ANR Pipeline Company; Notice of Request Under Blanket Authorization, 53190 [2014-21311]

Download as PDF 53190 Federal Register / Vol. 79, No. 173 / Monday, September 8, 2014 / Notices Dated: September 2, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–21312 Filed 9–5–14; 8:45 am] BILLING CODE 6717–01–P DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP14–540–000] rmajette on DSK2TPTVN1PROD with NOTICES ANR Pipeline Company; Notice of Request Under Blanket Authorization Take notice that on August 22, 2014 ANR Pipeline Company (ANR), 717 Texas Street, Houston, Texas 77002– 2761, filed in the above Docket, a prior notice request pursuant to sections 157.205 and 157.208(b) of the Commission’s regulations under the Natural Gas Act (NGA) and ANR’s blanket certificate issued in CP82–480– 000, for authorization to construct, own and operate facilities to expand its existing meter station and interconnection, located in Shelby County, Indiana. The REX Shelbyville Meter Station Expansion Project is designed to meet new firm contractual commitments up to 657 million cubic feet per day and to provide enhanced receipt point flexibility, all as more fully set forth in the application which is on file with the Commission and open to public inspection. The filing may also be viewed on the web at https:// www.ferc.gov using the ‘‘eLibrary’’ link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, please contact FERC Online Support at FERCOnlineSupport@ ferc.gov or toll free at (866) 208–3676, or TTY, contact (202) 502–8659. Any questions concerning this application may be directed to Linda Farquhar, Manager, Project Determinations & Regulatory Administration, ANR Pipeline Company, 717 Texas Street, Houston, Texas 77002–2761, at (832) 320–5685 or fax (832) 320–6685 or linda_farquhar@ transcanada.com. Pursuant to section 157.9 of the Commission’s rules, 18 CFR § 157.9, within 90 days of this Notice the Commission staff will either: Complete its environmental assessment (EA) and place it into the Commission’s public record (eLibrary) for this proceeding; or issue a Notice of Schedule for Environmental Review. If a Notice of Schedule for Environmental Review is issued, it will indicate, among other milestones, the anticipated date for the Commission staff’s issuance of the final VerDate Mar<15>2010 15:14 Sep 05, 2014 Jkt 232001 environmental impact statement (FEIS) or EA for this proposal. The filing of the EA in the Commission’s public record for this proceeding or the issuance of a Notice of Schedule for Environmental Review will serve to notify federal and state agencies of the timing for the completion of all necessary reviews, and the subsequent need to complete all federal authorizations within 90 days of the date of issuance of the Commission staff’s FEIS or EA. Any person may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission’s Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention. Any person filing to intervene or the Commission’s staff may, pursuant to section 157.205 of the Commission’s Regulations under the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to section 7 of the NGA. Persons who wish to comment only on the environmental review of this project should submit an original and two copies of their comments to the Secretary of the Commission. Environmental commenters will be placed on the Commission’s environmental mailing list, will receive copies of the environmental documents, and will be notified of meetings associated with the Commission’s environmental review process. Environmental commenters will not be required to serve copies of filed documents on all other parties. However, the non-party commenters will not receive copies of all documents filed by other parties or issued by the Commission (except for the mailing of environmental documents issued by the Commission) and will not have the right to seek court review of the Commission’s final order. The Commission strongly encourages electronic filings of comments, protests, and interventions via the internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s Web site (www.ferc.gov) under the ‘‘e-Filing’’ link. Dated: September 2, 2014. Kimberly D. Bose, Secretary. [FR Doc. 2014–21311 Filed 9–5–14; 8:45 am] BILLING CODE 6717–01–P PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 ENVIRONMENTAL PROTECTION AGENCY [EPA–HQ–OAR–2010–0162; FRL–9916–26– OAR] Agency Information Collection Activities; Proposed Collection; Comment Request; Reporting and Recordkeeping Requirements for Greenhouse Gas Emissions Standards and Fuel Efficiency Standards for Medium- and Heavy-Duty Engines and Vehicles Environmental Protection Agency. ACTION: Notice. AGENCY: The Environmental Protection Agency (EPA) has submitted an information collection request (ICR) ‘‘Greenhouse Gas Emissions Standards and Fuel Efficiency Standards for Medium- and Heavy-Duty Engines and Vehicles’’ (EPA ICR No. 2394.03, OMB Control No. 2060–0678), to the Office of Management and Budget (OMB) for review and approval in accordance with the Paperwork Reduction Act (44 U.S.C. 3501 et seq.). This is a proposed extension of the ICR, which is currently approved through February 28, 2015. Public comments were previously requested via the Federal Register on September 15, 2011 during a 60-day comment period. This notice allows for an additional 60 days for public comments. A fuller description of the ICR is given below, including its estimated burden and cost to the public. An Agency may not conduct or sponsor and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number. DATES: Additional comments may be submitted on or before November 7, 2014. SUMMARY: Submit your comments, referencing Docket ID Number Docket ID No. EPA–HQ–OAR–2010–0162, to (1) EPA online using www.regulations.gov (our preferred method), by email to a-and-r-Docket@epa.gov, or by mail to: EPA Docket Center, Environmental Protection Agency, Mail Code 28221T, 1200 Pennsylvania Ave. NW., Washington, DC 20460, and (2) OMB via email to oira_submission@omb.eop.gov. Address comments to OMB Desk Officer for EPA. EPA’s policy is that all comments received will be included in the public docket without change including any personal information provided, unless the comment includes profanity, threats, information claimed to be Confidential Business Information (CBI) or other ADDRESSES: E:\FR\FM\08SEN1.SGM 08SEN1

