Southeast Alaska Power Agency; Notice of Application Accepted for Filing, Ready for Environmental Analysis, Soliciting Comments, Motions To Intervene, Protests, Recommendations, Terms and Conditions, and Fishway Prescriptions, 53049-53050 [2014-21167]
Download as PDF
Federal Register / Vol. 79, No. 172 / Friday, September 5, 2014 / Notices
the requirements of Rules of Practice
and Procedure, 18 CFR 385.210,
385.211, and 385.214. In determining
the appropriate action to take, the
Commission will consider all protests
filed, but only those who file a motion
to intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any protests or
motions to intervene must be received
on or before the specified deadline date
for the particular application.
When the application is ready for
environmental analysis, the
Commission will issue a public notice
requesting comments,
recommendations, terms and
conditions, or prescriptions.
All filings must (1) bear in all capital
letters the title ‘‘PROTEST’’ or
‘‘MOTION TO INTERVENE,’’ ‘‘NOTICE
OF INTENT TO FILE COMPETING
APPLICATION,’’ or ‘‘COMPETING
APPLICATION;’’ (2) set forth in the
heading the name of the applicant and
the project number of the application to
which the filing responds; (3) furnish
the name, address, and telephone
number of the person protesting or
intervening; and (4) otherwise comply
with the requirements of 18 CFR
385.2001 through 385.2005. Agencies
may obtain copies of the application
directly from the applicant. A copy of
any protest or motion to intervene must
be served upon each representative of
the applicant specified in the particular
application.
Dated: August 28, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–21164 Filed 9–4–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 2911–038]
rmajette on DSK2TPTVN1PROD with NOTICES
Southeast Alaska Power Agency;
Notice of Application Accepted for
Filing, Ready for Environmental
Analysis, Soliciting Comments,
Motions To Intervene, Protests,
Recommendations, Terms and
Conditions, and Fishway Prescriptions
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Type of Application: Amendment
of License.
b. Project No.: 2911–038.
c. Date Filed: July 21, 2014.
d. Applicant: Southeast Alaska Power
Agency.
VerDate Mar<15>2010
14:29 Sep 04, 2014
Jkt 232001
e. Name of Project: Swan Lake
Hydroelectric Project.
f. Location: The project is located on
Falls Creek on Revillagigedo Island,
Alaska in Ketchikan Gateway Borough.
The project occupies federal lands
managed by the U.S. Forest Service
within the Tongass National Forest.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Trey Acteson,
CEO, Southeast Alaska Power Agency,
1900 First Avenue, Suite 318,
Ketchikan, AK 99901, (907) 228–2281.
i. FERC Contact: Mr. Steven Sachs
(202) 502–8666 or Steven.Sachs@
ferc.gov.
j. Deadline for filing motions to
intervene and protests, comments,
recommendations, terms and
conditions, and fishway prescriptions is
60 days from the issuance date of this
notice by the Commission; reply
comments are due 105 days from the
issuance date of this notice by the
Commission. The Commission strongly
encourages electronic filing. Please file
any motion to intervene, protest,
comments, and/or recommendations
using the Commission’s eFiling system
at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866)
208–3676 (toll free), or (202) 502–8659
(TTY). In lieu of electronic filing, please
send a paper copy to: Secretary, Federal
Energy Regulatory Commission, 888
First Street NE., Washington, DC 20426.
The first page of any filing should
include docket number P–2911–038.
k. Description of Request: The
applicant proposes to install a 20-footwide vertical gate and a 78-foot-wide
flashboard system on the spillway to
raise the maximum elevation of the
impoundment by 15 feet. The proposal
would inundate an additional 94 acres
of land, approximately 26 of which are
managed by the U.S. Forest Service. The
applicant also proposes to raise the nonoverflow section of the dam by about 1.5
feet and raise the intake gate tower by
15 feet. The proposal would not change
the project boundary or the authorized
installed capacity of the project.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
PO 00000
Frm 00035
Fmt 4703
Sfmt 4703
53049
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov/docs-filing/
efiling.asp. Enter the docket number
excluding the last three digits in the
docket number field to access the
document. You may also register online
at https://www.ferc.gov/docs-filing/
esubscription.asp to be notified via
email of new filings and issuances
related to this or other pending projects.
