quantified
benefits. The monetized discounted and annualized net benefits would
be:
------------------------------------------------------------------------
Discounted value
-------------------------------
Discounted values Discount factor
-------------------------------
7% 3%
------------------------------------------------------------------------
Total................................... $1,076,984 $1,479,331
Annualized.............................. 95,009 96,538
------------------------------------------------------------------------
Statement of Need
The United States has experienced a dramatic growth in the quantity
of flammable materials being shipped by rail in recent years. According
to the rail industry, in the U.S. in 2009, there were 10,800 carloads
of crude oil shipped by rail. In 2013, there were 400,000 carloads. In
the Bakken region, over one million barrels a day of crude oil was
produced in March 2014,\17\ most of which is transported by rail.
Transporting flammable material carries safety and environmental risks.
The risk of flammability is compounded in the context of rail
transportation because petroleum crude oil and ethanol are commonly
shipped in large unit trains. In recent years, train accidents
involving a flammable material release and resulting fire with severe
consequences have occurred with increasing frequency (i.e. Arcadia, OH,
Plevna, MT, Casselton, ND, Aliceville, AL, Lac-M[eacute]gantic,
Quebec).
---------------------------------------------------------------------------
\17\ Information regarding oil and gas production is available
at the following URL: https://www.eia.gov/petroleum/drilling/#tabs-summary-2.
---------------------------------------------------------------------------
Shippers and rail companies are not insured against the full
liability of the potential consequences of incidents involving
hazardous materials. As a result, these events impose externalities.
Among Class I railroads, a self-insured retention of $25 million is
common, though it can be as much as $50 million, especially when PIH/
TIH material is involved. Smaller regional and short line carriers,
i.e., Class II and Class III railroads, on the other hand, typically
maintain retention levels well below $25 million as they usually have a
more conservative view of risk and usually do not have the cash-flow to
support substantial self-insurance levels. At this time, the maximum
coverage available in the commercial rail insurance market appears to
be $1 billion per carrier, per incident.\18\ While this level of
insurance is sufficient for the vast majority of accidents, it appears
that no amount of coverage is adequate to cover a higher consequence
event. One example of this issue is the incident that occurred at Lac
M[eacute]gantic, Quebec, in July of 2013. The rail carrier responsible
for the incident was covered for a maximum of $25 million in insurance
liability, and it had to declare bankruptcy because that coverage and
the companies remaining capital combined were insufficient to pay for
more than a fraction of the harm that was caused. This is one example
where rail carriers and shippers may not bear the entire cost of
``making whole'' those affected when an incident
[[Page 53369]]
involving crude and ethanol shipment by rail occurs.
---------------------------------------------------------------------------
\18\ See ``The Transportation of Hazardous Materials: Insurance,
Security, and Safety Costs,'' DOT Report to Congress, December 2009,
at https://www.dot.gov/office-policy/transportation-hazardous-materials-insurance-security-and-safety-costs.
---------------------------------------------------------------------------
FRA believes that the failure to secure equipment decreases the
safe transportation of goods by rail, and increases the possibility of
a higher-consequence event, particularly when dealing with a key train
transporting a material such as crude oil. It is difficult to assess
how much of the decrease in safety is from railroads not requiring
their employees to secure equipment or from employees failing to comply
with railroad securement requirements. The Lac-M[eacute]gantic accident
shows that the railroads were not successful using operating rules in
effect at the time of the accident, perhaps because an employee did not
follow those rules or might not have had adequate guidance on what
constituted adequate securement. FRA believes that use of its authority
will enhance compliance with railroad issued orders. There may also
have been an issue of incomplete information--which can cause a market
failure--that was corrected in the wake of the Lac-M[eacute]gantic
accident and Emergency Order 28, in that railroads had not yet
developed the procedures required in response to Emergency Order 28.
This problem of incomplete information related to securement procedures
has been addressed, so it is not part of the baseline. Finally,
incomplete information also may be causing a market failure among some
railroads that have not put locks on their locomotives left outside
yards.
Cost-Benefit Analysis of Individual Sections
Following is a discussion of the regulatory costs and benefits
associated with each proposed requirement.
Proposed changes to the definition in Sec. 232.5 have no
substantive impact and do not result in any new costs or benefits.
Proposed changes to Sec. 232.103(n)(2) will have negligible impact
or real burdens, but may increase compliance with existing rules. As
noted above, the changes being proposed to this paragraph merely
clarify FRA's longstanding interpretation, application, and enforcement
of the existing regulation.
Proposed Sec. 232.103(n)(6) lists types of trains and equipment
covered by proposed Sec. 232.103(n)(7) and (n)(8), but does not
directly impose any specific requirements.
Proposed Sec. 232.103(n)(7)(i) prohibits leaving affected
equipment unattended on a main track or siding (except when that main
track or siding runs through, or is directly adjacent to a yard) until
the railroad has adopted and is complying with a plan identifying
specific locations or circumstances when the equipment may be left
unattended. Railroads already have developed and implemented such plans
under Emergency Order 28, so there is no cost to create such plans. The
initial revision and notification burden would have been in identifying
safety rationale related to such locations and circumstances, but that
has already been accomplished through compliance with Emergency Order
28. To the extent that railroads further revise their plans in the
future, there will be some additional costs. This will not occur
frequently, resulting in nominal burden in the future.
Proposed Sec. 232.103(n)(7)(ii), an expansion of Emergency Order
28 that applies to trains left unattended on main tracks that are in or
adjacent to yards, requires trains left in yards to have the locomotive
cab locked, or the reverser removed, if possible, but would not impose
additional requirements in a yard if the locking mechanism is
inoperative. This portion of the proposed requirement is part of long-
standing railroad business practices, and will add no costs or
benefits.
In proposed paragraph (n)(8)(i), there is a new proposed
requirement, which in almost all cases was already in place as a
business practice. It requires that the qualified individual who
secures the train verify with a second qualified individual that the
train has been secured in accordance with the railroad's operating
rules, including whatever the employee has done to ensure that an
adequate number of hand brakes have been employed. On a train with two
or more crew members, the train crew will verify among themselves. This
would happen as a matter of business practice. In the event that the
train is secured by a single person crew, the verification would
involve a second person, typically a yardmaster, who is also qualified.
All safety-critical activities by train crews are communicated to at
least one additional person as a standard operating practice. This is
part of the railroads' conscious effort to avoid a single point human
factor failure that can cause an accident. FRA believes that less than
one-tenth of one-percent (0.1%) of the affected trains will be operated
by a single crew member when securing in a yard, because there are very
few single person crews operating affected trains, and because many
affected trains will be operated continuously to their destination.
Some trains will be secured outside of yards, but that burden is
discussed below in this analysis. In this analysis, FRA assumes that
there will be 1,000 affected trains per day, of which 0.1% (1 daily or
365 annually) would have a single person crew. Further, FRA assumes
that in the absence of the proposed rule, 95 percent of railroads would
require the verification as a business practice. This means that over
20 years, only 365 trains would be affected. FRA believes the
communication will take 15 seconds of two qualified individuals' time,
or 30 labor seconds. There is no cost to initiate communication,
because in any event a person leaving a train would have to communicate
with the yardmaster to let the yardmaster know where the crew member
left the train and to let the yardmaster know the train would no longer
be moving in the yard. Over the 20-year life, the undiscounted value
would be 182.5 labor minutes or roughly 3 labor hours. At $50 per hour
the cost over 20 years, undiscounted cost would be $150, and the annual
cost would only be $7.50. FRA requests comments on the current and
future levels of train operations impacted and the labor estimates
associated with compliance.
Proposed Sec. 232.103(n)(8)(i) requires that where a freight train
or standing freight car or cars as described in proposed paragraph
(n)(6) is left unattended on a main track or siding outside of a yard,
an employee responsible for securing the equipment shall verify with
another person qualified to make the determination that the equipment
is secured in accordance with the railroad's processes and procedures.
This will impose no new burden nor create any new benefit since it is
identical to what is currently required by Emergency Order 28. Where
train crews with more than one crew member are involved, then the crew
members would need to discuss the securement and ensure that they had
secured the correct number of hand brakes and taken other steps to
properly secure the train. Where single member crews are involved, then
the crew member would have to call the dispatcher or some other
qualified railroad employee to verify with the qualified employee that
the train had been properly secured. As noted above, Emergency Order 28
requires this communication to occur presently, thus railroads already
have these procedures established and continuing such practice will not
impose an additional cost. Thus, the proposed changes to Sec.
232.103(n) would create no new benefits or costs, compared to the base
case.
Proposed Sec. 232.103(n)(8)(ii) requires that the controlling
locomotive cab of a freight train described in paragraph
[[Page 53370]]
(n)(6) shall be locked on locomotives capable of being locked or the
reverser on the controlling locomotive shall be removed from the
control stand and placed in a secured location. In the case of a
locomotive with an operative lock, the compliance will simply be
locking the lock. Railroads all require their employees to lock
unattended locomotives equipped with operative locks, for both safety
and security reasons. This provision of the proposed rule codifies
current business practices, and creates no new benefits or costs. Under
proposed Sec. 232.105(h) each locomotive will have been equipped with
a lock, and if there should be a lock malfunction, removing the
reverser will be sufficient to comply. Removing the reverser of such a
locomotive is likely to be a business practice required by operating
rules except for two conditions. The first condition is where the
locomotive does not have a removable reverser. Such locomotives are
relatively old and are rarely used outside of yard operations. The
second condition is where there is a reason to keep the locomotive
running while standing. Almost all locomotives can idle with the
reverser removed, but there are no locomotives that can run at speeds
above normal idle, sometimes needed for cold weather conditions, with
the reverser removed. If a lock should malfunction under either of
those two conditions, a railroad could comply by several means:
A railroad could remove the reverser; almost all
locomotives can idle with the reverser removed, except in very cold
weather;
A railroad could attend the locomotive, which could
involve either placing a qualified individual aboard the locomotive
while it stands, or boarding a new crew and having the new crew
continue moving the train toward its destination. The most economical
way to accomplish this would be to board a new crew and take the train
further along its route. The railroad was going to have to call a crew
to move the train on its route anyway, so if the railroad has
sufficient time to call a new crew, generally two hours, the railroad
would call a crew earlier than originally planned. Dispatchers
continually adjust the flow of trains, and adding a single train
earlier than originally planned would have little effect on operations
in almost all cases. If the train is already close to its destination
this would not be practical if the consignee unloading or transfer
operation were not available, or if the train could not proceed for
some other reason, such as track congestion or blockage, the railroad
would not simply board the next crew and the railroad would have to
comply by some other means;
A railroad could arrange for the train to stop in a yard,
or on a main track in or adjacent to a yard. This might involve having
the dispatcher expedite the train so it can make a yard further along
its route, which might have little cost;
A railroad could have the train crew switch locomotives,
putting a lock-equipped locomotive in the lead, which would be costly
and impractical; or
A railroad could arrange to have the lock repaired before
leaving the train unattended, which would also carry a cost.
