Environmental Impact Statements; Notice of Availability, 53061-53062 [2014-21202]
Download as PDF
Federal Register / Vol. 79, No. 172 / Friday, September 5, 2014 / Notices
may also be paper-filed. To paper-file,
mail an original and seven copies to:
Kimberly D. Bose, Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Please put the project number (P–2337–
076) on the first page of the filing.
If no such motions are filed, the
restricted service list will be effective at
the end of the 15 day period. Otherwise,
a further notice will be issued ruling on
any motion or motions filed within the
15 day period.
Dated: August 27, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–21160 Filed 9–4–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP14–537–000]
rmajette on DSK2TPTVN1PROD with NOTICES
Southern Star Central Gas Pipeline,
Inc.; Notice of Request Under Blanket
Authorization
Take notice that on August 19, 2014,
Southern Star Central Gas Pipeline, Inc.
(Southern Star), 4700 State Highway 56,
Owensboro, Kentucky 42301, filed in
the above Docket, a prior notice request
pursuant to section 157.216 of the
Commission’s regulations under the
Natural Gas Act (NGA) for authorization
to permanently abandon and plug
eighteen vertical injection/withdrawal
gas storage wells within it Colony
Storage Field located in Anderson and
Allen Counties, Kansas. Southern Star
states that the wells are in close
proximity to residential homes within
the city limits of Colony and the
abandonment will result in no change to
the storage field’s current certificated
capabilities, all as more fully set forth in
the application which is on file with the
Commission and open to public
inspection. The filing may also be
viewed on the Web at https://
www.ferc.gov using the ‘‘eLibrary’’ link.
Enter the docket number excluding the
last three digits in the docket number
field to access the document. For
assistance, please contact FERC Online
Support at FERCOnlineSupport@
ferc.gov or toll free at (866) 208–3676, or
TTY, contact (202) 502–8659.
Any questions concerning this
application may be directed to David N.
Roberts, Analyst Staff, Regulatory
Compliance, Southern Star Central Gas
Pipeline, Inc., 4700 State Highway 56,
Owensboro, Kentucky 42301, at (270)
VerDate Mar<15>2010
14:29 Sep 04, 2014
Jkt 232001
852–4654 or fax at (270) 852–5010, or
email to david.n.roberts@sscgp.com.
Pursuant to section 157.9 of the
Commission’s rules, 18 CFR 157.9,
within 90 days of this Notice the
Commission staff will either: Complete
its environmental assessment (EA) and
place it into the Commission’s public
record (eLibrary) for this proceeding; or
issue a Notice of Schedule for
Environmental Review. If a Notice of
Schedule for Environmental Review is
issued, it will indicate, among other
milestones, the anticipated date for the
Commission staff’s issuance of the final
environmental impact statement (FEIS)
or EA for this proposal. The filing of the
EA in the Commission’s public record
for this proceeding or the issuance of a
Notice of Schedule for Environmental
Review will serve to notify federal and
state agencies of the timing for the
completion of all necessary reviews, and
the subsequent need to complete all
federal authorizations within 90 days of
the date of issuance of the Commission
staff’s FEIS or EA.
Any person may, within 60 days after
the issuance of the instant notice by the
Commission, file pursuant to Rule 214
of the Commission’s Procedural Rules
(18 CFR 385.214) a motion to intervene
or notice of intervention. Any person
filing to intervene or the Commission’s
staff may, pursuant to section 157.205 of
the Commission’s Regulations under the
Natural Gas Act (NGA) (18 CFR 157.205)
file a protest to the request. If no protest
is filed within the time allowed
therefore, the proposed activity shall be
deemed to be authorized effective the
day after the time allowed for protest. If
a protest is filed and not withdrawn
within 30 days after the time allowed
for filing a protest, the instant request
shall be treated as an application for
authorization pursuant to section 7 of
the NGA.