For assistance, call 1–866–208–3676 or
email FERCOnlineSupport@ferc.gov, for
TTY, call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above.
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214.
In determining the appropriate action to
take, the Commission will consider all
protests or other comments filed, but
only those who file a motion to
intervene in accordance with the
Commission’s Rules may become a
party to the proceeding. Any comments,
protests, or motions to intervene must
be received on or before the specified
comment date for the particular
application.
o. Filing and Service of Responsive
Documents: All filings must (1) bear in
all capital letters the title
‘‘COMMENTS’’, ‘‘PROTEST’’,
‘‘MOTION TO INTERVENE’’, ‘‘TERMS
AND CONDITIONS’’ or ‘‘FISHWAY
PRESCRIPTIONS’’ as applicable; (2) set
forth in the heading the name of the
applicant and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
protesting or intervening; and (4)
otherwise comply with the requirements
of 18 CFR 385.2001 through 385.2005.
All comments, motions to intervene, or
protests must set forth their evidentiary
basis and otherwise comply with the
requirements of 18 CFR 4.34(b). All
comments, motions to intervene, or
protests should relate to project works
which are the subject of the amendment.
Agencies may obtain copies of the
application directly from the applicant.
A copy of any protest or motion to
intervene must be served upon each
representative of the applicant specified
in the particular application. If an
intervener files comments or documents
with the Commission relating to the
merits of an issue that may affect the
E:\FR\FM\05SEN1.SGM
05SEN1
53050
Federal Register / Vol. 79, No. 172 / Friday, September 5, 2014 / Notices
responsibilities of a particular resource
agency, they must also serve a copy of
the document on that resource agency.
A copy of all other filings in reference
to this application must be accompanied
by proof of service on all persons listed
in the service list prepared by the
Commission in this proceeding, in
accordance with 18 CFR 4.34(b) and
385.2010.
Dated: August 26, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–21167 Filed 9–4–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Project No. 1864–186]
rmajette on DSK2TPTVN1PROD with NOTICES
Upper Peninsula Power Company;
Notice of Application Accepted for
Filing and Soliciting Comments,
Motions To Intervene, and Protests
Take notice that the following
hydroelectric application has been filed
with the Commission and is available
for public inspection:
a. Application Type: Recreation Plan
Amendment.
b. Project No: 1864–186.
c. Date Filed: June 20, 2014.
d. Applicant: Upper Peninsula Power
Company.
e. Name of Project: Bond Falls.
f. Location: Ontonagon River in
Ontonagon and Gogebic Counties,
Michigan, and Vilas County, Wisconsin.
The project occupies federal lands
administered by the U.S. Forest Service
within the Ottawa National Forest.
g. Filed Pursuant to: Federal Power
Act, 16 U.S.C. 791a–825r.
h. Applicant Contact: Shawn Puzen,
Upper Peninsula Power Company, 700
North Adams Street, P.O. Box 19001,
Green Bay, Wisconsin 54307–9001;
Telephone: (920) 433–1094.
i. FERC Contact: Patricia A. Grant at
(312) 596–4435, or email:
patricia.grant@ferc.gov.
j. Deadline for filing comments,
motions to intervene, and protests:
September 26, 2014.
All documents may be filed
electronically via the Internet. See 18
CFR 385.2001(a)(1)(iii) and the
instructions on the Commission’s Web
site at https://www.ferc.gov/docs-filing/
efiling.asp. Commenters can submit
brief comments up to 6,000 characters,
without prior registration, using the
eComment system at https://
www.ferc.gov/docs-filing/
VerDate Mar<15>2010
14:29 Sep 04, 2014
Jkt 232001
ecomment.asp. You must include your
name and contact information at the end
of your comments. For assistance,
please contact FERC Online Support at
FERCOnlineSupport@ferc.gov or toll
free at 1–866–208–3676, or for TTY,
(202) 502–8659. Although the
Commission strongly encourages
electronic filing, documents may also be
paper-filed. To paper-file, mail an
original and seven copies to: Secretary,
Federal Energy Regulatory Commission,
888 First Street NE., Washington, DC
20426. Please include the project
number (P–1864–186) on any
comments, motions, or
recommendations filed.