The burdens of proposed Sec. 232.103(n)(8)(ii) on main track or
sidings outside of yards are imposed by Emergency Order 28, so they are
not new burdens, and they still are relatively small. For purposes of
this analysis, FRA conservatively estimates that 1,000 trains per day
\19\ will be subject to the proposed requirements of Sec.
232.103(n)(8)(ii), but that 90 percent of them will be excepted under
proposed Sec. 232.103(n)(8)(iii), because they will have routing that
calls for unattended stops only in or adjacent to yards.\20\ That
leaves 100 trains per day, or 36,500 trains per year. FRA estimates
that one in 500 locomotives or 73 per year will have a defective lock.
FRA also estimates that 50 percent, or 36.5 per year, would have been
left running while unattended, or would have been equipped with a non-
removable reverser. A locomotive would be left running either to avoid
cold weather starting or to avoid a brake test when the next crew takes
charge of the train. If the locomotive would have been left running to
maintain brake pressure, the train crew can leave one of the trailing
locomotives running to maintain brake pressure, and lock its door. FRA
estimates that in all but ten cases per year, the railroad will have
been notified of the lock malfunction, and will have the next crew or
current crew take the train to a yard or its destination, avoiding any
costs.\21\
---------------------------------------------------------------------------
\19\ In an analysis of the safety of HHFTs, PHMSA estimates that
there are 150 trains per day. FRA's estimate of 1,000 trains per day
is conservative.
\20\ FRA assumes that railroads will fix locks in or adjacent to
the first yard available, as a business practice, and will leave any
unattended trains in yards locked.
\21\ Taking the train further along its route is the least
costly method of attending a train. The railroad is obligated to
provide a crew to move the train further along its route anyway, and
train crews are on call. Once the train gets to the first yard on
its path, the lock will be repaired. Unloading facilities are not
part of the railroad, and FRA does not regulate securement at
unloading facilities, which are subject instead to PHMSA
regulations.
Trains per year:
Affected by the proposed rule: 365,000
No planned stop outside yards (90 percent of 365,000): 328,500
Planned stop outside yards (365,000-328,500): 36,500
Defective lock and planned stop outside yard (36,500/500): 73
Removing reverser provides compliance (50 percent of 73): 36.5
Further action needed (73-36.5): 36.5
Sent on to next yard or destination: 26.5
Remedial action must be taken: 10 \22\
---------------------------------------------------------------------------
\22\ FRA requests comment on the number of cases per year where
remedial action would be required, and on the assumptions relied
upon to estimate that number.
FRA believes that in half the cases remaining (five cases), the
railroad will repair or replace the lock, and in the other half (also
five cases), the railroad will have personnel attend a standing train.
The railroad may repair or replace the lock, in which case the cost is
the additional cost of repairing the lock outside of a yard. A railroad
using AAR standard locks may attach an additional locking mechanism,
not compliant with AAR standards until the AAR standard lock can be
replaced. This appears to be the lowest cost means of complying with
the rule. If a hasp is present, the railroad may have provided the crew
with a spare lock, in which case the cost is negligible, two of the
five cases per year. If a hasp is not present, the railroad may have
repair personnel locate to the train, estimated at an average cost of
$0.56 per mile for 20 miles, or $11.20 per incident. In addition, the
installation is expected to require two hours service time, including
travel, for two repair personnel, at an estimated cost of $50 per
person hour,\23\ for a labor cost of $200. The installation is expected
to cost $100 if the railroad does not install a standard lock, one case
per year. The total cost for this repair would be $11.20 for
transportation, $100 for materials, plus $200 for labor, a total of
$311.20. If the railroad replaces the existing lock, then no materials
cost is added, because the railroad could have been expected to replace
the lock at the next yard. The total cost to replace an existing lock
would be $11.20 for transportation, plus $200 for labor for a total of
$211.20. The total cost to replace existing locks is 2 times $211.20,
or $422.40. The total cost for lock replacement includes the negligible
costs if the crew has a lock that fits an existing hasp, plus $311.20
[[Page 53371]]
to install a new hasp and lock, plus $422.20 to replace existing locks,
a total of $733.60. In any estimate of net present value, the labor
costs for lock installation should not be incremented by a factor to
account for growth in real wages, because the growth in real wages is
assumed to be directly related to productivity. The more productive the
worker, the fewer hours needed to install a lock, including reductions
in time needed to travel. FRA believes that small railroads will not be
affected by these costs because small railroads will use a lock and
hasp system and will be able to replace the lock before the train is
left stopped, should the lock malfunction.
---------------------------------------------------------------------------
\23\ Surface Transportation Board (STB) wage data show that the
average compensation for personnel engaged in Maintenance of
Equipment & Stores was $28.46 in 2013. FRA adds a 75 percent burden
which would yield $49.81 per hour, which is rounded here to $50 per
hour.
---------------------------------------------------------------------------
FRA estimates the cost to switch locomotives at $150 for the cost
of switching and at least $500 for a brake test after switching, for a
total of $650 per train. A railroad is unlikely to do this unless the
purpose of keeping engines running was to keep the engines warm on a
cold day, no stop was likely at a location where the lock could be
repaired, and at least one more stop was likely on the train's route.
The likelihood of such a situation is so small as to be negligible. FRA
does not believe this is a likely response, and this value is not used
any further.
FRA estimates the cost to attend a standing train at $470 per
incident,\24\ or a total of $2,350 per year for 5 incidents, which
assumes a burdened rate for labor of $51.04 per hour.
---------------------------------------------------------------------------
\24\ STB wage data show that the average compensation for
personnel engaged in Train, Yard and Engine was $29.16 in 2013. FRA
adds a 75 percent burden which would yield $51.04 per hour. The
minimum payment for qualified personnel called out is a fixed sum or
hourly pay, whichever is greater. The fixed amount is roughly equal
to 8 hours' pay. There may be instances where the duration of the
assignment exceeds 8 hours. FRA assumed a 9 hour average pay, or 9
times $51.04, for a burdened wage of $459.32 per incident. FRA
further assumed $11.20 in travel costs, or a total cost of $470.52
per incident, which FRA rounded to $470 per incident.
---------------------------------------------------------------------------
In summary of the foregoing costs associated with locomotive locks,
FRA believes the likely responses to inoperative locking mechanisms,
where the railroad cannot simply remove a reverser or move the train,
will break down as follows:
----------------------------------------------------------------------------------------------------------------
Annual total
Approach taken Unit cost Frequency cost
----------------------------------------------------------------------------------------------------------------
Place Lock in Existing Hasp..................................... $0.00 2 $0.00
Install New Hasp and Lock....................................... 311.20 1 311.20
Replace Existing Lock........................................... 211.20 2 422.40
Attend Train.................................................... 470.00 5 2,350.00
-----------------------------------------------
Total....................................................... .............. .............. \25\ 3,083.60
----------------------------------------------------------------------------------------------------------------
The total cost imposed by proposed section 232.103(n)(8)(ii) would be
$2,350 plus $311.20 plus $411.40 per year, a total of $3,083.60, or
roughly $3,100, per year.
---------------------------------------------------------------------------
\25\ Rounds to $3,100.
---------------------------------------------------------------------------
To more accurately annualize these costs, however, FRA must also
consider the direct wage portion of the costs attending trains and
provide for annual real wage increases. Of the aforementioned burdened
wage rate, $29.16 is the direct wage portion. Multiplying the direct
wage portion hourly rate against 9 hours pay per event with 5 events
per year, the direct wage portion annual cost total is $1,312.33, which
we will round to $1,300. These direct wage costs for train personnel
will need to be incremented by a factor of 1.18 percent per year to
account for increases in real wage, induced by increased productivity
in accordance with estimates from the Congressional Budget Office.\26\
---------------------------------------------------------------------------
\26\ Based on real wage growth forecasts from the Congressional
Budget Office, DOT's guidance estimates that there will be an
expected 1.18 percent annual growth rate in median real wages over
the next 30 years (2013-2043).