Agencies

[Federal Register Volume 79, Number 173 (Monday, September 8, 2014)]
[Notices]
[Page 53190]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-21311]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP14-540-000]


ANR Pipeline Company; Notice of Request Under Blanket 
Authorization

    Take notice that on August 22, 2014 ANR Pipeline Company (ANR), 717 
Texas Street, Houston, Texas 77002-2761, filed in the above Docket, a 
prior notice request pursuant to sections 157.205 and 157.208(b) of the 
Commission's regulations under the Natural Gas Act (NGA) and ANR's 
blanket certificate issued in CP82-480-000, for authorization to 
construct, own and operate facilities to expand its existing meter 
station and interconnection, located in Shelby County, Indiana. The REX 
Shelbyville Meter Station Expansion Project is designed to meet new 
firm contractual commitments up to 657 million cubic feet per day and 
to provide enhanced receipt point flexibility, all as more fully set 
forth in the application which is on file with the Commission and open 
to public inspection. The filing may also be viewed on the web at 
https://www.ferc.gov using the ``eLibrary'' link. Enter the docket 
number excluding the last three digits in the docket number field to 
access the document. For assistance, please contact FERC Online Support 
at FERCOnlineSupport@ferc.gov or toll free at (866) 208-3676, or TTY, 
contact (202) 502-8659.
    Any questions concerning this application may be directed to Linda 
Farquhar, Manager, Project Determinations & Regulatory Administration, 
ANR Pipeline Company, 717 Texas Street, Houston, Texas 77002-2761, at 
(832) 320-5685 or fax (832) 320-6685 or 
lindafarquhar@transcanada.com.
    Pursuant to section 157.9 of the Commission's rules, 18 CFR Sec.  
157.9, within 90 days of this Notice the Commission staff will either: 
Complete its environmental assessment (EA) and place it into the 
Commission's public record (eLibrary) for this proceeding; or issue a 
Notice of Schedule for Environmental Review. If a Notice of Schedule 
for Environmental Review is issued, it will indicate, among other 
milestones, the anticipated date for the Commission staff's issuance of 
the final environmental impact statement (FEIS) or EA for this 
proposal. The filing of the EA in the Commission's public record for 
this proceeding or the issuance of a Notice of Schedule for 
Environmental Review will serve to notify federal and state agencies of 
the timing for the completion of all necessary reviews, and the 
subsequent need to complete all federal authorizations within 90 days 
of the date of issuance of the Commission staff's FEIS or EA.
    Any person may, within 60 days after the issuance of the instant 
notice by the Commission, file pursuant to Rule 214 of the Commission's 
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of 
intervention. Any person filing to intervene or the Commission's staff 
may, pursuant to section 157.205 of the Commission's Regulations under 
the Natural Gas Act (NGA) (18 CFR 157.205) file a protest to the 
request. If no protest is filed within the time allowed therefore, the 
proposed activity shall be deemed to be authorized effective the day 
after the time allowed for protest. If a protest is filed and not 
withdrawn within 30 days after the time allowed for filing a protest, 
the instant request shall be treated as an application for 
authorization pursuant to section 7 of the NGA.
    Persons who wish to comment only on the environmental review of 
this project should submit an original and two copies of their comments 
to the Secretary of the Commission. Environmental commenters will be 
placed on the Commission's environmental mailing list, will receive 
copies of the environmental documents, and will be notified of meetings 
associated with the Commission's environmental review process. 
Environmental commenters will not be required to serve copies of filed 
documents on all other parties. However, the non-party commenters will 
not receive copies of all documents filed by other parties or issued by 
the Commission (except for the mailing of environmental documents 
issued by the Commission) and will not have the right to seek court 
review of the Commission's final order.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the internet in lieu of paper. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site (www.ferc.gov) under the ``e-Filing'' link.

    Dated: September 2, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-21311 Filed 9-5-14; 8:45 am]
BILLING CODE 6717-01-P