Protests will be considered by the
Commission in determining the
appropriate action to be taken, but will
not serve to make protestants parties to
the proceeding. Any person wishing to
become a party must file a notice of
intervention or motion to intervene, as
appropriate. Such motions or protests
must be filed on or before the comment
date. Anyone filing a motion to
intervene or protest must serve a copy
of that document on the Applicant, on
or before the comment date. It is not
necessary to serve motions to intervene
or protests on persons other than the
Applicant.
The Commission strongly encourages
electronic filings of comments, protests,
and interventions via the internet in lieu
of paper. See 18 CFR 385.2001(a)(1)(iii)
and the instructions on the
PO 00000
Frm 00047
Fmt 4703
Sfmt 4703
53061
Commission’s Web site (www.ferc.gov)
under the ‘‘e-Filing’’ link. Persons
unable to file electronically should
submit an original and seven copies of
the protest or intervention to the Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
Dated: August 28, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–21165 Filed 9–4–14; 8:45 am]
BILLING CODE 6717–01–P
ENVIRONMENTAL PROTECTION
AGENCY
[ER–FRL–9016–8]
Environmental Impact Statements;
Notice of Availability
Responsible Agency: Office of Federal
Activities, General Information (202)
564–7146 or https://www.epa.gov/
compliance/nepa/.
Weekly Receipt of Environmental
Impact Statements
Filed 08/25/2014 through 08/29/2014
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act
requires that EPA make public its
comments on EISs issued by other
Federal agencies. EPA’s comment letters
on EISs are available at: https://
www.epa.gov/compliance/nepa/
eisdata.html.
EIS No. 20140244, Final EIS, BIA, MA,
Mashpee Wampanoag Tribe Fee to
Trust Acquisition and Casino Project,
Review Period Ends: 10/06/2014,
Contact: Chester McGhee 615–564–
6500.
EIS No. 20140245, Draft EIS, BOEM, 00,
Gulf of Mexico OCS Oil and Gas Lease
Sales: 2015 and 2016; Western
Planning Area Lease Sales 246 and
248, Comment Period Ends: 10/20/
2014, Contact: Gary D. Goeke 504–
736–3233.
EIS No. 20140246, Draft EIS, USFS, CA,
Master Special Use Permit and Permit
to Construct Power Line Replacement
Projects, Comment Period Ends:
11/04/2014, Contact: Robert Hawkins
916–849–8037.
EIS No. 20140247, Draft EIS, USFWS,
CO, San Luis Valley National Wildlife
Refuge Complex, Comment Period
Ends: 10/27/2014, Contact: Laurie
Shannon 303–236–4317.
EIS No. 20140248, Final EIS, FTA, CA,
Downtown San Francisco Ferry
Terminal Expansion Project, Contact:
Alex Smith 415–744–2599. Under
MAP–21 section 1319, FTA has
E:\FR\FM\05SEN1.SGM
05SEN1
53062
Federal Register / Vol. 79, No. 172 / Friday, September 5, 2014 / Notices
rmajette on DSK2TPTVN1PROD with NOTICES
issued a single FEIS and ROD.
Therefore, the 30-day wait/review
period under NEPA does not apply to
this action.
EIS No. 20140249, Final EIS, USFS, CA,
Rim Fire Recovery, Contact: Maria
Benech 209–532–3671. The issuance
of this Final EIS reflects the
President’s Council on Environmental
Quality (CEQ) alternative
arrangements granted in accordance
with 40 CFR 1506.11 on December 9,
2013. CEQ specifically eliminated the
30-day waiting period between the
publication of the FEIS and the
Record of Decision.
EIS No. 20140250, Final EIS, HHS, GA,
Centers for Disease Control and
Prevention Roybal Campus 2025
Master Plan EIS, Review Period Ends:
10/06/2014, Contact: George Chandler
404–639–5153.
EIS No. 20140251, Final EIS, NMFS, 00,
Amendment 7 to the 2006
Consolidated Atlantic Highly
Migratory Species Fishery
Management Plan, Review Period
Ends: 10/06/2014, Contact: Margo
Schulze-Haugen 301–427–8534.