---------------------------------------------------------------------------
FRA compiled the following summary table, using initial annual
costs of $3,100 (i.e., the first year's annual locomotive locks costs
total rounded up), broken into direct wage costs for simply attending
trains, $1,300--which are increased every year by 1.18 percent to
account for growth in real wages, whereas the first year's increase
would result in a direct wage cost of $1,315.34--and other costs of
$1,800, including initial burden on wages to attend trains, labor costs
to repair or replace locks, where productivity growth is assumed to
match growth in real wages, and costs for other items. The costs are
all the result of actions taken to comply with attendance of a train in
the event a locking mechanism becomes inoperative:
--------------------------------------------------------------------------------------------------------------------------------------------------------
Discounted value
-----------------------------------------------
Year Wage inflator Direct wage All other Discount factor
(percent) cost costs Total costs -------------------------------
7% 3%
--------------------------------------------------------------------------------------------------------------------------------------------------------
2015.................................................... 101.18 $1,315.34 $1,800 $3,115.34 $3,115 $3,115
2016.................................................... 102.37 1,330.86 1,800 3,130.86 2,926 3,040
2017.................................................... 103.58 1,346.57 1,800 3,146.57 2,748 2,966
2018.................................................... 104.80 1,362.45 1,800 3,162.45 2,582 2,894
2019.................................................... 106.04 1,378.53 1,800 3,178.53 2,425 2,824
2020.................................................... 107.29 1,394.80 1,800 3,194.80 2,278 2,756
2021.................................................... 108.56 1,411.26 1,800 3,211.26 2,140 2,689
2022.................................................... 109.84 1,427.91 1,800 3,227.91 2,010 2,625
2023.................................................... 111.14 1,444.76 1,800 3,244.76 1,888 2,561
2024.................................................... 112.45 1,461.81 1,800 3,261.81 1,774 2,500
2025.................................................... 113.77 1,479.06 1,800 3,279.06 1,667 2,440
2026.................................................... 115.12 1,496.51 1,800 3,296.51 1,566 2,381
2027.................................................... 116.47 1,514.17 1,800 3,314.17 1,472 2,324
2028.................................................... 117.85 1,532.04 1,800 3,332.04 1,383 2,269
2029.................................................... 119.24 1,550.11 1,800 3,350.11 1,299 2,215
2030.................................................... 120.65 1,568.40 1,800 3,368.40 1,221 2,162
[[Page 53372]]
2031.................................................... 122.07 1,586.91 1,800 3,386.91 1,147 2,111
2032.................................................... 123.51 1,605.64 1,800 3,405.64 1,078 2,060
2033.................................................... 124.97 1,624.58 1,800 3,424.58 1,013 2,012
2034.................................................... 126.44 1,643.75 1,800 3,443.75 952 1,964
-----------------------------------------------------------------------------------------------
Total............................................... .............. .............. .............. .............. 36,685 49,909
-----------------------------------------------------------------------------------------------
Annualized.......................................... .............. .............. .............. .............. 3,236 3,257
--------------------------------------------------------------------------------------------------------------------------------------------------------
Proposed Sec. 232.103(n)(8)(ii) also provides a direct safety
benefit of this rulemaking. Only about 36.5 trains per year are likely
to be affected, as described above. FRA believes that in the absence of
this rulemaking all locomotives would be equipped with locks as a
business practice, as described below. FRA believes that as a business
practice, the locomotives that can be locked will be locked, and the
remaining locomotives that have reversers that can be removed that are
not left running would have their reversers removed and secured. FRA
believes that trains left running with reversers in place are the most
vulnerable to serious harm as a result of casual mischief. It is
possible that a vandal moving a reverser in an unattended running
locomotive could cause a higher-consequence event, given the kinds of
materials regulated here. Further, individuals who believe they are
doing some good--for example first responders who believe the train is
in a dangerous location--may also be tempted to try to move the train.
If they lack proper skills, this movement creates a risk. FRA does not
have a good way to estimate the likelihood of a serious event from such
a small number of affected trains; however, given the kinds of trains
involved, FRA finds that the costs are justified by the benefits of
risk reduction.
Proposed Sec. 232.103(n)(8)(iii) provides an exception for trains
left unattended on main tracks in or adjacent to yards, and does not
change burdens from Emergency Order 28. The communication requirement
in proposed Sec. 232.103(n)(9), is unchanged from Emergency Order 28,
and will impose no new burden nor create any new benefit for train
crews with more than one crew member. Proposed Sec. 232.103(n)(10)
requires railroads to adopt and comply with procedures to ensure that,
as soon as safely practicable, a qualified employee verifies the proper
securement of any unattended equipment when the railroad has knowledge
that a non-railroad emergency responder has been on, under, or between
the equipment. This was required by Emergency Order 28 and remains
unchanged from Emergency Order 28, and will impose no new burden nor
create any new benefit. FRA also believes that after the Lac
M[eacute]gantic accident that railroads would have adopted this
practice even in the absence of Emergency Order 28, as a standard
business practice, so FRA is confident that this section creates no new
benefits or costs.
One requirement of Emergency Order 28 that is not included in the
proposed rule is a requirement that employees who are responsible for
securing trains and vehicles transporting Appendix A Materials must
communicate to the train dispatcher the number of hand brakes applied,
the tonnage and length of the train or vehicle, the grade and terrain
features of the track, any relevant weather conditions, and the type of
equipment being secured; train dispatchers must record the information
provided; and train dispatchers or other qualified railroad employees
must verify and confirm with the train crew that the securement meets
the railroad's requirements. The proposed rule includes verification
procedures but does not include the recordkeeping required by Emergency
Order 28. FRA's Paperwork Reduction Act analysis of the recordkeeping
requirements shows the annual burden at 867 hours to notify the
dispatcher to make the record, and an additional 867 hours to make the
record. FRA estimates that there will be an average of 26,000
communications (100 instances on 260 days per year) to dispatchers
triggering the recording requirement, which takes an average of four
minutes to complete, for a total of 1,734 hours. If the value of the
employees' time is $50 per hour, the annual cost of the Emergency Order
28 recordkeeping requirement is $86,700, and that cost would be
eliminated by the proposed rule. FRA believes the recordkeeping
requirements have been relatively more onerous for smaller railroads,
but does not have a breakdown of the proportion of the cost reduction
benefit that will accrue to small railroads.
Proposed Sec. 232.105(h) requires, after March 1, 2017, that each
locomotive left unattended outside of a yard shall be equipped with an
operative exterior locking mechanism. AAR standard S-5520 requires that
each locomotive left unattended outside of a yard shall be equipped
with an operative exterior locking mechanism, and requires that
locomotives be equipped in order to be used in interchange service.
These mechanisms will meet the requirements of proposed Sec.
232.105(h). FRA believes that for Class I and Class II railroads, all
costs and benefits of proposed Sec. 232.105(h) will be a result of
business practices because their locomotives operate in interchange
service. These railroads are already in the process of installing
exterior locking mechanisms on all of their locomotives that do not
operate exclusively in yard service. FRA further believes that small
railroads have already equipped virtually all of their locomotives with
exterior locking mechanisms. This was discussed at RSAC meetings.
FRA believes that the reason Class I and Class II railroads have
just recently started installing locking mechanisms on their
locomotives is that until recently there was no standard for keying the
locking mechanisms. Locomotives of these railroads operate in
interchange service and can move from railroad to railroad. If each
railroad had to maintain a set of keys for all other railroads'
locomotives, that would have been cumbersome. The recent, common keyed,
industry standard provides a solution, and allows the business practice
of installing locking mechanisms to proceed.
FRA believes that, for smaller railroads, locking locomotive cabs
is a good business practice that already takes place because it avoids
vandalism and locomotive cab intruders. Several reports indicate that a
locomotive belonging to the Adirondack Scenic Railroad was vandalized
on or around
[[Page 53373]]
October 15, 2013.\27\ Damage to the locomotive was approximately
$50,000, and does not include lost revenue. Anecdotal reports are that
the vandals removed the copper wiring, which has value as scrap. This
event was not reported to FRA. This is an example of unreported
vandalism, and FRA staff believes that a great deal of vandalism is
unreported, largely because the events do not meet all the requirements
that would result in filing an accident/incident report with FRA. Over
the years, FRA staff has received several first-hand accounts of
vandalism or cabs occupied by intruders. FRA believes that the
likelihood of vandalism or cabs being occupied by trespassers increases
as the likelihood of railroad observation of the train decreases. Most
small railroads operate in environments with a lower than average
likelihood of observation. FRA believes that vandalism is also more
likely to have a severe impact on a small railroad's operations since
these railroads do not have many spare locomotives or personnel. If a
railroad has ten locomotives and five get vandalized, its operations
will be severely impacted. Likewise if a small railroad's operating
crew is injured by an intruder in a cab, the operations for that day
will likely be halted. As indicated by small railroad representatives
at RSAC, small railroads do generally equip their locomotives with
exterior cab locks. FRA believes that if all small railroads considered
the impacts of vandalism and intruders, the small railroads would and
have installed exterior cab locks.
---------------------------------------------------------------------------
\27\ Adirondack Scenic Railroad Locomotive Vandalized, North
County Public Radio Web site, October 15, 2013.
---------------------------------------------------------------------------
The unit cost for a locking mechanism meeting AAR standard S-5520
is $215. FRA believes that smaller railroads could comply with proposed
Sec. 232.105(h) with a simpler lock and hasp system, for a unit cost
of $100. FRA requests comment regarding this estimate. Given the
smaller number of locomotives, personnel, territory, and facilities,
use of this type of system would not be problematic.
FRA believes that no more than 500 locomotives belonging to Class
III railroads lack locking mechanisms that comply with proposed Sec.
232.105(h). Thus, the cost to install the locking mechanisms would be
no more than 500 times $100, or $50,000.
Based on anecdotal information from FRA staff, between 1 percent
and 3 percent of locomotives are vandalized each year. Some vandalism
is relatively minor, such as graffiti sprayed on the walls of the cab,
but some is much more serious, for example damage or removal of
electrical equipment, or of instruments. More modern cabs have very
expensive control systems, with one or more monitor screens. It would
not be difficult for vandals to cause more than $50,000 in damage to a
modern cab. The repairs not only would involve removal and replacement
of damaged components, but would also involve calibration. For purposes
of this analysis, FRA is assuming 1 percent of locomotives would be
vandalized each year if not equipped with locks, and the mean cost of a
vandalism incident is $3,000. The expected cost of vandalism is
therefore $30 per locomotive year for unequipped locomotives.
Locomotive cabs are also occupied by unauthorized occupants,
usually homeless, from time to time. Based on staff anecdotal data, FRA
assumes that five percent of locomotive cabs are occupied at least once
per year. FRA believes that the cost per incident is $100, including
costs to clean debris and inspect to determine that nothing in the cab
has been damaged. This cost represents 20 minutes delay with a train
delay cost. The economic impact of slowing trains depends upon multiple
factors including other types of trains, other train speeds,
dispatching requirements, work zones, and topography. Looking at
numerous variables, for purposes of another analysis, DOT estimated the
average cost of a train delay to be $500 per hour.\28\ This cost
estimate was determined by reviewing costs associated with crew
members, supply chain logistic time delays based on various freight
commodities, and passenger operating costs for business and other
travel. It is reasonable to assume that delays to smaller railroad
operations are lower in cost. Thus, for purposes of this analysis, for
the impacted railroads, FRA is using an hourly train delay cost of $300
per hour. FRA requests comment regarding this assumption. Thus the cost
per year for 500 locomotives would be 500 times 5 percent times $100,
or $2,500, or $5 per locomotive year. Added to the vandalism cost the
total cost of exposure would be $35 per locomotive year. If an
installation of a locking mechanism costs $100, it would take less than
3 years for the locks to pay for themselves (before applying discount
factors). FRA believes that in the absence of this rule most small
railroads would apply locking mechanisms to locomotives left unattended
outside of yards, especially in light of the vandalism incident on the
Adirondack Scenic Railroad. FRA believes the net cost of installing and
using the locks for small railroads is zero because the installation
cost is offset by the business benefits.