The Commission’s Rules of Practice
and Procedure require all intervenors
filing documents with the Commission
to serve a copy of that document on
each person whose name appears on the
official service list for the project.
Further, if an intervenor files comments
or documents with the Commission
relating to the merits of an issue that
may affect the responsibilities of a
particular resource agency, they must
also serve a copy of the document on
that resource agency.
k. Description of Request: The
licensee proposes to relocate the canoe
portage trail and the boat landing
parking area at the Victoria
development (02) of the Bond Falls
project. The parking area and the
associated recreation facilities will be
transferred to the site which will be
vacated by the existing maintenance
building. The parking area will then be
closer to the boat landing. The canoe
portage route and its signage will be
slightly modified.
l. Locations of the Application: A
copy of the application is available for
inspection and reproduction at the
Commission’s Public Reference Room,
located at 888 First Street NE., Room
2A, Washington, DC 20426, or by calling
(202) 502–8371. This filing may also be
viewed on the Commission’s Web site at
https://www.ferc.gov using the
‘‘eLibrary’’ link. Enter the docket
number excluding the last three digits in
the docket number field (P–9951) to
access the document. You may also
register online at https://www.ferc.gov/
docs-filing/esubscription.asp to be
notified via email of new filings and
issuances related to this or other
pending projects. For assistance, call
1–866–208–3676 or email
FERCOnlineSupport@ferc.gov, for TTY,
call (202) 502–8659. A copy is also
available for inspection and
reproduction at the address in item (h)
above. Agencies may obtain copies of
the application directly from the
applicant.
PO 00000
Frm 00036
Fmt 4703
Sfmt 4703
m. Individuals desiring to be included
on the Commission’s mailing list should
so indicate by writing to the Secretary
of the Commission.
n. Comments, Protests, or Motions to
Intervene: Anyone may submit
comments, a protest, or a motion to
intervene in accordance with the
requirements of Rules of Practice and
Procedure, 18 CFR 385.210, .211, .214,
respectively. In determining the
appropriate action to take, the
Commission will consider all protests or
other comments filed, but only those
who file a motion to intervene in
accordance with the Commission’s
Rules may become a party to the
proceeding. Any comments, protests, or
motions to intervene must be received
on or before the specified comment date
for the particular application.
o. Filing and Service of Documents:
Any filing must (1) bear in all capital
letters the title ‘‘COMMENTS’’,
‘‘PROTEST’’, or ‘‘MOTION TO
INTERVENE’’ as applicable; (2) set forth
in the heading the name of the applicant
and the project number of the
application to which the filing
responds; (3) furnish the name, address,
and telephone number of the person
commenting, protesting or intervening;
and (4) otherwise comply with the
requirements of 18 CFR 385.2001
through 385.2005. All comments,
motions to intervene, or protests must
set forth their evidentiary basis. Any
filing made by an intervenor must be
accompanied by proof of service on all
persons listed in the service list
prepared by the Commission in this
proceeding, in accordance with 18 CFR
385.2010.
Dated: August 26, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014–21156 Filed 9–4–14; 8:45 am]
BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission
[Docket No. CP14–538–000]
KPC Pipeline, LLC; Notice of
Application
Take notice that on August 20, 2014,
KPC Pipeline, LLC (KPC), 14000 Quail
Springs Pkwy., Suite 250, Oklahoma
City, OK 73134, filed in Docket No.
CP14–538–000, an application pursuant
to section 7(b) of the Natural Gas Act
and Part 157 of the Commission’s
regulations, seeking authorization to
abandon in place approximately 98.92
E:\FR\FM\05SEN1.SGM
05SEN1
Agencies
[Federal Register Volume 79, Number 172 (Friday, September 5, 2014)]
[Notices]
[Pages 53049-53050]
From the Federal Register Online via the Government Printing Office [www.gpo.gov]
[FR Doc No: 2014-21167]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2911-038]
Southeast Alaska Power Agency; Notice of Application Accepted for
Filing, Ready for Environmental Analysis, Soliciting Comments, Motions
To Intervene, Protests, Recommendations, Terms and Conditions, and
Fishway Prescriptions
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Amendment of License.