EIS No. 20140252, Final EIS, USFS, MS,
Revised Land and Resource
Management Plan for the National
Forests in Mississippi, Review Period
Ends: 12/04/2014, Contact: Shaun
Williamson 601–965–1659.
EIS No. 20140253, Draft EIS, NMFS, 00,
Recreational Red Snapper Sector
Separation, Amendment 40 to the
Fishery Management Plan for the Reef
Fish Resources of the Gulf of Mexico,
Comment Period Ends: 10/20/2014,
Contact: Roy E. Crabtree 727–824–
5301.
EIS No. 20140254, Draft EIS, NMFS,
USFW, WA, To Analyze Impacts of
Issuance by the National Marine
Fisheries Service and the U.S. Fish
and Wildlife Service of Two
Incidental Take Permits under Section
10 of the Endangered Species Act for
Implementation of the Washington
Department of National Resources
Aquatic Lands Habitat Conservation
Plan, Comment Period Ends: 12/04/
2014, Contact: Scott Anderson 360–
753–5828. The U.S. Department of
Commerce’s National Marine
Fisheries Service and the U.S.
Department of the Interior’s Fish and
Wildlife Service are joint lead
agencies for the above project.
Amended Notices
EIS No. 20140215, Final EIS, USACE,
FL, Central Everglades Planning
Project, Review Period Ends: 10/03/
2014, Contact: Dr. Gretchen Ehlinger
904–232–1682. Revision to FR Notice
Published 08/08/2014; Extending the
VerDate Mar<15>2010
14:29 Sep 04, 2014
Jkt 232001
Comment Period from 09/08/2014 to
10/03/2014.
EIS No. 20140241, Draft Supplement,
FHWA, CO, I–70 East, from I–25 to
Tower Road, Comment Period Ends:
10/17/2014, Contact: Chris Horn 720–
963–3017. Revision to FR Notice
Published 09/03/2014; This project
was included in EPA’s NOA that was
inadvertently omitted from FR
Publication 08/29/2014. Therefore,
the Comment Period has been
recalculated from 10/14/2014 to
10/17/2014.
EIS No. 20140242, Draft EIS, USFS, CO,
Pawnee National Grassland Oil and
Gas Leasing Analysis, Comment
Period Ends: 10/20/2014, Contact:
Karen Roth 970–295–6621. Revision
to FR Notice Published 09/03/2014;
This project was included in EPA’s
NOA that was inadvertently omitted
from FR Publication 08/29/2014.
Therefore, the Comment Period has
been recalculated from 10/14/2014 to
10/20/2014.
EIS No. 20140243, Draft EIS, USFS, NV,
Heavenly Mountain Resort Epic
Discovery Project, Comment Period
Ends: 10/21/2014, Contact: Matt
Dickinson 530–543–2769. Revision to
FR Notice Published 09/03/2014; This
project was included in EPA’s NOA
that was inadvertently omitted from
FR Notice 08/29/2014. Correction to
the Comment Period should be
10/21/2014.
Dated: September 2, 2014.
Dawn Roberts,
Management Analyst, EPA Compliance
Division, Office of Federal Activities.
[FR Doc. 2014–21202 Filed 9–4–14; 8:45 am]
BILLING CODE 6560–50–P
FARM CREDIT ADMINISTRATION
Farm Credit Administration Board;
Sunshine Act; Regular Meeting
AGENCY: Farm Credit Administration.
SUMMARY: Notice is hereby given,
pursuant to the Government in the
Sunshine Act, of the regular meeting of
the Farm Credit Administration Board
(Board).
DATE AND TIME: The regular meeting of
the Board will be held at the offices of
the Farm Credit Administration in
McLean, Virginia, on September 11,
2014, from 9:00 a.m. until such time as
the Board concludes its business.
FOR FURTHER INFORMATION CONTACT: Dale
L. Aultman, Secretary to the Farm
Credit Administration Board, (703) 883–
4009, TTY (703) 883–4056.
