ANR Pipeline Company; Notice of Request Under Blanket Authorization, 53190 [2014-21311]
Download as PDF
53190
Federal Register / Vol. 79, No. 173 / Monday, September 8, 2014 / Notices
Dated: September 2, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–21312 Filed 9–5–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP14–540–000]
rmajette on DSK2TPTVN1PROD with NOTICES
ANR Pipeline Company; Notice of
Request Under Blanket Authorization
Take notice that on August 22, 2014
ANR Pipeline Company (ANR), 717
Texas Street, Houston, Texas 77002–
2761, filed in the above Docket, a prior
notice request pursuant to sections
157.205 and 157.208(b) of the
Commission’s regulations under the
Natural Gas Act (NGA) and ANR’s
blanket certificate issued in CP82–480–
000, for authorization to construct, own
and operate facilities to expand its
existing meter station and
interconnection, located in Shelby
County, Indiana. The REX Shelbyville
Meter Station Expansion Project is
designed to meet new firm contractual
commitments up to 657 million cubic
feet per day and to provide enhanced
receipt point flexibility, all as more fully
set forth in the application which is on
file with the Commission and open to
public inspection. The filing may also
be viewed on the web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Any questions concerning this
application may be directed to Linda
Farquhar, Manager, Project
Determinations & Regulatory
Administration, ANR Pipeline
Company, 717 Texas Street, Houston,
Texas 77002–2761, at (832) 320–5685 or
fax (832) 320–6685 or linda_farquhar@
transcanada.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR § 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
VerDate Mar<15>2010
15:14 Sep 05, 2014
Jkt 232001
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
Natural Gas Act (NGA) (18 CFR 157.205)
file a protest to the request. If no protest
is filed within the time allowed
therefore, the proposed activity shall be
deemed to be authorized effective the
day after the time allowed for protest. If
a protest is filed and not withdrawn
within 30 days after the time allowed
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Persons who wish to comment only
on the environmental review of this
project should submit an original and
two copies of their comments to the
Secretary of the Commission.
Environmental commenters will be
placed on the Commission’s
environmental mailing list, will receive
copies of the environmental documents,
and will be notified of meetings
associated with the Commission’s
environmental review process.
Environmental commenters will not be
required to serve copies of filed
documents on all other parties.
However, the non-party commenters
will not receive copies of all documents
filed by other parties or issued by the
Commission (except for the mailing of
environmental documents issued by the
Commission) and will not have the right
to seek court review of the
Commission’s final order.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link.
Dated: September 2, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–21311 Filed 9–5–14; 8:45 am]
BILLING CODE 6717–01–P
PO 00000
Frm 00029
Fmt 4703
Sfmt 4703
ENVIRONMENTAL PROTECTION
AGENCY
[EPA–HQ–OAR–2010–0162; FRL–9916–26–
OAR]
Agency Information Collection
Activities; Proposed Collection;
Comment Request; Reporting and
Recordkeeping Requirements for
Greenhouse Gas Emissions Standards
and Fuel Efficiency Standards for
Medium- and Heavy-Duty Engines and
Vehicles
Environmental Protection
Agency.
ACTION: Notice.
AGENCY:
The Environmental Protection
Agency (EPA) has submitted an
information collection request (ICR)
‘‘Greenhouse Gas Emissions Standards
and Fuel Efficiency Standards for
Medium- and Heavy-Duty Engines and
Vehicles’’ (EPA ICR No. 2394.03, OMB
Control No. 2060–0678), to the Office of
Management and Budget (OMB) for
review and approval in accordance with
the Paperwork Reduction Act (44 U.S.C.
3501 et seq.). This is a proposed
extension of the ICR, which is currently
approved through February 28, 2015.
Public comments were previously
requested via the Federal Register on
September 15, 2011 during a 60-day
comment period. This notice allows for
an additional 60 days for public
comments. A fuller description of the
ICR is given below, including its
estimated burden and cost to the public.
An Agency may not conduct or sponsor
and a person is not required to respond
to a collection of information unless it
displays a currently valid OMB control
number.
DATES: Additional comments may be
submitted on or before November 7,
2014.