---------------------------------------------------------------------------
\28\ PHMSA's proposed rule ``Hazardous Materials: Enhanced Rail
Tank Car Standards and Operational Controls for High-Hazard
Flammable Trains'' applies a $500 per hour estimate of the cost of
delay for the rail network overall. 79 FR 45015 (Aug. 1, 2014).
---------------------------------------------------------------------------
FRA assumes the locks will be purchased in the first year, because
the business benefit is apparent. Thus, the costs are $100 times 500
locomotives, or $50,000, the same at both discount rates because 2015
is not discounted.
----------------------------------------------------------------------------------------------------------------
Discounted value
-------------------------------
Year Total costs Discount factor
-------------------------------
7% 3%
----------------------------------------------------------------------------------------------------------------
2015............................................................ $50,000.00 $50,000 $50,000
-----------------------------------------------
Total....................................................... 50,000.00 50,000 50,000
-----------------------------------------------
Annualized.................................................. .............. 4,411 3,263
----------------------------------------------------------------------------------------------------------------
A more serious crime with far more potential to cause harm off the
railroads' rights-of-way is theft and operation of a train. In 1975,
two teenagers stole a switching locomotive and operated it until it
crashed.\29\ FRA staff has received
[[Page 53374]]
anecdotal information regarding other locomotives being stolen and
operated, but permanent records of the incidents could not be found. If
a train described in proposed Sec. 232.103(n)(6) was stolen and
operated, it could easily cause the kinds of harm seen at in the
Graniteville, South Carolina accident and the Lac M[eacute]gantic
incident, with societal costs of $260 million to $1.2 billion. The Lac
M[eacute]gantic incident is illustrative of, but not necessarily the
outer limit of, a high-consequence event scenario for derailment of a
paragraph (n)(6) train. The derailment occurred in a small town with a
low population density by U.S. standards, but resulted in the deaths of
47 people and the destruction of much of the downtown area. A year
after the event, decontamination of the soil and water/sewer systems is
still ongoing. Cleanup of the lake and river that flows from it has not
been completed, and downstream communities are still using alternative
sources for drinking water. Initial estimates of the cost of this event
were roughly $1 billion, but the cleanup costs have doubled from
initial estimates of $200 million to at least $400 million, and the
total cost to clean up, remediate, and rebuild the town could rise as
high as $2.7 billion. The frequency and magnitude of these events is
highly uncertain. It is, therefore, difficult to predict with any
precision how many of these higher consequence events may occur over
the coming years, or how costly these events may be. In the worst case
scenario for a fatal event, the results could be several times the
damages seen at Lac M[eacute]gantic both in loss of life and other
associated costs.
---------------------------------------------------------------------------
\29\ Pierce Haviland, The Putnam Division, last updated November
10, 2010, available at https://piercehaviland.com/rail/putnam.html
This incident was probably not reportable because it occurred on an
abandoned railroad, no longer part of the general system of rail
transportation.
---------------------------------------------------------------------------
In estimating the damages of a higher-consequence event, we begin
with the current estimated damages of Lac M[eacute]gantic. We used this
accident to illustrate the potential benefits of preventing or
mitigating events of this magnitude. It is challenging to use this one
data point to model potential damages of higher consequence events that
differ in nature from the Lac M[eacute]gantic accident. However, as the
volume of crude oil shipped by rail continues to grow, it is reasonable
to assume that events of this magnitude may occur.
By installing locks to avoid such dangers, the benefits indicated
in the following table are $17,500 per year ($35 times 500
locomotives), starting in 2016, the year after the locks are installed.
----------------------------------------------------------------------------------------------------------------
Discounted value
-------------------------------
Year Total benefits Discount factor
-------------------------------
7% 3%
----------------------------------------------------------------------------------------------------------------
2015............................................................ $0.00 $0 $0
2016............................................................ 17,500.00 16,355 16,990
2017............................................................ 17,500.00 15,285 16,495
2018............................................................ 17,500.00 14,285 16,015
2019............................................................ 17,500.00 13,351 15,549
2020............................................................ 17,500.00 12,477 15,096
2021............................................................ 17,500.00 11,661 14,656
2022............................................................ 17,500.00 10,898 14,229
2023............................................................ 17,500.00 10,185 13,815
2024............................................................ 17,500.00 9,519 13,412
2025............................................................ 17,500.00 8,896 13,022
2026............................................................ 17,500.00 8,314 12,642
2027............................................................ 17,500.00 7,770 12,274
2028............................................................ 17,500.00 7,262 11,917
2029............................................................ 17,500.00 6,787 11,570
2030............................................................ 17,500.00 6,343 11,233
2031............................................................ 17,500.00 5,928 10,905
2032............................................................ 17,500.00 5,540 10,588
2033............................................................ 17,500.00 5,178 10,279
2034............................................................ 17,500.00 4,839 9,980
-----------------------------------------------
Total....................................................... .............. 180,873 250,666
-----------------------------------------------
Annualized.................................................. .............. 15,956 16,358
----------------------------------------------------------------------------------------------------------------
In addition to the above noted benefits, the proposed rule itself
reduces costs--by removing the requirement to record securement
activities provided under Emergency Order 28--by $86,700 per year, with
no decrease in safety. In FRA's view, these savings more than offset
the minor costs associated with the proposed rule.
----------------------------------------------------------------------------------------------------------------
Discounted value
-------------------------------
Year Total benefits Discount factor
-------------------------------
7% 3%
----------------------------------------------------------------------------------------------------------------
2015............................................................ $86,700.00 $86,700 $86,700
2016............................................................ 86,700.00 81,028 84,175
2017............................................................ 86,700.00 75,727 81,723
2018............................................................ 86,700.00 70,773 79,343
2019............................................................ 86,700.00 66,143 77,032
2020............................................................ 86,700.00 61,816 74,788
2021............................................................ 86,700.00 57,772 72,610
2022............................................................ 86,700.00 53,992 70,495
[[Page 53375]]
2023............................................................ 86,700.00 50,460 68,442
2024............................................................ 86,700.00 47,159 66,448
2025............................................................ 86,700.00 44,074 64,513
2026............................................................ 86,700.00 41,191 62,634
2027............................................................ 86,700.00 38,496 60,810
2028............................................................ 86,700.00 35,977 59,038
2029............................................................ 86,700.00 33,624 57,319
2030............................................................ 86,700.00 31,424 55,649
2031............................................................ 86,700.00 29,368 54,029
2032............................................................ 86,700.00 27,447 52,455
2033............................................................ 86,700.00 25,651 50,927
2034............................................................ 86,700.00 23,973 49,444
-----------------------------------------------
Total....................................................... .............. 982,796 1,328,573
-----------------------------------------------
Annualized.................................................. .............. 86,700 86,700
----------------------------------------------------------------------------------------------------------------
FRA calculated the total monetized costs of the rule, with the
costs for locomotive lock installation accounted for only for the first
year:
--------------------------------------------------------------------------------------------------------------------------------------------------------
Discounted value
-------------------------------
Year Wage inflator Direct wage All other Total costs Discount factor
(percent) cost costs -------------------------------
7% 3%
--------------------------------------------------------------------------------------------------------------------------------------------------------
2015.................................................... 101.18 $1,315.34 $51,800 $53,115.34 $53,115 $53,115
2016.................................................... 102.37 1,330.86 1,800 3,130.86 2,926 3,040
2017.................................................... 103.58 1,346.57 1,800 3,146.57 2,748 2,966
2018.................................................... 104.80 1,362.45 1,800 3,162.45 2,582 2,894
2019.................................................... 106.04 1,378.53 1,800 3,178.53 2,425 2,824
2020.................................................... 107.29 1,394.80 1,800 3,194.80 2,278 2,756
2021.................................................... 108.56 1,411.26 1,800 3,211.26 2,140 2,689
2022.................................................... 109.84 1,427.91 1,800 3,227.91 2,010 2,625
2023.................................................... 111.14 1,444.76 1,800 3,244.76 1,888 2,561
2024.................................................... 112.45 1,461.81 1,800 3,261.81 1,774 2,500
2025.................................................... 113.77 1,479.06 1,800 3,279.06 1,667 2,440
2026.................................................... 115.12 1,496.51 1,800 3,296.51 1,566 2,381
2027.................................................... 116.47 1,514.17 1,800 3,314.17 1,472 2,324
2028.................................................... 117.85 1,532.04 1,800 3,332.04 1,383 2,269
2029.................................................... 119.24 1,550.11 1,800 3,350.11 1,299 2,215
2030.................................................... 120.65 1,568.40 1,800 3,368.40 1,221 2,162
2031.................................................... 122.07 1,586.91 1,800 3,386.91 1,147 2,111
2032.................................................... 123.51 1,605.64 1,800 3,405.64 1,078 2,060
2033.................................................... 124.97 1,624.58 1,800 3,424.58 1,013 2,012
2034.................................................... 126.44 1,643.75 1,800 3,443.75 952 1,964
-----------------------------------------------------------------------------------------------
Total............................................... .............. .............. .............. .............. 86,685 99,909
-----------------------------------------------------------------------------------------------
Annualized.......................................... .............. .............. .............. .............. 7,647 6,520
--------------------------------------------------------------------------------------------------------------------------------------------------------
FRA calculated the total monetized benefits of the rule, which
includes savings from relief of Emergency Order 28's recordation
requirement for each year plus savings provided each year from the use
of locomotive locks after the first year of installation:
----------------------------------------------------------------------------------------------------------------
Discounted value
-------------------------------
Year Total benefits Discount factor
-------------------------------
7% 3%
----------------------------------------------------------------------------------------------------------------
2015............................................................ $86,700.00 $86,700 $86,700
2016............................................................ 104,200.00 97,383 101,165
2017............................................................ 104,200.00 91,012 98,218
2018............................................................ 104,200.00 85,058 95,358
2019............................................................ 104,200.00 79,494 92,580
2020............................................................ 104,200.00 74,293 89,884
[[Page 53376]]
2021............................................................ 104,200.00 69,433 87,266
2022............................................................ 104,200.00 64,891 84,724
2023............................................................ 104,200.00 60,645 82,256
2024............................................................ 104,200.00 56,678 79,861
2025............................................................ 104,200.00 52,970 77,535
2026............................................................ 104,200.00 49,505 75,276
2027............................................................ 104,200.00 46,266 73,084
2028............................................................ 104,200.00 43,239 70,955
2029............................................................ 104,200.00 40,411 68,888
2030............................................................ 104,200.00 37,767 66,882
2031............................................................ 104,200.00 35,296 64,934
2032............................................................ 104,200.00 32,987 63,043
2033............................................................ 104,200.00 30,829 61,207
2034............................................................ 104,200.00 28,812 59,424
-----------------------------------------------
Total....................................................... .............. 1,163,669 1,579,240
-----------------------------------------------
Annualized.................................................. .............. 102,656 103,058
----------------------------------------------------------------------------------------------------------------
Summary of the Costs and Benefits
To summarize the above identified costs and benefits, FRA tabulated
the contributions of each item to the total discounted costs and
benefits over 20 years.