ADDRESSES: Farm Credit
Administration, 1501 Farm Credit Drive,
PO 00000
Frm 00048
Fmt 4703
Sfmt 4703
McLean, Virginia 22102–5090. Submit
attendance requests via email to
VisitorRequest@FCA.gov. See
SUPPLEMENTARY INFORMATION for further
information about attendance requests.
SUPPLEMENTARY INFORMATION: Parts of
this meeting of the Board will be open
to the public (limited space available),
and parts will be closed to the public.
Please send an email to
VisitorRequest@FCA.gov at least 24
hours before the meeting. In your email
include: Name, postal address, entity
you are representing (if applicable), and
telephone number. You will receive an
email confirmation from us. Please be
prepared to show a photo identification
when you arrive. If you need assistance
for accessibility reasons, or if you have
any questions, contact Dale L. Aultman,
Secretary to the Farm Credit
Administration Board, at (703) 883–
4009. The matters to be considered at
the meeting are:
Open Session
A. Approval of Minutes
• August 14, 2014
B. New Business
• Fall 2014 Abstract of the Unified
Agenda of Federal Regulatory and
Deregulatory Actions and Fall 2014
Regulatory Projects Plan
C. Reports
• Quarterly Report on Economic
Conditions and FCS Conditions
Closed Session*
Reports
• Office of Examination Quarterly
Report
*Session Closed—Exempt pursuant to
5 U.S.C. 552b(c)(8) and (9).
Dated: September 3, 2014.
Dale L. Aultman,
Secretary, Farm Credit Administration Board.
[FR Doc. 2014–21316 Filed 9–3–14; 4:15 pm]
BILLING CODE 6705–01–P
FEDERAL DEPOSIT INSURANCE
CORPORATION
Notice to All Interested Parties of the
Termination of the Receivership of
10443, First Capital Bank; Kingfisher,
Oklahoma
Notice is hereby given that the Federal
Deposit Insurance Corporation (‘‘FDIC’’)
as Receiver for First Capital Bank,
Kingfisher, Oklahoma (‘‘the Receiver’’)
intends to terminate its receivership for
said institution. The FDIC was
appointed receiver of First Capital Bank
on June 8, 2012. The liquidation of the
E:\FR\FM\05SEN1.SGM
05SEN1
Agencies
[Federal Register Volume 79, Number 172 (Friday, September 5, 2014)]
[Notices]
[Pages 53061-53062]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-21202]
=======================================================================
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-9016-8]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 564-7146 or https://www.epa.gov/compliance/nepa/.
Weekly Receipt of Environmental Impact Statements
Filed 08/25/2014 through 08/29/2014
Pursuant to 40 CFR 1506.9.
Notice
Section 309(a) of the Clean Air Act requires that EPA make public
its comments on EISs issued by other Federal agencies. EPA's comment
letters on EISs are available at: https://www.epa.gov/compliance/nepa/eisdata.html.
EIS No. 20140244, Final EIS, BIA, MA, Mashpee Wampanoag Tribe Fee to
Trust Acquisition and Casino Project, Review Period Ends: 10/06/2014,
Contact: Chester McGhee 615-564-6500.
EIS No. 20140245, Draft EIS, BOEM, 00, Gulf of Mexico OCS Oil and Gas
Lease Sales: 2015 and 2016; Western Planning Area Lease Sales 246 and
248, Comment Period Ends: 10/20/2014, Contact: Gary D. Goeke 504-736-
3233.
EIS No. 20140246, Draft EIS, USFS, CA, Master Special Use Permit and
Permit to Construct Power Line Replacement Projects, Comment Period
Ends: 11/04/2014, Contact: Robert Hawkins 916-849-8037.
EIS No. 20140247, Draft EIS, USFWS, CO, San Luis Valley National
Wildlife Refuge Complex, Comment Period Ends: 10/27/2014, Contact:
Laurie Shannon 303-236-4317.
EIS No. 20140248, Final EIS, FTA, CA, Downtown San Francisco Ferry
Terminal Expansion Project, Contact: Alex Smith 415-744-2599. Under
MAP-21 section 1319, FTA has
[[Page 53062]]
issued a single FEIS and ROD. Therefore, the 30-day wait/review period
under NEPA does not apply to this action.