SUMMARY:
Submit your comments,
referencing Docket ID Number Docket
ID No. EPA–HQ–OAR–2010–0162, to (1)
EPA online using www.regulations.gov
(our preferred method), by email to
a-and-r-Docket@epa.gov, or by mail to:
EPA Docket Center, Environmental
Protection Agency, Mail Code 28221T,
1200 Pennsylvania Ave. NW.,
Washington, DC 20460, and (2) OMB via
email to oira_submission@omb.eop.gov.
Address comments to OMB Desk Officer
for EPA.
EPA’s policy is that all comments
received will be included in the public
docket without change including any
personal information provided, unless
the comment includes profanity, threats,
information claimed to be Confidential
Business Information (CBI) or other
ADDRESSES:
E:\FR\FM\08SEN1.SGM
08SEN1
Agencies
[Federal Register Volume 79, Number 173 (Monday, September 8, 2014)]
[Notices]
[Page 53190]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-21311]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP14-540-000]
ANR Pipeline Company; Notice of Request Under Blanket
Authorization
Take notice that on August 22, 2014 ANR Pipeline Company (ANR), 717
Texas Street, Houston, Texas 77002-2761, filed in the above Docket, a
prior notice request pursuant to sections 157.205 and 157.208(b) of the
Commission's regulations under the Natural Gas Act (NGA) and ANR's
blanket certificate issued in CP82-480-000, for authorization to
construct, own and operate facilities to expand its existing meter
station and interconnection, located in Shelby County, Indiana. The REX
Shelbyville Meter Station Expansion Project is designed to meet new
firm contractual commitments up to 657 million cubic feet per day and
to provide enhanced receipt point flexibility, all as more fully set
forth in the application which is on file with the Commission and open
to public inspection. The filing may also be viewed on the web at
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket
number excluding the last three digits in the docket number field to
access the document. For assistance, please contact FERC Online Support
at FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or TTY,
contact (202) 502-8659.
Any questions concerning this application may be directed to Linda
Farquhar, Manager, Project Determinations & Regulatory Administration,
ANR Pipeline Company, 717 Texas Street, Houston, Texas 77002-2761, at
(832) 320-5685 or fax (832) 320-6685 or
lindafarquhar@transcanada.com.
Pursuant to section 157.9 of the Commission's rules, 18 CFR Sec.
157.9, within 90 days of this Notice the Commission staff will either:
Complete its environmental assessment (EA) and place it into the
Commission's public record (eLibrary) for this proceeding; or issue a
Notice of Schedule for Environmental Review. If a Notice of Schedule
for Environmental Review is issued, it will indicate, among other
milestones, the anticipated date for the Commission staff's issuance of
the final environmental impact statement (FEIS) or EA for this
proposal. The filing of the EA in the Commission's public record for
this proceeding or the issuance of a Notice of Schedule for
Environmental Review will serve to notify federal and state agencies of
the timing for the completion of all necessary reviews, and the
subsequent need to complete all federal authorizations within 90 days
of the date of issuance of the Commission staff's FEIS or EA.
Any person may, within 60 days after the issuance of the instant
notice by the Commission, file pursuant to Rule 214 of the Commission's
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of
intervention. Any person filing to intervene or the Commission's staff
may, pursuant to section 157.205 of the Commission's Regulations under
the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the
request. If no protest is filed within the time allowed therefore, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for protest. If a protest is filed and not
withdrawn within 30 days after the time allowed for filing a protest,
the instant request shall be treated as an application for
authorization pursuant to section 7 of the NGA.
Persons who wish to comment only on the environmental review of
this project should submit an original and two copies of their comments
to the Secretary of the Commission. Environmental commenters will be
placed on the Commission's environmental mailing list, will receive
copies of the environmental documents, and will be notified of meetings
associated with the Commission's environmental review process.
Environmental commenters will not be required to serve copies of filed
documents on all other parties. However, the non-party commenters will
not receive copies of all documents filed by other parties or issued by
the Commission (except for the mailing of environmental documents
issued by the Commission) and will not have the right to seek court
review of the Commission's final order.
The Commission strongly encourages electronic filings of comments,
protests, and interventions via the internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (www.ferc.gov) under the ``e-Filing'' link.
Dated: September 2, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-21311 Filed 9-5-14; 8:45 am]
BILLING CODE 6717-01-P