------------------------------------------------------------------------
Discounted value
-------------------------------
Discounted values Discount factor
-------------------------------
7% 3%
------------------------------------------------------------------------
Costs:
Attending Trains.................... $36,685 $49,909
Installing Locks.................... 50,000 50,000
Total Costs......................... 86,685 99,909
Benefits:
Reduced Vandalism................... 180,873 250,666
Reduced Recordkeeping............... 982,786 1,328,573
-------------------------------
Total Benefits.................. 1,163,669 1,579,240
------------------------------------------------------------------------
For further distillation, FRA calculated the net benefits over 20
years:
------------------------------------------------------------------------
Discounted value
-------------------------------
Discounted values net benefits Discount factor
-------------------------------
7% 3%
------------------------------------------------------------------------
Total................................... $1,076,984 $1,479,331
Annualized.............................. 95,009 96,538
------------------------------------------------------------------------
FRA could eliminate Emergency Order 28, but most of the
requirements of Emergency Order 28 conform to business practices of the
railroads.
The costs that are not directly offset by a monetized benefit are
the annual costs of either attending locomotives or expediting their
repair. Above, FRA estimates the annualized cost beyond current
business practices at $3,236-$3,257 per year.\30\ These costs are
balanced against an incident with costs of $260 million to $1.2
billion, but with extremely low probability. The incidents avoided by
attendance provisions would only occur where the train was not equipped
with functioning locking mechanisms under conditions where the railroad
would have sent a repair team out to the location of the train to
repair the locking mechanism or would have sent a qualified employee to
attend the train, roughly ten events per year. As discussed above,
these situations would involve a locomotive that is left running either
to avoid cold weather starting or to avoid a brake test when the next
crew takes charge of the train. The number of events estimated is based
on professional judgment. If the
[[Page 53377]]
event avoided is $330 million,\31\ and the annual cost is less than
$3,300 for ten events, then the rule costs about $330 per event and
would roughly break even if one in a million events of leaving a
locomotive consist for one of the regulated trains unattended with an
unlocked cab and a reverser unsecured in the cab were to result in a
higher-consequence incident. FRA believes the small but relatively
predictable annual cost is justified by the hard to measure very small
probability, very high consequence incident risk avoided. The portion
of the rule requiring attendance of a train with inoperative locking
mechanisms will not affect the likelihood of such an incident where the
locking mechanism is functioning or where railroad does not comply with
the proposed rule.
---------------------------------------------------------------------------
\30\ This cost is slightly increased by the increase in value of
real wages over time.
\31\ This estimate falls between the damages of Graniteville and
Lac-Megantic. It is selected only for illustrative purposes.
---------------------------------------------------------------------------
The remainder of Emergency Order 28 and the proposed rule do not
impose costs beyond expected business practices. FRA believes that the
business benefits of installing locking mechanisms and locking
locomotive cabs return net benefits to the railroads. FRA believes that
locking the locomotive cab or removing the reverser will reduce the
likelihood of a higher-consequence event. FRA believes the continuing
requirements from Emergency Order 28 or the requirements of the
proposed rule will sever the potential causal chain of a low-
probability high-consequence event. Thus, FRA rejects the alternative
of simply removing Emergency Order 28.
Alternatives Considered
FRA considered as an alternative requiring all trains subject to
proposed Sec. 232.103(n)(6) to be attended if left stopped outside
yards, without regard to the presence of a locking mechanism or
reverser. FRA believes that railroads would work to enhance routing and
crew scheduling so that of the 1,000 affected trains per day, only 50
would require unattended stops outside of yards. The cost per event to
attend a train would be $470 per incident. The daily cost would be 50
times $470, or $23,500. The annual cost would be $8,577,500.
FRA believes the proposed rule is as effective as the alternative
considered, at much lower cost. Thus, FRA rejected the more restrictive
alternative. FRA further believes that given the tradeoff between the
certainty of relatively low costs and the benefit of very low-
probability yet very high-consequence incidents, the proposed rule is a
reasonable approach. FRA requests comments on all aspects of this
analysis.
B. Regulatory Flexibility Act and Executive Order 13272
To ensure that the impact of this rulemaking on small entities is
properly considered, FRA developed this proposed rule in accordance
with Executive Order 13272 (``Proper Consideration of Small Entities in
Agency Rulemaking'') and DOT's policies and procedures to promote
compliance with the Regulatory Flexibility Act (5 U.S.C. 601 et seq.).
The Regulatory Flexibility Act requires an agency to review
regulations to assess their impact on small entities. An agency must
conduct a regulatory flexibility analysis unless it determines and
certifies that a rule is not expected to have a significant economic
impact on a substantial number of small entities.
As discussed in the preamble above, FRA is proposing to amend
regulations affecting securement of certain trains carrying particular
hazardous materials in particular quantities, and requiring that cabs
of all locomotives left unattended, except for those left unattended on
main tracks that are in or adjacent to yards, be equipped with locking
mechanisms. FRA is certifying that this proposed rule will result in
``no significant economic impact on a substantial number of small
entities.'' The following section explains the reasons for this
certification.
1. Description of Regulated Entities and Impacts
The ``universe'' of the entities under consideration includes only
those small entities that can reasonably be expected to be directly
affected by the provisions of this rule. In this case, the ``universe''
will be Class III freight railroads that own locomotives or that have
traffic including trains that would be subject to proposed Sec.
232.103(n)(6).
The U.S. Small Business Administration (SBA) stipulates in its
``Size Standards'' that the largest a railroad business firm that is
``for-profit'' may be, and still be classified as a ``small entity,''
is 1,500 employees for ``Line Haul Operating Railroads'' and 500
employees for ``Switching and Terminal Establishments.'' ``Small
entity'' is defined in the Act as a small business that is
independently owned and operated, and is not dominant in its field of
operation. Additionally, section 601(5) defines ``small entities'' as
governments of cities, counties, towns, townships, villages, school
districts, or special districts with populations less than 50,000.
Federal agencies may adopt their own size standards for small
entities in consultation with SBA and in conjunction with public
comment. Pursuant to that authority, FRA has published a final policy
that formally establishes ``small entities'' as railroads which meet
the line haulage revenue requirements of a Class III railroad.\32\ The
revenue requirements are currently $20 million or less in annual
operating revenue. The $20 million limit (which is adjusted by applying
the railroad revenue deflator adjustment) \33\ is based on the Surface
Transportation Board's (STB) threshold for a Class III railroad
carrier. FRA is using the STB's threshold in its definition of ``small
entities'' for this rule.
---------------------------------------------------------------------------
\32\ See 68 FR 24891 (May 9, 2003); 49 CFR Part 209, app. C.
\33\ For further information on the calculation of the specific
dollar limit, please see 49 CFR Part 1201.
---------------------------------------------------------------------------
FRA believes that virtually all small railroads on the general
system of rail transportation will be affected by this rule, as there
are almost no railroads that do not own at least one locomotive. There
are 671 small railroads on the general system of rail transportation.
As noted above, no small entities are expected to incur any costs
under proposed Sec. 232.103. Small entities owning locomotives may
incur a cost to install a locking mechanism under proposed Sec.
232.105, but as also noted above, the locking mechanisms will pay for
themselves in reduced vandalism costs in less than three years. FRA
believes that at least 90 percent of affected locomotives are already
equipped with locking mechanisms, and the cost to install a locking
mechanism is $100 for a mechanism that does not have to comply with AAR
standards for interchange. Any small railroad's locomotives operated in
interchange service would have to have AAR compliant locks to remain in
interchange service, but that is not a cost of the rule. Thus, the rule
will impose a cost of $100 on about ten percent of locomotives, but the
investment will pay for itself in less than three years. FRA believes
this is not a substantial impact on any small entity.
Further, small railroads will benefit from a reduction in
recordkeeping requirements, as described above.
Pursuant to the Regulatory Flexibility Act, 5 U.S.C. 605(b), the
FRA Administrator certifies that this proposed rule would not have a
significant economic impact on a substantial number of small entities.
FRA requests comment on both this
[[Page 53378]]
analysis and this certification, and its estimates of the impacts on
small railroads.
C. Paperwork Reduction Act
The new information collection requirements in this proposed rule
are being submitted for approval to the Office of Management and Budget
(OMB) under the Paperwork Reduction Act of 1995, 44 U.S.C. 3501 et seq.
The sections that contain the new and current information collection
requirements and the estimated time to fulfill each requirement are as
follows:
----------------------------------------------------------------------------------------------------------------
Respondent Total annual Average time per Total annual
CFR Section universe responses response burden hours
----------------------------------------------------------------------------------------------------------------
229.27--Annual tests............ 30,000 locomotives 120,000 tests..... 15 minutes........ 30,000 hours.
232.3--Applicability--Export, 655 railroads..... 8 cards........... 10 minutes........ 1 hour.
industrial, & other cars not
owned by railroads-
identification.
232.7--Waivers.................. 655 railroads..... 10 petitions...... 160 hours......... 1,600 hours.
232.15--Movement of Defective 1,620,000 cars.... 128,400 tags/ 2.5 minutes....... 5,350 hours
Equipment--Tags/Records. records.
--Written Notification...... 1,620,000 cars.... 25,000 notices.... 3 minutes......... 1,250 hours.
232.17--Special Approval
Procedure.
--Petitions for special 655 railroads..... 1 petition........ 100 hours......... 100 hours.
approval of safety-critical
revision.
--Petitions for special 655 railroads..... 1 petition........ 100 hours......... 100 hours.
approval of pre-revenue
service acceptance plan.
--Service of petitions...... 655 railroads..... 1 petition........ 20 hours.......... 20 hours.
--Statement of interest..... Public/railroads.. 4 statements...... 8 hours........... 32 hours.