EIS No. 20140249, Final EIS, USFS, CA, Rim Fire Recovery, Contact:
Maria Benech 209-532-3671. The issuance of this Final EIS reflects the
President's Council on Environmental Quality (CEQ) alternative
arrangements granted in accordance with 40 CFR 1506.11 on December 9,
2013. CEQ specifically eliminated the 30-day waiting period between the
publication of the FEIS and the Record of Decision.
EIS No. 20140250, Final EIS, HHS, GA, Centers for Disease Control and
Prevention Roybal Campus 2025 Master Plan EIS, Review Period Ends: 10/
06/2014, Contact: George Chandler 404-639-5153.
EIS No. 20140251, Final EIS, NMFS, 00, Amendment 7 to the 2006
Consolidated Atlantic Highly Migratory Species Fishery Management Plan,
Review Period Ends: 10/06/2014, Contact: Margo Schulze-Haugen 301-427-
8534.
EIS No. 20140252, Final EIS, USFS, MS, Revised Land and Resource
Management Plan for the National Forests in Mississippi, Review Period
Ends: 12/04/2014, Contact: Shaun Williamson 601-965-1659.
EIS No. 20140253, Draft EIS, NMFS, 00, Recreational Red Snapper Sector
Separation, Amendment 40 to the Fishery Management Plan for the Reef
Fish Resources of the Gulf of Mexico, Comment Period Ends: 10/20/2014,
Contact: Roy E. Crabtree 727-824-5301.
EIS No. 20140254, Draft EIS, NMFS, USFW, WA, To Analyze Impacts of
Issuance by the National Marine Fisheries Service and the U.S. Fish and
Wildlife Service of Two Incidental Take Permits under Section 10 of the
Endangered Species Act for Implementation of the Washington Department
of National Resources Aquatic Lands Habitat Conservation Plan, Comment
Period Ends: 12/04/2014, Contact: Scott Anderson 360-753-5828. The U.S.
Department of Commerce's National Marine Fisheries Service and the U.S.
Department of the Interior's Fish and Wildlife Service are joint lead
agencies for the above project.
Amended Notices
EIS No. 20140215, Final EIS, USACE, FL, Central Everglades Planning
Project, Review Period Ends: 10/03/2014, Contact: Dr. Gretchen Ehlinger
904-232-1682. Revision to FR Notice Published 08/08/2014; Extending the
Comment Period from 09/08/2014 to 10/03/2014.
EIS No. 20140241, Draft Supplement, FHWA, CO, I-70 East, from I-25 to
Tower Road, Comment Period Ends: 10/17/2014, Contact: Chris Horn 720-
963-3017. Revision to FR Notice Published 09/03/2014; This project was
included in EPA's NOA that was inadvertently omitted from FR
Publication 08/29/2014. Therefore, the Comment Period has been
recalculated from 10/14/2014 to 10/17/2014.
EIS No. 20140242, Draft EIS, USFS, CO, Pawnee National Grassland Oil
and Gas Leasing Analysis, Comment Period Ends: 10/20/2014, Contact:
Karen Roth 970-295-6621. Revision to FR Notice Published 09/03/2014;
This project was included in EPA's NOA that was inadvertently omitted
from FR Publication 08/29/2014. Therefore, the Comment Period has been
recalculated from 10/14/2014 to 10/20/2014.
EIS No. 20140243, Draft EIS, USFS, NV, Heavenly Mountain Resort Epic
Discovery Project, Comment Period Ends: 10/21/2014, Contact: Matt
Dickinson 530-543-2769. Revision to FR Notice Published 09/03/2014;
This project was included in EPA's NOA that was inadvertently omitted
from FR Notice 08/29/2014. Correction to the Comment Period should be
10/21/2014.
Dated: September 2, 2014.
Dawn Roberts,
Management Analyst, EPA Compliance Division, Office of Federal
Activities.
[FR Doc. 2014-21202 Filed 9-4-14; 8:45 am]
BILLING CODE 6560-50-P