b. Project No.: 2911-038.
c. Date Filed: July 21, 2014.
d. Applicant: Southeast Alaska Power Agency.
e. Name of Project: Swan Lake Hydroelectric Project.
f. Location: The project is located on Falls Creek on Revillagigedo
Island, Alaska in Ketchikan Gateway Borough. The project occupies
federal lands managed by the U.S. Forest Service within the Tongass
National Forest.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Trey Acteson, CEO, Southeast Alaska Power
Agency, 1900 First Avenue, Suite 318, Ketchikan, AK 99901, (907) 228-
2281.
i. FERC Contact: Mr. Steven Sachs (202) 502-8666 or
Steven.Sachs@ferc.gov.
j. Deadline for filing motions to intervene and protests, comments,
recommendations, terms and conditions, and fishway prescriptions is 60
days from the issuance date of this notice by the Commission; reply
comments are due 105 days from the issuance date of this notice by the
Commission. The Commission strongly encourages electronic filing.
Please file any motion to intervene, protest, comments, and/or
recommendations using the Commission's eFiling system at https://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief
comments up to 6,000 characters, without prior registration, using the
eComment system at https://www.ferc.gov/docs-filing/ecomment.asp. You
must include your name and contact information at the end of your
comments. For assistance, please contact FERC Online Support at
FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-
8659 (TTY). In lieu of electronic filing, please send a paper copy to:
Secretary, Federal Energy Regulatory Commission, 888 First Street NE.,
Washington, DC 20426. The first page of any filing should include
docket number P-2911-038.
k. Description of Request: The applicant proposes to install a 20-
foot-wide vertical gate and a 78-foot-wide flashboard system on the
spillway to raise the maximum elevation of the impoundment by 15 feet.
The proposal would inundate an additional 94 acres of land,
approximately 26 of which are managed by the U.S. Forest Service. The
applicant also proposes to raise the non-overflow section of the dam by
about 1.5 feet and raise the intake gate tower by 15 feet. The proposal
would not change the project boundary or the authorized installed
capacity of the project.
l. Locations of the Application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street NE., Room 2A, Washington,
DC 20426, or by calling (202) 502-8371. This filing may also be viewed
on the Commission's Web site at https://www.ferc.gov/docs-filing/efiling.asp. Enter the docket number excluding the last three digits in
the docket number field to access the document. You may also register
online at https://www.ferc.gov/docs-filing/esubscription.asp to be
notified via email of new filings and issuances related to this or
other pending projects. For assistance, call 1-866-208-3676 or email
FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is
also available for inspection and reproduction at the address in item
(h) above.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions to Intervene: Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
o. Filing and Service of Responsive Documents: All filings must (1)
bear in all capital letters the title ``COMMENTS'', ``PROTEST'',
``MOTION TO INTERVENE'', ``TERMS AND CONDITIONS'' or ``FISHWAY
PRESCRIPTIONS'' as applicable; (2) set forth in the heading the name of
the applicant and the project number of the application to which the
filing responds; (3) furnish the name, address, and telephone number of
the person protesting or intervening; and (4) otherwise comply with the
requirements of 18 CFR 385.2001 through 385.2005. All comments, motions
to intervene, or protests must set forth their evidentiary basis and
otherwise comply with the requirements of 18 CFR 4.34(b). All comments,
motions to intervene, or protests should relate to project works which
are the subject of the amendment. Agencies may obtain copies of the
application directly from the applicant. A copy of any protest or
motion to intervene must be served upon each representative of the
applicant specified in the particular application. If an intervener
files comments or documents with the Commission relating to the merits
of an issue that may affect the
[[Page 53050]]
responsibilities of a particular resource agency, they must also serve
a copy of the document on that resource agency. A copy of all other
filings in reference to this application must be accompanied by proof
of service on all persons listed in the service list prepared by the
Commission in this proceeding, in accordance with 18 CFR 4.34(b) and
385.2010.
Dated: August 26, 2014.
Kimberly D. Bose,
Secretary.
[FR Doc. 2014-21167 Filed 9-4-14; 8:45 am]