--Comment................... Public/railroads.. 13 comments....... 4 hours........... 52 hours.
232.103--Gen'l requirements--all 114,000 cars...... 70,000 sticker.... 10 minutes........ 11,667 hours.
train brake systems--Stickers.
Proposed Rule New Requirements
232.103(n)(3)(iv)--RR Procedure Already Fulfilled Fulfilled under Fulfilled under Fulfilled under
for Securing Unattended under OMB No. 210- OMB No. 210-0601. OMB No. 210-0601. OMB No. 210-0601.
Locomotive. 0601.
232.103(n)(7)--RR Plan 655 railroads..... 10 revised plans.. 10 hours.......... 100 hours.
Identifying Specific Locations
or Circumstances where
Equipment May Be Left
Unattended.
--Notification to FRA When 655 railroads..... 10 notices........ 30 minutes........ 5 hours.
RR Develops and Hast Plan
in Place or Modifies
Existing Plan.
232.103(n)(8)--Employee Included under Included Under Included under Included under
Verification with Another Sec. Sec. Sec. Sec.
Qualified Employee of 232.103(n)(9). 232.103(n)(9). 232.103(n)(9). 232.103(n)(9).
Securement of Freight Train or
Freight Car Left Unattended.
232.103(n)(9)--RR Implementation 655 railroads..... 491 revised rules/ 2 hours........... 982 hours.
of Op. Rules/Practices practices.
Requiring Job Briefing for
Securement of Unattended
Equipment.
--Securement Job Briefings.. 100,000 Employees. 23,400,000 job 30 seconds........ 195,000 hours.
briefings.
232.103(n)(10)--RR Adoption of 655 railroads..... 100 inspections/ 4 hours........... 400 hours.
Procedure for Verification of records.
Securement of Equipment by
Qualified Employee--Inspection
of Equipment by Qualified
Employee after Responder Visit.
232.105--General requirements 30,000 Locomotives 30,000 forms...... 5 minutes......... 2,500 hours.
for locomotives--Inspection.
Proposed Rule New Requirements
232.105(h)--RR Inspection of 30,000 Locomotives 30,000 insp. 30 seconds........ 250 hours.
Locomotive Exterior Locking records.
Mechanism/Records.
--RR Repair, where 30,000 Locomotives 73 repairs/records 60.25 minutes..... 73 hours.
necessary, of Locomotive
Exterior Locking Mechanism.
232.107--Air source requirements 10 new railroads.. 1 plan............ 40 hours.......... 40 hours.
and cold weather operations--
Monitoring Plan (Subsequent
Years).
--Amendments/Revisions to 50 railroads/plans 10 revisions...... 20 hours.......... 200 hours.
Plan.
--Recordkeeping............. 50 railroads/plans 1,150 records..... 20 hours.......... 23,000 hours.
232.109--Dynamic brake 655 railroads..... 1,656,000 rec..... 4 minutes......... 110,400 hours.
requirements--status/record.
--Inoperative dynamic 30,000 locomotives 6,358 records..... 4 minutes......... 424 hours.
brakes: Repair record.
--Tag bearing words 30,000 locomotives 6,358 tags........ 30 seconds........ 53 hours.
``inoperative dynamic
brakes''.
--Deactivated dynamic brakes 8,000 locomotives. 10 markings....... 5 minutes......... 1 hour.
(Sub. Yrs.).
--Operating rules 5 new railroads... 5 .rules.......... 4 hours........... 20 hours.
(Subsequent Years).
--Amendments/Revisions...... 655 railroads..... 15 revisions...... 1 hour............ 15 hours.
[[Page 53379]]
--Requests to increase 5 mph 655 railroads..... 5 requests........ 30 min. + 20 hours 103 hours.
Overspeed restriction.
--Knowledge criteria-- 5 new railroads... 5 amendments...... 16 hours.......... 80 hours.
locomotive engineers--
Subsequent Years.
232.111--Train information 5 new railroads... 5 procedures...... 40 hours.......... 200 hours.
handling.
--Sub. Yrs.--Amendments/ 100 railroads..... 100 revisions..... 20 hours.......... 2,000 hours.
Revisions.
--Report requirements to 655 railroads..... 2,112,000 reports. 10 minutes........ 352,000 hours.
train crew.
232.203--Training requirements-- 15 railroads...... 5 programs........ 100 hours......... 500 hours.
Tr. Prog.--Sub Yr.
--Amendments to written 655 railroads..... 559 revisions..... 8 hours........... 4,472 hours.
program.
--Training records.......... 655 railroads..... 67,000 record..... 8 minutes......... 8,933 hours.
--Training notifications.... 655 railroads..... 67,000 notices.... 3 minutes......... 3,350 hours.
--Audit program............. 655 railroads..... 1 plan + 559 40 hours/1 min.... 49 hours.
copies.
--Amendments to validation/ 655 railroads..... 50 revisions...... 20 hours.......... 1,000 hours.
assessment program.
232.205--Class 1 brake test-- 655 railroads..... 1,646,000 notices/ 45 seconds........ 20,575 hours.
Notifications/Records. record.
232.207--Class 1A brake tests-- 655 railroads..... 5 lists........... 1 hour............ 5 hours.
Designation Lists Where
Performed.
Subsequent Years: Notice of 655 railroads..... 250 notices....... 10 minutes........ 42 hours.
Change to.
232.209--Class II brake tests-- 655 railroads..... 1,597,400 comments 3 seconds......... 1,331 hours.
intermediate ``Roll-by
inspection--Results to train
driver.
232.213--Written Designation to 83,000 long dist. 250 letters....... 15 minutes........ 63 hours.
FRA of Extended haul trains. movements.
232.303--General requirements-- 1,600,000 frgt. 5,600 tags........ 5 minutes......... 467 hours.
single car test: Tagging of cars.
Moved Equipment.
--Last repair track brake 1,600,000 frgt. 320,000 markings.. 5 minutes......... 26,667 hours.
test/single car test-- cars.
Stenciled on Side of
Equipment.
232.305--Single Car Tests-- 1,600,000 frgt. 320,000 tests/ 60 minutes........ 320,000 hours.
Performance and Records. cars. records.
232.307--Modification of single AAR............... 1 request + 3 100 hours + 5 100 hours.
car air brake test procedures: copies. minutes.
Requests.
--Affirmation Statement on AAR............... 1 statement + 4 30 minutes + 5 1 hour.
Mod. Req. To Employee copies. minutes.
Representatives.
--Comments on Modification Railroad/Public... 2 comments........ 8 hours........... 16 hours.
Request.
232.309--Repair track brake test 640 shops......... 5,000 tests....... 30 minutes........ 2,500 hours.
232.403--Unique Code............ 245 railroads..... 12 requests....... 5 minutes......... 1 hour.
232.407--EOT Operations 245 railroads..... 50,000 verbal 30 seconds........ 417 hours.
requiring 2-way Voice Radio comments.
Communications.
232.409--Inspection/Tests/ 245 railroads..... 447,500 tests/ 30 seconds........ 3,729 hours.
Records EOTs. notices/record.
--Telemetry Equipment-- 245 railroads..... 32,708 units 1 minute.......... 545 hours.
Testing and Calibration. marked.
232.503--Process to introduce 655 railroads..... 1 letter.......... 1 hour............ 1 hour.
new brake technology.
--Special approval.......... 655 railroads..... 1 request......... 3 hours........... 3 hours.
232.505--Pre-revenue svc accept.
test plan.
--Submission of maintenance 655 railroads..... 1 procedure....... 160 hours......... 160 hours.
procedure.
--Amendments to maintenance 655 railroads..... 1 revision........ 40 hours.......... 40 hours.
procedure.
--Design description........ 655 railroads..... 1 petition........ 67 hours.......... 67 hours.
--Report to FRA Assoc. 655 railroads..... 1 report.......... 13 hours.......... 13 hours.
Admin. for Railroad Safety.
--Brake system technology 655 railroads..... 1 description..... 40 hours.......... 40 hours.
testing.
232.603--Configuration 4 railroads....... 1 plan............ 160 hours......... 160 hours.
Management--Configuration
Management Plan (ECP).
--Subsequent Years-- 4 railroads....... 1 plan............ 60 hours.......... 60 hours.
Configuration Management
Plans.
--Request for Modification 4 railroads....... 1 request + 2 8 hours + 5 8 hours.
of Standards and Extra copies. minutes.
Copies to FRA.
--Affirmative Statements 4 railroads....... 4 statements + 24 60 minutes + 5 6 hours.
that RRs have served copies copies. minutes.
of Modification Request to
Employee Representatives.
--Comments on requested Public/Industry... 4 comments........ 2 hours........... 8 hours.
modification.
232.605--ECP Brakes: Training-- 1 railroad........ 1 program......... 100 hours......... 100 hours.
Adopt/Developing an ECP
Training Program--First Year.
--Subsequent Years--ECP 1 railroad........ 1 program......... 100 hour.......... 100 hours.
Training Prog.
--ECP Brakes Training of 1 railroad........ 1,602 trained 8 hours/24 hrs.... 26,480 hours.
Employees--First Year. employees.
--ECP Brakes Training of 2 railroads....... 1,602 trained 1 hour/8 hours.... 7,580 hours.
Employees--Subsequent Years. employees.
[[Page 53380]]
--ECP Training Records--Yr. 2 railroads....... 1,602 records..... 8 minutes......... 214 hours.
One.
--ECP Training Records-- 2 railroads....... 1,602 records..... 4 minutes......... 107 hours.
Subsequent Yrs.
--Assessment of ECP Training 2 railroads....... 1 ECP plan........ 40 hours.......... 40 hours.
Plan.
--Adopt Operating Rules for 2 railroads....... 1 Oper. Rule...... 24 hours.......... 24 hours.
ECP Brakes.
--Amended Locomotive 2 railroads....... 1 amended programs 40 hours.......... 40 hours.
Engineer Certification
Program (ECP Brakes).
232.607--ECP Inspection and 1 railroad........ 2,500 insp.+ 2,500 90 min. + 45 3,781 hours.
Testing--Initial Terminal-- notices. seconds.
Inspections and Notification/
Record of Class I Brake Tests.
--Cars added or removed en 1 railroad........ 250 inspection + 60 minutes + 45 253 hours.
route--Class I Brake Test 125 notices. seconds.
and Notification.
--Non-ECP cars added to ECP 200 Cars.......... 50 insp.+ 100 tags/ 5 minutes + 2.5 8 hours.
Trains--Inspections and records. minutes.
Tags for Defective Cars.
232.609--Handling of Defective 25 Cars........... 50 tags/records... 2.5 minutes....... 2 hours.
Equipment with ECP Brake
Systems--Freight Car w/
defective conventional brakes
moved in train operating in ECP
brake mode.
--Inspections/Tagging for 20 Cars........... 20 insp. + 40 tags/ 5 minutes + 2.5 3 hours.
ECP Train moving w/less records. minutes.
than 85 percent operative/
effective brakes.
--Cars tagged in accordance 25 Cars........... 50 tags/records... 2.5 minutes....... 2 hours.
with Section 232.15.
232.609--Conventional Train with 50 Cars........... 100 tags/records.. 2.5 minutes....... 4 hours.
stand-alone ECP brake equipped
cars--Tagging.
--Procedures for handling 2 railroads....... 2 procedures...... 24 hours.......... 48 hours.
ECP brake system repairs
and designation of repair
locations.
--List of repair locations.. 2 railroads....... 2 lists........... 8 hours........... 16 hours.
--Notification to FRA Safety 2 railroads....... 1 notification.... 1 hour............ 1 hour.
Administrator regarding
change to repair location
list.
232.611--Periodic Maintenance-- 500 Freight Cars.. 500 insp./rcds.... 10 minutes........ 83 hours.
Inspections before being
released from repair Shop.
--Procedures/Petition for 1 Railroad Rep.... 1 petition + 2 24 hours + 5 24 hours.
ECP Single Car Test. copies. minutes.
--Single Car Air Brake 50 Freight Cars... 50 tests/records.. 45 minutes........ 38 hours.
Tests--Records.
--Modification of Single Car 1 Railroad Rep.... 1 mod. Proc....... 40 hours.......... 40 hours.
Test Standards.
----------------------------------------------------------------------------------------------------------------
The new requirements of the proposed rule essentially duplicate
those already approved by OMB for Emergency Order No. 28 (under OMB No.
2130-0601). When this instant rule becomes final (assuming no changes
from proposed to final rule) and the information collection associated
with it is approved by OMB (under OMB No. 2130-0008), FRA will
discontinue OMB No. 2130-0601 and eliminate the 205,404 hour burden
associated with it from the OMB inventory. Thus, the FRA total burden
in OMB's inventory then will actually show a net reduction of 24,520
hours from the present inventory.
As reflected in the below table, program changes will have
increased the number of burden hours by 196,810 hours, and increased
the number of responses by 23,430,684. The current inventory shows a
burden total of 991,451 hours, while the present submission exhibits a
burden total of 1,172,335 hours. Hence, there is a total burden
increase of 180,884 hours for this information collection request.
Accordingly here is the table for program changes:
--------------------------------------------------------------------------------------------------------------------------------------------------------
Responses & avg. time Responses & avg. time Burden hours FRA burden hours Difference (plus/
CFR Section (previous submission) (this submission) (previous submission) (this submission) minus)
--------------------------------------------------------------------------------------------------------------------------------------------------------
232.103(n)(7)--RR Plan identifying 0 revised plans....... 10 revised plans...... 0 hours.............. 100 hours............ +100 hours
specific locations where equipment 0 hours............... 10 hours.............. +10 responses.
may be left unattended.
--Notification to FRA when RR 0 notices............. 10 notices............ 0 hours.............. 5 hours.............. +5 hours
develops & has plan in place 0 minutes............. 30 minutes............ +10 responses.
or modifies existing plan.
--(n)(9)--Railroad 0 revised rules/ 491 revised rules/ 0 hours.............. 982 hours............ +982 hours
Implementation of operating practices. practices. +491 resp.
rules requiring job briefing 0 hours............... 2 hours...............
for securing unattended trains.
[[Page 53381]]
232.103(n)(9)--Securement Job 0 job briefings....... 23,400,000 job 0 hours.............. 195,000 hours........ +195,000 hrs.
Briefings. 0 seconds............. briefings. +23,400,000
30 seconds............ responses.
--(n)(10)--Inspection of 0 inspections......... 100 inspections....... 0 hours.............. 400 hours............ +400 hours
equipment after emergency 0 hours............... 4 hours............... +100 resp.
responder visit.
232.105(h)--RR inspection of 0 inspections......... 30,000 inspections/ 0 hours.............. 250 hours............ +250 hours
exterior locking mechanism on 0 seconds............. records. +30,000 resp.
locomotive left unattended outside 30 seconds............
a yard.
--RR repair, where necessary, 0 repairs/record...... 73 repairs/records.... 0 hours.............. 73 hours............. +73 hours
of locomotive exterior locking 0 minutes............. 60.25 minutes......... +73 responses.
mechanism.
--------------------------------------------------------------------------------------------------------------------------------------------------------
All estimates include the time for reviewing instructions;
searching existing data sources; gathering or maintaining the needed
data; and reviewing the information. Pursuant to 44 U.S.C.
3506(c)(2)(B), FRA solicits comments concerning: Whether these
information collection requirements are necessary for the proper
performance of the functions of FRA, including whether the information
has practical utility; the accuracy of FRA's estimates of the burden of
the information collection requirements; the quality, utility, and
clarity of the information to be collected; and whether the burden of
collection of information on those who are to respond, including
through the use of automated collection techniques or other forms of
information technology, may be minimized. For information or a copy of
the paperwork package submitted to OMB, contact Mr. Robert Brogan,
Information Clearance Officer, at 202-493-6292, or Ms. Kimberly Toone
at 202-493-6132.
Organizations and individuals desiring to submit comments on the
collection of information requirements should direct them to Mr. Robert
Brogan or Ms. Kimberly Toone, Federal Railroad Administration, 1200 New
Jersey Avenue SE., 3rd Floor, Washington, DC 20590. Comments may also
be submitted via email to Mr. Brogan or Ms. Toone at the following
address: Robert.Brogan@dot.gov; Kimberly.Toone@dot.gov.
OMB is required to make a decision concerning the collection of
information requirements contained in this proposed rule between 30 and
60 days after publication of this document in the Federal Register.
Therefore, a comment to OMB is best assured of having its full effect
if OMB receives it within 30 days of publication. The final rule will
respond to any OMB or public comments on the information collection
requirements contained in this proposal.
FRA is not authorized to impose a penalty on persons for violating
information collection requirements which do not display a current OMB
control number, if required. FRA intends to obtain current OMB control
numbers for any new information collection requirements resulting from
this rulemaking action prior to the effective date of the final rule.
The OMB control number, when assigned, will be announced by separate
notice in the Federal Register.
D. Federalism
Executive Order 13132, ``Federalism'' (64 FR 43255, Aug. 10, 1999),
requires FRA to develop an accountable process to ensure ``meaningful
and timely input by State and local officials in the development of
regulatory policies that have federalism implications.'' ``Policies
that have federalism implications'' are defined in the Executive Order
to include regulations that have ``substantial direct effects on the
States, on the relationship between the national government and the
States, or on the distribution of power and responsibilities among the
various levels of government.'' Under Executive Order 13132, the agency
may not issue a regulation with federalism implications that imposes
substantial direct compliance costs and that is not required by
statute, unless the Federal government provides the funds necessary to
pay the direct compliance costs incurred by State and local governments
or the agency consults with State and local government officials early
in the process of developing the regulation. Where a regulation has
federalism implications and preempts State law, the agency seeks to
consult with State and local officials in the process of developing the
regulation.
This proposed rule has been analyzed in accordance with the
principles and criteria contained in Executive Order 13132. FRA has
determined that the proposed rule does not have substantial direct
effects on the States, on the relationship between the national
government and the States, or on the distribution of power and
responsibilities among the various levels of government. In addition,
FRA has determined that this proposed rule does not impose substantial
direct compliance costs on State and local governments. Therefore, the
consultation and funding requirements of Executive Order 13132 do not
apply.
This rule adds requirements to part 232. FRA is not aware of any
State having regulations similar to these proposals. However, FRA notes
that this part could have preemptive effect by the operation of law
under a provision of the former Federal Railroad Safety Act of 1970,
repealed, revised, reenacted, and codified at 49 U.S.C. 20106 (Sec.
20106). Sec. 20106 provides that States may not adopt or continue in
effect any law, regulation, or order related to railroad safety or
security that covers the subject matter of a regulation prescribed or
order issued by the Secretary of Transportation (with respect to
railroad safety matters) or the Secretary of Homeland Security (with
respect to railroad security matters), except when the State law,
regulation, or order qualifies under the ``essentially local safety or
security hazard'' exception to Sec. 20106. In addition, section
20119(b) authorizes FRA to issue a rule governing the discovery and use
of risk analysis information in litigation.
In sum, FRA has analyzed this proposed rule in accordance with the
principles and criteria contained in Executive Order 13132. As
explained above, FRA has determined that this proposed rule has no
federalism implications, other than the possible preemption of State
laws under 49 U.S.C. 20106 and 20119. Accordingly, FRA has determined
that preparation of
[[Page 53382]]
a federalism summary impact statement for this proposed rule is not
required.
E. International Trade Impact Assessment
The Trade Agreement Act of 1979 prohibits Federal agencies from
engaging in any standards or related activities that create unnecessary
obstacles to the foreign commerce of the United States. Legitimate
domestic objectives, such as safety, are not considered unnecessary
obstacles. The statute also requires consideration of international
standards and where appropriate, that they be the basis for U.S.
standards. This rulemaking is purely domestic in nature and is not
expected to affect trade opportunities for U.S. firms doing business
overseas or for foreign firms doing business in the United States.
F. Environmental Assessment
FRA has evaluated this rule in accordance with its ``Procedures for
Considering Environmental Impacts'' (FRA's Procedures) (64 FR 28545,
May 26, 1999) as required by the National Environmental Policy Act (42
U.S.C. 4321 et seq.), other environmental statutes, Executive Orders,
and related regulatory requirements. FRA has determined that this rule
is not a major FRA action (requiring the preparation of an
environmental impact statement or environmental assessment) because it
is categorically excluded from detailed environmental review pursuant
to section 4(c)(20) of FRA's Procedures. See 64 FR 28547, May 26, 1999.
Section 4(c)(20) reads as follows: ``(c) Actions categorically
excluded. Certain classes of FRA actions have been determined to be
categorically excluded from the requirements of these Procedures as
they do not individually or cumulatively have a significant effect on
the human environment. * * * The following classes of FRA actions are
categorically excluded:
* * * (20) Promulgation of railroad safety rules and policy statements
that do not result in significantly increased emissions or air or water
pollutants or noise or increased traffic congestion in any mode of
transportation.''
In accordance with section 4(c) and (e) of FRA's Procedures, the
agency has further concluded that no extraordinary circumstances exist
with respect to this proposed regulation that might trigger the need
for a more detailed environmental review. As a result, FRA finds that
this rule is not a major Federal action significantly affecting the
quality of the human environment.
G. Unfunded Mandates Reform Act of 1995
Pursuant to section 201 of the Unfunded Mandates Reform Act of 1995
(Pub. L. 104-4, 2 U.S.C. 1531), each Federal agency ``shall, unless
otherwise prohibited by law, assess the effects of Federal regulatory
actions on State, local, and tribal governments, and the private sector
(other than to the extent that such regulations incorporate
requirements specifically set forth in law).'' Section 202 of the Act
(2 U.S.C. 1532) further requires that ``before promulgating any general
notice of proposed rulemaking that is likely to result in the
promulgation of any rule that includes any Federal mandate that may
result in expenditure by State, local, and tribal governments, in the
aggregate, or by the private sector, of $100,000,000 or more (adjusted
annually for inflation) in any 1 year, and before promulgating any
final rule for which a general notice of proposed rulemaking was
published, the agency shall prepare a written statement'' detailing the
effect on State, local, and tribal governments and the private sector.
For the year 2013, this monetary amount of $100,000,000 has been
adjusted to $151,000,000 to account for inflation. This proposed rule
will not result in the expenditure of more than $151,000,000 by the
public sector in any one year, and thus preparation of such a statement
is not required.
H. Energy Impact
Executive Order 13211 requires Federal agencies to prepare a
Statement of Energy Effects for any ``significant energy action.'' 66
FR 28355, May 22, 2001. Under the Executive Order, a ``significant
energy action'' is defined as any action by an agency (normally
published in the Federal Register) that promulgates, or is expected to
lead to the promulgation of, a final rule or regulation (including a
notice of inquiry, advance NPRM, and NPRM) that (1)(i) is a significant
regulatory action under Executive Order 12866 or any successor order
and (ii) is likely to have a significant adverse effect on the supply,
distribution, or use of energy; or (2) is designated by the
Administrator of the Office of Information and Regulatory Affairs as a
significant energy action. FRA has evaluated this proposed rule in
accordance with Executive Order 13211. FRA has determined that this
proposed rule will not have a significant adverse effect on the supply,
distribution, or use of energy. Consequently, FRA has determined that
this proposed regulatory action is not a ``significant energy action''
within the meaning of Executive Order 13211.
I. Privacy Act
Interested parties should be aware that anyone is able to search
the electronic form of all comments received into any agency docket by
the name of the individual submitting the comment (or signing the
comment, if submitted on behalf of an association, business, labor
union, etc.). You may review DOT's complete Privacy Act Statement in
the Federal Register published on April 11, 2000 (65 FR 19477-19478),
or you may visit https://www.dot.gov/privacy.html.
List of Subjects in 49 CFR Part 232
Hazardous material, Power brakes, Railroad safety, Securement.
The Proposed Rule
In consideration of the foregoing, FRA is proposing to amend part
232 of chapter II, subtitle B of title 49, Code of Federal Regulations
as follows:
PART 232--[AMENDED]
0
1. The authority citation for part 232 is revised to read as follows:
Authority: 49 U.S.C. 20102-20103, 20107, 20133, 20141, 20301-
20303, 20306, 21301-20302, 21304; 28 U.S.C. 2461, note; and 49 CFR
1.89.
0
2. Section 232.5 is amended by adding in alphabetical order the
definition of ``Unattended equipment'', by removing the word ``limits''
from the term ``Yard limits'', and by moving the newly designated
definition of ``Yard'' before the definition of ``Yard air'' to read as
follows:
Sec. 232.5 Definitions.
* * * * *
Unattended equipment means equipment left standing and unmanned in
such a manner that the brake system of the equipment cannot be readily
controlled by a qualified person.
* * * * *
Yard * * *
0
3. Amend Sec. 232.103 by:
0
a. Revising paragraphs (n) introductory text and (n)(1) through (3).
0
b. Adding paragraphs (n)(6) through (10).
The revisions and additions read as follows:
Sec. 232.103 General requirements for all train brake systems.
* * * * *
(n) Securement of unattended equipment. Unattended equipment shall
be secured in accordance with the following requirements:
[[Page 53383]]
(1) A sufficient number of hand brakes, to be not fewer than one,
shall be applied to hold the equipment unless an acceptable alternative
method of securement is provided. Railroads shall develop and implement
a process or procedure to verify that the applied hand brakes will
sufficiently hold the equipment with the air brakes released.
(2) Except for equipment connected to a source of compressed air
(e.g., locomotive or ground air source), prior to leaving equipment
unattended, the brake pipe shall be reduced to zero at a rate that is
no less than a service rate reduction, and the brake pipe vented to
atmosphere by leaving the angle cock in the open position on the first
unit of the equipment left unattended. A train's air brake shall not be
depended upon to hold equipment standing unattended (including a
locomotive, a car, or a train whether or not locomotive is attached).
(3) Except for distributed power units, the following requirements
apply to unattended locomotives:
(i) All hand brakes shall be fully applied on all locomotives in
the lead consist of an unattended train.
(ii) All hand brakes shall be fully applied on all locomotives in
an unattended locomotive consist outside of a yard.
(iii) At a minimum, the hand brake shall be fully applied on the
lead locomotive in an unattended locomotive consist within a yard.
(iv) A railroad shall develop, adopt, and comply with procedures
for securing any unattended locomotive required to have a hand brake
applied pursuant to paragraph (n)(3)(i) through (n)(3)(iii) of this
section when the locomotive is not equipped with an operative hand
brake.
* * * * *
(6)(i) The requirements in paragraph (n)(7) through (n)(8) of this
section apply to any freight train or standing freight car or cars that
contain:
(A) Any loaded freight car containing a material poisonous by
inhalation as defined in Sec. 171.8 of this title, including anhydrous
ammonia (UN 1005) and ammonia solutions (UN 3318); or
(B) Twenty (20) or more loaded cars or loaded intermodal portable
tanks of any one or any combination of a hazardous material listed in
paragraph (n)(6)(i)(A), or any Division 2.1 (flammable gas), Class 3
(flammable or combustible liquid), Class 1.1 or 1.2 (explosive), or a
hazardous substance listed at Sec. 173.31(f)(2) of this title.
(ii) For the purposes of this paragraph, a tank car containing a
residue of a hazardous material as defined in Sec. 171.8 of this title
is not considered a loaded car.
(7)(i) No equipment described in paragraph (n)(6) of this section
shall be left unattended on a main track or siding (except when that
main track or siding runs through, or is directly adjacent to a yard)
until the railroad has adopted and is complying with a plan identifying
specific locations or circumstances when the equipment may be left
unattended. The plan shall contain sufficient safety justification for
determining when equipment may be left unattended. The railroad must
notify FRA when the railroad develops and has in place a plan, or
modifies an existing plan, under this provision prior to operating
pursuant to the plan. The plan shall be made available to FRA upon
request. FRA reserves the right to require modifications to any plan
should it determine the plan is not sufficient.
(ii) Except as provided in paragraph (n)(8)(iii) of this section,
any freight train described in paragraph (n)(6) of this section that is
left unattended on a main track or siding that runs through, or is
directly adjacent to a yard shall comply with the requirements
contained in paragraphs (n)(8)(i) and (n)(8)(ii) of this section.
(8)(i) Where a freight train or standing freight car or cars as
described in paragraph (n)(6) of this section is left unattended on a
main track or siding outside of a yard, and not directly adjacent to a
yard, an employee responsible for securing the equipment shall verify
with another person qualified to make the determination that the
equipment is secured in accordance with the railroad's processes and
procedures.
(ii) The controlling locomotive cab of a freight train described in
paragraph (n)(6) of this section shall be locked on locomotives capable
of being locked. If the controlling cab is not capable of being locked,
the reverser on the controlling locomotive shall be removed from the
control stand and placed in a secured location.
(iii) A locomotive that is left unattended on a main track or
siding that runs through, or is directly adjacent to, a yard is
excepted from the requirements in (n)(8)(ii) of this section where the
locomotive is not equipped with an operative lock and the locomotive
has a reverser that cannot be removed from its control stand or has a
reverser that is necessary for cold weather operations.
(9) Each railroad shall implement operating rules and practices
requiring the job briefing of securement for any activity that will
impact or require the securement of any unattended equipment in the
course of the work being performed.
(10) Each railroad shall adopt and comply with procedures to ensure
that, as soon as safely practicable, a qualified employee verifies the
proper securement of any unattended equipment when the railroad has
knowledge that a non-railroad emergency responder has been on, under,
or between the equipment.
* * * * *
0
4. Add paragraph (h) to Sec. 232.105 to read as follows:
Sec. 232.105 General requirements for locomotives.
* * * * *
(h)(1) After March 1, 2017, each locomotive left unattended outside
of a yard or on a track directly adjacent to the yard shall be equipped
with an operative exterior locking mechanism.
(2) The railroad shall inspect and, where necessary, repair the
locking mechanism during a locomotive's periodic inspection required in
Sec. 229.23 of this chapter.
(3) In the event that a locking mechanism becomes inoperative
during the time interval between periodic inspections, the railroad
must repair the locking mechanism within 30 days of finding the
inoperative lock.
(4) A railroad may continue the use of a locomotive without an
operative locking mechanism; however, if the controlling locomotive of
a train meeting the requirements of Sec. 232.103(n)(6)(i) does not
have an operative locking mechanism for the locomotive, the train must
not be left unattended on main track or a siding unless the reverser is
removed from the control stand as required in Sec. 232.103(n)(8)(ii)
or the locomotive otherwise meets one of the exceptions described in
Sec. 232.103(n)(8)(iii).
* * * * *
Joseph C. Szabo,
Administrator.
[FR Doc. 2014-21253 Filed 9-8-14; 8:45 am]
BILLING CODE 4910-06-P